ANSWERS TO THE QUESTIONS FROM THE PREPOSAL CONFERENCE.doc

DOC document 77 KB Posted

Attached to
DIAC Delivery Order Contract - Construction
Solicitation number
Not on record
Issued by

About this file

Please see attachment for details of amendment 0001.

View the file

Other files

File Type Posted
Amendment 0004.PDF PDF
FINAL LISTING OF QUESTIONS FROM THE PRE-PROPOSAL CONFERENCE HELD March 25 2009.doc DOC document
scan0001.pdf PDF
ADDITIONAL QUESTIONS FROM THE PRE-PROPOSAL CONFERENCE.doc DOC document
Amendment 00020001.pdf PDF
Site Visit Attendance.xls XLS spreadsheet
1-110102911-clean.pdf PDF
Amendment 00010001.pdf PDF
DD_254_DD_Form.doc DOC document
FAR 52.232-16.doc DOC document
E3-110102911.pdf PDF
M3-110102911.pdf PDF
M1-110102911.pdf PDF
M2-110102911.pdf PDF
Solicitation —
FP1-110102911.pdf PDF
M5-110102911.pdf PDF
DDOC Spec —
E2-110102911.pdf PDF
Schedule of Material Submittals.pdf PDF
PPQ —
E1-110102911.pdf PDF
SOW —
M4-110102911.pdf PDF
Past Performance Reference List —
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. Page 14, RFP Section H-11, Personnel Security Requirements states:

“Military security requirements in the performance of this contract shall be maintained in accordance with the DD Form 254 listed in Section J. The highest classification involved in the performance of this contract is

TS/SCI.”

Q: The DD Form 254 is not listed in Section J. Will the Government provide the DD 254?

Please see attachment for a Copy of the DD254.

2. Ref. 4.6.1. Field/Lab Testing.

Testing such as soil compaction, concrete strength, pneumatic, hydrostatic, etc. is all expected to be completed by the contractor and can easily be included in one’s coefficient. However, a concern is expressed over the magnitude of the cost and work required to test for asbestos or lead. These tests have to be conducted by professionals certified to do so and often times includes respirators, suits, area closures, air pumps, etc. all of which could lead to a very expensive testing operation. Ideally, this testing would be done before issuance of a delivery order RFP so that the contractor can accurately price the amount of abatement required.

Answer: For all intends and purposes, no known lead or asbestos products have been installed in the DIAC or Expansion Facilities. If required, or suspected, DIA would include it as a part of the requirement for that specific task order.

3. Would it be possible to include the cost of asbestos and lead testing as line items in a specific delivery order estimate and make reasonable assumptions as to the amount of abatement to include, keeping in mind the final quantity or scope could change based on the results of the tests?

Answer: For all intends and purposes, no known lead or asbestos products have been installed in the DIAC or Expansion Facilities. If required, or suspected, DIA would include it as a part of the requirement for that specific task order

4. Please confirm the design document submission for the response. Documents provided with the RFP are adequate to perform the work. Are additional construction documents, specifications and calculations required for the response submission?

Answer: One drawing was omitted (A1) which is being provided.

Please see attachment.

5. Will CAD files of the RFP documents be provided to the bidders?

Answer: We provided RDF files only. For subsequent task orders DIA will provide CADD files when available.

6. Will preliminary design calculations used for the A/E1 documents be provided to the bidders for analysis? If not, please provide occupancy and equipment load requirements so that a complete design analysis can be completed.

Answer: The information provided in the Request for Proposal should be sufficient to respond to the requirement.

7. On page 10 of 47 under item G-1 Invoicing and Payment Procedures #c. “The contractor is authorized to invoice_______.” Will this be filled out for each individual task or will a blanket schedule be set for the whole contract. Answer: Contractors will be allowed to invoice upon an approved progress report from the Engineer – IAW with FAR 52.232-16 (Progress Payments).

8. Can the CADD (Auto CADD) files be provided for the Demonstration Project? Answer: We provided RDF files only. For subsequent task orders DIA will provide CADD files when available.

(a) Is it the intent to verify the design from drawings that were provided for the Demonstration Project? Yes.

(b). Part 3.2.1.1. of Technical Specs references SPECSINTACT for specifications. Is it acceptable under this task to provide specifications in note form on the drawings in lieu of book specs? Yes.

9. The scope of work on Page 3 of 67 (Specifications) states the contract could include project locations within 100 miles or in the Capital Region. To assist the proposer in developing a more accurate coefficient, would the DIA please provide a breakdown of the number of projects expected to be assigned in each facility under this contract?

Answer: We do not know the location of future projects at this time as the DIA mission dictates the requirement for projects is very unpredictable. However, based on past DDOC contracts, the majority of the projects will be within the greater Washington, D.C. Metropolitan area.

(a) Would the DIA please indicate the percentage of projects requiring the TS/SCI clearance level? If projects with varying level of clearance will be assigned under this contract, will the DIA please provide an estimate of the percentage of projects expected under each level of clearance?

Answer: All of the DIAC and Expansion is TS/SCI. IAW Note 4 of the RFP, “The majority of work required will be in SCIF facilities and appropriate clearances will be required IAW the specifications.” Plan on 98 to 99% of the projects requiring the TS/SCI.

10. I need your assistance to clarify language in the Technical Specifications documents. Specifically, page 7 of 67, paragraph 2.1.1 entitled “Program Manager”.

The language seems to imply that both the Program Manager and the Alternate are located at DIAC at the same time. Is this correct?

Answer: The primary workplace for both the PM and Alternate PM is the DIAC and both are expected to be available daily.

(b) Since this is a Delivery Order driven contract, how does the Program Manager and/or the Alternate account for their time when all Delivery Orders are completed and subsequent Delivery Orders have not been issued? Will there be a line item under the contract to charge their time (no delivery order exists to charge their time), or will they not be required to be in your spaces during that time (only charge time to ongoing delivery orders)?

Answer: The primary workplace for both the PM and Alternate PM is the DIAC and both are expected to be available daily. If there’re no current delivery orders, then the cost will be absorbed as part of the overhead and profit of the company.

(c) The solicitation does not specifically address any pass/fail criteria (automatic dismissal from competitive range) for your evaluation. We understand that the requirement for Program Manager is a Licensed Professional Engineer. If we propose a Program Manager or Alternate who is not a Licensed Engineer, is that a show stopper or will we just lose points during the evaluation?

Answer: IAW paragraph 2.1.1, the requirement for Program Manager and Alternate is that they be Licensed Professional Engineers.

11. The SOW(Final) for the Bolling project refers to a drawing A-1. I went into the solicitation on the net and it does not show it there. Will drawing A-1 be posted at a later time?

Answer: A1 is being provided. Please visit attachment for A-1 drawing.

12. Page 45 of 47, Section H-6, Pre- proposal Conference.

Q: Will Meeting attendee list be published? Please visit attachment for listing of company.

13. Page 25 of 67, Technical Specifications, paragraph 3.3.24.1 Asbestos and lead based paint testing and Samples:

2A Q: Would the client like the pipe insulation, drywall compound and floor mastic included in the sampling or just pipe insulation?

2B Q: Is there a sample protocol currently in facility use or does local regulations apply?

Answer: For all intends and purposes, no known lead or asbestos products have been installed in the DIAC or Expansion Facilities. There is not a need to account for this type of work.

14.

Page 27 of 67 of Attachment 1, Technical Specifications, paragraph 3.3.25.13 Contractor Coefficient states:

“A Framed one-line schematic drawing of the electrical system, measuring no less than 11” x 17”, shall be mounted in the electrical room.”

Q: Will a CD of this drawing be provided so updates can be made as necessary or will this need to be developed the first time each Electrical Room/ equipment is upgraded?

Answer: Plan on developing when Electrical Room/equipment is upgraded.

15.

Page 27 of 67 of Attachment 1, Technical Specifications, paragraph 3.3.26.4 Contractor Coefficient states:

“A Framed one-line schematic drawing of the fire protection system, measuring no less than 11” x 17”, shall be maintained with the Fire Control Panel.”

Q: Will a CD of this drawing be provided so updates can be made as necessary or will this need to be developed the first time each Fire Panel is upgraded?

Answer: Plan on developing when Fire Panel is upgraded.

16.

Page 39 of 67 of Attachment 1, Technical Specifications, paragraph 4.6.1 Field/Lab Testing states:

“All Labor, Equipment, Materials and rentals/fees required to perform all field/lab testing shall be at no additional cost to the Government and is considered Field Overhead, therefore part of the Contractor’s coefficient.”

Q: Will Task Orders with little or no testing be allowed a different coefficient then Task Orders with large volumes of construction / remediation testing?

Answer: No. Follow the guides provided in the solicitation and identified in Section H, Contract Line Item Coefficient Ranges.

17. Page 42 of 67 of Attachment 1, Technical Specifications, paragraph 4.6.5.1 Field Verification states:

“All Labor, Equipment, Materials and rentals/fees required to perform all field verification for excavation shall be at no additional cost to the Government and is considered Field Overhead, therefore part of the Contractor’s coefficient.”

Q: Will Task Orders with no site work be allowed a different coefficient then Task Orders with site work?

Answer: This statement allows for site verification not site work. It is part of verifying site conditions as part of the pre-proposal process for each delivery order. This is considered filed overhead and should be costed appropriately as part of the Contractor overhead coefficient.

18. Page 46 of 67 of Attachment 1, Technical Specifications, paragraph 4.6.10.9 Erosion and Sediment Control states:

“All Labor, Equipment, Materials and rentals/fees required provide, operate, maintain and disassemble all erosion and sediment controls shall be at no additional cost to the Government and is considered Field Overhead, therefore part of the Contractor’s coefficient.”

Q: Will Task Orders with interior renovation work be allowed a different coefficient then Task Orders with site work?

Answer: This is considered filed overhead and should be costed appropriately as part of the Contractor overhead coefficient.

19. Page 49 of 67 of Attachment 1, Technical Specifications, paragraph 5.2.5.6 Equipment Warranty:

Q Does the warranty start when the equipment is installed, tested and accepted or when the final inspection takes place?

Answer: Warranty will start once Beneficial Occupancy Date (BOD) is established – This is when the equipment is accepted as usable by the customer.

20. Page 3 of 4 of Attachment 4, Technical Specifications, and Mechanical SOW items 1 to 10.

Q Will this work be completed while the print shop is in operation?

Answer: Print shop is considered to be potentially a 24/7 operation so planning has take place with the DIA Project Manager.

21. Are contractors required to have TS/SCI facility clearance at the time of proposal submission? Answer: Yes.

22. If a contractor currently holds TS facility clearance, but not SCI, can the contractor qualify? Answer: No, contractors are required to have a TS/SCI facility clearance upon proposal submission.

23. Are all contractor employees (including tradesmen) required to be cleared? If so, are there different, acceptable clearance levels required for different positions to perform the work, i.e., project management and support personnel vs. craftsmen and tradesmen?

All of the DIAC and Expansion is TS/SCI. Some contractor employees can remain uncleared, but contractor will need to arrange to escort these employees. It is the intent of this contract that the contractor will be responsible to provide adequate cleared escorts.

24. Will the two contractors required to compete for the work? Answer: Yes – see FAR 16.505(b) and (ii).

25. Will the contractor be required to submit a detailed cost break down for each task order? Answer. Yes.

26. Will you post the names of contractors who attended the pre-proposal conference? Ans: Please visit attachment for listing of companies.

27. Are all contractor employees (including tradesmen) required to be cleared? If so, are there different, acceptable clearance levels required for different positions to perform the work, i.e., project management and support personnel vs. craftsmen and tradesmen?

(ANS: Some contractor employees can remain uncleared, but contractor will need to arrange to escort these employees.)

29. Page 17of 67, 3.2.1.3.1 Unauthorized Sections: “RS Means line items from Division 1 in its entirety except Section 01215 (Factors Allowance: Security and Shift Work),… Although there is confusion as to the exact section number, Factors Allowance for high security areas in the several different Means publications reviewed includes adjustments from 30% to 50%. Since the entire facility is secure, we are not sure at what point these percentages would be applied.”

Answer: The intent of including this coefficient is to account for work outside of normal duty hours. Security requirements should be considered part of the contractor coefficient. It is the intent of this contract that the contractor will be responsible to provide adequate cleared escorts.

30. Under what circumstances would the Means percentages for work in high security areas be applied? And when applicable, how do we determine whether to apply the 30% minimum or 50% maximum?

Answer: The intent of including this coefficient is to account for work outside of normal duty hours. Security requirements should be considered part of the contractor coefficient. It is the intent of this contract that the contractor will be responsible to provide adequate cleared escorts.

31. Page 45 of the RFP, Section M, Technical, Volume II, Technical Part 1 – Management, a. Subfactor 1 – Key Project Management/Technical Support.

This paragraph requires offerors to “address…credentials of key management personnel…” and then cites paragraph 2.1 of Attachment 1, Technical Specifications, which states: “The Contractor shall submit for approval by the CO, a detailed resume of the PM and alternate prior to assumption of duties, and any subsequent replacement of each position in sufficient time to allow proper evaluation.”

Q: Please clarify the key personnel requirements. Are resumes required in the proposal for key personnel?

Answer: Yes, resumes are required for key personnel as indicated.

32. Page 10 of Attachment 1, Technical Specifications, paragraph 2.2.3.1.2 states the Quality Control Plan shall include:

(a) “The name, qualifications (in resume format), duties, responsibilities, and authorities of each person assigned a Quality Control (QC) function:”

33. Please clarify the quality control personnel requirements. Are resumes required in the proposal for all quality control personnel?

Answer: Yes resumes for Quality Control Personnel are required in the proposal.

34. Page 43, Section M, Basis for Award, Paragraph A. states:

“The Government intends to award two contracts as a result of this solicitation, but reserves the right to award more or less if it is determined to be in the best interest of the Government.” Ans. Yes.

36. After contract award, will the Delivery Orders be competed among two or more successful bidders? Answer: Yes – see FAR 16.505(b) and (ii).

37. If so, what are the criteria? See FAR 16.505(b) and (ii).

38. Please clarify the procedures for issuance of Delivery Orders and cost estimating and Task Order negotiation? Answer: Competition will be at the Task Order level; negotiations will take place if deem necessary.