DD_254_DD_Form.doc

DOC document 122 KB Posted

Attached to
DIAC Delivery Order Contract - Construction
Solicitation number
Not on record
Issued by

About this file

Please see attachment for details of amendment 0001.

View the file

Other files

File Type Posted
Amendment 0004.PDF PDF
FINAL LISTING OF QUESTIONS FROM THE PRE-PROPOSAL CONFERENCE HELD March 25 2009.doc DOC document
scan0001.pdf PDF
ADDITIONAL QUESTIONS FROM THE PRE-PROPOSAL CONFERENCE.doc DOC document
Amendment 00020001.pdf PDF
Site Visit Attendance.xls XLS spreadsheet
1-110102911-clean.pdf PDF
Amendment 00010001.pdf PDF
ANSWERS TO THE QUESTIONS FROM THE PREPOSAL CONFERENCE.doc DOC document
FAR 52.232-16.doc DOC document
E3-110102911.pdf PDF
M3-110102911.pdf PDF
M1-110102911.pdf PDF
M2-110102911.pdf PDF
Solicitation —
FP1-110102911.pdf PDF
M5-110102911.pdf PDF
DDOC Spec —
E2-110102911.pdf PDF
Schedule of Material Submittals.pdf PDF
PPQ —
E1-110102911.pdf PDF
SOW —
M4-110102911.pdf PDF
Past Performance Reference List —
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF DEFENSE

1. CLEARANCE AND SAFEGUARDING

CONTRACT SECURITY CLASSIFICATION SPECIFICATION

a. FACILITY CLEARANCE REQUIRED

TS/SCI

(The requirements of the DoD Industrial Security Manual apply to all security aspects of this effort.)

b. LEVEL OF SAFEGUARDING REQUIRED

NONE

2. THIS SPECIFICATION IS FOR: (X and complete as applicable)
3. THIS SPECIFICATION IS: (X and complete as applicable)

a. PRIME CONTRACT NUMBER

UKN

X
a. ORIGINAL (Complete date in all cases)
Date (YYYYMMDD)

20090115

b. SUBCONTRACT NUMBER

b. REVISED (Supersedes all previous specs)
REVISION NO.

Date (YYYYMMDD)

X
c. SOLICITATION OR OTHER NUMBER

448/0057A/09 DUE Date(YYYYMMDD)

c. FINAL (Complete Item 5 in all cases)
Date (YYYYMMDD)

4. IS THIS A FOLLOW-ON CONTRACT?

YES
X
NO. If Yes, complete the following:

Classified material received or generated under as required (Preceding Contract Number) is transferred to this follow-on contract.

5. IS THIS A FINAL DD Form 254?

YES
X
NO. If Yes, complete the following:

In response to the contractor’s request dated , retention of the classified material is authorized for the period of .

6. CONTRACTOR (Include Commercial and Government Entity (CAGE) Code)

a. NAME, ADDRESS, and ZIP CODE

TBD

b. CAGE CODE

1VWD8

c. COGNIZANT SECURITY OFFICE (Name, Address, and Zip Code) Defense Security Service (DDS) location 2300 Lake Park Dr.

Suite 250

Smyrna, GA 30080-7606

7. SUBCONTRACTOR

a. NAME, ADDRESS, AND ZIP CODE

N/A

b. CAGE CODE

N/A

c. COGNIZANT SECURITY OFFICE (Name, Address, and Zip Code) N/A

8. ACTUAL PERFORMANCE

a. LOCATION

Refer to Block 13

b. CAGE CODE

N/A

c. COGNIZANT SECURITY OFFICE (Name, Address, and Zip Code)

DIA/DAC-2A

3100 Clarendon Blvd.

Arlington, VA. 22201-5300

9. GENERAL IDENTIFICATION OF THIS PROCUREMENT

Perform facility engineering services as a part of the DIA Facilities and Engineering Division. Responsibilities include project management, of construction and maintenance projects.

10. THIS CONTRACT WILL REQUIRE ACCESS TO:
YES
No
11. IN PERFORMING THIS CONTRACT, THE CONTRACTOR WILL:
YES
NO

a. COMMUNICATIONS SECURITY (COMSEC) INFORMATION

X
a. HAVE ACCESS TO CLASSIFIED INFORMATION ONLY AT ANOTHER

CONTRACTOR’S FACILITY OR A GOVERNMENT ACTIVITY

X

b. RESTRICTED DATA

X
b. RECEIVE CLASSIFIED DOCUMENTS ONLY

X

c. CRITICAL NUCLEAR WEAPON DESIGN INFORMATION

X
c. RECEIVE AND GENERATE CLASSIFIED MATERIAL

X

d. FORMERLY RESTRICTED DATA

X
d. FABRICATE, MODIFY, OR STORE CLASSIFIED HARDWARE

X

e. INTELLIGENCE INFORMATION

e. PERFORM SERVICES ONLY
X
(1) Sensitive Compartmented Information (SCI)
X

f. HAVE ACCESS TO U.S. CLASSIFIED INFORMATION OUTSIDE THE U.S., PUERTO RICO, U.S. POSSESSIONS AND TRUST TERRITORIES

X

(2) Non-SCI
X

g. BE AUTHORIZED TO USE THE SERVICES OF DEFENSE TECHNICAL INFORMATION CENTER (DTIC) OR OTHER SECONDARY DISTRIBUTION CENTER

X

f. SPECIAL ACCESS INFORMATION

X
h. REQUIRE A COMSEC ACCOUNT

X

g. NATO INFORMATION

X
I. HAVE TEMPEST REQUIREMENTS

X

h. FOREIGN GOVERNMENT INFORMATION

X
j. HAVE OPERATIONS SECURITY (OPSEC) REQUIREMENTS

X

I. LIMITED DISSEMINATION INFORMATION

X
k. BE AUTHORIZED TO USE THE DEFENSE COURIER SERVICE

X

j. FOR OFFICIAL USE ONLY INFORMATION
X

I. OTHER (Specify)

X

k. OTHER (Specify) NIPR Net, SIPR Net
X

DD FORM 254, DEC 1999

PREVIOUS EDITION IS OBSOLETE.

12. PUBLIC RELEASE. Any information (classified or unclassified) pertaining to this contract shall not be released for public dissemination except as provided by the Industrial Security Manual or unless it has been approved for public release by appropriate U.S. Government authority. Proposed public releases shall be submitted for approval prior to release

Direct
X
Through (Specify)

The Contract Monitor / Contracting Officer Representative (CM/COR): James E. Steinke, DIA/DAL-1A, (202) 231-5033. Mac Dill Blvd, Bolling, AFB, Washington, D.C. NO PUBLIC RELEASE OF SCI IS AUTHORIZED. Requests for other than SCI must be approved through the CM/COR and appropriate channels prior to release.

to the Directorate for Freedom of Information and Security Review, Office of the Assistant Secretary of Defense (Public Affairs)* for review.

* In the case of non-DoD User Agencies, requests for disclosure shall be submitted to that agency.

13. SECURITY GUIDANCE: The Security classification guidance needed for this classified effort is identified below. If any difficulty is encountered in applying this guidance or if any other contributing factor indicates a need for changes in this guidance, the contractor is authorized and encouraged to provide recommended changes; to challenge the guidance or the classification assigned to any information or material furnished or generated under this contract; and to submit any questions for interpretation of this guidance to the official identified below. Pending final decision, the information involved shall be handled and protected at the highest level of classification assigned or recommended. (Fill in as appropriate for the classified effort. Attach, or forward under separate correspondence, any documents/guides/extracts referenced herein. Add additional pages as needed to provide complete guidance.)

THE CONTRACTOR WILL BE REQUIRED TO HAVE A TOP SECRET FACILITY CLEARANCE GRANTED BY THE DEFENSE SECURITY SERVICE (DSS) PRIOR TO CONTRACT IMPLEMENTATION.

