HHM402-09-R-0090
Past Performance Questionnaire
ATTACHMENT 2
TO: Insert addressee and address
FROM: Insert company name and address
SUBJECT: Request for Past/Present Performance Information
1. You have been identified as a point of contact for a past and/or present performance evaluation of insert company’s name. Insert company’s name is currently being considered for a combined Simplified Acquisition of Base Engineering Requirements (SABER) IDIQ contract at Andrews AFB and Bolling AFB, DC.
2. Your prompt attention to this survey will be greatly appreciated. Please be sure to e-mail the completed worksheet directly to Hakim Shakir: hakim.shakir@dia.mil. Worksheets shall not be sent back to insert company’s name. If you have any questions or concerns regarding this request, please contact Hakim Shakir at 202-231-6469 or by email at the addresses listed above. In the event that email cannot be utilized, the questionnaires can be faxed to 202-231-6179.
Past Performance Questionnaire SECTION A: Contractor Information (to be completed by the contractor requesting information prior to mailing)
A. Contractor’s name and address: ___________________________________________
B. Point of Contact: _______________________________________________________
C. Phone/Fax/Email Address: _______________________________________________
D. Contract Number: ______________________________________________________ E. Project Title/Description of Work: ________________________________________
F. Contract Type: Firm-Fixed Price Indefinite-Delivery/Indefinite-Quantity Cost-Reimbursement G. Project Award Date: _______________ Scheduled Completion Date ______________
Current/Final Completion Date ____________
H. Project Award Amount: ____________ Current/Final Project Amount _____________
I. Contractor being evaluated performed as the: Prime Contractor Subcontractor Supplier
J. Authorization is hereby granted to provide the information requested in SECTION B of this Questionnaire
(Signature)
(Name and Title of Authorizing Official) (Date)
EVALUATED BY:
(Signature) (Date)
_____________________________________ Address: _____________________________
(Typed or Printed Name) _____________________________________
(Title)
(Phone/Fax/Email)
NOTE: The identity of individual(s) providing reference information shall not be disclosed
| A |
| B |
| C |
| D |
NA
| Substantial Confidence |
| Satisfactory Confidence |
| Limited Confidence |
| No |
Confidence
Unknown Confidence
| Based on the offeror’s performance record, there is a high expectation that the offeror will successfully perform. |
| Based on the offeror’s performance record, there is an expectation that the offeror will successfully perform. |
| Based on the offeror’s performance record, there is low expectation that the offeror will successfully perform. |
| Based on the offeror’s performance record, there is no expectation that the offeror will successfully perform. |
No performance record is identifiable or the offeror’s performance record is so sparse that no rating can be reasonably assigned.
EVALUATION AREAS
I. Quality A B C D NA
| 1. |
| Contractor provided effective quality control and inspection procedures that resulted in a quality-finished project. |
| □ |
| □ |
| □ |
| □ |
| 2. |
| Contractor developed and submitted realistic progress schedules. |
| □ |
| □ |
| □ |
| □ |
| 3. |
| Contractor provided well researched and clearly identified submittals that matched contract requirements. |
| □ |
| □ |
| □ |
| □ |
| 4. |
| Contractor completed all work with good workmanship and in conformance with the specifications, resulting in minor, if any, punchlist items. |
| □ |
| □ |
| □ |
| □ |
| 5. |
| Contractor thoroughly reviewed design package proposals for accuracy, completeness, and compliance with contract requirements. |
| □ |
| □ |
| □ |
| □ |
| 6. |
| Contractor designs were all concise, accurate and captured all details of the site visit. |
| □ |
| □ |
| □ |
| □ |
II. Timely Performance A B C D NA
| 1. |
| Contractor met established project schedules to complete the project on time. |
| □ |
| □ |
| □ |
| □ |
| 2. |
| Contractor performed all work without the issuance of a cure notice or show cause letter. (If a notice was issued, please describe the circumstances on a separate sheet of paper and identify if liquidated damages were assessed.) |
| □ |
| □ |
| □ |
| □ |
| 3. |
| Contractor provided timely cost/design proposals. |
| □ |
| □ |
| □ |
| □ |
| 4. |
| Contractor submitted the progress schedule and interim progress reports as required in a timely manner and the schedule was approved prior to actual construction. |
| □ |
| □ |
| □ |
| □ |
| 5. |
| Contractor provided submittals on time as required. |
| □ |
| □ |
| □ |
| □ |
| 6. |
| Contractor provided payrolls for both their firm and their subcontractor’s employees as required and scheduled |
| □ |
| □ |
| □ |
| □ |
| 7. |
| Contractor provided timely resolution of all punchlist items. |
| □ |
| □ |
| □ |
| □ |
III. Management Effectiveness A B C D NA
| 1. |
| Contractor provided experienced qualified managers and supervisors with the technical and administrative abilities needed to meet contract requirements. |
| □ |
| □ |
| □ |
| □ |
| 2. |
| Contractor hired quality subcontractors and effectively managed and coordinated their work. |
| □ |
| □ |
| □ |
| □ |
| 3. |
| Contractor hired, maintained, and replaces as necessary, qualified personnel and subcontractors/suppliers. |
| □ |
| □ |
| □ |
| □ |
| 4. |
| Contractor ensured the site manager had sufficient authority to make decisions and take actions during project performance to keep the project on schedule. |
| □ |
| □ |
| □ |
| □ |
| 5. |
| Contractor provided timely and satisfactory response to warranty issues after project completion. |
| □ |
| □ |
| □ |
| □ |
| 6. |
| Contractor paid employees/subcontractors/suppliers as required. |
| □ |
| □ |
| □ |
| □ |
| 7. |
| Contractor cooperated to resolve problems, attended meetings and maintained communication to assure satisfactory resolution. |
| □ |
| □ |
| □ |
| □ |
IV. Compliance with Safety Standards A B C D NA
| 1. |
| Adequacy of Safety Plan |
| □ |
| □ |
| □ |
| □ |
| 2. |
| Implementation of Safety Plan |
| □ |
| □ |
| □ |
| □ |
V. Overall Performance A B C D NA
| 1. |
| Please rate the contractor’s overall performance |
| □ |
| □ |
| □ |
| □ |
Additional Information:
(1) Identify the contractor's overall strengths and weaknesses.
(2) Given the choice, would you award to this contractor again?
(3) Are you aware of any other contracted efforts performed by this contractor similar in nature to this contract? Please identify contract/program and point of contact.
(4) Is there anyone else we should send this questionnaire to? Please identify by name, organization, and phone number.
(If more comment space is needed, write on back or attach pages.)
Thank you for taking the time to complete this questionnaire. If you have any additional comments or questions, you can contact Hakim Shakir at 202-231-6469 / hakim.shakir@dia.mil.
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 0004.PDF | ||
| FINAL LISTING OF QUESTIONS FROM THE PRE-PROPOSAL CONFERENCE HELD March 25 2009.doc | DOC document | |
| scan0001.pdf | ||
| ADDITIONAL QUESTIONS FROM THE PRE-PROPOSAL CONFERENCE.doc | DOC document | |
| Amendment 00020001.pdf | ||
| Site Visit Attendance.xls | XLS spreadsheet | |
| 1-110102911-clean.pdf | ||
| Amendment 00010001.pdf | ||
| ANSWERS TO THE QUESTIONS FROM THE PREPOSAL CONFERENCE.doc | DOC document | |
| DD_254_DD_Form.doc | DOC document | |
| FAR 52.232-16.doc | DOC document | |
| E3-110102911.pdf | ||
| M3-110102911.pdf | ||
| M1-110102911.pdf | ||
| M2-110102911.pdf | ||
| Solicitation | — | |
| FP1-110102911.pdf | ||
| M5-110102911.pdf | ||
| DDOC Spec | — | |
| E2-110102911.pdf | ||
| Schedule of Material Submittals.pdf | ||
| E1-110102911.pdf | ||
| SOW | — | |
| M4-110102911.pdf | ||
| Past Performance Reference List | — |
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .