SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
| ���� | � |
| �������� |
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
9. FOR INFORMATION
CALL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".
| ���� | ������������ | ����������������� | |
| ������� | ��� ��!�������������� | ������������ | ��"��� |
���� #$��%&'(�)'%(�*#�++��$,-&�.$(/%(0�&)$ )�+$&1�(�1�2*��&1�)%0.+$'$�-'�3-'#-& )�+$&1�(�1�2*��/'$(�($)$-4-&, &%'-)$�'%�.(%)$$1��� #-*�.$(/%(0�&)$�.$(-%1�-*�3�(15 0�&1�'%(2 &$,%'-��+$������� ��
| ���� | ������ | � |
| � | ������ | ��������� |
| ��� | ������6 |
| ����!"���!����� | �� |
| �#��$���$�#�%���� | � |
�������������� �7
1� �//$(*�.(%4-1-&,�+$**�'#�& )�+$&1�(�1�2*�/%(��%4$(&0$&'��))$.'�&)$��/'$(�'#$�1�'$�%//$(*��($�18$�3-++�&%'��$�)%&*-1$($1��&1�3-++��$
($9$)'$1�
++�%//$(*��($�*8�9$)'�'%�'#$�"�:�3%(;�($<-8($0$&'*5��&1�"�:�%'#$(�.(%4-*-%&*��&1�)+�8*$*�-&)%(.%(�'$1�-&�'#$�*%+-)-'�'-%&�-&�/8++�'$='�%(��2
&�%//$(�,8�(�&'$$ -*5 -*�&%'�($<8-($1�
�����$�+$1�%//$(*�-&�%(-,-&�+��&1 )%.-$*�'%�.$(/%(0�'#$�3%(;�($<8-($1��($�18$��'�'#$�.+�)$�*.$)-/-$1�-&��'$0����2 ���� �
+%)�+�'-0$ "1�'$:����/�'#-*�-*���*$�+$1��-1�*%+-)-'�'-%&5�%//$(*�3-++��$�.8�+-)+2�%.$&$1��'�'#�'�'-0$����$�+$1�$&4$+%.$*
)%&'�-&-&,�%//$(*�*#�++��$�0�(;$1�'%�*#%3�'#$�%//$(%(>*�&�0$��&1��11($**5�'#$�*%+-)-'�'-%&�&80�$(5��&1�'#$�1�'$��&1�'-0$�%//$(*��($�18$�
| �����?@�A��A�??A���� ���� | � |
| ��� |
������"�����@A�?:
�($*)(-�$1��2��� �A��
��"@�����:�?����BA�"1:
| @����� | � | |
| � | ���� ?��������� | ���C����� |
| ��������� | ���� |
See Attached
6. PROJECT PLAN
OFFER (Must be fully completed by offeror)
�B������
��� #$�%//$(%(��,($$*�'%�.$(/%(0�'#$�3%(;�($<8-($1��'�'#$�.(-)$*�*.$)-/-$1��$+%3�-&�*'(-)'��))%(1�&)$�3-'#�'#$�'$(0*�%/�'#-*�*%+-)-'�'-%&5�-/�'#-*�%//$(�-*��))$.'$1
�2�'#$��%4$(&0$&'�-&�3(-'-&,�3-'#-& )�+$&1�(�1�2*��/'$(�'#$�1�'$�%//$(*��($�18$������&
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
| ��� | � | ������������� |
| � | ����D��� | ����������������/ |
| ��� ��)��������� |
| � |
AWARD (To be completed by Government)
| ����� | ���� |
| ���� | ��7 |
| ���� | ���� |
| ����� | ���� |
| ������������� | � | ��������� |
| � | � | � |
�B��
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
| ��� | � | ��������� | � |
| � | ������������� | ||
| � | ����D��� | ������� |
| �������� | � | |
| ��� | ||
| ������� | �������� | �����&�� |
'%�/8(&-*#��&1�1$+-4$(��++� -'$0*�%(�.$(/%(0��++�3%(;�($<8-($0$&'*�-1$&'-/-$1�%&�'#-* /%(0��&1��&2�)%&'-&8�'-%&�*#$$'*�/%(�'#$�)%&*-1$(�'-%&�*'�'$1�-&�'#-*�)%&'(�)'��� #$ (-,#'*��&1�%�+-,�'-%&*�%/�'#$�.�('-$*�'%�'#-*�)%&'(�)'�*#�++��$�,%4$(&$1��2�"�:�'#-* )%&'(�)'� �3�(15� "�:� '#$� *%+-)-'�'-%&5� �&1� "):� '#$� )+�8*$*5� ($.($*$&'�'-%&*5 )$('-/-)�'-%&*5� �&1� *.$)-/-)�'-%&*� -&)%(.%(�'$1� �2� ($/$($&)$� -&� %(� �''�)#$1� '%� '#-*
�E��
%8(�%//$(
%&�'#-*�*%+-)-'�'-%&�-*�#$($�2��))$.'$1��*�'%�'#$�-'$0*�+-*'$1��� #-*��3�(1�)%&*800�'$* '#$�)%&'(�)'5�3#-)#�)%&*-*'*�%/�"�:�'#$��%4$(&0$&'�*%+-)-'�'-%&��&1�2%8(�%//$(5��&1�"�:
'#-*�)%&'(�)'��3�(1����%�/8('#$(�)%&'(�)'8�+�1%)80$&'�-*�&$)$**�(2�
| ��������� | � |
| � | ������������"��/ |
| ��� ��)��� | |
| � �������� | ���� |
| ������ |
| ���� | � |
| ��� |
������"�����@A�?:�����
Defense Intelligence Agency Delivery Order Construction Contract (DDOCC)
This is a fixed-price, indefinite delivery-indefinite quantity (IDIQ), Multiple Award Contract (MAC) for the acquisition of multi-discipline projects valued between $2,000.00 and $10,000,000.00. The government anticipates the selection of two contractors but reserves the right to select more or less based on actual need.
The minimum quantity of work which will be required under this contract during the basic period and which will be initiated by one or more delivery orders will not be less than $250,000.00 per contract. The maximum dollar value of all awarded contracts shall not exceed $25,000,000.00 for the basic contract period, $25,000,000.00 for Option Period 1, $25,000,000.00 for Option Period 2, $25,000,000.00 for Option Period 3, and $25,000,000.00 for Option Period 4.
The notice to proceed (NTP) will be stated in individual delivery orders written against the contract.
The contractor shall begin performance within the number of calendar days specified in each delivery order and complete the work ready for its intended use within the number of days specified therein.
**MARK ALL ENVELOPES "SOURCE SELECTION
SENSITIVE - TO BE OPENED BY THE ADDRESSEE
ONLY"
This requirement is a SBA Region III 100% Small Business set-aside for firms certified with the Small Business Administration (SBA). The NAICS number is 236220
BASE YEAR
0001 FFP-DDOCC, BASE YEAR: Definitive beginning and end dates will be established on the award document. The contractor(s) shall perform all requirements in accordance with the contract and each individual delivery order issued against the contract.
Offeror shall insert proposed coefficient rates for CLINs as described within the table below (see page 5 of 55 and notes). Proposed coefficient rates for the CLINs shall remain constant and in effect for the entire life of the contract (base year plus four option years).
Period of Performance: 05/14/2009 to 05/13/2010
1.00 YR
OPTION YEAR 1
1001 FFP-DDOCC, OPTION YEAR 1: Definitive beginning and end dates will be established on the award document.
The contractor(s) shall perform all requirements in accordance with the contract and each individual delivery order issued against the contract.
Period of Performance: 05/14/2010 to 05/13/2011
0.00 YR
OPTION YEAR 2
2001 FFP-DDOCC, OPTION YEAR 2: Definitive beginning and end dates will be established on the award document.
The contractor(s) shall perform all requirements in accordance with the contract and each individual delivery order issued against the contract.
Period of Performance: 05/14/2011 to 05/13/2012
0.00 YR
OPTION YEAR 3
3001 FFP-DDOCC, OPTION YEAR 3: Definitive beginning and end dates will be established on the award document.
0.00 YR
SCHEDULE Continued
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
PAGE 3 OF
The contractor(s) shall perform all requirements in accordance with the contract and each individual delivery order issued against the contract.
Period of Performance: 05/14/2012 to 05/13/2013
OPTION YEAR 4
4001 FFP-DDOCC, OPTION YEAR 4: Definitive beginning and end dates will be established on the award document.
The contractor(s) shall perform all requirements in accordance with the contract and each individual delivery order issued against the contract.
Period of Performance: 05/14/2013 to 05/13/2014
0.00 YR
SCHEDULE Continued
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
PAGE 4 OF
DDOCC HHM402-09-R-0090
The contractor shall perform any and all functions in accordance with the contract and specifications herein, and as called out in the contract per the scope specified in individual delivery orders issued against this contract. The unit prices shall be as specified in the unit price database provided by the R.S. MEANS, bare costs and Washington DC Cost City Index current as of the date of the base contract period, multiplied times the applicable coefficients entered below. The following forms the basis of Section B, Schedule of Prices and the Contract Line Item Number (CLIN) structure:
CLIN ITEM DESCRIPTION COEFFICIENT
0001-
The following coefficients shall apply to all contract periods - Base Year plus all Four Option Years.
0001AA-
4001AA
Project bare costs between $2000 - $99,999.99: during standard working hours (see below Notes)
0001AB –
4001AB
Project bare costs between $100,000 - $249,999.99: during
0001AC –
4001AC
Project bare costs between $250,000 - $499,999.99: during
0001AD –
4001AD
Project bare costs between $500,000 - $999,999.99: during
0001AE –
4001AE
Project bare costs greater than $1,000,000: during standard working hours (see below Notes)
0001AF-
4001AF
All projects bare cost ranges: during non-standard working hours (see below Notes)
NOTES:
1.0 In order to be considered for award, each offeror must submit coefficients for each CLIN identified above. The government uses these multipliers to determine the price of work for each individual delivery order. The prices established in the R.S. MEANS database bare costs (which means no markup for overhead and profit column, will be multiplied by the City Cost Index for Washington DC and the coefficient to arrive at the actual total price for a unit of work. The coefficients shall be represented as “net”, a “decrease from” or an “increase to” the prices listed in the R.S. MEANS. An offer of “net” would be represented as “1.0”. An example of a decrease from the prices in R.S.
MEANS would be “0.98”. An example of an increase above the prices listed in the R.S. MEANS would be “1.10”. Proposed coefficients rates shall not extend greater than the third decimal place.
2.0. If the government directs a work schedule during non-standard hours (see Specs. Para 1.4.2), then the coefficient entered for CLIN 0001AF – 4001AF shall be applied against those items of work which will be performed during the nonstandard hours. The price for the remaining items of work is calculated using the coefficients entered for CLINS 0001AA-4001AE as applicable based on the estimated bare cost of the project (with the RS Means Washington DC Cost City Index applied).
The term “nonstandard working hours” is not to be interpreted as “overtime”.
3.0. Offered coefficients must contain all allowable indirect contractor costs not covered by RS Means
Pre-Priced costs, including but not limited to contingencies, overhead, general and administrative expenses, bonding costs and profit. Additional examples of such costs are: gross receipts taxes and payroll taxes, such as FICA, workmen’s compensation, state and federal unemployment taxes for direct payroll employees, superintendents’ salaries, builders’ risk insurance, initial contract startup mobilization and demobilization expenses, individual project mobilization and demobilization expenses and any and all bond premiums. Coefficients shall also include various overhead expenses, including project estimating, project engineering, site office overhead, field office building, furniture, equipment, on-site office staff salaries, vehicle and construction equipment maintenance, office administrative expenses, grounds keeping in and around the field office site and a proportional share of home office overhead. The coefficient shall also include all insurance, special clothing for workers, traffic barricades, flag persons, daily and final cleanup, additional supervision, delivery of materials/equipment, paperwork fees associated with a particular delivery order and any other field overhead costs attributable to the contract requirements identified within the contract and/or specifications.
