ADDITIONAL QUESTIONS FROM THE PRE-PROPOSAL CONFERENCE.doc

DOC document 55 KB Posted

Attached to
DIAC Delivery Order Contract - Construction
Solicitation number
Not on record
Issued by

About this file

Please see questions.

View the file

Other files

File Type Posted
Amendment 0004.PDF PDF
FINAL LISTING OF QUESTIONS FROM THE PRE-PROPOSAL CONFERENCE HELD March 25 2009.doc DOC document
scan0001.pdf PDF
Amendment 00020001.pdf PDF
Site Visit Attendance.xls XLS spreadsheet
1-110102911-clean.pdf PDF
Amendment 00010001.pdf PDF
ANSWERS TO THE QUESTIONS FROM THE PREPOSAL CONFERENCE.doc DOC document
DD_254_DD_Form.doc DOC document
FAR 52.232-16.doc DOC document
E3-110102911.pdf PDF
M3-110102911.pdf PDF
M1-110102911.pdf PDF
M2-110102911.pdf PDF
Solicitation —
FP1-110102911.pdf PDF
M5-110102911.pdf PDF
DDOC Spec —
E2-110102911.pdf PDF
Schedule of Material Submittals.pdf PDF
PPQ —
E1-110102911.pdf PDF
SOW —
M4-110102911.pdf PDF
Past Performance Reference List —
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. Ref. D.6, Copies.

Q: What is the page limit for Volume IV Price, if any? Ans: Refer to pages 32; 34; and 35 of the solicitation.

2. Ref. Spec para 2.2.3.1.3, Authorizing Letters

Q: Can submittal of the several letters requested to be part of the QC Plan in Spec paragraph 2.2.3.1.3 be excluded from the page count or deferred until after contract award?

A: No this letter can not be excluded from the page count. DIA requires the QC Appointment Letter with the proposal. Additionally, please refer to page 31 of the solicitation.

3. Ref. Attachment 4, Project SOW

Q: For project planning and proposal assumption purposes, may offerors assume a project start date no later than April 1, 2009 (since SOW requires completion within 120 calendar days and no later than July 31)? Alternatively, can completion date be changed to a later date?

A: Start Date will be changed to June 1 plus 120 days

4. Ref. Specification – Technical Exhibit 3, SOW Package Format (“Cost Estimate”)

Q: Please correct the erroneous cross reference (a possible typo) to spec paragraph 2.3.2.4 (which doesn’t exist).

A: The requirement is to use the RS Means, E4 Clicks software.

5. Ref. Spec para 3.2.1.6. Construction Work Schedule (CWS)

Q: What version of Microsoft Project is currently utilized by DAL-1A?

A: 2003

6. Ref. Spec para 3.2.1.4. Project Drawings.

Q: What is latest version of CADD software currently being utilized by DAL-1?

A: 2008 – Also see TE-4

7. Ref. Page 32, Ref Volume II & III, Redacted Copies Q: Please specify the preferred method to redact information (i.e., black boxes over text, dashes) from the required Redacted Copies?

A: Remove any information that referencing the name of your company.

9. Ref Page 33, F.1, Offerors shall submit their proposals by mail

Q: Can proposals be hand delivered to the mail address provided?

A: Mail or fedex.

10. Ref SF1442, Copy Quantity: A: Refer to page 32 of the solicitation.

Q: The SF1442.13.a states, “Sealed offers in original and 4 copies to perform the work…” and on page 33 varying paper copies are noted: Volume 1 = 4 Paper Copies, Volume II = 1 Original & 3 Redacted Copies, Volume III = 1 Original & 3 Redacted Copies and Volume IV = 2 Copies. Which is the correct amount of copies required? A: The requested copies are for internal use – they’re correct as listed.

11. From our experience, when cleared personnel are required to perform on contract, the offeror is required to have a facility security clearance in order to be awarded the contract.

Q: Is an FCL required for an award of this contract? A: Yes.

12. Q: If the Government’s answers to the questions submitted by potential offerors require an additional submission of question(s) for further clarification, will the offerors be able to submit these additional questions? A: If clarifications are needed, the Government will contact you.

13. If our employees are required to escort uncleared individuals in the work site, will there be DIA Security Training for this or are we required to train our employees? Per solicitation “The Contractor's permanent personnel must be TS/SCI cleared with escorting privileges. The Contractor shall escort all uncleared personnel and sub-contractors at no charge to the government.” A: This question will be answered in a future amendment.

14. Q: Will our employees need Government issues CAC cards for base identification etc.

A: Usually, a list of employees and their SSNs are submitted to the base South (Visitor’s) Gate and and they get “Contractor’s Badges” that are valid for up to one year. All employees that get the TS/SCI Clearances can assess the Base Gate with these.

15. Q: Will our employees be required to get government issued DOD stickers for their vehicles for base access?

A: With proof of insurance, and appropriate authorization contractor can long-term gate passes. Again, with the TS/SCI, DOD stickers can be issued.

16. SF 1442, page 3: States, “two contractors will be selected but reserves the right to select more or less”. A: Yes, as indicated in the solicitation.

Q: Will contractors be required to compete delivery orders? A: Yes.

17. Solicitation page 6 of 47, Clause B-1: States that the maximum dollar value of all contracts for this requirement shall not exceed $125,000,000.

Q: Is the $125,000,000 the maximum for all contracts and not per contractor? A: Yes, the total value plus option years.

18. Solicitation page 5 of 47, Note 3.0: The last sentence on the page states that “project engineering” is to be included in the contractor’s proposed coefficient. Yet on page 21 of 67, 3.3.1, it states: “A DO RFP may require PE Certification on some or all designs, or portions of designs. Government will direct the contract as necessary to provide certification.”

Q1: Since the level of PE Certified engineering is determined by delivery order wouldn’t it be more cost effective to price PE Certified engineering by delivery order rather than assuming an amount to be factored into a coefficient that will be applied to all delivery orders whether there is PE Certified engineering or not?

Q2: If 100% design and PE certified engineering is to remain in the contractor’s bid coefficient, can you provide an estimated percentage of the time that it will be required?

A: To clarify, project engineering and project management fees should be included in the contractor’s coefficient. For selected delivery orders, DIA may require a Certified Professional Engineers’ stamp on the designs, which would then be allowable as a separate cost for that delivery order, only.

19. Solicitation page 5 of 47, Note 3.0, 5th line: States that the superintendents’ salaries need to be factored into the contractor’s coefficient. In order to estimate the cost for superintendents over a contract year and since superintendents are not priced by delivery order, we need to make assumptions as to the number of superintendents required. Looking at the “Contract Line Item Coefficient Ranges” on page 12 of 47, H-1, the vast majority of the delivery orders will be less than $100,000. If each delivery order of this minor magnitude requires a full-time, dedicated superintendent, the cost will become very prohibitive.

Q: Is it safe to assume that, like project managers, superintendents can be assigned to numerous delivery orders as long as they are effective in managing the work?

A: Yes. Since the majority of the work is expected to be on the one site (DIAC and DIAC Expansion) the same proposed contractor team can cover all projects (Example: Superintendent, Assistant Superintendent, QC Manager, Admin, etc.)

20. Page 13 of 47, H-5b: This paragraph states that the unit price database to be used for this contract is “i.e. the Means Facilities Composite Database” yet this doesn’t seem to be a listed option in the myriad of choices offered by Means. Page 14 of 67, 2.3.2.1.2 requires the “R.S. Means Facilities Cost Data” module.” The nomenclature seems to be out of sync. It is most common on JOC’s and SABER’s to use the “Means Facilities Construction Cost Data” as the database for delivery order pricing.

Q: Is it the intent to use the “Means Facilities Construction Cost Data” database as the source of pricing for this contract? If not, please provide additional detail.

A: Yes, it is what the Government recognizes and uses as a standard pricing tool for maintenance and construction.

21. Page 13-14 of 67, 2.3.2.1 Technical Library: Several manuals and codes are requested to be provided as well as all published updates. This list of manuals/codes seems to be in conflict with those listed under 3.2.1.3 Estimating Guides.

Q: Related to the previous question, would you please verify that the Means Facilities Construction Cost Data database is to be used as the unit price book for this contract and how the additionally provided manuals and guides would be utilized or incorporated?

A: Paragraph 2.3.2.1 is the more comprehensive list of references. Paragraph 3.2.1.3 lists those estimating guides that are applicable to paragraph 2.3.2.1.5.

22. Page 34 of 47, III. VOLUME III, TECHNICAL, PART 2, DEMONSTRATION PROJECT: References are made here to paragraph 3 of the contract specifications and the level of drawings to be submitted with the Demonstration Project is addressed. Specifically, page 16 of 67, 3.2 COMMENCEMENT DOCUMENTS states: “The concept of the DIAC program provides for 35% design level effort. However, some portions of a design may require up to a 65% to 80% design effort depending upon nature/complexity (i.e. mechanical/electrical).” (In our experience managing numerous DOC and IDIQ contracts, the drawings provided with the RFP package and coupled with the site visit are complete enough to prepare a detailed, definitive estimate.)

Q1: Is it the intent of the Demonstration Project to take the drawings provided and increase them to the 65%-80% level? If so, can the 35% drawings provided with the RFP be provided in Autocad (.dwg) format so that we can expound upon them and not have to recreate them from scratch?

A: The Demonstration Project Drawings can be considered to be 100%. The missing A1 Drawing is being provided.

Q2: If additional drawings are required to be submitted with the proposal and the RFP drawings can be provided to bidders in Autocad format, there may not be adequate time to produce advance drawings from the date when these questions are answered to the proposal due date of April 17th.

A: No additional drawings are required from the contractor.

23. Page 34 of 47, III. VOLUME III, TECHNICAL, PART 2, DEMONSTRATION PROJECT: References are made here to paragraph 3 of the contract specifications, with specific attention to page 28 of 67, 3.4 DESIGN ANALYSIS:

Q: With the Air-handling unit, ductwork, etc. already being laid-out and sized in the drawings provided, what design calculations are you looking to be submitted with our proposal for the Demonstration Project?

A: Based on contractor’s expertise, he should review the design and bid based on the calculations provided. No further calculation should be required.

24. Attachment 4, page 2 of 4, 3.4. Specific Tasks: Reference is made to drawing A1 however it was not included in the drawings provided with the RFP. This question was already addressed with the amendment.

Q: Is drawing A1 going to be provided?

A: Yes, this drawing was provided with the amendment.

25. Page 5 of 67, 1.5.1 Office Facilities, 2nd sentence: “The contractor shall provide a modular building or trailer, not to exceed 60 feet, single width, for his/her own shop space and material storage.” With the staffing requirements delineated under 2.1 Personnel including Program Manager, PMS with all engineering disciplines, administrative, QC, safety, CADD, etc., it will be nearly impossible to put all the necessary on-site personnel into a 60 foot, single wide trailer.

Q: Will it be possible to house some of the dedicated project staff elsewhere or would additional or larger on-site facilities be allowed?

A: This requirement is based on past DDOC requirements and should be bid upon as required. If it is determined that space is not sufficient, DIA (DAL) will revisit the requirement and address it as a space issue after contract award.

26. Page 7 of 67, 2.1 PERSONNEL: Throughout this section the following people are identified as being required to have or be able to obtain within 30 days a TS/SCI clearance: Program Manager, alternate PM, Project Managers, Superintendents and Quality Control Manager.

Q: Is it reasonable to assume that the CADD/GIS technician, QC Inspectors, Safety Officer and support positions of administration do not require clearances?

A: Only the stated individuals are required to get the TS/SCI Clearances within that time period, however, other contractor’s employees should be submitted and working towards obtaining the clearances in order to provide a more efficient operation without having to utilize escorts.

27. Attachment 4, 1.3 Location of Project: This paragraph requires the contractor to be responsible for all permits prior to the start of any work.

Q1: Since the majority of the work will be taking place on U.S. Military installation, is it safe to assume no city, county or state permits are required?

A: To execute the Demo Project no permits are required. However, there may be other jurisdiction permits required on some projects (example: Environmental). If any projects are issued that require additional permitting, that will be addressed at that time.

Q2: What permits are required internally by DIAC or Bolling AFB?

A:

DIAC: Outage Request, Camera Pass, Laptop Pass, and possibly a few others Base: Digging Permit, Fire Permit for any open flame operation, Confined Space Permit, and possibly a few others based on the scope of the D.O.

28. Page 17 of 67, 3.2.1.3.1 Unauthorized Sections: Three sections from Division #1 are identified as being available for use in preparing estimates including 01500 (Temporary Facilities and Controls), 01215 (Factors Allowance: Security and Shift Work) and 01590 (Equipment Rental). These numbers don’t appear to align with the new CSI (44 Division Masterformat) as delineated in the 2009 versions of Means. If we are using the Means Facilities Construction Cost Data as the Unit Price Book, new sections should be referenced.

Q: Can you clarify which Means publication these sections come from or make new references?

A: Use 2008 R.S. Means for the Sample Project. DIA would expect the selected contractor(s) to use the most current RS Means for subsequent D.O.s.

29. Q: Will the proposal due date be extended to allow contractors sufficient time to modify their proposals after answers are posted on the FBO? A. Yes.

30. Ref Page 32, 3: Printing shall be easily readable (for example: 12 pitch type or 10 point proportional spacing) Q: Will the Government allow smaller size font in graphics and the headers and footers as long as it’s easily readable? A. Please follow the guidelines in the solicitation.