About this file

This document outlines two federal contract opportunities issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 9. The solicitations are for replacement of an operating room chiller and a building 204 chiller at the James H. Quillen VA Medical Center in Mountain Home, Tennessee.

The work includes demolition and disposal of existing equipment, purchase and installation of new chillers sized at 150 tons and 120 tons respectively, along with associated pumps, controls, piping and commissioning. The contractor must provide all labor, materials and supervision to complete the work according to specifications within 300 calendar days of the notice to proceed. Bids are due by March 7, 2022. The solicitations are set aside for service-disabled veteran owned small businesses. Pricing will be on a firm fixed price basis.

View the file

Other files

File Type Posted
36C24922B0010 0004.docx DOCX document
621-22-126 Existing Chiller Submittal 8.15.2011.pdf PDF
621-22-126 Scope of work 3.28.2022.pdf PDF
621-19-125 Specifications 3.25.2022.pdf PDF
36C24922B0010 0003.docx DOCX document
621-19-125 Drawings 3.3.2022.pdf PDF
RFIs - OR B204 Chiller - Answers 3.28.2022.pdf PDF
621-22-126 Drawings 3.3.2022.pdf PDF
621-22-126 Specifications 3.16.2022.pdf PDF
36C24922B0010 0002.pdf PDF
Site Visit Sign In Sheet.pdf PDF
VHA Supplemental Contract Requirements for Combatting COVID-19 Updated 12-14-2021.docx DOCX document
621-19-125 Project Drawings 2.1.2022.pdf PDF
Drawing 621-19-125 Project Area .pdf PDF
Safety Specs.pdf PDF
Drawing 621-22-126 Project Area .pdf PDF
Cast in Place Concrete Specs.pdf PDF
WD TN20220111 1-07-2022.pdf PDF
General Commissioning Specs.pdf PDF
General Requirements Specs.pdf PDF
OR and 204 Chiller Specs.pdf PDF
Contractor EMR Certification Form.docx DOCX document
Earthwork Short Form Specs.pdf PDF
HVAC Commissioning Specs.pdf PDF
Electrical Requirements Specs.pdf PDF
S02 - RFI Form - Chillers.docx DOCX document
Common Work for HVAC Specs.pdf PDF
Demolition Specs.pdf PDF
Waste Management Specs.pdf PDF
36C24922B0010_1.docx DOCX document
Shop Drawings.pdf PDF
Common Work for Plumbing Specs.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:

Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 2/1/2022 621-22-2-5082-0019 621-22-2-5082-0020 621-22-126/19-125 Department of Veterans Affairs Network Contracting Office 9 (90C)

NCO 9

1639 Medical Center Parkway, Suite 400 Murfreesboro TN 37129 90C Network Contracting Office 9 Department of Veterans Affairs Network Contracting Office (90C) 1639 Medical Center Parkway Suite 400 Murfreesboro TN 37129 To all Offerors/Bidders

36C24922B0010 01-15-2022

X X X

MONDAY, MARCH 7, 2022

The purpose of this amendment is to upload a revised SOW for Project No. 621-19-125 - Replace OR Chiller and Bid Schedule, add drawings and VHA Supplemental Contract Requirements for Combatting COVID-19.

The Invitation for Bid (IFB) is further modified to delete 4.8 52.223-99 ENSURING ADEQUATE COVID-19 SAFETY PROTOCOLS FOR FEDERAL CONTRACTORS (OCT 2021) (DEVIATION) on Page 50, correct PSC, and extend the Bid Due Date.

New Bid Due Date: Monday, March 7, 2022 at 2:00 PM CT.

See Page for Attachments.

Teresa Rogofsky Contracting Officer

STATEMENT OF WORK

Project 621-19-125 Contractor Services to Replace OR Chiller James H. Quillen VA Medical Center Mountain Home, TN

1. General

The operation room (OR) area is currently supplied by a 150-ton chiller unit that is oversized and is near the end of its useful life. This project is to supplement it with an equivalent 150-ton system. Chilled water service to the OR cannot be interrupted at any time.

Base Bid includes select demolition, purchase, and installation of a new 150-ton air cooled chiller, pumps, controls, and commissioning for fully functional system meeting all current codes and standards. It assumed that the existing controls and power wiring can be reused. Demolition will include select removal of fencing, bollards, electrical and plumbing. New work will consist of a new concrete pad and fencing with required safety and service clearances, installation of the new chiller including piping, insulation, valves, controls, and electrical power. The existing chiller will remain in service. The new controls will allow only one chiller be operating at any time.