4.0. The majority of work required will be in Secret Compartmental Information Facilities (SCIFs) and appropriate clearances will be required IAW the specifications. Plan accordingly when calculating your coefficients.
5.0. No changes to the coefficient will be permitted for option periods. The R.S. MEANS updates their database yearly. This update shall provide the only economic price adjustment under the contract.
6.0. Coefficient is defined as a numerical factor that compensates the contractor for any and all costs
(generally indirect costs) and profit not included in the R.S. Means database.
CLAUSES AND PROVISIONS
B-1 The minimum quantity of work required under this contract during the basic period which will be initiated by one or more delivery orders will not be less than $250,000.00 per contract. The maximum dollar value of all contracts for this requirement shall not exceed $125,000,000.00 (for the life of the contract).
B-2 Notices to Proceed (NTP) will be issued after award of individual delivery orders written against the contract.
SECTION C Descriptions and Specifications
C-1 CLAUSES AND PROVISIONS
Clauses and provisions from the Federal Acquisition Regulation (FAR) and Defense Federal Acquisition Regulation Supplement (DFARS) are hereby incorporated by reference with the same force and effect as though herein set forth in full. The date of each clause shall be the current date set forth in the FAR and DFARS on the issuance date of this order or contract (e.g. orders or contracts for services instead of supplies) are self-deleting. The complete text of any clause incorporated herein by reference may be obtained from http://farsite.hill.af.mil/.
C-2 SPECIFICATIONS dated 22 January 2009, are attached at Section J.
http://farsite.hill.af.mil/
SECTION E Inspection and Acceptance
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government 1001 Destination Government Destination Government 2001 Destination Government Destination Government 3001 Destination Government Destination Government 4001 Destination Government Destination Government
CLAUSES INCORPORATED BY REFERENCE:
52.246-12 Inspection of Construction AUG 1996 52.246-13 Inspection--Dismantling, Demolition, or Removal of Improvements AUG 1996
SECTION F Deliveries or Performance
DELIVERY INFORMATION
CLINS UNIT OF ISSUE QUANTITY FOB SHIP TO ADDRESS
0001 Each 1.00 Dest. DAL
200 MacDill Blvd Washington, DC 20340
FOB: Destination
1001 Each 1.00 Dest. Same as CLIN 0001 2001 Each 1.00 Dest. Same as CLIN 0001 3001 Each 1.00 Dest. Same as CLIN 0001 4001 Each 1.00 Dest. Same as CLIN 0001
52.211-13 Time Extensions SEP 2000 52.211-18 Variation in Estimated Quantity APR 1984 52.242-14 Suspension of Work APR 1984 52.247-34 F.O.B. Destination NOV 1991
CLAUSES INCORPORATED BY FULL TEXT
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed (NTP), (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than the time specified within each Delivery Order. The time stated for completion shall include final cleanup of the premises. Specific performance periods will be negotiated and specified within each project delivery order issued against the contract. Unless the Contracting Officer determines otherwise, the NTP shall be considered effective the date the contractor receives a properly executed Delivery Order. Projects deemed emergencies by the Government; the Contracting Officer may issue an oral confirming order prior to the issuance of a written Delivery Order. In these instances, the NTP shall be the date the contractor is provided a Delivery Order number and verbal direction to proceed by the Contracting Officer, with written confirmation to follow within 72 hours thereafter.
(End of clause)
52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)
(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in range between $296.00 and $332.00 per day. Each request for proposal for an individual delivery order will identify whether liquidated damages apply.
(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
(End of clause)
SECTION G Contract Administration Data
252.201-7000 Contracting Officer's Representative DEC 1991
CLAUSES INCORPORATED BY FULL TEXT
G-1 INVOICING AND PAYMENT PROCEDURES
INVOICE PROCEDURES: ELECTRONIC INVOICING REQUIREMENT (DEC 2008)
a. Invoices shall be submitted through the Electronic Invoicing internet website using the procedures described at http://www.nsa.gov/business/busin00004.cfm, unless otherwise authorized. Access to the Electronic Invoicing website requires an External Certificate Authority/Interim External Certificate Authority (ECA/IECA) PKI certificate. Information on purchasing an ECA/IECA certificate is available on the internet at:
http://iase.disa.mil/pki/eca/index.html. Contact the Electronic Commerce office at (410) 854-5445 if you need additional information. After obtaining the ECA/IECA certificate, contact the Electronic Commerce office to obtain an account if one does not currently exist.
OPTIONAL:
The Government requests that concurrent “hard copies” of invoices be submitted in addition to the required electronic invoices. Send one (1) each “hard copy” invoice concurrently with your electronic invoice, but to the following addressees:
COR’s and/or CO’s Office (Insert COR or CO’s name, telephone number, internal mailing address, email address)
DCAA and/or DCMA Office (Insert the cognizant audit or contract management branch and applicable address)
b. At a minimum, all invoices—whether electronic invoice or hard copy-- must contain the following:
1. Name and address of the contractor.
2. Invoice date and invoice number.
3. Contract, Purchase Order or other authorization for supplies delivered or services performed (if award is a delivery or job order, ensure entire contract number - basic award and order number - is included)
4. Description, quantities and prices must be described exactly as shown on the contract, including Line Item and Accounting Classification Reference Number (ACRN) if delineated in the contract.
5. Name of the Contractor official and address to whom payment is to be sent (if other than Electronic Funds Transfer is authorized.)
