This is a DD Form 1423-1, Contract Data Requirements List (CDRL), which specifies a single data item requirement for the MCC7500 EoL Console Upgrade contract awarded to CONS @ AWD. The data item, designated A005, requires the contractor to deliver "Product Drawings and Associated Lists" with the subtitle "As-installed" Customized Documentation. The requirement is based on SOO/TRP Section 4.2 and Section 6, with authority from NSIS-S1000F/Tailored standards. The requiring office is 45 CES/CEF, with point of contact William Goehl.
The contractor must deliver a complete, synchronized set of as-built customized documentation serving as the master engineering and logical record of the final configuration of twelve Command/Central AXS dispatch consoles following turn-key installation and cutover. Deliverables include as-built physical drawings showing exact rack space and slot layouts, workstation floor-plan footprints, wiring and cabling schematics with end-to-end routing and connection maps, logical configurations including switch/router scripts and IP address spreadsheets, and backup/system recovery images with licensing records. All text and schematic documents must be provided in high-resolution PDF format, while physical, wiring, and cabling diagrams must also be delivered in editable native vector format (AutoCAD .dwg or Microsoft Visio .vsd). The draft documentation is due thirty days after successful system cutover and acceptance, with government review and comments within fifteen calendar days, and final approved documentation due within ten calendar days after receipt of government comments. Distribution is to five addressees: 45 CES/CEF, 45 CES/SCS, 45 CONS/PKB, 45 CES/COR, and 45 CES/CEOER, with one copy each of draft and final versions. The submission frequency is once, as of Block 16, with an estimated total price of $550.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DD FORM 1423-1, FEB 2001
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
16. REMARKS (Continued)
DD FORM 1423-1, FEB 2001 Page of Pages
INSTRUCTIONS FOR COMPLETING DD FORM 1423
(See DoD 5010.12-M for detailed instructions.)
FOR GOVERNMENT PERSONNEL
Item A. Self-explanatory.
Item B. Self-explanatory.
Item C. Mark (X) appropriate category: TDP - Technical Data Package;
TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.
Item D. Enter name of system/item being acquired that data will support.
Item E. Self-explanatory (to be filled in after contract award).
Item F. Self-explanatory (to be filled in after contract award).
Item G. Signature of preparer of CDRL.
Item H. Date CDRL was prepared.
Item I. Signature of CDRL approval authority.
Item J. Date CDRL was approved.
Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.
Item 2. Enter title as it appears on data acquisition document cited in Item 4.
Item 3. Enter subtitle of data item for further definition of data item (optional entry).
Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.
Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).
Item 6. Enter technical office responsible for ensuring adequacy of the data item.
Item 7. Specify requirement for inspection/acceptance of the data item by the Government.
Item 8. Specify requirement for approval of a draft before preparation of the final data item.
Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).
Item 10. Specify number of times data items are to be delivered.
Item 11. Specify as-of date of data item, when applicable.
Item 12. Specify when first submittal is required.
Item 13. Specify when subsequent submittals are required, when applicable.
Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.
Item 15. Enter total number of draft/final copies to be delivered.
Item 16. Use for additional/clarifying information for Items 1 through 15.
Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.
FOR THE CONTRACTOR
Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.
a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.
Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.
b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.
Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.
c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.
Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.
d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.
Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.
Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.
These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.
DD FORM 1423-1 (BACK), FEB 2001
| data_item: A005 |
| title: Product Drawings and Associated Lists |
| sub: "As-installed" Customized Documentation |
| auth: DI-SESS-81000F / Tailored |
| ref: SOO / TRP Section 4.2 and Section 6 |
| req_ofc: 45 CES/CEF (Attn: William Goehl) |
| dd250: LT |
| appcode: A |
| dist: D |
| freq: Once |
| asof: |
| firstsub: SEE BLK 16 |
| subsub: SEE BLK 16 |
| addressee1: 45 CES/CEF |
| draft1: 1 |
| reg1: 1 |
| repro1: |
| addressee2: 45 CES/SCS |
| draft2: 1 |
| reg2: 1 |
| repro2: |
| addressee3: 45 CONS/PKB |
| draft3: 1 |
| reg3: 1 |
| repro3: |
| addressee4: 45 CES/CEOR |
| draft4: 1 |
| reg4: 1 |
| repro4: |
| addressee5: 45 CES/CEOER |
| draft5: 1 |
| reg5: 1 |
| repro5: |
| addressee6: |
| draft6: |
| reg6: |
| repro6: |
| addressee7: |
| draft7: |
| reg7: |
| repro7: |
| addressee8: |
| draft8: |
| reg8: |
| repro8: |
| addressee9: |
| draft9: |
| reg9: |
| repro9: |
| addressee10: |
| draft10: |
| reg10: |
| repro10: |
| addressee11: |
| draft11: |
| reg11: |
| repro11: |
| addressee12: |
| draft12: |
| reg12: |
| repro12: |
| addressee13: |
| draft13: |
| reg13: |
| repro13: |
| addressee14: |
| draft14: |
| reg14: |
| repro14: |
| addressee15: |
| draft15: |
| reg15: |
| repro15: |
| addressee16: |
| draft16: |
| reg16: |
| repro16: |
| addressee17: |
| draft17: |
| reg17: |
| repro17: |
| addressee18: |
| draft18: |
| reg18: |
| repro18: |
| addressee19: |
| draft19: |
| reg19: |
| repro19: |
| addressee20: |
| draft20: |
| reg20: |
| repro20: |
| addressee21: |
| draft21: |
| reg21: |
| repro21: |
| addressee22: |
| draft22: |
| reg22: |
| repro22: |
| addressee23: |
| draft23: |
| reg23: |
| repro23: |
| addressee24: |
| draft24: |
| reg24: |
| repro24: |
| addressee25: |
| draft25: |
| reg25: |
| repro25: |
| addressee26: |
| draft26: |
| reg26: |
| repro26: |
| addressee27: |
| draft27: |
| reg27: |
| repro27: |
| addressee28: |
| draft28: |
| reg28: |
| repro28: |
| addressee29: |
| draft29: |
| reg29: |
| repro29: |
| addressee30: |
| draft30: |
| reg30: |
| repro30: |
| addressee31: |
| draft31: |
| reg31: |
| repro31: |
| addressee32: |
| draft32: |
| reg32: |
| repro32: |
| addressee33: |
| draft33: |
| reg33: |
| repro33: |
| addressee34: |
| draft34: |
| reg34: |
| repro34: |
| addressee35: |
| draft35: |
| reg35: |
| repro35: |
| addressee36: |
| draft36: |
| reg36: |
| repro36: |
| addressee37: |
| draft37: |
| reg37: |
| repro37: |
| addressee38: |
| draft38: |
| reg38x: |
| repro38: |
| total_draft: 5 |
| total_reg: 5 |
| total_repro: 0 |
| remarks: Use/relationship:The Contractor shall deliver a complete and synchronized set of "As-installed" (As-Built) customized documentation. This package serves as the master engineering and logical record of the final configuration of the twelve (12) CommandCentral AXS dispatch consoles following turn-key installation and cutover. |
The package must contain:
As-Built Physical Drawings: Final server-rack elevations showing the exact rack space and slot layout of all processing equipment in the server rooms (Bldg 1319 and Bldg 49750). Workstation floor-plan footprints showing console monitor and peripheral placements on the dispatch floors across all three sites (Bldgs 1319, 49750, and 710).
Wiring & Cabling Schematics: End-to-end cable routing, connection maps, and port-to-port assignments for all local switches, KVM transmitters/receivers, UPS systems, and peripherals.
Logical Configurations: Final switch/router configuration scripts, IP address spreadsheets, and physical/logical connection layouts interfacing with the overarching ASTRO® 25 IP core and the Vesta R7 E911 radio arbitration telephony.
Backup & System Recovery Images: Clean, post-configuration backup software images, operating system recovery profiles, and software licensing records for each of the 12 positions.
Format:
All text and schematic documents shall be provided in high-resolution, print-ready PDF. All physical, wiring, and cabling diagrams must also be delivered in editable native vector format (AutoCAD .dwg or Microsoft Visio .vsd).
Submittal Timeline (Clarification for Blocks 12 & 13):
- Block 12 - First Submission (30 DACP): The draft "As-installed" documentation package is due to the Government for review within thirty (30) calendar days after successful system cutover and acceptance.
- Government Review: The Government will have fifteen (15) calendar days to review the draft and return written comments.
- Block 13 - Subsequent Submission (10 DARC): The final approved, customized documentation package is due within ten (10) calendar days after receipt of Government comments.
| group: | |
| total_price: | |
| prep_name: | |
| line_item: | |
| exhibit: A | |
| xtdp: Yes | |
| xtm: Off | |
| othercat: | |
| system: MCC7500 EoL Console Upgrade | |
| ctr_no: | |
| contr: CONS @ AWD | |
| remarksb: | |
| Page2: | |
| Reset: | |
| 2026-09-11T17:29:54-0400 | |
| GOEHL.WILLIAM.J.1170230457 |
| prep_date: 20260911 |
| app_by: |
| app_date: |
| Page: |
| of_pages: |
| app: Adobe Professional 8.0 |
File details come from the government source that posted it. Updated .