TRAFFIC REGULATION
01 55 26-1
SECTION 01 55 26
TRAFFIC REGULATION
PART 1 - GENERAL
1.01 SECTION DESCRIPTION
A. This Section involves the Contractor’s obligations relative to maintaining the safe and efficient movement of traffic in the vicinity of construction.
B. Contractor will be required to furnish, erect, and maintain traffic cones, drums, barricades, flashing danger signal lights, directional signs and provide trained and equipped flagmen as required by the Traffic Control Plan and State and local permit requirements to restrict the movement of traffic within the construction areas and to clearly indicate the restrictions well in advance to vehicular traffic.
1.02 SECTION INCLUDES
A. Traffic Control Plan B. Notification C. Construction parking controls.
D. Flag persons.
E. Flares and lights.
F. Haul routes.
G. Traffic signs and signals.
H. Other Requirements I. Removal.
1.03 RELATED SECTIONS
A. Section 01 11 13 - Summary of Work B. Section 01 31 00 - Coordination and Meetings: Coordination and Project conditions.
C. Section 01 50 00: Construction Facilities and Temporary Controls: Barriers, access roads and parking.
D. Section 31 23 00 – Excavation for Roadways E. Section 32 12 23 – Restoration of Paved Surfaces
PART 2 - PRODUCTS
2.01 SIGNS, SIGNALS, AND DEVICES
A. Post Mounted and Wall Mounted Traffic Control and Informational Signs: As approved by the authority having jurisdiction.
B. Traffic Control Signals: As approved by the authority having jurisdiction.
C. Traffic Cones and Drums, Flares and Lights: As approved by the authority having jurisdiction.
D. Flag person Equipment: As required by the authority having jurisdiction.
PART 3 - EXECUTION
3.01 TRAFFIC CONTROL PLAN
01 55 26-2
A. Contractor shall implement the Traffic Control Plan shown on the Drawings as approved by PennDOT along with any related conditions imposed by the Township relative to Work in or along all roadways within the project area.
3.02 NOTIFICATIONS
A. Contractor shall provide advance notification to the Township in accordance with the required time schedule. In any event, the local municipal Police Department shall be notified at least ten (10) days prior to the date Contractor desires to restrict traffic in or along any highways or roads.
B. Contractor shall obtain advance approval from the authority having jurisdiction (PennDOT, local municipality) should it be necessary to temporarily close a road. The following parties shall be notified at least twenty-four (24) hours in advance.
1. Local Municipal Police
2. Local Fire Company
3. Local School District
4. Local Ambulance Service
5. All affected residents
[At least one lane must be open for traffic during non-working periods and Contractor must be prepared to allow passage of emergency vehicles at any time.]
3.03 CONSTRUCTION PARKING CONTROLS
A. Control vehicular parking to prevent interference with public traffic and parking, access by emergency vehicles, and Owner's operations.
B. Monitor parking of construction personnel’s vehicles [in existing facilities]. Maintain vehicular access to and through parking areas.
C. Prevent parking on or adjacent to access roads or in non-designated areas.
3.04 FLAG PERSONS
A. Provide trained and equipped flag persons to regulate traffic when construction operations or traffic encroach on public traffic lanes.
3.05 FLARES AND LIGHTS
A. Use flares and lights during hours of low visibility to delineate traffic lanes and to guide traffic.
3.06 HAUL ROUTES
A. Consult with authority having jurisdiction, establish public thoroughfares to be used for haul routes and site access.
3.07 TRAFFIC SIGNS AND SIGNALS
A. At approaches to site and on site, install at crossroads, detours, parking areas, and elsewhere as needed to direct construction and affected public traffic.
B. Install and operate traffic control signals to direct and maintain orderly flow of traffic in areas
01 55 26-3 under Contractor’s control, and areas affected by Contractor’s operations.
C. Relocate as Work progresses, to maintain effective traffic control.
3.08 OTHER REQUIREMENTS
A. Maintain access at all times during non-working periods and to the maximum extent feasible during working periods to all driveways and entrances of adjacent properties. In this regard, use and maintenance of steel plates or other decking across the trench may be necessary to reduce to a minimum interference with access to the adjacent properties.
B. Provide safe decking over open trenches in or along highways or roads during non-work periods by the use and maintenance of steel plates or other decking, which shall have sufficient strength to safely support all traffic including truck loads.
3.09 REMOVAL
A. Remove equipment and devices when no longer required.
B. Repair damage caused by installation.
C. Remove post settings to a depth of 2 feet.
END OF SECTION