6. Shipping/payment terms (date of shipment, address, discount for prompt payment)
7. Name, title, phone number and mailing address of person to be notified in the event of a defective invoice.
8. Taxpayer Identification Number (TIN), Electronic Funds Transfer (EFT) banking information, and DUNS number.
9. COR name.
10. Any other information or documentation required by the contract.
c. The contractor is authorized to invoice _____________ (insert, as appropriate: “monthly,” “bi-weekly”, etc.)
d. The Contracting Officer's Representative (COR) is required to review and approve invoices as part of the payment process. When invoicing electronically, the identified COR will automatically receive notification of a pending http://www.nsa.gov/business/busin00004.cfm http://iase.disa.mil/pki/eca/index.html invoice. If a concurrent hardcopy invoicing has been authorized, prominently mark all transmittals or envelopes that contain invoice copies "DUPLICATE INVOICE ENCLOSED" for CORs in order to ensure timely payment.
e. Note: Payment approvals under cost reimbursement type contracts, including and time and materials/labor hour contracts, are considered provisional invoice approvals until DCAA or other cognizant government audit authority has determined that the costs and fees under the contract are valid and allowable.
f. Questions regarding payment shall be directed to the Finance and Accounting Office at (410) 854-7657.
G-2 CONTRACT ADMINISTRATION
In no event shall any understanding or agreement, contract modification, change order or other matter in deviation from the terms of this contract between the contractor and a person other than the Contracting Officer be effective or binding upon the Government. All such actions must be formalized by a proper contractual document executed by the Contracting Officer.
G-3 ACCOUNTING AND APPROPRIATION DATA
Funds, including funds for the contract minimum, will be obligated on individual delivery orders, not on the contract itself.
SECTION H Special Contract Requirements
H-1 PROJECT DISTRIBUTION:
It is estimated that the projects under this requirement will be distributed approximately as follows:
Distribution Contract Line Item Coefficient Ranges 60% Project costs between $2000 - $99,999.99 during standard working hours 20% Project costs between $100,000 - $249,999.99 during standard working hours 8% Project costs between $250,000 - $499,999.99 during standard working hours 6% Project costs between $500,000 - $999,999.99 during standard working hours 4% Project costs greater than $1,000,000.00 during standard working hours 2% Work during non-standard working hours
The above information is provided for estimating and planning purposes only. This information does not obligate the Government to meet this workload distribution in any way. Actual distribution of projects may vary from the above.
H-2 STATUTORY COST LIMITATIONS:
Some delivery orders may be subject to a statutory cost limitation. In those instances the following provision, DFARS 252.236-7006 “Cost Limitation (Jan 1997)” shall apply and it shall be referenced in those delivery orders.
H-3 BONDS:
a. The initial bond amount is based upon the contract minimum for each contract ($250,000.00). When the value of delivery orders in progress exceeds the existing bonding, the contracting officer may require additional bond protection by directing the contractor to increase the penal amount of the existing bond, or to obtain additional bonds. Although the amount of the initial bond is based on the minimum dollar amount, bond premium costs should be included in the coefficients as an indirect cost based on the estimated annual contract amount of $25M, not just the bonding requirements imposed for the minimum amount at award. Bond premiums are considered allowable indirect cost and as such must be part of the offered coefficients; bond premiums will not be invoiced separately.
b. BID BOND: A proposal/bid bond is not required with the proposal. However, a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States will be required in the amount of 20 percent of the contract minimum or $50,000; whichever is less (FAILURE TO PROVIDE A PROPER BID GUARANTEE WHEN
SUBMITTING PROPOSAL MAY RESULT IN THE PROPSAL BEING CONSIDERED
UNACCEPTABLE).
c. PERFORMANCE AND PAYMENT BONDS: The contractor shall submit a Performance Bond (Standard Form
25) and a Payment Bond (Standard Form 25-A) with good and sufficient surety or sureties to the Government. The penal sum of such bonds will be as follows:
• PERFORMANCE BONDS: The penal amount of the performance bond shall equal one hundred percent (100%) of the contract minimum.
• PAYMENT BONDS: The penal amount of the performance bond shall equal one hundred percent (100%) of the contract minimum.
• Contractor selected for contract award must have the capability to obtain Performance and Payments bonds at the aggregate value of $25M in the event that an active workload of such value exists.
Required performance and payment bonds will be furnished by the contractor to the Government prior to commencement of contract performance. Performance and payment bonds, in the amounts stated above, will also be required for any options exercised.
H-4 CONTRACT PHASE-IN/PHASE-OUT:
a. The contractor shall commence any mobilization and familiarization activities prior to actual work on individual delivery orders as soon after contract award as practicable. However, within 15 calendar days after contract award, the contractor shall mobilize the necessary personnel and equipment to estimate and negotiate requirements. The contractor shall have fully operational field offices with all required facilities, staff and automated data processing (ADP) capabilities within 30 calendar days after contract award.
b. Contractor must vacate government furnished office space and storage areas on the last day of the contract period. Premises must be returned in the same condition in which they were received or as agreed to by the contracting officer. All ongoing delivery orders must be completed from an approved field office or off-base location.
H-5 DAVIS-BACON WAGE RATE(s) APPLICATION
a. This contract is an indefinite-delivery, indefinite-quantity (IDIQ) requirement and contains options to extend the term of the contract. The specific sites of performance for the various delivery orders that may be issued are unknown. The wage determination issued under the Davis-Bacon Act by the Administrator, Wage and Hour Division, Employment Standards Administration, U.S. Department of Labor, current at time of award or at the exercise of each option to extend the term of the contract, shall be incorporated into the contract in full text and, as applicable, by reference into each delivery order issued during each performance period. They shall be effective for the complete period of performance of those delivery orders without further revision. It should be noted that it is the offerors responsibility, when establishing coefficient rates, to visit http://www.wdol.gov/ to review current wage rate information for Highway, Heavy, and Building in the following areas:
• District of Columbia
• Maryland (Frederick County and Prince George County)
• Virginia (Albemarle County, Alexandria County, Arlington County, Fairfax County, and
Prince William County)
b. At the beginning of each option period, a new Unit Pre-Priced Database (i.e. the Means Facilities Composite Database) with current year pricing will be incorporated and used to price individual projects in conformance with the terms and conditions specified herein. Therefore, no further adjustment to contract pricing will be permitted to cover any increase or decrease in wages and benefits as a result of:
(1) Incorporation of the wage determination(s) applicable at the exercise of the option to extend the term of the contract.
