Attachment J-9 Volume 2 Facility Survey
View the file
Other files for this federal contract opportunity
Show all 30
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pinellas County
Job Corps Center St. Petersburg, FL
Facility Planning Report Volume II
Supporting Data
Final May 2013
Department of Labor/ Office of Job Corps
22Pinellas County Job Corps Center
Pinellas County
Job Corps Center St. Petersburg, FL
Facility Planning Report Volume II
Supporting Data
Final May 2013
Gymnasium and Recreation Building 8
33 Pinellas County Job Corps Center
CONTENTS
PINELLAS JOB CORPS CENTER
FACILITY PLANNING REPORT
VOLUME I - Planning Strategy
• Existing Site Plan
• Center Statistics
INTRODUCTION
• Purpose
• Report Contents
EXECUTIVE SUMMARY
A. EXISTING CONDITIONS
• Background
• General Site Conditions
• General Building Conditions
• Preventive Maintenance
• Ownership
• Facility Assessment by Function
• Energy Issues
• Environmental Issues
• Sustainability
• Accessibility Standards
• Completed and Current Projects Since the Last Survey
• Health and Life Safety Issues
• Summary of Defi ciencies
B. RECOMMENDATIONS
• Status of the Previous (PY09) Plan
• Signifi cant Issues
• PY 12 Plan Overview
• Summary of Proposed Projects
• Proposed Site Plan
C. PLANNING ANALYSIS
• Purpose
• Planning Objectives and Assumptions
• Space Utilization Analysis
• Federal Real Property Asset Management
• Mission Dependency Site Plan
• Defi ciency Analysis
• Facility Condition Summary Report
• Building Condition by Function
• Building Condition Site Plan
VOLUME II - Supporting Data
• Vicinity Map
• Location Map
• Existing Site Plan
D. DESCRIPTIONS
• Building and Structures
• Space Utilization By Function
• NSF by Building
• Energy Report
• Environmental Management
Radon Report
• Site Descriptions
• Building Descriptions
E. DEFICIENCIES
F. CORRESPONDENCE AND REPORTS
• Center Review Meeting Minutes
• Survey Brief
• Life Safety Defi ciencies Transmittal and List
• O & M Defi ciency List
• Active Warranty Report
• FRPC Performance Measures Matrix
44Pinellas County Job Corps Center
55 Pinellas County Job Corps Center
Pinellas C ounty Job C orps C enter
77 Pinellas County Job Corps Center
D Descriptions
BUILDINGS AND STRUCTURES
00428 PINELLAS COUNTY 05/29/2013
1Page: of Date:
0001 - ADMINISTRATION
0002 - STUDENT SERVICES
0003 - EDUCATION
0004 - HARD VOCATIONAL
0005 - CAFETERIA
0006 - DORMITORY
0007 - DORMITORY
0008 - GYMNASIUM & RECREATION
0009 - MAINTENANCE & OPERATIONS
0021 - PAVILION
0022 - GAZEBO
0023 - GAZEBO
0024 - GAZEBO
0025 - GAZEBO
0026 - GAZEBO
Name GSF
13,261 11,574 19,406 16,000 16,000 31,974 31,974 20,935 7,021
Active Active Active Active Active Active Active Active Active Active Active Active Active Active Active
StatusType
Building Building Building Building Building Building Building Building Building Structure Structure Structure Structure Structure Structure
Use Group Built Flrs Const
Business Business Business Business Assembly Residential Residential Assembly Storage Assembly Assembly Assembly Assembly Assembly Assembly
Good Good Good Good Good Good Good Good Good Good Good Good Good Good Good
ConditionAsset Number
0042800004 0042800005 0042800006 0042800007 0042800009 0042800008 0042800010 0042800011 0042800012 0042800018 0042800019 0042800020 0042800021 0042800022 0042800023
9 168,145
6 545
15 168,690
Buildings
Structures
Total
GSF
GSF
GSF
Summary
05/29/2013
Space Utilization By Function 00428 Pinellas County Page: 1 of Date:
HOUSING
EDUCATION
FOOD SERVICE
SUGGESTED
NSF/
ENROLLEE
SUGGESTED
TOTAL
NSF
ACTUAL
TOTAL
NSF
TYPE OF SPACE
SUB TOTAL
SUB TOTAL
SUB TOTAL
Resident Men Resident Women Total Residents
Residents 272 Non Residents 28
300Total Students
(272)
(300)
(300)
DIFFERENCE
27,200
14,660
5,400
39,992
35,278
8,110
Lounge Other Shower/Toilet Sleeping excl. SPD( rooms; beds) Storage
Academic (300) Non-Academic
20 -- ACT (Off-Ctr) 12 -- Carpentry + 40 -- Cert. Nursing Asst.
12 -- Electrical + 20 -- Facilities Maint. and Const. + 30 -- HVAC (Off-Ctr) 40 -- Medical Assistant 20 -- Medical Office Specialist 20 -- Pharmacy Tech + 12 -- Plumbing +
Vocational Theory (76)
Dining (2 Servings) Food Preparation Food Storage
7,000 3,848 5,616
22,908
7,020 7,935
3,850 2,900 3,000 3,850
1,150 3,000
4,180 2,800 1,130
2,720
3,264 19,584
1,632
1,600
1,500
1,200
2,400 1,800 1,200
4,280
2,352 3,324 -1,012
4,020 4,935
2,950 1,300 2,400 2,350
-326
2,400
1,780 1,000
-70
Vocations
12,792
20,618
2,710
05/29/2013
Space Utilization By Function 00428 Pinellas County Page: 2 of Date:
RECREATION
MEDICAL/DENTAL
ADMINISTRATION
STORAGE/SUPPORT
SUGGESTED
NSF/
ENROLLEE
SUGGESTED
TOTAL
NSF
ACTUAL
TOTAL
NSF
TYPE OF SPACE
SUB TOTAL
SUB TOTAL
SUB TOTAL
SUB TOTAL
TOTAL 251.17 75,350 115,028
(300)
(300)
(300)
(300)
DIFFERENCE
168,145
0.68
TOTAL GSF
NET TO GROSS RATIO
14,020
2,070
6,000
6,000
16,355
3,153
6,130
6,010
Aerobics/Exercise Arts & Crafts Canteen Gymnasium Learning Resource Center/Library Meeting Room Recreation Hall Recreation Office Theater Weight Room
Medical/Dental
Administration
Operations & Maintenance Warehouse
6.9
2,300 8,160
2,040
3,153
6,130
2,640 3,370
2,070
6,000
2,400 3,600
1,083
-230
RESIDENT
NON-RESIDENT
(272)
(28) 15
50 13,600
2,335
1,083
39,678
Net Square Footage By Building Date: 05/29/2013 Page: 1
Center: PINELLAS COUNTY (00428) of 4
HOUSING
Sleeping excl. SPD
Lounge
Storage
Shower/Toilet
Other
Function Suggested
NSF
11,454 11,454
3,500 3,500
2,808 2,808
1,924 1,924
0006 - DORMITORY
0007 - DORMITORY
0007 - DORMITORY
0006 - DORMITORY
0006 - DORMITORY
0007 - DORMITORY
0007 - DORMITORY
0006 - DORMITORY
0006 - DORMITORY
0007 - DORMITORY
Bldg Name Actual NSF Difference
22,908
7,000
5,616
3,848
Sub Total: 39,992
19,584
2,720
1,632
3,264
27,200
3,324
4,280
-1,012
2,352
3,848
( 272
12,792 rooms; beds rooms; beds
Page: 2
Center: PINELLAS COUNTY (00428) of 4
EDUCATION
Academic
Vocational Theory (76)
Carpentry
Electrical
Plumbing
Facilities Maint. and Const.
Medical Assistant
Non-Academic
Pharmacy Tech
Medical Office Specialist
Cert. Nursing Asst.
Function Suggested
NSF
1,200
1,800
3,850
3,000
3,000
3,850
6,000
1,175
1,150
2,900
0003 - EDUCATION
0003 - EDUCATION
0003 - EDUCATION
0002 - STUDENT SERVICES
0003 - EDUCATION
0002 - STUDENT SERVICES
0003 - EDUCATION
0002 - STUDENT SERVICES
0002 - STUDENT SERVICES
0003 - EDUCATION
0004 - HARD VOCATIONAL
0004 - HARD VOCATIONAL
0004 - HARD VOCATIONAL
0004 - HARD VOCATIONAL
0003 - EDUCATION
0002 - STUDENT SERVICES
0008 - GYMNASIUM & RECREATION
0003 - EDUCATION
0003 - EDUCATION
0003 - EDUCATION
0003 - EDUCATION
Bldg Name Actual NSF Difference
7,020
3,850
3,000
3,000
3,850
7,935
1,150
2,900
Sub Total: 35,278
3,000
1,500
1,200
3,000
1,600
14,660
4,020
2,950
2,400
2,400
2,350
-326
4,935
1,300
( 300
20,618
Page: 3
Center: PINELLAS COUNTY (00428) of 4
FOOD SERVICE
RECREATION
MEDICAL/DENTAL
ADMINISTRATION
Dining (2 Servings)
Food Preparation
Food Storage
Recreation Hall
Arts & Crafts
Gymnasium
Weight Room
Theater
Canteen
Aerobics/Exercise
Meeting Room
Learning Resource Center/Libr
Recreation Office
Medical/Dental
Administration
Function Suggested
NSF
4,180
2,800
1,130
2,040
8,160
2,300
3,153
6,130
0005 - CAFETERIA
0005 - CAFETERIA
0005 - CAFETERIA
0008 - GYMNASIUM & RECREATION
0008 - GYMNASIUM & RECREATION
0008 - GYMNASIUM & RECREATION
0008 - GYMNASIUM & RECREATION
0008 - GYMNASIUM & RECREATION
0005 - CAFETERIA
0008 - GYMNASIUM & RECREATION
0005 - CAFETERIA
0008 - GYMNASIUM & RECREATION
0008 - GYMNASIUM & RECREATION
0001 - ADMINISTRATION
0001 - ADMINISTRATION
Bldg Name Actual NSF Difference
4,180
2,800
1,130
2,040
8,160
2,300
3,153
6,130
Sub Total:
Sub Total:
Sub Total:
Sub Total:
8,110
16,355
3,153
6,130
2,400
1,800
1,200
2,070
6,000
5,400
14,020
2,070
6,000
1,780
1,000
-70
1,083
2,710
2,335
1,083
Page: 4
Center: PINELLAS COUNTY (00428) of 4
STORAGE/SUPPORT
Warehouse
Operations & Maintenance
Function Suggested
NSF
3,370
2,640
0009 - MAINTENANCE & OPERATIONS
0009 - MAINTENANCE & OPERATIONS
Bldg Name Actual NSF Difference
3,370
2,640
Sub Total: 6,010
3,600
2,400
6,000
-230
( 300
Energy Management Report Center: PINELLAS COUNTY (00428)
Page: 1 Date: 05/29/2013 of 3
CENTER ENERGY DATA
Deferred (new center)
ENERGY CONSUMPTION ASSESSMENT
0% 48,948
57,135 48,948
ENERGY USE BY FUEL TYPE
Energy Audit :
Date of Audit :
Electric Company :
Percent Change since Baseline Year :
Natural Gas Company :
Property Status :
Progress Energy Florida Peoples Gas
Federally Owned (DOL)
2,023,311 6,904=
Total 8,231
MBtu
MBtu
Total $256,854 MBtu/ $31.206
BTU/GSF
BTU/GSF
BTU/GSF
Electricity
Natural Gas kWh
1,287 MCF = 1,327 MBtu
$242,317 $0.120= kWhElectricity
Natural Gas $14,537 = $11.295 MCF
ENERGY COST BY FUEL TYPE
WATER CONSUMPTION ASSESSMENT
Percent Reduction Since Baseline Year:
1,000 Gallons
1,000 Gallons
FY 2012 Energy Goal:
Further Reduction in Energy Usage is needed to meet Energy Reduction Goals.
FY 2012 Energy Consumption:
Note: The Federal Government has set a goal of 3% Energy Consumption Reduction per year in EO 13423.
2,260 2,034 3,060
- 35%
Further Reduction in Water Usage is needed to meet Water Reduction Goals.
Note: The Federal Government has set a goal of 2% Water Consumption Reduction per year in EO 13423.
FY 2012 Goal:
FY 2012 Water Consumption:
1,000 Gallons
FY 2012 Energy Baseline:
FY 2011 Baseline:
Page: 2 of 3
Implementing some of the below recommendations can save you 10% to 25% off your annual energy bill without negatively impacting comfort or productivity.
1. Your staff and students are the key to savings. Educate the students and staff on the why of energy saving - costs and environmental impacts. Encouraging them to actively participate in energy reduction is also important. Post reminders at exit doors and bulletin boards about energy conservation. Simple tips include:
a. Turn it down (lights, heating & cooling),
b. Turn it off (lights, computers, other equipment),
c. Keep it tight (close doors and windows, use window blinds)
2. Operations and Maintenance: Educate the O&M staff on the why of energy saving -costs and environmental impacts. Simple tips include:
a. Make sure that the Operations and Maintenance staff is properly trained for the equipment they operate.
b. Tune and clean HVAC: Perform seasonal cleanups on air conditioners, boilers and furnaces, and regularly clean cooling coils and drain pans. Get rooftop or outdoor condenser coils cleaned and maintain an appropriate filter changing schedule.
c. Check (or ask your HVAC contractor to check) your outside air dampers or economizers to verify proper ventilation. Make sure economizer controls function properly. Make sure automatic dampers close during unoccupied periods.
d. Restore automatic control: When troubleshooting a system, take time to figure out and repair the automatic controls. Today's quick fix is tomorrow's bad idea.
e. Reasonable set points: Try 68°F in the heating season and 75°F in the cooling season.
f. Schedule HVAC equipment and lighting: (weekdays, weekends, holidays, off-season). Make sure equipment runs only when it is needed and the buildings are occupied. When buildings are vacant (i.e. dormitories during the day with students in class), make sure all the lights in the building are off.
g. Seasonal (resets, schedules, and shutoffs): As the seasons change, adjust set points and schedules to match the system's response to the weather.
h. Lighting: Invest in an inexpensive light level meter to measure the foot-candles in spaces to determine whether or not they are over lit and lamps can be safely removed. Where four-lamp fixtures are in use, two lamps can usually be removed from every fixture or every other fixture. After lamps are removed, disconnect ballasts. Contact the Energy team at PBDewberry for suggested light levels for individual space types. Cleaning fixtures regularly increases light levels.
i. Utilize power management features for all computers and monitors to shut them off when idle for more than 15 minutes.
