SUMMARY OF WORK
01 11 13-1
SECTION 01 11 13
SUMMARY OF WORK
PART 1 GENERAL
1.01 SECTION DESCRIPTION
A. The Work of This Section Includes:
1. Description of Work.
2. Work by Owner.
3. Work by other parties.
4. Owner supplied Products.
5. Contractor use of site
6. Future work.
7. Work sequence of construction.
8. Owner occupancy.
1.02 DESCRIPTION OF WORK
A. The project involves installation of Decorative Pedestrian Light Standards within the Horsham Township Business Park along Dresher Road. Associated improvements include electrical service and meter installation, underground electrical conduit and wire along with lawn restoration.
1.03 WORK BY OWNER
A. No other work is being planned by Owner at the site during construction of the Work under this contract.
1.04 WORK BY OTHER PARTIES
A. No other work is being planned by Other Parties at the site during construction of the Work under this contract.
1.05 OWNER SUPPLIED PRODUCTS
A. No Products are to be supplied and paid for by Owner.
1.06 CONTRACTOR USE OF SITE
A. The Work under this contract must be accomplished while the existing roadway and driveways remain open to traffic to the maximum extent feasible. Upon completion of work, the Contractor shall clean-up and restore the area of his operations to a condition at least equal to original conditions. Damage to property outside of specified construction limits shall be the responsibility of the Contractor and restoration of same shall be made at the Contractor’s expense.
SUMMARY OF WORK
01 11 13-2
B. Contractor shall take all necessary precautions to protect all existing water, gas, electric, communications, sanitary sewer, storm sewer, or other facilities encountered during the course of his operations, to guard against disruption of service. Before beginning Work, Contractor shall determine the location of each facility which is questionable. The location of utilities shown on the Drawings represents the best information available; however, it is the responsibility of Contractor to establish the exact location in accordance with the requirements of Pennsylvania Act 287 (1974) as last amended by Act 121 (2008).
C. Contractor will be responsible to notify all property owners and residents at least twenty-four
(24) hours prior to the start of construction on or near their properties.
D. Contractor shall conduct all Work in strict compliance with OSHA Construction Workplace Safety Standards.
1.07 FUTURE WORK
A. No future work is anticipated.
1.08 WORK SEQUENCE OF CONSTRUCTION
A. The contractor shall submit a complete construction schedule prior to the start of any construction.
1.09 OWNER OCCUPANCY
A. Owner will occupy the site during the entire period of construction.
B. Cooperate with Owner to minimize conflict, and to facilitate Owner's operations.
C. Schedule the Work to accommodate Owner occupancy.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
END OF SECTION