(2) Incorporation of a wage determination(s) otherwise applied to the contract by operation of law; or
(3) An increase in wages and benefits resulting from any other requirement applicable to workers subject to the Davis-Bacon Act.
H-6 PRE-PROPOSAL CONFERENCE
A pre-proposal conference will be conducted on 25 March 2009 at 10:30AM EST. A site visit for the demonstration project will follow the pre-proposal conference. Prospective offerors interested in attending should contact Hakim Shakir: hakim.shakir@dia.mil NLT 23 March 2009 in order to RSVP. In the event that email cannot be utilized, please fax the RSVP to 202-231-6179.
H-7 CONSTRUCTION EQUIPMENT
All equipment to be used for this contract shall be safe and in good operating condition. The contracting officer reserves the right to inspect any equipment and reject the use of such equipment if he/she considers it unsafe, in poor operating condition, or inappropriate for work. Any equipment rejected due to operating condition will be removed from the project site immediately and any resulting costs will be the responsibility of the contractor.
H-8 CONTRACTOR RESPONSIBILITY
Contractors operating on government installations will be responsible for briefing and ensuring the employees adhere to the traffic rules and regulations. The Project Manager (PM) and/or any other personnel providing workman leadership will ensure all workers comply with these rules and regulations. Speed limits on the installations are posted and must be complied with. Law Enforcement personnel utilize speed detection devices to monitor speed and citations carrying monetary fines will be issued to violators. Personnel who park in areas other than those designated for parking will be cited. Individuals are to obey all entry procedures; all instructions given by Security personnel at the entry points (gates) shall be complied with immediately.
http://www.wdol.gov/ mailto:hakim.shakir@dia.mil
H-9 HOLIDAYS
The following Federal legal holidays are observed:
New Year’s Day Labor Day Martin Luther King’s Birthday Columbus Day President’s Day Veterans Day Memorial Day Thanksgiving Day Independence Day Christmas Day *Any other day designated by Federal Statute, executive Order or a Presidential proclamation.
When a holiday falls on a Sunday, the following Monday will be observed as a legal holiday. When a holiday falls on a Saturday, the preceding Friday is observed as a holiday by U.S. Government Agencies.
Unless authorized by the Contracting Officer or his duly authorized representative, the contractor shall not work under a VaCA Contract at any government facility or any holiday listed above nor should any deliveries under this contract be made to any government facility on those days.
The amounts in Section B of the contract include an allowance for holidays to be observed; and, accordingly the government will not be billed for such holidays, except when services are required by the government and are actually performed on a holiday.
Administrative Leave: When the Government grants administrative leave to employees as a result of inclement weather, potentially hazardous conditions, or other special circumstances, contractor personnel working at the specific facility/location granted administrative leave shall also be dismissed. However, the contractor shall provide sufficient on-site personnel to perform the requirements of critical work already in process, if instructed by the Contracting Officer or duly authorized representative.
H-10 INSURANCE
The following insurance will be required IAW FAR 28-307-2:
Workers’ compensation and employer’s liability. Contractors are required to comply with applicable Federal and State workers’ compensation and occupational disease statutes. If occupational diseases are not compensable under those statutes, they shall be covered under the employer’s liability section of the insurance policy, except when contract operations are so commingled with a contractor’s commercial operations that it would not be practical to require this coverage. Employer’s liability coverage of at least $100,000 shall be required, except in States with exclusive or monopolistic funds that do not permit workers’ compensation to be written by private carriers. (See 28.305(c) for treatment of contracts subject to the Defense Base Act.)
General liability:
- The contracting officer shall require bodily injury liability insurance coverage written on the comprehensive form of policy of at least $500,000 per occurrence.
- Property damage liability insurance shall be required only in special circumstances as determined by the agency.
Automobile liability. The contracting officer shall require automobile liability insurance written on the comprehensive form of policy. The policy shall provide for bodily injury and property damage liability covering the operation of all automobiles used in connection with performing the contract. Policies covering automobiles operated in the United States shall provide coverage of at least $200,000 per person and $500,000 per occurrence for bodily injury and $20,000 per occurrence for property damage. The amount of liability coverage on other policies shall be commensurate with any legal requirements of the locality and sufficient to meet normal and customary claims.
H-11 PERSONNEL SECURITY REQUIREMENTS
The Contractor shall maintain and administer a security program in accordance with Industrial Security Manual DoD 5220.22M and DIA Manual 50-5. Copies of these documents are available for review in the office of the Contracting Officer.
http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/far/28.htm#P360_59325
Loss or suspension of required security clearance as set forth on the DD Form 254, "Contract Security Classification Specifications," would result in contractor's inability to perform in accordance with the terms and conditions of this contract. As a result of this failure to perform, the contractor is subject to default under the appropriate termination clause herein.
The Government reserves the right to direct any contractor employee to be removed from performance, direct or indirect, whenever there is probable cause to believe, on the basis of all facts available, that such action is warranted in the interest of national security, whether or not the cause is deemed of sufficient severity to warrant action to terminate the Contractor's or individual's security clearance. The Government also reserves the right to direct any contractor employee to be removed from performance, direct or indirect, for the period of time necessary to conduct any investigation of alleged misconduct which may in the opinion of the Contracting Officer jeopardize the security of the project.
Military security requirements in the performance of this contract shall be maintained in accordance with the DD Form 254 listed in Section J. The highest classification involved in the performance of this contract is
TS/SCI.
This contract document is unclassified.
The contractor will not use any electrical information processing equipment in his possession for the purpose of processing or transmitting classified information under this contract without the written permission of the Contracting Officer.