The contractor facility security officer on file with DSS is____________________, address _________________________, Phone (xxx) xxx-xxxx.

If this information in not correct the contractor must contact DSS field office identified on Block 6C and update all contractor information as applicable.

From Block 8A. Contract performance locations.

1. Defense Intelligence Analysis Center, Building 600, Bolling Air Force Base Washington, DC

2. Pentagon, Arlington, VA.

3. 3100 Clarendon Boulevard, Arlington, VA.

4. Armed Forces Medical Intelligence Center, 1607 Porter Street, Fort Detrick, MD

5. 7321 Parkway Drive South, Hanover, MD

14. ADDITIONAL SECURITY REQUIREMENTS. Requirements, in addition to ISM requirements, are established for this contract.
X
Yes

No

(If Yes, identify the pertinent contractual clauses in the contract document itself, or provide an appropriate statement which identifies the additional requirements. Provide a copy of the requirements to the cognizant security office. Use Item 13 if additional space is needed.)

SEE ATTACHED SECURITY ADDENDUM

15. INSPECTIONS. Elements of this contract are outside the inspection responsibility of the cognizant security office.

Yes
X
No

(If Yes, explain and identify specific areas or elements carved out and the activity responsible for inspections. Use Item 13 if additional space is needed.)

16. CERTIFICATION AND SIGNATURE. Security requirements stated herein are complete and adequate for safeguarding the classified information to be released or generated under this classified effort. All questions shall be referred to the official named below.

a. TYPED NAME OF CERTIFYING OFFICIAL

Conley, Carlton

b. TITLE

SECURITY OFFICER

c. TELEPHONE

(703) 907-

d. ADDRESS (Include Zip Code)
17. REQUIRED DISTRIBUTION

DIA/DAC-2A

3100 Clarendon Blvd.

Arlington, VA 22201-5300

X
a. CONTRACTOR

b. SUBCONTRACTOR

X
c. COGNIZANT SECURITY OFFICE FOR PRIME AND SUBCONTRACTOR

e. SIGNATURE

d. U.S. ACTIVITY RESPONSIBLE FOR OVERSEAS SECURITY ADMINISTRATION

X
e. ADMINISTRATION CONTRACTING OFFICER

f. OTHERS AS NECESSARY:

DD FORM 254 (BACK), DEC 1999

Security Addendum

As Applied to Contract

Insert Contract Number Here Dated: TBD

1. The Director, DIA has exclusive security responsibility for all Sensitive Compartmented Information (SCI); classified material released to or developed under the contract and held within the Contractor SCI Facility (SCIF). DoD 5105.21-M-1, (SCI Administrative Security Manual), DCID 6/1, DCID 6/3, DCID 6/4, DCID 6/6, DCID 6/7, DCID 6/9, National Industrial Security Program Operating Manual (NISPOM), DoD 5220.22-R (Department of Defense Industrial Security Program) and will comply with all regulations/manuals/directives stated therein which provide the necessary security & classification guidance for personnel, information, physical, AIS, and technical security measures and is a part of the SCI security specifications for the contract. Inquiries pertaining to SCI classification guidance determination or interpretations shall be directed to the Contracting Officer /Contracting Officer Representative (CO/COR) identified in paragraph (3), below.

2. Date to be completed: The User Agency SCI security office will recognize this date as the completion date for the contract. The User Agency SCI security office will initiate action to debrief contractor personnel with access to this contract unless extensions or modifications to the contract are received by the User Agency SCI security office no later than 30 days after the established completion date.

3. The name, telephone number, and address of the COR for this contract is: James E. Steinke, 202-231-5033.

4. This contract requires frequent and continuing SCI accesses.

5. Contract performance is restricted to appropriately cleared contractor facility(ies) listed in Blocks 6.a. and 8.a., DD Form 254, or listed in Block 8a.

6. This contract does require access to SCI at U.S. Government installations.

7. The private use of classified information is not permitted except in furtherance of a lawful and authorized Government purpose.