Page: 3 of 3
j. Have your vending machine suppliers turn off or remove light tubes from the advertising lighting in the machine. This will save about $50 per year per vending machine.
k. Save water with low flow sink aerators (0.5gpm) and low flow shower heads (1.5gpm - 2.0gpm). This will also reduce water heating energy consumption.
l. Set your water heater to 120°F. Verify by measuring at the tap. Never go below 115°F.
m. For water heaters installed in unconditioned spaces, add insulation blankets making sure that access covers, electric connection areas, and pressure relief valves are left uncovered.
n. Caulk and fill cracks around doors and windows to reduce costly air leaks.
o. When replacing broken glass, use high transmittance, low heat gain windows.
p. Make sure automatic door closers are functioning properly to avoid drafts.
3. Buy energy efficient, buy EnergyStar (www.energystar.gov).
a. Buy EnergyStar appliances and equipment.
b. Replace burned out lightbulbs with EnergyStar labeled compact fluorescent lightbulbs (CFLs).
c. Replace broken thermostats with EnergyStar labeled programmable products.
d. Replace broken exit signs with EnergyStar LED exit signs.
Environmental Management Report
Page: 1 Date: 05/29/2013 of 1
SOLID & HAZARDOUS WASTE MANAGEMENT (RCRA)
Municipal Waste Service
HAZARDOUS MATERIALS STORAGE (EPCRA)
N/A
No
PETROLEUM UNDERGROUND STORAGE TANKS (RCRA)
Compliance0
PETROLEUM ABOVEGROUND STORAGE TANKS (CWA)
ASBESTOS AND PCB MANAGEMENT (TSCA)
AIR POLLUTION CONTROL (CAA)
None
Non-Attainment
Solid Waste Disposal :
Hazardous Waste Generator :
Hazardous Waste ID :
Generator Classification :
Hazadous Materials Storage :
Hazardous Materials ID :
HazMat Storage Area :
HazMat Spill Response Plan :
Number of Regulated USTs :
Number of Un-regulated USTs :
Local Hazardous Use Permit :
LEPC Notification :
EPA Generator ID Number :
Hazardous Waste Disposal :
RCRA Compliance
ID LocationFuel Type Capacity
Number of ASTs :
Asbestos Survey Date :
Asbestos Type :
Asbestos Coordinator :
Coordinator Training Date:
Custodial/Maintenance Training :
AHERA Regulated :
Management Plan Approval :
PCB Transformer Testing :
PCB Transformers :
PCB-Contaminated Transformers :
Transformers Labelled :
Regional Air Quality :
Permitted Air Pollution Source :
Source Description :
City of Saint Petersburg No
N/A
N/A N/A
Overfill Leak Corrosion
SPCC Plan Required : SPCC Plan Completed :
No N/A
No Survey Required due to Age of Buildings None
N/A N/A
No
No
Lead
ID Fuel Type Capacity Location Overfill
Prevention Secondary ContainmentTank Status
Tank Status Prevention/Detection
Radon
Date: 05/29/2013Center : Pinellas County (00428) Page: 1 of 1
0001 - ADMINISTRATION
0002 - STUDENT SERVICES
0003 - EDUCATION
0004 - HARD VOCATIONAL
0005 - CAFETERIA
0006 - DORMITORY
0007 - DORMITORY
0008 - GYMNASIUM & RECREATION
0009 - MAINTENANCE & OPERATIONS
Bldg Name Test Date
No
No
No
No
No
No
No
No
No
Radon Testing
Test Result
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
Mitigation Mitigation Date
RADON EXPLANATORY NOTES
The US Environmental Protection Agency (EPA) has established a radon action level of 4.0 picoCuries per liter (pCi/L). Occupied buildings with radon concentrations less than 4.0 pCi/L do not require radon mitigation; un-occupied buildings, or those buildings which are occupied only infrequently for brief periods of time, also do not require radon mitigation. Occupied buildings with radon concentrations greater than
4.0 pCi/L require radon mitigation and verification of radon reductions as soon as possible, with priority given to dormitories and student recreation buildings. Occupied buildings with radon concentrations greater than 20.0 pCi/L should be considered significant radon exposure hazards, and priority for mitigation should be given to buildings with these highly elevated radon concentrations.
Radon mitigation techniques include: (1) adjustment of the building HVAC system to create a positive pressure within the building; (2) sealing of foundation wall cracks, penetrations, or other openings;
(3) sealing crawlspace openings and sump pits; (4) installing an active subslab depressurization (ASD) system.
Site Description
PINELLAS COUNTY
View of Central Plaza from Dormitory Building 7 roof
Page: 1 Date: 05/29/2013 of 4
Paving Type for Roads & Parking Paving Type for Sidewalks
Asphalt Concrete
Comments:
Topography Buildings and Structures
Center is not fully enclosed by fencing. The campus is effectively planned to create a protected inner zone.
Buildings form part of the periphery. Wrought iron fencing is provided between buildings to enclose the central plaza. The area behind the cafeteria and the ball field is enclosed by chain link fencing.
ROADS, PARKING & SIDEWALKS
Water Source Water Authority Service Meter On-Site Treatment Plant
1. Water System
Treatment Type Storage Type Storage Capacity(Gallons)
NoMasterCity of St. PetersburgCity of St. Petersburg
None 0None
There is a domestic water booster pump package in Building 9 (three 5HP pumps to maintain 65 PSI).Comments:
Fire Hydrants On-Site Water Supply Storage Capacity
(Gallons) Pressure Source FD Response Time (Minutes)
Yes 0 4None Municipal
Sewage Treatment Flow
City of St. Petersburg
City of St Petersburg
City of St. Petersburg
Gravity
Maintenance ResponsibilityOwnership
Number of Deficiencies = 1SITE FEATURES
UTILITIES
3. Sanitary Sewer System/ Sewage Treatment Plant
2. Fire Protection System
Buildings Structures9 6Flat
Surrounding
Outdoor Recreation
Light Industrial
Field
Behind Cafeteria and Ballfield
Between Buildings
Chain Link
Wrought Iron
Location Type
Maintenance Responsibility System Capacity Adequate System Condition
Center Center Yes Good
Separate Loop
Yes
Ownership Maintenance Responsibility System Capacity Adequate System Condition
Center Center Yes Good
System Capacity Adequate System Condition
Yes Good
Ownership
Roads & Parking Adequate Roads & Parking Condition Sidewalks Adequate Sidewalk Condition Yes Good Yes Good
Number of Deficiencies = 1
Fencing
Other Features
Page: 2 Date: 05/29/2013 of 4
Peoples Gas
Comments:
Electric Company PCB Trans.
Transformer Mounting Transformer Ownership
Systems Ownership Maintenance Responsibility
Progress Energy Florida
The overhead service is delivered to the center from a power pole located along 20th street , where it dips underground and loops around the exterior perimeter of the center providing power to six pad-mounted, utility owned step down transformers located near and serving individual Buildings 1, 5, 7 and groups of buildings:
Buildings 2 and 3, 6 and 8, and 4 and 9. All buildings have individual secondary, solid state, utility meters. Building 5 is provided with an automatic transfer switch (ATS) with a CAM Lock for generator connection. One distribution panel of the north wing of Dormitory Building 6 is provided with an ATS, which through the safety switch with a CAM Lock, could be connected to a generator. Three pressure pumps in Maintenance/Operation Building 9 providing pressure for the water systems are also provided with an ATS. Progress Energy Florida owns and maintains all primary utilities, transformers and metering.
Pad Utility
Utility Utility
No
12470Y/7200, 3-phase, 4wire
208/120, 3-phase, 4wireUnderground
UndergroundPrimary Service
Secondary Service
Distribution Characteristics
5. Fuel Distribution System
Number of Deficiencies = 2
4. Storm Water System
Drain Type On-Site Storm Water Management
Surface Runoff Detention Pond
Ownership Maintenance Responsibility System Capacity Adequate System Condition
Center Yes GoodCenter
Gas Company Metering
Master
Ownership Maintenance Responsibility System Capacity Adequate System Condition
Center Center Yes Good
7. Electrical (Service)
Transformer Maint Resp
Utility
System Capacity Adequate System Condition
Yes Good
Generator
None
ATS MTS
Yes No
6. Central Plant: None
Metering Individual
Page: 3 Date: 05/29/2013 of 4
ACCESSIBILITY
Yes
UnknownUnknownUnknownNo
Nationally Registered Site
Site Eligible for National Register
Located in Historic District
Archaeological Significance
Comments:
Telephone Company
On-site Line Owner
The local telephone network is provided by Verizon. The long distance (VoIP) and data networks are provided by Job Corps Data Center. Four T1 lines entering the main center phone and data closet MC located in the data room in Administration Building 1. Two UPS batteries buffer power surges and drops in the line voltage and maintains the power requirement of the system for 15 to 30 minutes. Buildings are connected to the MC by fiber optic cable.
Connection in the buildings from the switches to the outlets is by CAT 5. There are eight land lines provided by Verizon. There are 10 digital Fax lines and 100 phone lines provided through the VoIP. A central fire alarm control/annunciator panel located in the security office in Building 1 monitors all fire alarm and security panels at the center. The last fire alarm inspection report was done 8/14/2012 by ACSI Alarm and Communication System Inc. ((813) 873-1851). There are magnetic door alarms at the wing exits in Dormitory Buildings 6 and 7. There is direct TV in Dormitory Buildings 6 and 7, and Buildings 1, 2 and 8.
Verizon
Maint. Responsibility
Center Center
Door alarms
Earthquake Risk
Low Medium LowHigh MediumIBC High
LightningEarthquake Def. Authority Flooding Tornado Hurricane Forest
Fire
Number of Deficiencies = 1
Accessible Parking: Accessible Slope:
Yes
Curb Cuts:
Yes
Ramps:
N/AYes
Site Accessible Route:
HISTORIC PRESERVATION
9. Electrical (Communication/Alarm/Security)
NATURAL HAZARDS
Yes
Central
VOIP
System Capacity Adequate System Condition
GoodYes
8. Electrical (Site Lighting)
Roadways Parking Walkways Building Outdoor Sports
Mounting
Control
Pole Pole Pole Building None
Photocell Photocell, Time Clock Photocell, Time Clock Photocell, Time Clock None
System Ownership Maintenance Responsibility System Capacity Adequate System Condition
Center Center Yes Good
Comments: Wall-mounted and pole-mounted lighting within the center property lines belongs to and is maintained by the center and is served from the respective buildings. All lights are divided into two groups: the security lighting controlled by the roof-mounted photocells through the security lighting contactors and the energy saving lighting controlled by the time clocks through the energy saving lighting contactors. Pole-mounted street lighting along 5th Street and 22 Street belongs to and is maintained by the utility.
Number of Deficiencies = 2
STORAGE TANKS: None
Fire Alarm Security
Page: 4 Date: 05/29/2013 of 4
GENERAL SITE CONDITION
Rating X Good Fair Poor
The site condition is not impacting the functional use of the facilities.
The site condition IS impacting the functional use of the facilities.
The site condition IS SIGNIFICANTLY impacting the functional use of the facilities.
Building Descriptions and Utilities
BUILDING 1 - ADMINISTRATION
Building Descriptions
Page: 1 of 50
Building: 0001 - ADMINISTRATION
BUILDING ENVELOPE
Foundation RoofBuilding
Concrete Structural Steel, Concrete Steel
Brick Masonry Curtain Wall Stucco
Comments: There are aluminum sunshades along the building exterior walls.
Wall Roof Rigid Rigid
AccessibilityFeature
GSF NSF Year Built Use Group Historic Ownership#Floors
Business 13,261 9,283 1 Owned 2009 Not Evaluated
REAL ESTATE
Access to Building
Ramps
Entrance
2nd Egress
Visual Alarm
Corridor/Aisle
Rooms
Stairs
Elevator
Restrooms
Drinking Fountain
Telephone
Yes
N/A
Yes
Yes
N/A
Yes
Yes
N/A
N/A
Yes
N/A
N/A
ACCESSIBILITY
Structural Systems1.
Exterior Walls2.
Insulation4.
Material Drainage Year Life
Remaining Type Area Served
Metal
Built-up Roofing
Gutters and Downspouts
Interior Roof Drains
Arched
Flat
Vestibule
Offices
Number of Deficiencies = 13. Roof
Entire Building
Area Served
Page: 2 of 50
Building: 0001 - ADMINISTRATION
Comments: Awning windows have mosquito screens
INTERIOR FINISH
Carpet Concrete Epoxy Quarry Tile Resilient Vinyl Tile
CMU Ceramic Tile Drywall
Metal Unit - Metal Frame Wood Unit - Metal Frame
VERTICAL CIRCULATION
None
Metal Unit - Metal Frame Storefront - Storefront Frame
Awning Units - Aluminum Frame; Double Glazing; Fixed - Aluminum Frame; Double Glazing;
Acoustical Tile Exposed Structure Gypsum Board Metal Finish Panel Plaster
Exterior Doors5.
Windows6.
Floors1.
Interior Walls2.
3.
Interior Doors4.
Ceilings
Page: 3 of 50
Building: 0001 - ADMINISTRATION
Mechanical
Mechanical
Restroom
Janitor's Closet
Ventilation Area ServedExhaust Ventilation
Heat Source
Heat Distribution
Piping System
Control System
Fresh Air Intake
Energy Conservation
Measure
Area Served
Building 1 is comprised of three distinct functions (security, medical/dental and administration) each with its own space. The security space is served by one system, air handler AHU-1A with electric heat (Carrier #FX4CNF042, 11.3 kW heater, mfd. 8/2008).
The medical/dental space is served by three systems, air handlers AHU-1B, C and D with electric heat (two Carrier #FX4CNF030, mfd. 12/2008; one #FX4CNF036, mfd. 8/2008).