SECTION I Contract Clauses
52.202-1 Definitions JUL 2004 52.203-3 Gratuities APR 1984 52.203-5 Covenant Against Contingent Fees APR 1984 52.203-6 Restrictions On Subcontractor Sales To The Government SEP 2006 52.203-7 Anti-Kickback Procedures JUL 1995 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or
Improper Activity
JAN 1997
52.203-10 Price Or Fee Adjustment For Illegal Or Improper Activity JAN 1997 52.203-12 Limitation On Payments To Influence Certain Federal Transactions SEP 2007 52.204-2 Security Requirements AUG 1996 52.204-2 Alt II Security Requirements (Aug 1996) - Alternate II APR 1984 52.204-4 Printed or Copied Double-Sided on Recycled Paper AUG 2000 52.204-9 Personal Identity Verification of Contractor Personnel SEP 2007 52.209-6 Protecting the Government’s Interest When Subcontracting With
Contractors Debarred, Suspended, or Proposed for Debarment
SEP 2006
52.211-15 Defense Priority And Allocation Requirements APR 2008 52.215-2 Audit and Records--Negotiation JUN 1999 52.215-8 Order of Precedence--Uniform Contract Format OCT 1997 52.215-10 Price Reduction for Defective Cost or Pricing Data OCT 1997 52.215-11 Price Reduction for Defective Cost or Pricing Data--Modifications OCT 1997 52.215-12 Subcontractor Cost or Pricing Data OCT 1997 52.215-13 Subcontractor Cost or Pricing Data--Modifications OCT 1997 52.215-15 Pension Adjustments and Asset Reversions OCT 2004 52.215-21 Requirements for Cost or Pricing Data or Information Other Than
Cost or Pricing Data – Modifications
OCT 1997
52.219-8 Utilization of Small Business Concerns MAY 2004 52.219-14 Limitations On Subcontracting DEC 1996 52.222-1 Notice To The Government Of Labor Disputes FEB 1997 52.222-3 Convict Labor JUN 2003 52.222-4 Contract Work Hours and Safety Standards Act - Overtime
Compensation
JUL 2005
52.222-6 Davis Bacon Act JUL 2005 52.222-7 Withholding of Funds FEB 1988 52.222-8 Payrolls and Basic Records FEB 1988 52.222-9 Apprentices and Trainees JUL 2005 52.222-10 Compliance with Copeland Act Requirements FEB 1988 52.222-11 Subcontracts (Labor Standards) JUL 2005 52.222-12 Contract Termination-Debarment FEB 1988 52.222-13 Compliance with Davis-Bacon and Related Act Regulations. FEB 1988 52.222-14 Disputes Concerning Labor Standards FEB 1988 52.222-15 Certification of Eligibility FEB 1988 52.222-21 Prohibition Of Segregated Facilities FEB 1999 52.222-26 Equal Opportunity MAR 2007 52.222-27 Affirmative Action Compliance Requirements for Construction FEB 1999 52.222-35 Equal Opportunity For Special Disabled Veterans, Veterans of the
Vietnam Era and Other Eligible Veterans
SEP 2006
52.222-36 Affirmative Action For Workers With Disabilities JUN 1998 52.222-37 Employment Reports On Special Disabled Veterans, Veterans Of
The Vietnam Era, and Other Eligible Veterans
SEP 2006
52.222-50 Combating Trafficking in Person AUG 2007 52.223-3 Hazardous Material Identification And Material Safety Data JAN 1997 52.223-5 Pollution Prevention and Right-to-Know Information AUG 2003 52.223-6 Drug Free Workplace MAY 2001 52.223-14 Toxic Chemical Release Reporting AUG 2003 52.225-13 Restrictions on Certain Foreign Purchases JUN 2008 52.226-1 Utilization of Indian Organizations and Indian-Owned JUN 2000 52.227-1 Authorization and Consent DEC 2007
52.227-2 Notice and Assistance Regarding Patent and Copyright Infringement
DEC 2007
52.227-4 Patent Indemnity-Construction Contracts DEC 2007 52.228-2 Additional Bond Security OCT 1997 52.228-5 Insurance - Work On A Government Installation JAN 1997 52.228-11 Pledges Of Assets FEB 1992 52.228-12 Prospective Subcontractor Requests for Bonds OCT 1995 52.228-14 Irrevocable Letter of Credit DEC 1999 52.228-15 Performance and Payment Bonds--Construction NOV 2006 52.229-3 Federal, State And Local Taxes APR 2003 52.232-5 Payments under Fixed-Price Construction Contracts SEP 2002 52.232-17 Interest OCT 2008 52.232-18 Availability Of Funds APR 1984 52.232-23 Assignment Of Claims JAN 1986 52.232-27 Prompt Payment for Construction Contracts OCT 2008 52.232-33 Payment by Electronic Funds Transfer--Central Contractor
Registration
OCT 2003
52.233-1 Disputes JUL 2002 52.233-1 Alt I Disputes - Alternate I DEC 1991 52.233-3 Protest After Award AUG 1996 52.233-4 Applicable Law For Breach Of Contract Claim OCT 2004 52.236-2 Differing Site Conditions APR 1984 52.236-3 Site Investigation and Conditions Affecting the Work APR 1984 52.236-5 Material and Workmanship APR 1984 52.236-6 Superintendence by the Contractor APR 1984 52.236-7 Permits and Responsibilities NOV 1991 52.236-8 Other Contracts APR 1984 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements
APR 1984
52.236-10 Operations and Storage Areas APR 1984 52.236-11 Use and Possession Prior to Completion APR 1984 52.236-12 Cleaning Up APR 1984 52.236-13 Accident Prevention NOV 1991 52.236-14 Availability and Use of Utility Services APR 1984 52.236-15 Schedules for Construction Contracts APR 1984 52.236-17 Layout of Work APR 1984 52.236-21 Specifications and Drawings for Construction FEB 1997 52.236-21 Alt I Specifications and Drawings for Construction (Feb 97) - Alternate I APR 1984 52.236-26 Preconstruction Conference FEB 1995 52.242-13 Bankruptcy JUL 1995 52.243-4 Changes JUN 2007 52.244-6 Subcontracts for Commercial Items DEC 2008 52.245-1 Government Property JUN 2007 52.245-9 Use and Charges JUN 2007 52.246-21 Warranty of Construction MAR 1994 52.246-25 Limitation of Liability – Services FEB 1997 52.248-3 Value Engineering-Construction SEP 2006 52.249-2 Alt I Termination for Convenience of the Government (Fixed-Price) -
Alternate I
SEP 1996
52.249-10 Default (Fixed-Price Construction) APR 1984 52.253-1 Computer Generated Forms JAN 1991 252.203-7001 Prohibition On Persons Convicted of Fraud or Other Defense-
