This solicitation package includes specifications and statements of work for two federal construction projects to replace chillers at the James H. Quillen VA Medical Center in Mountain Home, Tennessee.

The solicitation is a 100% set-aside for service-disabled veteran-owned small businesses. The contractor shall demolish and remove existing chillers in the operating room area and building 204, and install new approximately 80-ton and 120-ton chillers respectively. The contractor must provide construction services such as equipment installation and commissioning. The contractor shall also submit documentation including drawings, schematics, and test reports. The period of performance is 300 calendar days for both projects completed concurrently. Bids are due by January 7, 2022, and the award date is tentatively scheduled for February 2022. The estimated contract values range between $1-2 million.

The solicitation includes standard federal contracting provisions such as requirements for System for Award Management registration, wage determinations, bonding, security background checks, and past performance reporting in the Contractor Performance Assessment Reporting System.

View the file

Other files

File Type Posted
36C24922B0010 0004.docx DOCX document
621-22-126 Existing Chiller Submittal 8.15.2011.pdf PDF
621-22-126 Scope of work 3.28.2022.pdf PDF
621-19-125 Specifications 3.25.2022.pdf PDF
36C24922B0010 0003.docx DOCX document
621-19-125 Drawings 3.3.2022.pdf PDF
RFIs - OR B204 Chiller - Answers 3.28.2022.pdf PDF
621-22-126 Drawings 3.3.2022.pdf PDF
621-22-126 Specifications 3.16.2022.pdf PDF
36C24922B0010 0002.pdf PDF
Site Visit Sign In Sheet.pdf PDF
VHA Supplemental Contract Requirements for Combatting COVID-19 Updated 12-14-2021.docx DOCX document
621-19-125 Project Drawings 2.1.2022.pdf PDF
36C24922B0010 0001.docx DOCX document
Drawing 621-19-125 Project Area .pdf PDF
Safety Specs.pdf PDF
Drawing 621-22-126 Project Area .pdf PDF
Cast in Place Concrete Specs.pdf PDF
WD TN20220111 1-07-2022.pdf PDF
General Commissioning Specs.pdf PDF
General Requirements Specs.pdf PDF
OR and 204 Chiller Specs.pdf PDF
Contractor EMR Certification Form.docx DOCX document
Earthwork Short Form Specs.pdf PDF
HVAC Commissioning Specs.pdf PDF
Electrical Requirements Specs.pdf PDF
S02 - RFI Form - Chillers.docx DOCX document
Common Work for HVAC Specs.pdf PDF
Waste Management Specs.pdf PDF
36C24922B0010_1.docx DOCX document
Shop Drawings.pdf PDF
Common Work for Plumbing Specs.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

08-01-17

02 41 00 - 1

SECTION 02 41 00

DEMOLITION

PART 1 - GENERAL

1.1 DESCRIPTION:

This section specifies demolition and removal of buildings, portions of buildings, utilities, other structures and debris from trash dumps shown.

1.2 RELATED WORK:

A. Demolition and removal of roads, walks, curbs, and on-grade slabs outside buildings to be demolished: Section 31 20 00, EARTH WORK

Section 31 20 11, EARTH WORK (SHORT FORM).

B. Safety Requirements: Section 01 35 26 Safety Requirements Article, ACCIDENT PREVENTION PLAN (APP).

C. Disconnecting utility services prior to demolition: Section 01 00 00, GENERAL REQUIREMENTS.

D. Reserved items that are to remain the property of the Government:

Section 01 00 00, GENERAL REQUIREMENTS.

E. Construction Waste Management: Section 01 74 19 CONSTRUCTION WASTE

MANAGEMENT.

F. Infectious Control: Section 01 35 26, SAFETY REQUIREMENTS.

1.3 PROTECTION:

A. Perform demolition in such manner as to eliminate hazards to persons and property; to minimize interference with use of adjacent areas, utilities and structures or interruption of use of such utilities; and to provide free passage to and from such adjacent areas of structures.

Comply with requirements of GENERAL CONDITIONS Article, ACCIDENT

PREVENTION.

B. Provide safeguards, including warning signs, barricades, temporary fences, warning lights, and other similar items that are required for protection of all personnel during demolition and removal operations.

Comply with requirements of Section 01 00 00, GENERAL REQUIREMENTS, Article PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES AND IMPROVEMENTS.

C. Maintain fences, barricades, lights, and other similar items around exposed excavations until such excavations have been completely filled.

D. Provide enclosed dust chutes with control gates from each floor to carry debris to truck beds and govern flow of material into truck.

02 41 00 - 2

Provide overhead bridges of tight board or prefabricated metal construction at dust chutes to protect persons and property from falling debris.

E. Prevent spread of flying particles and dust. Sprinkle rubbish and debris with water to keep dust to a minimum. Do not use water if it results in hazardous or objectionable condition such as, but not limited to; ice, flooding, or pollution. Vacuum and dust the work area daily.

F. In addition to previously listed fire and safety rules to be observed in performance of work, include following:

1. No wall or part of wall shall be permitted to fall outwardly from structures.

2. Maintain at least one stairway in each structure in usable condition to highest remaining floor. Keep stairway free of obstructions and debris until that level of structure has been removed.

3. Wherever a cutting torch or other equipment that might cause a fire is used, provide and maintain fire extinguishers nearby ready for immediate use. Instruct all possible users in use of fire extinguishers.

4. Keep hydrants clear and accessible at all times. Prohibit debris from accumulating within a radius of 4500 mm (15 feet) of fire hydrants.

G. Before beginning any demolition work, the Contractor shall survey the site and examine the drawings and specifications to determine the extent of the work. The contractor shall take necessary precautions to avoid damages to existing items to remain in place, to be reused, or to remain the property of the Medical Center; any damaged items shall be repaired or replaced as approved by the Resident Engineer. The

Contractor shall coordinate the work of this section with all other work and shall construct and maintain shoring, bracing, and supports as required. The Contractor shall ensure that structural elements are not overloaded and shall be responsible for increasing structural supports or adding new supports as may be required as a result of any cutting, removal, or demolition work performed under this contract. Do not overload structural elements. Provide new supports and reinforcement for existing construction weakened by demolition or removal works.

02 41 00 - 3

Repairs, reinforcement, or structural replacement must have Resident

Engineer’s approval.

H. The work shall comply with the requirements of Section 01 57 19, TEMPORARY ENVIRONMENTAL CONTROLS.

I. The work shall comply with the requirements of Section 01 00 00, GENERAL REQUIREMENTS and Section 01 35 26, SAFETY REQUIREMENTS.

1.4 UTILITY SERVICES:

A. Demolish and remove outside utility service lines shown to be removed.

B. Remove abandoned outside utility lines that would interfere with installation of new utility lines and new construction.

PART 2 - PRODUCTS (NOT USED)

PART 3 – EXECUTION

3.1 DEMOLITION:

A. Completely demolish and remove buildings and structures, including all appurtenances related or connected thereto, as noted below:

1. As required for installation of new utility service lines.

2. To full depth within an area defined by hypothetical lines located

1500 mm (5 feet) outside building lines of new structures.

B. Debris, including brick, concrete, stone, metals and similar materials shall become property of Contractor and shall be disposed of by him daily, off the Medical Center to avoid accumulation at the demolition site. Materials that cannot be removed daily shall be stored in areas specified by the COR. Break up concrete slabs below grade that do not require removal from present location into pieces not exceeding 600 mm

(24 inches) square to permit drainage. Contractor shall dispose debris in compliance with applicable federal, state or local permits, rules and/or regulations.

C. Remove and legally dispose of all materials, other than earth to remain as part of project work, from any trash dumps shown. Materials removed shall become property of contractor and shall be disposed of in compliance with applicable federal, state or local permits, rules and/or regulations.

E. Remove existing utilities as indicated or uncovered by work and terminate in a manner conforming to the nationally recognized code covering the specific utility and approved by the COR. When Utility lines are encountered that are not indicated on the drawings, the COR shall be notified prior to further work in that area.

02 41 00 - 4

3.2 CLEAN-UP:

On completion of work of this section and after removal of all debris, leave site in clean condition satisfactory to Resident Engineer.

Clean-up shall include off the Medical Center disposal of all items and materials not required to remain property of the Government as well as all debris and rubbish resulting from demolition operations.

- - - E N D - - -