8. If DD Form 254, Block 11f, is marked ‘YES’, the contractor requires access to classified information outside the U.S., Puerto Rico, U.S. Possessions and Trust Territories in the following cities and countries: CITY, COUNTRY.

9. SCI material associated with this contract will be separately stored and worked on only in facilities accredited through DIA/DAC-2A, or accredited through another Government agency and properly covered by a Co-Utilization Agreement (CUA).

* Contact DIA/DAC-2A for all SCIF related accreditation, (i.e. physical, TEMPEST) issues.

10. The contractor will establish and maintain a current access list of those employees working on the contract. A copy of this list will be furnished to the CO/COR, supporting SCI security office, and User Agency SCI security office.

11. Names of contractor personnel requiring access to SCI will be submitted to the CO/COR for approval. On written approval by the CO/COR, forms requesting Single Scope Background Investigations (SSBI) will be prepared in accordance with the National Industrial Security Program Operating Manual (NISPOM) and submitted to the User Agency SCI security office.

12. All contractor personnel nominated for access to classified information, (released or generated under this contract) must be U.S. citizens granted a final security clearance in accordance with DCID 6/4 by the Cognizant Security Authority (CSA), have a valid need-to-know, sign a nondisclosure agreement, and complete applicable security indoctrination’s, prior to being given access. Immigrant aliens, interim-cleared personnel, or personnel holding contractor-granted CONFIDENTIAL clearances are not eligible for access to classified information released or generated under this contract without the express permission of the Director, DIA.

13. Security briefings will be in accordance with the NISPOM, and/or other appropriate directives, (DoD 5105.21-M-1, DoD TS-5105.21-M-2, and DoD TS-5105.21-M-3). In all cases, the employee will be briefed on his/her obligation to safeguard the information. The employee/contractor will be debriefed according to the applicable regulations when the access is terminated and/or no longer has the need-to-know.

14. As a further enhancement of security measures, for the protection of classified information, the Contractor agrees to permit necessary polygraph interviews on Contractor personnel having access to National Security Information (NSI) under this contract. It is understood that the polygraph interview will be limited to counterintelligence issues.

15. The Special Security Officer/Contractor Special Security Officer, (SSO/CSSO) will maintain records, by name and title, of all employees and authorized visitors who have access to the classified and/or intelligence material. The SSO/CSSO will confirm that all employees/visitors are appropriately cleared and authorized, prior to gaining access to the material.

16. The contractor will inform the CO/COR and the User Agency SCI security office at least 20 working days in advance of any business visits that will involve the passing of access from one location to another. (Note: Emergency exceptions will be handled on a case-by-case basis.) The CO/COR will certify need-to-know and approve passing of clearances by User Agency SCI security offices.

17. The government activity will provide security and classification guidance for the performance of this contract. The highest level of classification for the contract is TOP SECRET.

18. ALL MATERIALS GENERATED BY THE CONTRACTOR (including but not limited to correspondence, drawings, models, mockups, photographs, schematics, status, progress, and special reports) will be classified according to its own content and/or by special instructions issued by the CSA, Contracting Officer or his/her duly appointed representative.

19. All classified information received or generated in performance of this contract is the property of the U.S. Government and shall be safeguarded, classified, (according to the marking shown on the source material) and returned to the U.S. Government in accordance with the DoD 5105.21-M-1 and/or other applicable documents.

20. Special instructions and controls for the handling, processing, storing, and transmission of classified information and material are provided in the appropriate regulations, manuals, or directive. The documents are identified as follows: DIAM (58-Series Manuals) and DIA Desk Reference Guide to Executive Order 12958.

21. SCI with restrictive caveats will be released to the contractor only when the originator’s approval has been obtained. All other SCI may be released to the contractor on approval by the CO/COR. The contractor will not release SCI to any personnel without prior approval from the CO/COR.

22. NO PUBLIC RELEASE OF SCI IS AUTHORIZED. The contractor will not make any reference to SCI access, even unclassified acronyms, in any public publication. Requests for release for other than SCI, (CLASSIFIED or UNCLASSIFIED) must be approved by DIA/PO-PA (Public Affairs) through the CO/COR.

23. Any SCI released to the contractor in support of this contract remains the property of the Military Department, agency, or organization that releases it. The contractor will maintain a record of all SCI released to his custody and on completion or cancellation of the contract, must return all such materials in accordance with disposition instructions of the CO/COR unless a follow-on contract specifies that the material will be transferred to a follow-on contract or the CO/COR approves retention of the material. This retention must be in accordance with approved procedures, to include a final DD Form 254.

24. The contractors will not release classified and/or intelligence material to any activity, employee, or other person not directly engaged in providing under this contract unless specific written authorization for such release is received from the CO/COR. This prohibition precludes release without written authority to another contractor or subcontractor, Government agency, private individual, or organization.

25. Unclassified information released or generated under this contract will be restricted in its dissemination to contractor and Government personnel involved in the contract. Release in open literature or exhibition of such information is strictly prohibited without permission of the CO/COR.

26. Intelligence material, whether or not bearing control markings, will not be released to foreign visitors, foreign nationals, or immigrant aliens regardless of their position or level of their security clearance, except with the specific permission of the originating agency.

27. Electronic processing of SCI must be accomplished on equipment accredited in accordance with DoD 5105.21-M-1, DIAM 50-4, DCID 6/3, and the Joint DoDIIS Cryptologic SCI Information Systems Security Standards.

28. The contractor will control and account for reproduced SCI related material in the same manner as pertains to the originals. Markings will be in accordance with DoD 5105.21-(M-Series) Manuals.

29. If the contractor requires the construction of a Sensitive Compartmented Information Facility (SCIF), the contractor is required to submit a copy of DCID 6/9, Annex A, Fixed Facility Checklist (FFC), and DoD 5105.21-M-1, Appendix J, TEMPEST Addendum to the FFC, to DIA/DAC-2A for review and approval prior to initiating construction. If the contractor possesses an accredited SCIF where the work will be accomplished, the contractor must contact DIA/DAC-2A to determine if a Co-Utilization Agreement (CUA) is required or other documentation is necessary. If the contractor possesses a previously accredited SCIF, the contractor will submit the FFC and TEMPEST Addendum to the FFC to DIA/DAC-2A for review and approval. In all cases, the SCIF must be accredited prior to the introduction of Sensitive Compartmented Information.

30. The contractor will not make any modifications to a DIA accredited SCIF without first consulting with DIA/DAC-2A, submitting appropriate page changes to the FFC and TEMPEST Addendum to the FFC, and obtaining from DIA/DAC-2A, in writing, approval for such modifications. Modifications include but are not limited to expanding or decreasing SCIF perimeter size, changes to the Intrusion Detection System, changes to the telephone system, relocating the SCIF, installing doors, installation of any transmitter devices (including RF alarm systems), or any other action which could affect the physical security or Inspectable Space Determination (TEMPEST) of the SCIF. Minor modifications, such as sub-dividing a room within a SCIF to form two rooms, may be reported after the fact.

31. Prior to any processing, the contractor will comply with obtaining and receiving Automated Information Systems (Computer) accreditations with DIA/SY as outlined in DCID 6/3 and as may be supplemented.

32. The contractor will reference DoD 5105.21-M-1 for initial guidance on TEMPEST requirements. Contact the DIA/DAC-2A TEMPEST Team for more information regarding specific TEMPEST requirements and Inspectable Space Determination.

33. If the contractor is required to utilize any wireless transmitter devices, to include radio frequency (RF) or infrared (IR) to support this contract, the contractor must contact DIA/DAC-2A and identify the device(s), the planned use purpose or scope of the devices, respond to requests for additional information concerning such devices, and comply with TEMPEST guidelines identified by DAC-2A.

34. If the contractor is utilizing any encryption to transmit any classified information, the encryption must have prior approval of the National Security Agency (NSA). Use of commercially available encryption is prohibited for the transmission of any classified material.

35. The contractor will comply with DIA policy, and policy as may be revised, regarding the use of Personal Electronic Devices (PED) within DIA accredited spaces. Should the contractor be within spaces belonging to another agency (host), the contractor will comply with the host requirement. A PED is any electronic device that receives, transmits, stores, processes, records audio/visual, scans, or otherwise is capable of manipulating information in any form. A PED includes but is not limited to cellular telephones, cameras, pocket scanners, voice recorders, pagers, and computers.

36. The contractor will reference DoD 5205.2 “DoD Operations Security Program,” for guidance on operations security (OPSEC) requirements.

37. Except in the case of an emergency, the contractor will not allow another program either SCI or collateral, to co-utilize the SCIF without the establishment of a Co-Utilization Agreement (CUA). The CUA must be reviewed and approved by DIA/DAC-2A prior to the introduction of the outside agency personnel or material. In the case of an emergency, the contractor must contact DIA/DAC-2A the next duty day.

38. Transporting of SCI on commercial aircraft is only authorized by an exception waiver issued by the User Agency Senior Intelligence Officer (SIO).

39. Classified and/or intelligence related material released to or generated by the contractor may be destroyed locally by the contractor. Such destruction will be in accordance with the applicable regulations: DoD 5105.21-M-1, DoD TS-5105.21-M-2, and DoD TS-5105.21-M-3 or Chapter 5, Section 7, NISPOM, utilizing destruction procedures, devices, methods, or equipment approved by the National Security Agency.

40. By virtue of access to SCI and/or intelligence material, contractor employees may have restrictions placed on them for foreign travel in or through designated countries or geographic areas. The contractor shall be responsible for exercising adequate supervision to assure that employees are willing to comply with notification requirements for anticipated and completed foreign travel.

41. The contractor is authorized direct communications with the designated CO/COR and the User Agency SCI security office in all matters pertaining to SCI requirements. The CO/COR identified in paragraph (3), above, will receive a copy of any correspondence, which may have an impact upon the contractor’s ability to perform under this contract.

42. On receipt of any SCI that impacts the cost of the contract, the contractor will inform the CO/COR, who, in turn, will notify the Contracting Officer/Activity prior to expending additional funds. The User Agency SCI security office will receive a copy of this cost modification as well.

43. The contractor is governed by DOD 5220.22-S COMSEC Supplement to the NISPOM. Access to COMSEC material is restricted to U.S. citizens holding a final U.S. Government clearance. Such information is not releasable to personnel holding only reciprocal clearances. The COMSEC account will be under control of OSAGWI/MR/MD Component Security Manager. A COMSEC account is not required for contractor access. The contractor will handle COMSEC keying material up to and including the TOP SECRET/Sensitive Compartmented Information level. Work with COMSEC equipment and material will be by direction of the government agent. Contractor must comply with DIA/SY guidelines.

44. If the contractor requires access to Restricted Data (RD), Critical Nuclear Weapons Design Information (CNWDI), and/or Formerly Restricted Data (FRD) which is classified, controlled and protected under the Atomic Energy Act of 1954, then the contractor personnel must have a final ‘Q’ clearance issued by the Department of Energy (DOE) prior to access. Additionally, DOE may require a 'Q' facility clearance or equivalent, as determined by the DOE. Additional briefings may be required as determined by DOE and DAC-3C. Access to RD, CNWDI, and/or FRD must be coordinated through DIA/DAC-3C in conjunction with DOE. These requirements may be in addition to other requirements outlined within this Security Addendum.

45. If the contractor requires access to North Atlantic Treaty Organization (NATO) information. Special briefings are required for access to NATO information, and then access to classified NATO information requires a final U.S. Government clearance at the TOP SECRET level for this project. Access to this information will be authorized at the location identified in Block 8a. Contractor personnel shall be debriefed by the Government program manager prior to departure from this contract.

46. If the contractor is required access to Special Access Information, then special briefings are required for each individual program. Access to Special Access Information requires a final U.S. Government clearance at the TOP SECRET level or as identified by the Special Program Manager for each, appropriate, Special Access Program. The contractor must contact the Special Access Program Manager for each program, through the CO/COR, for authorization and access to such material.

47. If the contractor requires access to Foreign Government Information (FGI), then access to FGI requires a final U.S. Government Facility Clearance at the level required for this contract. Access to FGI will be granted on a case-by-case basis at the locations identified in DD 254, Block 8a. FGI will be protected, handled, disseminated and stored as the U.S.

48. For Official Use Only (FOUO) Information will be safeguarded as specified in DoD 5400.7R “Protecting FOUO Information” and as may be supplemented by DIA.

49. If the contractor requires use of the Defense Courier Service (DCS), then the contractor, through the CO/COR, must contact DCS, Fort Meade, MD, to establish a DCS account.

50. Subcontracting this contract or any portion thereof of this contract requires the contractor to sponsor the subcontractor and be approved by the CO/COR. The subcontractor must complete a separate DD 254. Additionally the subcontractor must have a final facility clearance issued by Defense Security Service (DSS) or other U.S. Government agency authorized to issue equivalent clearances.

51. If the contractor requires the services of the Defense Technical Information Center (DTIC), then the contractor, through the CO/COR must submit DD Form 1540, Registration for Scientific and Technical Information Services, and/or DD Form 2345, Military Critical Technical Data Agreement, as may be applicable, to the address on the form(s).

52. Contractors are prohibited from having access to "PROPRIEATRY INFORMATION" (abbreviated PROPIN or PR), and "DISSEMINATION AND EXTRACTION OF INFORMATION CONTROLLED BY ORIGINATOR (abbreviated ORCON) unless in compliance with one of the following:

A. The originating agency of the PROPIN and ORCON provides written consent to the accessing contractor, and the accessing contractor agrees in writing with the originating agency not to divulge, use, or otherwise release PROPIN and ORCON. The originating agency of the PROPIN and ORCON is responsible for identifying and marking PROPIN and ORCON. The CO/COR is responsible for identifying marked PROPIN and ORCON information within their control and initiating the request and release documentation between the originating agency owning the PROPIN and ORCON and the accessing contractor. If the originating agency of the PROPIN and ORCON fails to or denies access to the accessing contractor, or if the accessing contractor fails to or does not agree to not to divulge, use, or otherwise release the PROPIN and ORCON, then the CO/COR is responsible for denying PROPIN and ORCON access until the appropriate documentation has been completed. Contractors who intentionally obtain access to PROPIN and ORCON without the required documentation, may be subject to civil and criminal liabilities and penalties as provided by law. US Government employees who release PROPIN and ORCON, whether intentionally or accidentally, to unauthorized contractors, are subject to civil and criminal liabilities and penalties as provided by law, or

B. A US Government employee (military or civilian) is on-site, when contractor access to PROPIN or ORCON is possible or available.

53. If the contractor requires access to JWICS/INTELINK at the contractor site, the contractor must establish a COMSEC account with NSA prior to installation. The contractor through the CO/COR, must submit a concept of operations to JWICS PMO and SYS-4 for review and approval prior to installation and connectivity. DIA retains full responsibility for the secure operation of the connectivity, and protection of classified material on the system. The CO/COR will ensure that the concept of operations includes how access to all Proprietary Information (PROPIN), ORCON, GAMMA, Law Enforcement Sensitive (LES), and other special program materials are secured to preclude contractor access to this material. See Paragraph 52, above.

54. Contractors who have TOP SECRET/SCI access may have unescorted access to a government facility, including Government Owned Contractor Operated (GOCO) facilities, and may be permitted to work alone inside the facility without the requirement for the presence of a U.S. Government employed representative provided all PROPIN, ORCON, GAMMA, SIOP, CNWDI, Law Enforcement Sensitive (LES) and other special program materials are secured to preclude contractor access to this material, or as outlined in Paragraph 52, above.

55. The contractor is governed by DCID 6/4, ‘Personnel Security Standards and Procedures Governing Eligibility for Access to Sensitive Compartmented Information (SCI)’ and as may be supplemented by DIA. Although contractor personnel may be eligible for access to SCI or currently possess an SCI personnel security clearance with another non-DIA agency, contractor personnel performing on this contract must be adjudicated by DIA/DAC-3 prior to having access to SCI information retained by DIA, unescorted access to DIA spaces, and receipt of a DIA issued contractor badge. The contractor will identify in writing, contractor personnel assigned to this contract by NAME, SSN, Date of Birth and Place of Birth, and provide this documentation to the CO/COR identified in paragraph 3, above. The CO/COR will forward a copy of this documentation to DIA/DAC-3 for adjudication. This documentation will be marked and protected under the Privacy Act of 1974.

56. The contractor must comply with Foreign Ownership, Control or Influence (FOCI) restrictions and notifications as outlined in the NISPOM.

57. If the contractor identified in DD 254, Block 6a, Block 7a or Block 8a is identified as a being under FOCI by Defense Security Service (DSS), a favorable National Interest Determination (NID) must be completed as outlined within the NISPOM prior to the contractor being awarded the contract and having access to PROSCRIBED INFORMATION. PROSCRIBED INFORMATION includes COMSEC, Sensitive Compartmented Information, Critical Nuclear Weapons Design Information, Restricted Data, Formerly Restricted Data, TOP SECRET, Special Access Programs, other classified information, and other Executive Branch Departments and Agencies for classified information under the cognizance of such.

58. The contractor must have a FINAL TOP SECRET FACILITY CLEARANCE prior to having access to BYE and HCS Sensitive Compartmented Information, and to RESTRICTED DATA, CRITICAL NUCLEAR WEAPONS DESIGN INFORMATION.

59. The contractor must have a valid need-to-know as determined by the CO/COR prior to having access to LAW ENFORCEMENT SENSITIVE (LES) information. A facility clearance is not required.

60. The contractor may introduce but is not authorized to activate or use any wireless transmission devices within any DIA facilities or any DIA accredited facilities without first receiving written permission from DAC-2A. Military Departments, Major Commands, Combatant Commands, Senior Intelligence Officers, and local Special Security Officers or Contractor Special Security Officers may require more stringent standards which must be complied with. If the contractor is located within another agency’s facility or accredited facility, the contractor will comply with the other agency’s policies regarding the introduction, activation or use of any such device. The Director, National Intelligence (DNI) may by policy, directive or other means, bar the introduction of any wireless transmission device into any SCIF area after the date of this contract. Should this occur the DNI policy will automatically supercede this paragraph and if the wireless device is still required to be introduced into the SCIF area, justification and a waiver request must be submitted to DAC-2A for a determination.

61. Contractors who anticipate a change of name and/or ownership, must notify the CO/COR in writing upon consideration of the proposed change. Changes may affect facility clearances which may affect continuance of the contract.

62. A security review of this DD Form 254 is required during the different stages of the contract or any revision of this contract. The CO/COR will provide the contractor with applicable changes in security requirement(s) by issuing a revised DD Form 254.

NOTE: CONTRACTORS, PLEASE GO THROUGH YOUR CONTRACT MONITOR/CONTRACTING OFFICER REPRESENTATIVE (CO/COR) PRIOR TO CONTACTING THE OFFICES BELOW.

DIA Points of Contact for Security Issues:

DIA/DAC-2A, (703) 907-1300

(Accreditation Management Branch)

DIA/DAC-2B, (703) 907-1365

(Policy & Security Awareness Branch)

DIA/DAC-3A, (703) 907-1311

(Central Clearance Branch)

DIA/SYS-4,

(202) 231-8868 (Information System Security)

File details come from the government source that posted it. Updated .