Contract-Related Felonies
DEC 2008
252.203-7002 Requirement to Inform Employees of Whistleblowers Rights JAN 2009 252.204-7003 Control Of Government Personnel Work Product APR 1992 252.204-7004 Alt A
Central Contractor Registration (52.204-7) Alternate A
SEP 2007
252.205-7000 Provisions Of Information To Cooperative Agreement Holders DEC 1991 252.209-7004 Subcontracting With Firms That Are Owned or Controlled By The
Government of a Terrorist Country
DEC 2006
252.215-7000 Pricing Adjustments DEC 1991
252.223-7006 Prohibition On Storage And Disposal Of Toxic And Hazardous Materials
APR 1993
252.225-7001 Buy American Act and Balance of Payments Program JAN 2009 252.225-7002 Qualifying Country Sources as Subcontractors APR 2003 252.225-7012 Preference For Certain Domestic Commodities DEC 2008 252.225-7013 Duty-Free Entry OCT 2006 252.225-7016 Restriction On Acquisition Of Ball and Roller Bearings MAR 2006 252.225-7021 Trade Agreements NOV 2008 252.225-7031 Secondary Arab Boycott Of Israel JUN 2005 252.226-7001 Utilization of Indian Organizations and Indian-Owned Economic
Enterprises, and Native Hawaiian Small Business Concerns
SEP 2004
252.227-7033 Rights in Shop Drawings APR 1966 252.232-7010 Levies on Contract Payments DEC 2006 252.236-7000 Modification Proposals-Price Breakdown DEC 1991 252.236-7001 Contract Drawings and Specifications AUG 2000 252.236-7006 Cost Limitation JAN 1997 252.243-7001 Pricing Of Contract Modifications DEC 1991 252.243-7002 Requests for Equitable Adjustment MAR 1998 252.244-7000 Subcontracts for Commercial Items and Commercial Components
(DoD Contracts)
JAN 2009
252.247-7023 Transportation of Supplies by Sea MAY 2002 252.247-7024 Notification Of Transportation Of Supplies By Sea MAR 2000
CLAUSES INCORPORATED BY FULL TEXT:
52.216-18 – ORDERING (OCT 1995)
(a) Any supplies and services to be furnished under this contract shall be ordered by issuance of delivery orders or task orders by the individuals or activities designated in the Schedule. Such orders may be issued from date of contract award through completion of basic plus all option years; to include any authorized extensions.
(b) All delivery orders or task orders are subject to the terms and conditions of this contract. In the event of conflict between a delivery order or task order and this contract, the contract shall control.
(c) If mailed, a delivery order or task order is considered “issued” when the Government deposits the order in the mail. Orders may be issued orally, by facsimile, or by electronic commerce methods only if authorized in the Schedule.
(End of Clause)
52.216-19 – ORDER LIMITATIONS (OCT 1995)
(a) Minimum order. When the Government requires supplies or services covered by this contract in an amount of less than $2,000.00, the Government is not obligated to purchase, nor is the Contractor obligated to furnish, those supplies or services under the contract.
(b) Maximum order. The Contractor is not obligated to honor –
(1) Any order for a single item in excess of $10,000,000.00;
(2) Any order for a combination of items in excess of $10,000,000.00; or
(3) A series of orders from the same ordering office within 5 days that together call for quantities exceeding the limitation in subparagraph (b)(1) or (2) of this section.
(c) If this is a requirements contract (i.e., includes the Requirements clause at subsection 52.216-21 of the Federal Acquisition Regulation (FAR)), the Government is not required to order a part of any one requirement from the Contractor if that requirement exceeds the maximum-order limitations in paragraph (b) of this section.
(d) Notwithstanding paragraphs (b) and (c) of this section, the Contractor shall honor any order exceeding the maximum order limitations in paragraph (b), unless that order (or orders) is returned to the ordering office within 5 days after issuance, with written notice stating the Contractor’s intent not to ship the item (or items) called for and the reasons. Upon receiving this notice, the Government may acquire the supplies or services from another source.
(End of Clause)
52.216-22 INDEFINITE QUANTITY (OCT 1995)
(a) This is an indefinite-quantity contract for the supplies or services specified and effective for the period stated, in the Schedule. The quantities of supplies and services specified in the Schedule are estimates only and are not purchased by this contract.
(b) Delivery or performance shall be made only as authorized by orders issued in accordance with the Ordering clause. The Contractor shall furnish to the Government, when and if ordered, the supplies or services specified in the Schedule up to and including the quantity designated in the Schedule as the "maximum". The Government shall order at least the quantity of supplies or services designated in the Schedule as the "minimum".
(c) Except for any limitations on quantities in the Order Limitations clause or in the Schedule, there is no limit on the number of orders that may be issued. The Government may issue orders requiring delivery to multiple destinations or performance at multiple locations.
(d) Any order issued during the effective period of this contract and not completed within that period shall be completed by the Contractor within the time specified in the order. The contract shall govern the Contractor's and Government's rights and obligations with respect to that order to the same extent as if the order were completed during the contract's effective period; provided that the Contractor shall not be required to make any deliveries under this contract after the completion date of this contract or the last active delivery order.