The administration space is served by four systems. Two systems, air handlers AHU-1F and H with electric heat, are constant volume (Carrier #FX4CNF024, mfd. 10/2007; one #FX4CNF060, mfd.
11/2008, respectively). AHU-1H serves the communication hub and does not heat nor provide outdoor air.
The administration space is served by four systems. Two systems, air handlers AHU-1E and G with electric heat, are VVT systems (Carrier #40RM007, 9 kW, mfd. 8/2008; one #40MR008, 22 kW, mfd.
10/2008, respectively). AHU-1E supplies five zone dampers and has one bypass damper; AHU-1G supplies seven zone dampers and has two bypass dampers.
Comments:
Comments:
Comments:
Comments:
HVAC
Heat1.
Electric Resistance
Electric Resistance
Electric Resistance
Electric Resistance
Single Duct
Single Duct
Single Duct
Multi- Zone/Single
AHU
None
None
None
None
Electronic
Electronic
Electronic
Electronic
Mechanical
Mechanical
Mechanical
Mechanical
None
None
None
None
Offices
Medical/Dental
Offices
Offices
Ventilation2. Number of Deficiencies = 1
Page: 4 of 50
Building: 0001 - ADMINISTRATION
Cast Iron/PVC None Cast Iron
Electric Water Cooler Hose Bibb Lavatory Mop Sink Multi-Compartment Sink Shower Sink Water Closet (Flush Valve) Waterless Urinal
None
Copper Copper Electric None No
Hot Water Cold Water Water Heater Water Treatment HW Storage Tank
Grease InterceptorWaste / Vent Interior Storm
Split Direct Expansion (Air
Source)
Split Direct Expansion (Air
Source)
Split Direct Expansion (Air
Source)
Split Direct Expansion (Air
Source)
Single Duct
Single Duct
Single Duct
Multi- Zone/Single
AHU
Refrigerant
Refrigerant
Refrigerant
Refrigerant
Electronic
Electronic
Electronic
Electronic
Mechanical
Mechanical
Mechanical
Mechanical
None
None
None
None
Offices
Medical/Dental
Offices
Offices
PLUMBING
The security space is served by one system, air handler AHU-1A with electric heat (Carrier #FX4CNF042, mfd. 8/2008).
The medical/dental space is served by three systems, air handlers AHU-1B, C and D with electric heat (two Carrier #FX4CNF030, mfd. 12/2008; one #FX4CNF036, mfd. 8/2008).
The administration space is served by four systems. Two systems, air handlers AHU-1F and H with electric heat, are constant volume (Carrier #FX4CNF024, mfd. 10/2007; one #FX4CNF060, mfd.
11/2008, respectively) and are provided cooling by two condensing units (Carrier #23ACA324, 2 ton, mfd. 9/2007; #24ACB360, 5 ton, 8/2008, respectively). AHU-1H serves the communication hub and does not provide outdoor air.
The administration space is served by four systems. Two systems, air handlers AHU-1E and G with electric heat, are VVT systems (Carrier #40RM007, mfd. 8/2008; one #40MR008, mfd. 10/2008, respectively) and are provided cooling by two condensing units (Carrier #38ARZ007, 6 ton, mfd.
8/2008; #38ARZ008, 7-1/2 ton, 9/2008, respectively). AHU-1E supplies five zone dampers and has one bypass damper; AHU-1G supplies seven zone dampers and has two bypass dampers.
Comments:
Comments:
Comments:
Comments:
System Type
Air Distribution
Piping System
Control System
Fresh Air Intake
Energy Conservation
Measure
Area Served
Water Distribution1.
Sanitary Distribution2.
Fixtures3.
Fuel Distribution4.
3. Air Conditioning
Page: 5 of 50
Building: 0001 - ADMINISTRATION
None None ABC Type Fire Extinguisher
Comments: Underground service is provided from a 150 kVA utility-owned, pad-mounted transformer located east of the NE building corner to a 600A MCB distribution panel (GE APNB, Spectra series, 42 kA) located in the medical/dental wing electrical room. The 600A panel serves one 400A MCB distribution panel (from a 400A CB) in the administration wing, two 150A MCB panels (from two 150A CB) in the medical/dental wing, one 100A MCB panel (from a 100A CB) in the Security Building and a TVSS system (from a 60A CB). The 400A distribution panel in the administration wing serves one 250A MCB panel (from a 250A CB) and two 100A MCB secondary panels (from two 100A CB), all located in the same wing. Both distribution panels are provided witha surge protection systems (LEA International, SP200). The utility meter is mounted on the NE building corner.
Service Entrance Electrical Characteristics Distribution Equipment Wiring Devices
Comments: Recorded footcandle levels include natural light contribution. Recessed direct/indirect T5 light fixtures are utilized throughout the building, with the exception of the utility rooms provided by wall/ceiling-mounted strip lighting. Lighting in the offices, conference room, and storages is controlled by passive infra-red, ultrasonic wall-mounted sensors. Lighting in the corridors, wards and the reception areas is controlled by dual technology passive infra-red and ultrasonic ceiling-mounted occupancy sensors. Incandescent light fixtures controlled by the dimmer are utilized in the main conference room.
Compact Fluorescent High Intensity Discharge (HID)
Comments: Strategically located exterior light fixtures are controlled by the roof-mounted photocell through the security lighting contactor. The rest of the exterior lighting is controlled by the time clock through the energy saving lighting contactor. Both lighting contactors are located in the main electrical room.
Inc and T5 - Fluorescent
T5 - Fluorescent
T5 - Fluorescent
T5 - Fluorescent
T5 - Fluorescent
T5 - Fluorescent
CFL + T5 - Fluorescent
T5 - Fluorescent
T8 - Fluorescent
Conference Rooms
Offices
Medical/Dental
Wards (Patient)
Reception
Corridors & Stairs
Toilets
Storage Rooms
Equipment Rooms (Elec/Mech)
Area Recommended Level
Recorded Level Light Type
Battery Backup Battery Backup
Main Distribution Panel 120/208V, 3-Phase, 4 Wire Panelboards Receptacles, GFCI, Switches
Sprinkler System Stand Pipe System Fire Suppression
Emergency Exit
FIRE PROTECTION
ELECTRICAL SERVICES Number of Deficiencies = 1
Exterior Lighting1.
Interior Lighting2. Number of Deficiencies = 1
Emergency /Exit Lighting3. Number of Deficiencies = 1
LIGHTING
Page: 6 of 50
Building: 0001 - ADMINISTRATION
FIRE ALARM
Comments: Two analog addressable fire alarm panels, a Faraday MCP-7000 and a Faraday MCP-6000 are located in the security area of the Security Building. The control/annunciator panel (Faraday MCP-6000) monitors duct smoke detectors in Buildings 1, 2, and 3 and exterior wall-mounted audio/visual devices in Buildings 2 and 3. The central control/annunciator panel (Faraday MCP-7000) monitors fire alarm panels in Cafeteria/Culinary Arts Building 5, Dormitory Buildings 6 and 7, Gymnasium Building 8 and control/annunciator panel (Faraday MCP-6000) in this building. The remote annunciator panel is mounted at the counter at the security area. The AHU units serving the building are provided with duct smoke detectors interconnected by relay for HVAC shut down. One smoke detector is provided above the fire alarm panels in the security area and one above the power extender panel (RSE-300) in the Security Building mechanical room.
Comments: This building is utilized as the main communication service entrance point for the center telephone and data systems. The DMARK for the telephone distribution/entrance is set in the data closet in the administration department. The center has (4) T1 lines which are provided by JCDC and managed by Verizon Communications for local and long distance calls. The room is cooled to protect the sensitive equipment. The equipment in this room has surge protection (Surge-Gap). The center utilizes a VoIP system installed and maintained by the JCDC. The equipment is manufactured by Cisco. The MC houses three Cisco 3800 series routers, a Catalyst 6500 switch, providing a platform for data, WAN, an Ethernet network, and a Blue Coat unit for transfer of an analog signal for digital fax lines. The system provides local and long distance calling, Voicemail and FAX service. The equipment is connected to two UPS back-up units (APC 10000W) providing backup power for up to 15 minutes.
Control/Annunciator Panel Duct Smoke Detector Remote Annunciator Panel Smoke Detector
Connected to Main System None None Satellite Dish
Telephone Security Public Address Television
GENERAL BUILDING CONDITION
Rating X Good
Fair Poor
COMMUNICATION
The facility condition is not impacting the functional use of the facility.
The facility condition IS impacting the functional use of the facility.
The facility condition IS SIGNIFICANTLY impacting the functional use of the facility.
Electric Water Gas No N/AYes
BUILDING UTILITY METERING
Structure: Good Exterior: Good Interior: Good Mechanical: Good Electrical: Good
BUILDING 2 - STUDENT SERVICES
Page: 7 of 50
Building: 0002 - STUDENT SERVICES
BUILDING ENVELOPE
Foundation RoofBuilding
Concrete Structural Steel, Concrete Steel
Brick Masonry Curtain Wall Stucco
Comments: There are aluminum sunshades along the building exterior walls.
Wall Roof Rigid Batt
AccessibilityFeature
GSF NSF Year Built Use Group Historic Ownership#Floors
Business 11,574 7,984 1 Owned 2009 Not Evaluated
REAL ESTATE
Access to Building
Ramps
Entrance
2nd Egress
Visual Alarm
Corridor/Aisle
Rooms
Stairs
Elevator
Restrooms
Drinking Fountain
Telephone
Yes
N/A
Yes
Yes
N/A
Yes
Yes
N/A
N/A
Yes
N/A
N/A
ACCESSIBILITY
Structural Systems1.
Exterior Walls2.
Insulation4.
Material Drainage Year Life
Remaining Type Area Served
Metal
Built-up Roofing
Gutters and Downspouts
Interior Roof Drains
Arched
Flat
Lobbies
Classrooms & Offices
3. Roof
Page: 8 of 50
Building: 0002 - STUDENT SERVICES
Comments: Awning windows have mosquito screens
INTERIOR FINISH
Carpet Concrete Epoxy Vinyl Tile
CMU Ceramic Tile Drywall
Metal Unit - Metal Frame Wood Unit - Metal Frame
Mechanical
Mechanical
Restroom
Janitor's Closet
Ventilation Area Served
VERTICAL CIRCULATION
None
Metal Unit - Metal Frame Storefront - Storefront Frame
Awning Units - Aluminum Frame; Double Glazing; Fixed - Aluminum Frame; Double Glazing;
Acoustical Tile Gypsum Board Metal Plaster
Exhaust Ventilation
Exterior Doors5.
Windows6.
Floors1.
Interior Walls2.
3. Number of Deficiencies = 1
Interior Doors4.
Heat Source
Heat Distribution
Piping System
Control System
Fresh Air Intake
Energy Conservation
Measure
Area Served
Air handling unit AHU-2 (Carrier #39M21, mfd. 9/2008) provides supply air (VFD controlled) to 13 fan-powered VAV units, each equipped with an electric heater.
Comments:
HVAC
Heat1.
Electric Resistance
Variable Air Volume
None Electronic Mechanical None Entire Building
Ventilation2.
Page: 9 of 50
Building: 0002 - STUDENT SERVICES
The water heater (Lochinvar, 12 gallon, 2 kW) is located in the janitor's closet.Comments:
Cast Iron None Cast Iron
Electric Water Cooler Hose Bibb Lavatory Mop Sink Water Closet (Flush Valve) Waterless Urinal
None
None None ABC Type Fire Extinguisher
Copper Copper Electric None No
Hot Water Cold Water Water Heater Water Treatment HW Storage Tank
Grease InterceptorWaste / Vent Interior Storm
Split Direct Expansion (Air
Source)
Variable Air Volume
Refrigerant Electronic Mechanical None Entire Building
Sprinkler System Stand Pipe System Fire Suppression
PLUMBING
Two condensing units, CU-2-1 & 2 (Carrier #38AKS024, 20 ton and #38AKS016, 15 ton, both mfd.
9/2008) provide cooling to an air handling unit AHU-2 (Carrier #39MASTM04K1KC, mfd. 9/2008). AHU- 2 provides supply air (VFD controlled) to 13 fan-powered VAV units.
Comments:
System Type
Air Distribution
Piping System
Control System
Fresh Air Intake
Energy Conservation
Measure
Area Served
Water Distribution1.
Sanitary Distribution2.
Fixtures3.
Fuel Distribution4.
FIRE PROTECTION
3. Number of Deficiencies = 1Air Conditioning
Page: 10 of 50
Building: 0002 - STUDENT SERVICES
Comments: Underground service is provided from a 300A KVA utility-owned, pad-mounted transformer located east of the building's corner to a 600A distribution panel with a 500A MCB located in the electrical room. The distribution panel serves one two-section 400A MCB panel (from a 400A CB) and two 100A MCB panels (from two 100A CB) located in the main electrical room, one 100A MCB panel (from a 100A CB) located in the communication room , and two outdoor condensing units (from a 200A CB). The distribution panel is provided with a surge protection system (LEA International SP200). The utility meter is provided on the east exterior wall. Projectors are provided in the classrooms. Building 3 is served from the same utility transformer as this building.
FIRE ALARM
Comments: Duct smoke detectors and an exterior wall-mounted audio/visual device are controlled and monitored by the control/annunciator panel (MCP-6000) located in the security office in Building 1. The AHU unit serving the building is provided with a duct smoke detector for HVAC shut down.
Service Entrance Electrical Characteristics Distribution Equipment Wiring Devices
Duct Smoke Detector Exterior Audible Alarm Exterior Visual Alarm
Comments: Recorded footcandle levels include natural light contribution. Recessed direct/indirect T5 light fixtures are utilized throughout the building, with the exception of the utility rooms which have wall/ceiling-mounted strip lighting. Lighting in the offices and storage rooms is controlled by wall-mounted, passive infra-red/ultrasonic sensors. Lighting in the corridors, lobby and the reception area is controlled by ceiling-mounted, dual technology, passive infra-red/ultrasonic occupancy sensors. Lighting in the classrooms is controlled by dual switching.
Compact Fluorescent High Intensity Discharge (HID)
Comments: Building-mounted exterior lighting consists of wall-mounted HID wall-packs and canopy-mounted recessed light fixtures with compact fluorescent lamps. Strategically located exterior light fixtures are controlled by the roof-mounted photocell through the security lighting contactor. The rest of the exterior lighting is controlled by the time clock through the energy saving lighting contactor. Both lighting contactors are located in the main electrical room.
T5 - Fluorescent
T5 - Fluorescent
T5 - Fluorescent
T5 - Fluorescent
T5 - Fluorescent
T5 - Fluorescent
T8 - Fluorescent
T8 - Fluorescent
Offices
Classrooms
Conference Rooms
Lounges
Corridors & Stairs
Toilets
Storage Rooms
Equipment Rooms (Elec/Mech)
Area Recommended Level
Recorded Level Light Type
Battery Backup Battery Backup
Main Distribution Panel 120/208V, 3-Phase, 4 Wire Panelboards Receptacles, GFCI, Switches
Emergency Exit
ELECTRICAL SERVICES
Exterior Lighting1.
Interior Lighting2. Number of Deficiencies = 1
Page: 11 of 50
Building: 0002 - STUDENT SERVICES
Comments: This building is connected to the center's LAN system.
Connected to Main System None None Satellite Dish
Telephone Security Public Address Television
GENERAL BUILDING CONDITION
Rating X Good
Fair Poor
COMMUNICATION
The facility condition is not impacting the functional use of the facility.
The facility condition IS impacting the functional use of the facility.
The facility condition IS SIGNIFICANTLY impacting the functional use of the facility.
Electric Water Gas No N/AYes
BUILDING 3 - EDUCATION
Page: 12 of 50
Building: 0003 - EDUCATION
BUILDING ENVELOPE
Foundation RoofBuilding
Concrete Structural Steel, Concrete Steel
Brick Masonry Curtain Wall Stucco
Comments: There are aluminum sunshades along the building exterior walls.
Wall Roof Rigid Rigid
AccessibilityFeature
GSF NSF Year Built Use Group Historic Ownership#Floors
Business 19,406 12,834 1 Owned 2009 Not Evaluated
REAL ESTATE
Access to Building
Ramps
Entrance
2nd Egress
Visual Alarm
Corridor/Aisle
Rooms
Stairs
Elevator
Restrooms
Drinking Fountain
Telephone
Yes
N/A
Yes
Yes
N/A
Yes
Yes
N/A
N/A
Yes
N/A
N/A
ACCESSIBILITY
Structural Systems1.
Exterior Walls2.
Insulation4.
Material Drainage Year Life
Remaining Type Area Served
Built-up Roofing
Metal
Interior Roof Drains
Gutters and Downspouts
Flat
Arched
Classrooms
Lobbies
3. Roof
Page: 13 of 50
Building: 0003 - EDUCATION
Comments: Awning windows have mosquito screens
INTERIOR FINISH
Concrete Epoxy Vinyl Tile
CMU Ceramic Tile Drywall Exposed Structure
Metal Unit - Metal Frame Wood Unit - Metal Frame
Mechanical
Mechanical
Restroom
Janitor's Closet
Ventilation Area Served
VERTICAL CIRCULATION
None
Metal Unit - Metal Frame Storefront - Storefront Frame
Awning Units - Metal Frame; Double Glazing; Fixed - Aluminum Frame; Double Glazing;
Acoustical Tile Gypsum Board Metal Plaster
Exhaust Ventilation
Number of Deficiencies = 1
Exterior Doors5.
Windows6.
Floors1.
Interior Walls2.
3.
Interior Doors4.
Heat Source
Heat Distribution
Piping System
Control System
Fresh Air Intake
Energy Conservation
Measure
Area Served
Air handling unit AHU-3 (Carrier #39M36, mfd. 9/2008) provides supply air (VFD controlled) to 17 fan-powered VAV units, each equipped with an electric heater.
Comments:
HVAC
Heat1.
Electric Resistance
Variable Air Volume
None Electronic Mechanical None Entire Building
Ventilation2.
Page: 14 of 50
Building: 0003 - EDUCATION
The water heater (Lochinvar, 12 gallon, 2 kW) is located in the janitor's closet.Comments:
Cast Iron/PVC None Cast Iron
Electric Water Cooler Hose Bibb Lavatory Mop Sink Water Closet (Flush Valve) Waterless Urinal
None
None None ABC Type Fire Extinguisher
Copper Copper Electric None No
Hot Water Cold Water Water Heater Water Treatment HW Storage Tank
Grease InterceptorWaste / Vent Interior Storm
Split Direct Expansion (Air
Source)
Variable Air Volume
Refrigerant Electronic Mechanical None Entire Building
Sprinkler System Stand Pipe System Fire Suppression
PLUMBING
Two condensing units, CU-3-1 & 2 (Carrier #38AKS028, 25 ton, both mfd. 9/2008) provide cooling to an air handling unit, AHU-3 (Carrier #39M36, mfd. 9/2008). AHU-3 provides supply air (VFD controlled) to 17 fan-powered VAV units.
Comments:
System Type
Air Distribution
Piping System
Control System
Fresh Air Intake
Energy Conservation
Measure
Area Served
Water Distribution1.
Sanitary Distribution2.
Fixtures3.
Fuel Distribution4.
FIRE PROTECTION
Page: 15 of 50
Building: 0003 - EDUCATION
Comments: Underground service is provided from a 300 kVA utility-owned, pad-mounted transformer located west of the NW building's corner to an 800A MCB distribution panel (GE APNB, Spectra series, 42 kA) located in the electrical room. The 800A panel serves one 600A/500A MCB panel (from a 500A CB) and three 100A MCB panels (from three 100A CB), all located in the main electrical room, and two condensing units (from a 200A CB). The distribution panel is provided with a surge protection system (LEA International, SP200).
The utility meter is provided on the west exterior wall. Projectors are provided in the classrooms. Building 2 is served from the same utility transformer as this building.
FIRE ALARM
Comments: Duct smoke detectors and an exterior wall-mounted audio/visual device are controlled and monitored by the control/annunciator panel (MCP-6000) located in the security office in Building 1. The AHU unit serving the building is provided with a duct smoke detector for HVAC shut down.
Service Entrance Electrical Characteristics Distribution Equipment Wiring Devices
Duct Smoke Detector Exterior Audible Alarm Exterior Visual Alarm
Comments: Recorded footcandle levels include natural light contribution. Recessed direct/indirect T5 light fixtures are utilized throughout the building, with the exception of the utility rooms provided by the wall/ceiling-mounted strip lighting. Lighting in the offices and storage rooms is controlled by wall-mounted, passive infra-red/ultrasonic switches. Lighting in the corridors, lobby and the reception area is controlled by ceiling-mounted, dual technology, passive infra-red/ultrasonic occupancy sensors. Lighting in the classrooms is controlled by dual switching.
Compact Fluorescent High Intensity Discharge (HID)
Comments: Building-mounted exterior lighting consists of wall-mounted HID wall-packs and canopy-mounted recessed light fixtures with compact fluorescent lamps. Strategically located exterior light fixtures are controlled by the roof-mounted photocell through the security lighting contactor. The rest of the exterior lighting is controlled by the time clock through the energy saving lighting contactor. Both lighting contactors are located in the main electrical room.
T5 - Fluorescent
T5 - Fluorescent
T5 - Fluorescent
T5 - Fluorescent
CFL and T5 - Fluorescent
T8 - Fluorescent
Classrooms
Offices
Corridors & Stairs
Storage Rooms
Toilets
Equipment Rooms (Elec/Mech)
Area Recommended Level
Recorded Level Light Type
Battery Backup Battery Backup
Main Distribution Panel 120/208V, 3-Phase, 4 Wire Panelboards Receptacles, GFCI, Switches
Emergency Exit
ELECTRICAL SERVICES Number of Deficiencies = 1
Exterior Lighting1. Number of Deficiencies = 1
Interior Lighting2.
Page: 16 of 50
Building: 0003 - EDUCATION
Comments: This building is connected to the center's LAN system. The data room is provided with four Catalyst 3560-E series PoE-24 switches and a VG204 switch for digital data transfer to an analog format for the fax machine.
Connected to Main System None None TV with VCR
Telephone Security Public Address Television
GENERAL BUILDING CONDITION
Rating X Good
Fair Poor
COMMUNICATION
The facility condition is not impacting the functional use of the facility.
The facility condition IS impacting the functional use of the facility.
The facility condition IS SIGNIFICANTLY impacting the functional use of the facility.
Electric Water Gas No N/AYes
BUILDING 4 - HARD VOCATIONAL
Page: 17 of 50
Building: 0004 - HARD VOCATIONAL
BUILDING ENVELOPE
Foundation RoofBuilding
Concrete Structural Steel, Concrete Steel
Brick Masonry Stucco
Comments: There are aluminum sunshades along the building exterior walls.
Wall Roof Rigid Rigid
Metal Overhead - Steel Frame Metal Unit - Metal Frame
AccessibilityFeature
GSF NSF Year Built Use Group Historic Ownership#Floors
Business 16,000 13,700 1 Owned 2009 Not Evaluated
REAL ESTATE
Access to Building
Ramps
Entrance
2nd Egress
Visual Alarm
Corridor/Aisle
Rooms
Stairs
Elevator
Restrooms
Drinking Fountain
Telephone
Yes
N/A
Yes
Yes
N/A
Yes
Yes
Yes
N/A
Yes
N/A
N/A
ACCESSIBILITY
Structural Systems1.
Exterior Walls2.
Insulation4.
Exterior Doors5.
Material Drainage Year Life
Remaining Type Area Served
Built-up Roofing
Metal
Interior Roof Drains
Gutters and Downspouts
Flat
Arched
Classrooms
Shop Area
3. Roof
Page: 18 of 50
Building: 0004 - HARD VOCATIONAL
Comments: Awning windows and escape windows have mosquito screens
INTERIOR FINISH
Concrete Epoxy Open Grid Steel Vinyl Tile
Comments: Open grid steel flooring is at the mezzanine.
CMU Ceramic Tile Drywall
Metal Unit - Metal Frame Wood Unit - Metal Frame
VERTICAL CIRCULATION
Metal Stairs
Comments: Each shop has a metal stair to the loft storage area.
Awning Units - Aluminum Frame; Double Glazing; Escape Window - Aluminum Frame; Double Glazing;
Fixed - Aluminum Frame; Double Glazing;
Acoustical Tile Exposed Structure
Number of Deficiencies = 1
Windows6.
Floors1.
Interior Walls2.
3.
Interior Doors4.
Heat Source
Heat Distribution
Piping System
Control System
Fresh Air Intake
Energy Conservation
Measure
Area Served
Each of the four vocational shop modules has a classroom and instructor's office served by an air handler with an electric heater (Carrier #FX4CNF042, 11.3 kW, mfd. 8/2008).
Comments:
HVAC
Heat1.
Electric Resistance
Single Duct None Electronic Mechanical None Classrooms and Offices
Page: 19 of 50
Building: 0004 - HARD VOCATIONAL
Mechanical
Dust Collection
Welding Fume Exhaust
Mechanical
Shop Area
Shop Area
Shop Area
Restroom
Comments:
Comments:
Comments:
Each of the four shops has an exhaust fan mounted high on the exterior wall and an intake louver at the other end of the shop.
The carpentry shop is equipped with a dust collection system (Aget #30SN90D1).
The facility maintenance shop is equipped with a welding exhaust system.
Cast Iron/PVC None PVC
Electric Water Cooler Fixed Emergency Eyewash Hose Bibb Lavatory Water Closet (Flush Valve)
None
None None ABC Type Fire Extinguisher
Ventilation Area Served
Copper Copper Electric None No
Hot Water Cold Water Water Heater Water Treatment HW Storage Tank
Grease InterceptorWaste / Vent Interior Storm
Split Direct Expansion (Air
Source)
Single Duct Refrigerant Electronic Mechanical None Classrooms and Offices
Sprinkler System Stand Pipe System Fire Suppression
PLUMBING
Exhaust Ventilation
Each of the four vocational shop modules has a classroom and an instructor's office served by an air handler (Carrier #FX4CNF042, mfd. 8/2008) provided cooling by a condensing unit (Carrier #24ACB342, 3-1/2 ton, mfd. 10/2008).
Comments:
Ventilation2.
System Type
Number of Deficiencies = 1
Air Distribution
Piping System
Control System
Fresh Air Intake
Energy Conservation
Measure
Area Served
Water Distribution1.
Sanitary Distribution2.
Fixtures3.
Fuel Distribution4.
Number of Deficiencies = 1FIRE PROTECTION
Page: 20 of 50
Building: 0004 - HARD VOCATIONAL
Comments: Underground service is provided from a 300 kVA utility-owned, pad-mounted transformer located east of the building to a 1200A MCB distribution panel located in the main electrical room in the electrical shop.
The 1200A panel has (4) 200A and (4) 150A circuit breakers. The 1200A panel serves four 200A MCB and four 150A MCB panels (AQF3422CBX) providing for the shop loads. The 150A panels serve lighting and HVAC loads in the shops and the 200A panels with main shunt trip circuit breakers are controlled, each by three emergency shut off switches located at the shop entrances and in the instructor office. The main building distribution panel is provided with a surge protection system (LEA International, SP200).
The utility meter is provided on the east exterior wall. The cord real receptacles are ceiling-mounted in the middle of the shops. Projectors are installed in the classrooms. Building 9 is served from the same utility transformer.
FIRE ALARM
Service Entrance Electrical Characteristics Distribution Equipment Wiring Devices
None
Comments: Recorded footcandle levels include natural light contribution. Recessed direct/indirect T5 light fixtures are utilized throughout in the classrooms and instructor's offices. The shops are provided with 250W HID industrial high bay light fixtures. The storage areas and utility rooms are provided by wall/ceiling-mounted strip lighting. Lighting in the offices is controlled by passive infra-red, ultrasonic wall-mounted switches.
Lighting in the shops is controlled by on/off switches. Lighting in the classrooms is controlled by both ceiling-mounted and wall-mounted infra-red and ultrasonic occupancy sensors.
Compact Fluorescent High Intensity Discharge (HID)
Comments: Building-mounted exterior lighting consists of wall-mounted HID wall-packs and canopy-mounted recessed light fixtures with compact fluorescent lamps.