Bid Alternate 1 is same as the Base Bid except that the existing chiller will be removed including disposal.

2. Scope of Work

2.1 The contractor shall be required to furnish all labor, materials, transportation, equipment, tools, and supervision to perform the scope of work for this project.

2.2 The contractor will be responsible for performing a site visit to determine the existing equipment details and current installation.

2.3 The new equipment will be installed in the same area as the existing equipment and the contractor will need to develop a plan to provide chilled water service to the OR at all times during the demolition, installation, and commissioning of the new equipment.

2.4 The contractor will be required to demo and dispose of all the equipment and materials being removed and re-install safety barriers, fence, etc. The contractor will be required to return all landscaping to current conditions.

2.5 The new chiller will be a 150-ton air cooled chiller. The contractor is to provide and install controls to maintain the correct temperature for the OR and surgery areas. The new controls shall allow only one chiller to operate at a time.

2.6 The chiller must maintain minimum recommended water volume in circulation to avoid frequent cycling of the compressors, which could potentially require a chilled water tank.

2.7 The contractor will provide and install all necessary piping for a fully functional system. Propress fittings will not be allowed. The new system shall have quick disconnects for emergency situations.

2.8 The system must include acoustic options for noise attenuation if there is a need for noise control.

2.9 The contractor will provide and install a temporary chiller if necessary, to keep correct temperature during demolition and installation of the system.

2.10 All equipment to complete the scope of work shall be new, not used, remanufactured, or refurbished.

2.11 All OEM equipment shall be UL certified and have UL labels on the equipment.

2.12 Chiller shall be rated and certified per AHRI conditions

2.13 The selected chiller and all components, piping, pumps, controls, etc. shall be designed in compliance with applicable standards and codes described in VA program guides, design materials and construction (PG-18-1 and PG -18-2), Design manuals for HVAC (PG-18-10) specifications available in the Technical Information Library (TIL) on VA Website address: (http://www.cfm.va.gov/til/).

2.14 The contractor shall be required to develop and submit the following documentation to the COR:

a) Elevation drawings indicating the location of the new equipment.

b) Control schematics for the new equipment.

c) Wiring diagrams and cable/conduit schedules.

d) Network diagrams for metering and/or control devices internal to the new equipment.

e) Factory test reports for the equipment.

2.15 The contractor shall be responsible for the following services:

a) On-site commissioning, which includes oversight of the demolition of the existing equipment, new equipment installation and functional testing of the equipment.

b) Coordination of any subcontractors required for the demolition and installation of the new equipment, including any rework of the existing wiring and conduit to terminate the existing wiring to create a fully functional system. The work shall also include necessary rework of any existing piping and insulation.

c) The Contractor shall develop and provide a detailed schedule in Microsoft Project® or other approved scheduling software for completion of all Design Stage activities, tasks, and submissions required herein, leading up to and including the final design development submission(s). After the Contractor receives notice to proceed with the Construction Stage work, the Contractor shall provide and maintain a detailed schedule in Microsoft Project® for completion of all Construction Documents Phase activities, tasks, and submissions required herein. The Contractor schedules shall itemize all required submission dates and review durations and must conform to the milestones and durations provided in the COR overall schedule and the Submission, Review.

d) After construction begins, the Contractor shall conduct a weekly progress meeting(s) and weekly subcontractor meeting(s). A COR representative and/or approved delegate will attend. The Contractor shall also attend construction oversight meetings with representatives from the COR and the project team monthly.

2.16 Below is information on the existing equipment. This information is for reference only, the contractor is required to verify all information.

a) Existing Chiller is a York International CORP. YCAV0157SA46VAASXTXXXXXLXXXX42XXXXXXHXXXSAXXXXXXBXXLXXBXAXXX

3. Schedule and Performance

3.1 The contractor shall provide the schedule required in section 2.15 item c above, including delivery date for all equipment within 60 calendar days of the notice to proceed (NTP).

3.2 The contractor shall update the COR of any changes to the delivery date bimonthly or immediately upon notification from the plant that there is a delay so to schedule the outage and resources more accurately for the demolition and installation of the equipment.

3.3 Any work that requires an electrical or HVAC shall be coordinated with the COR with a minimum of five (5) days’ notice if it affects a patient care area and a minimum of a three (3) days’ notice if it affects an administrative area.

3.4 All work requiring an energized work permit requires a minimum of three (3) days’ notice and must be approved by the Chief Engineer.

3.5 The work hours for this scope shall be planned for normal business hours except for outages and tie-ins which may require after hours and/or weekends unless otherwise directed by the COR.

3.6 The contractor is responsible for all financial costs associated with any sub-contractors required for the execution of the scope of work.

3.7 If the contractor determines a change in schedule is required, which will affect a planned outage or require an additional outage, the COR shall be notified immediately and a change in schedule shall be proposed and approved by the COR.

3.8 Final Project Closeout shall be completed within 300 calendar days after notice to proceed (NTP). The Contractor schedule shall allow for VA review periods ending with Contractor’s receipt of VA comments for each submission no later than 15 working days after VA receives the submission.

4. Deliverables

4.1 The contractor shall submit preliminary drawings and bill of materials within 60 calendar days of the NTP to the COR. This deliverable will include at a minimum:

a) Chiller specs and shop drawings

b) Equipment layout with dimensions.

4.2 Prior to completion of the contract, the contractor shall submit final copies of all drawings, schematics, diagrams, bill of materials, and coordination study results to the COR.

4.3 The preliminary deliverables shall be submitted in electronic format only (no USB drives).

4.4 The final deliverables, other than the arc flash labels, shall be submitted in electronic format (no USB drives).

5 Accuracy of Planning Information

5.1 The contractor shall visit the project site to investigate the information shown on any Government-Furnished drawings, record (as-built) drawings, and other planning documents provided by VA. This information is the best available, but the Government does not guarantee its accuracy or completeness.

5.2 The contractor shall promptly report to the Contracting Officer in writing any discrepancies between this contract and the planning information provided by the Government. The contractor shall make no adjustments to his work due to the discrepancy before the Contracting Officer has reviewed the matter and forwarded his determination to the contractor. The contractor’s failure to report any such discovered discrepancy or to wait for the Contracting Officer's determination shall be at his risk and expense.

6 Ownership of Original Documents

All designs, drawings, specifications, notes, and other work developed in the performance of this contract shall be the sole property of the Government and may be used on any other work without additional compensation to the Contractor. The Contractor agrees not to assert any rights and not to establish any claim under the design patent or copyright laws. The Contractor, for a period of no less than 3 years after completion of the project, agrees to furnish and provide access to all retained materials (including electronic) upon request of the VA. Unless otherwise provided in this contract, the Contractor shall have the right to retain copies of all such materials beyond such period.

7 Security Requirements

7.1 Contractors, contractor personnel, subcontractors and subcontractor personnel shall be subject to the same Federal laws, regulations, standards, and VA Directives and Handbooks as VA and VA personnel regarding information and information system security.

7.2 All contractor personnel shall be required to complete the “VA Privacy Training for Personnel without Access to VA Computer Systems or VA Sensitive Information” and submit to the COR prior to beginning work on site.

7.3 All contractor personnel shall be required to review the “Contractor Rules of Behavior” agreement and Acknowledge and Accept the agreement and submit to the COR prior to beginning work on site.

7.4 Due to the scope of this work, the C&A requirements do not apply, and a Security Accreditation Package is not required.

PRICE/COST SCHEDULE

ITEM INFORMATION

ITEM NUMBER
DESCRIPTION OF SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

1.00

JB

BID ITEM NO. 1: Project Number 621-22-126 - Replace Bldg. 204 Chiller.

POP: 300 Calendar Days

NAICS: 236220

PSC: Z1DA

BID ITEM NO. 2: Project Number 621-19-125 - Replace OR Chiller POP: 300 Calendar Days

ALTERNATE DEDUCT NO.1: Same as BID ITEM NO. 2 except that the existing chiller will be removed including disposal.

Project Number 621-19-125 - Replace OR Chiller POP: 300 Calendar Days

ATTACHMENTS

See attached document: VHA Supplemental Contract Requirements for Combatting COVID-19 Updated 12-14-2021.

See attached document: 621-19-125 - Project Drawings 2.1.2022.

File details come from the government source that posted it. Updated .