(End of clause)
52.217-8 OPTION TO EXTEND SERVICES (NOV 1999)
The Government may require continued performance of any services within the limits and at the rates specified in contract. These rates may be adjusted only as a result of revisions to prevailing labor rates provided by the Secretary of Labor. The option provision may be exercised more than once, but the total extension of performance hereunder shall not exceed 6 months. The Contracting Officer may exercise the option by written notice to the Contractor within 15 days prior to contract expiration.
(End of clause)
52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)
(a) The Government may extend the term of this contract by written notice to the Contractor within 15 calendar days prior to the contract expiration date; provided that the Government gives the Contractor a preliminary written notice of its intent to extend at least 30 days before the contract expires. The preliminary notice does not commit the Government to an extension.
(b) If the Government exercises this option, the extended contract shall be considered to include this option clause.
(c) The total duration of this contract, including the exercise of any options under this clause, shall not exceed five
(5) years, six (6) months.
(End of clause)
52.222-30 DAVIS-BACON ACT--PRICE ADJUSTMENT (NONE OR SEPARATELY SPECIFIED METHOD)
(DEC 2001)
(a) The wage determination issued under the Davis-Bacon Act by the Administrator, Wage and Hour Division, Employment Standards Administration, U.S. Department of Labor, that is effective for an option to extend the term of the contract, will apply to that option period.
(b) The Contracting Officer will make no adjustment in contract price, other than provided for elsewhere in this contract, to cover any increases or decreases in wages and benefits as a result of—
(1) Incorporation of the Department of Labor's wage determination applicable at the exercise of the option to extend the term of the contract;
(2) Incorporation of a wage determination otherwise applied to the contract by operation of law; or
(3) An increase in wages and benefits resulting from any other requirement applicable to workers subject to the Davis-Bacon Act.
(End of Clause)
52.223-9 ESTIMATE OF PERCENTAGE OF RECOVERED MATERIAL CONTENT FOR EPA DESIGNATED
PRODUCTS (MAY 2008)
(a) Definitions. As used in this clause—
“Postconsumer material” means a material or finished product that has served its intended use and has been discarded for disposal or recovery, having completed its life as a consumer item. Postconsumer material is a part of the broader category of “recovered material.”
“Recovered material” means waste materials and by-products recovered or diverted from solid waste, but the term does not include those materials and by-products generated from, and commonly reused within, an original manufacturing process.
(b) The Contractor, on completion of this contract, shall—
(1) Estimate the percentage of the total recovered material content for EPA-designated item(s) delivered and/or used in contract performance, including, if applicable, the percentage of post-consumer material content; and
(2) Submit this estimate to _____________________ [Contracting Officer complete in accordance with agency procedures].
(End of clause)
Alternate I (May 2008). As prescribed in 23.406(d), redesignate paragraph (b) of the basic clause as paragraph (c) and add the following paragraph (b) to the basic clause:
(b) The Contractor shall execute the following certification required by the Resource Conservation and Recovery Act of 1976 (42 U.S.C. 6962(i)(2)(C)):
CERTIFICATION
I, _______________ (name of certifier), am an officer or employee responsible for the performance of this contract and hereby certify that the percentage of recovered material content for EPA-designated items met the applicable contract specifications or other contractual requirements.
[Signature of the Officer or Employee]
[Typed Name of the Officer or Employee]
[Title]
[Name of Company, Firm, or Organization]
[Date]
(End of certification)
(End of clause)
52.223-11 OZONE-DEPLETING SUBSTANCES (MAY 2001)
(a) Definition. Ozone-depleting substance, as used in this clause, means any substance the Environmental Protection Agency designates in 40 CFR part 82 as--
(1) Class I, including, but not limited to, chlorofluorocarbons, halons, carbon tetrachloride, and methyl chloroform;
or
(2) Class II, including, but not limited to, hydro chlorofluorocarbons.
(b) The Contractor shall label products which contain or are manufactured with ozone-depleting substances in the manner and to the extent required by 42 U.S.C. 7671j (b), (c), and (d) and 40 CFR Part 82, Subpart E, as follows:
“WARNING: Contains (or manufactured with, if applicable), a substance(s) which harm(s) public health and environment by destroying ozone in the upper atmosphere.”----------------------------
The Contractor shall insert the name of the substance(s).
(End of clause)
52.225-9 BUY AMERICAN ACT-CONSTRUCTION MATERIALS (JAN 2005)
(a) Definitions. As used in this clause--
“Component” means an article, material, or supply incorporated directly into a construction material.
“Construction material” means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site.
Materials purchased directly by…
This is the start of the file's text. The full file is on GovTribe.
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 0004.PDF | ||
| FINAL LISTING OF QUESTIONS FROM THE PRE-PROPOSAL CONFERENCE HELD March 25 2009.doc | DOC document | |
| scan0001.pdf | ||
| ADDITIONAL QUESTIONS FROM THE PRE-PROPOSAL CONFERENCE.doc | DOC document | |
| Amendment 00020001.pdf | ||
| Site Visit Attendance.xls | XLS spreadsheet | |
| 1-110102911-clean.pdf | ||
| Amendment 00010001.pdf | ||
| ANSWERS TO THE QUESTIONS FROM THE PREPOSAL CONFERENCE.doc | DOC document | |
| DD_254_DD_Form.doc | DOC document | |
| FAR 52.232-16.doc | DOC document | |
| E3-110102911.pdf | ||
| M3-110102911.pdf | ||
| M1-110102911.pdf | ||
| M2-110102911.pdf | ||
| FP1-110102911.pdf | ||
| M5-110102911.pdf | ||
| DDOC Spec | — | |
| E2-110102911.pdf | ||
| Schedule of Material Submittals.pdf | ||
| PPQ | — | |
| E1-110102911.pdf | ||
| SOW | — | |
| M4-110102911.pdf | ||
| Past Performance Reference List | — |
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .