About this file
This is a Form DC-116 Advertisement for a public works project issued by the Oakland County Water Resources Commissioner, involving the Walnut Lake No. 1 Pump Station Conveyance Corrective Action Plan Phase II. The project encompasses the removal and replacement of existing sewer siphon pipes between the Evergreen-Farmington Sanitary Drain and Great Lakes Water Authority (GLWA), with work to be completed on sewer infrastructure owned by Detroit Water and Sewerage Department (DWSD) and operated by GLWA. Key project components include constructing temporary bypass conduits, slip lining and grouting existing siphons, modifying junction and meter chambers, building new sanitary sewer tunnels and manholes, abandoning existing sewer lines, and installing a new sluice gate. Electronic sealed bids will be received until Wednesday, June 25, 2025, at 3:00 PM, with a recommended pre-bid meeting and site tour scheduled for June 5, 2025, at 21455 Melrose Ave., Bldg R, Suite 12, Southfield, MI.
The project will be financed by the State of Michigan Department of Environment, Great Lakes, and Energy (EGLE) using state and federal funding from the Clean Water State Revolving Fund (CWSRF), with program tracking number CW5872-01. The procurement includes specific State of Michigan Equivalency contracting requirements such as Build America, Buy America provisions, restrictions on telecommunications equipment, Davis-Bacon Act compliance, labor standards for federally assisted projects, Disadvantaged Business Enterprise (DBE) requirements, and debarment certifications. Bidders must submit a certified check, cashier's check, or bid bond for 5% of the proposal amount, and the owner reserves the right to accept, reject, or waive irregularities in proposals.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Form DC-116 ADVERTISEMENT
JIM NASH
OAKLAND COUNTY WATER RESOURCES COMMISSIONER
Page ADV-1 of ADV-3 4-23-2024
Walnut Lake No. 1 Pump Station Conveyance Corrective Action Plan Phase II
Electronic sealed Bids will be received by the Owner for the construction of the following project:
This project includes removal of an existing 78-inch and 66-inch diameter sewer siphon pipe connection between of the Evergreen-Farmington Sanitary Drain and Great Lakes Water Authority (GLWA) to the 96-inch diameter sewer. The new alignment will be hand mined over the top of the existing siphon. This section of the sewer is owned by Detroit Water and Sewerage Department (DWSD) and leased/operated by the Great Lakes Water Authority (GLWA). The project details consist of :
1. Construction of a temporary in-line flow sewer bypass conduit using existing 78-inch and 66-inch diameter siphon. This project requires temporary flow control management.
2. Slip line and grout the existing 66-inch and 78-inch diameter siphon with a 54-inch pipe.
2. Modifications to the existing Junction Chamber, Riser Chamber, and Meter Chamber OC-S-1, including structural, electrical, and telemetry components.
4. Construction of new 66-inch diameter sanitary sewer between manhole SOT140007 and
Junction Chamber
5. Construction of new 78-inch diameter sanitary sewer tunnel between the existing Evergreen-
Farmington Flume and Meter Chamber.
6. Abandoning existing 78-inch and 66-inch diameter sanitary sewers
7. Construction of a new sanitary manhole over an existing 96-inch diameter sanitary sewer located on the M-39 Southfield Freeway, with a 21-inch Diameter sewer connection with drop connection.
8. Construction of new 96-inch diameter sanitary sewer tunnel between the existing Junction and riser Chamber.
9. Abandoning existing 78-inch and 66-inch diameter sanitary sewers.
9. Abandoning existing 21-inch and 42-inch diameter sanitary sewers located in M-39 Southfield freeway and M-102 West Eight Mile Road.
10. Procurement and installation of a new 96-inch sluice gate, actuator, and establishing electrical connections.
10. Structural and site concrete work, asphalt paving, grading, and landscaping.
THE BIDS RECEIVED WILL BE PUBLICLY OPENED VIA MICROSOFT TEAMS AND READ AT THE
FOLLOWING DATE AND TIME:
Wednesday, June 25, 2025, 3 PM https://teams.microsoft.com/l/meetup-join/19%3ameeting_MDBkNGY4MWMtN2M5NS00OTA4LWEzMTItNzMwNGMxNzMyNTg0%40thread.
v2/0?context=%7b%22Tid%22%3a%226dd9592c-fa62-4c52-920e-c6981494a443%22%2c%22Oid%22%3a%2294997e1f-500c-48aa-9612-2fc40d2b9acc%22%7d Meeting ID: 294 166 288 029 0 Passcode: 8zb2QA6t
Bidders shall review and comply with the Information for Bidders, which is incorporated by reference, and carefully review all Bidding Documents. Bids submitted after the exact time specified for receipt will not be considered.
Bidding Documents will be available on the BidNet Direct website. The proposed Contract Documents under which the work will be performed are included in the Bidding Documents. For questions about https://teams.microsoft.com/l/meetup-join/19%3ameeting_MDBkNGY4MWMtN2M5NS00OTA4LWEzMTItNzMwNGMxNzMyNTg0%40thread.v2/0?context=%7b%22Tid%22%3a%226dd9592c-fa62-4c52-920e-c6981494a443%22%2c%22Oid%22%3a%2294997e1f-500c-48aa-9612-2fc40d2b9acc%22%7d https://teams.microsoft.com/l/meetup-join/19%3ameeting_MDBkNGY4MWMtN2M5NS00OTA4LWEzMTItNzMwNGMxNzMyNTg0%40thread.v2/0?context=%7b%22Tid%22%3a%226dd9592c-fa62-4c52-920e-c6981494a443%22%2c%22Oid%22%3a%2294997e1f-500c-48aa-9612-2fc40d2b9acc%22%7d https://teams.microsoft.com/l/meetup-join/19%3ameeting_MDBkNGY4MWMtN2M5NS00OTA4LWEzMTItNzMwNGMxNzMyNTg0%40thread.v2/0?context=%7b%22Tid%22%3a%226dd9592c-fa62-4c52-920e-c6981494a443%22%2c%22Oid%22%3a%2294997e1f-500c-48aa-9612-2fc40d2b9acc%22%7d https://teams.microsoft.com/l/meetup-join/19%3ameeting_MDBkNGY4MWMtN2M5NS00OTA4LWEzMTItNzMwNGMxNzMyNTg0%40thread.v2/0?context=%7b%22Tid%22%3a%226dd9592c-fa62-4c52-920e-c6981494a443%22%2c%22Oid%22%3a%2294997e1f-500c-48aa-9612-2fc40d2b9acc%22%7d
OAKLAND COUNTY WATER RESOURCES COMMISSIONER
Page ADV-2 of ADV-3 4-23-2024
BidNet Direct, refer to https://www.oakgov.com/government/purchasing/bidder-registration/bid-solicitation-public-search.
A recommended pre-bid meeting is at the following location 21455 Melrose Ave., Bldg R, Suite 12, Southfield, MI 48075 on June 5, 2025 at 3:00 pm, local time, and virtually via Microsoft Teams. The virtual meeting link is shown below:
https:/teams.microsoft.com/l/meetupjoin/19%3ameeting_ODEzYjNlZjItOGI5My00ZmU3LWI0NTUtYzk1 MGUzZGNlYzg0*40thread.v2/0?context=%7b%22Tid%22%3a%2244983d42-ab66-49ff-b1e6- 1ad889673644%22%2c%22Oid%22%3a%2283703c7e-a372-4479-ad38-a55320c29de6%22%7d___.YXAzOm9ha2dvdjphOm86YTQ3MDc3MzMxNDY2ZTJlMWNiNDA4ZWI1Yj QzYzE0MjU6Nzo4YzE2OmM1Yjg1NjI4Mzk2MmFkMTkyNzljMmQ3OGYzYmY5ZGU5NmYyOWI1ZGNk OTRlOTgyNDExNzAyNDk1M2NjNTBlYmE6aDpUOk4 Meeting ID: 297 265 527 859 8 Passcode: 7fc3Wb7x
A recommended site tour is scheduled at the following location Westhaven Avenue and Southfield Road on June 5, 2025 following the pre-bid meeting.
Bidders will be required to sign-in at the pre-bid meeting and the site tour.
Questions, comments, or concerns of any Bidder regarding the Bidding Documents or the project, must be submitted in writing via the BidNet Direct website by 3:00 pm on Monday, June 16, 2025. No questions received after this time will be given consideration. Questions will be reviewed, and formal responses will be disseminated via addenda on BidNet Direct.
Addenda issued to Bidders prior to the date of receipt of Bids shall become a part of the Contract Documents and all Bids shall include the work described in each addendum issued. Failure to attend the pre-bid meeting shall not relieve the Bidder from compliance with all applicable federal and state laws and regulations, including without limitation the Equal Employment and Minority, Small, and Women's Business Regulations.
P.L. 111-88 requires compliance with the Davis Bacon Act and adherence to the current U.S.
Department of Labor Wage Decision. Attention is called to the fact that not less than the minimum salaries and wages as set forth in the Contract Documents (see Wage Decision included in the Bidding Documents) must be paid on this Project. The Wage Decision, including modifications, must be posted by the Contractor on the job site. A copy of the Federal Labor Standards Provisions is also included and will hereby be a part of the Contract.
A certified check, cashier's check, or Bid Bond for a sum not less than five percent (5%) of the amount of the proposal will be required for each proposal.
Owner reserves the right to accept any proposal, to reject any proposal and to waive irregularities in the proposals.
This project will be financed from the State of Michigan Department of Environment, Great Lakes, and Energy (EGLE) using state and federal funding authorized by the Clean Water State Revolving Fund (CWSRF). The program tracking number is CW5872-01. This project has specific State of Michigan Equivalency contracting requirements including the following:
https://www.oakgov.com/government/purchasing/bidder-registration/bid-solicitation-public-search https://www.oakgov.com/government/purchasing/bidder-registration/bid-solicitation-public-search https://url.avanan.click/v2/r01/___https:/teams.microsoft.com/l/meetup-join/19%3ameeting_ODEzYjNlZjItOGI5My00ZmU3LWI0NTUtYzk1MGUzZGNlYzg0*40thread.v2/0?context=%7b%22Tid%22%3a%2244983d42-ab66-49ff-b1e6-1ad889673644%22%2c%22Oid%22%3a%2283703c7e-a372-4479-ad38-a55320c29de6%22%7d___.YXAzOm9ha2dvdjphOm86YTQ3MDc3MzMxNDY2ZTJlMWNiNDA4ZWI1YjQzYzE0MjU6Nzo4YzE2OmM1Yjg1NjI4Mzk2MmFkMTkyNzljMmQ3OGYzYmY5ZGU5NmYyOWI1ZGNkOTRlOTgyNDExNzAyNDk1M2NjNTBlYmE6aDpUOk4 https://url.avanan.click/v2/r01/___https:/teams.microsoft.com/l/meetup-join/19%3ameeting_ODEzYjNlZjItOGI5My00ZmU3LWI0NTUtYzk1MGUzZGNlYzg0*40thread.v2/0?context=%7b%22Tid%22%3a%2244983d42-ab66-49ff-b1e6-1ad889673644%22%2c%22Oid%22%3a%2283703c7e-a372-4479-ad38-a55320c29de6%22%7d___.YXAzOm9ha2dvdjphOm86YTQ3MDc3MzMxNDY2ZTJlMWNiNDA4ZWI1YjQzYzE0MjU6Nzo4YzE2OmM1Yjg1NjI4Mzk2MmFkMTkyNzljMmQ3OGYzYmY5ZGU5NmYyOWI1ZGNkOTRlOTgyNDExNzAyNDk1M2NjNTBlYmE6aDpUOk4 https://url.avanan.click/v2/r01/___https:/teams.microsoft.com/l/meetup-join/19%3ameeting_ODEzYjNlZjItOGI5My00ZmU3LWI0NTUtYzk1MGUzZGNlYzg0*40thread.v2/0?context=%7b%22Tid%22%3a%2244983d42-ab66-49ff-b1e6-1ad889673644%22%2c%22Oid%22%3a%2283703c7e-a372-4479-ad38-a55320c29de6%22%7d___.YXAzOm9ha2dvdjphOm86YTQ3MDc3MzMxNDY2ZTJlMWNiNDA4ZWI1YjQzYzE0MjU6Nzo4YzE2OmM1Yjg1NjI4Mzk2MmFkMTkyNzljMmQ3OGYzYmY5ZGU5NmYyOWI1ZGNkOTRlOTgyNDExNzAyNDk1M2NjNTBlYmE6aDpUOk4 https://url.avanan.click/v2/r01/___https:/teams.microsoft.com/l/meetup-join/19%3ameeting_ODEzYjNlZjItOGI5My00ZmU3LWI0NTUtYzk1MGUzZGNlYzg0*40thread.v2/0?context=%7b%22Tid%22%3a%2244983d42-ab66-49ff-b1e6-1ad889673644%22%2c%22Oid%22%3a%2283703c7e-a372-4479-ad38-a55320c29de6%22%7d___.YXAzOm9ha2dvdjphOm86YTQ3MDc3MzMxNDY2ZTJlMWNiNDA4ZWI1YjQzYzE0MjU6Nzo4YzE2OmM1Yjg1NjI4Mzk2MmFkMTkyNzljMmQ3OGYzYmY5ZGU5NmYyOWI1ZGNkOTRlOTgyNDExNzAyNDk1M2NjNTBlYmE6aDpUOk4 https://url.avanan.click/v2/r01/___https:/teams.microsoft.com/l/meetup-join/19%3ameeting_ODEzYjNlZjItOGI5My00ZmU3LWI0NTUtYzk1MGUzZGNlYzg0*40thread.v2/0?context=%7b%22Tid%22%3a%2244983d42-ab66-49ff-b1e6-1ad889673644%22%2c%22Oid%22%3a%2283703c7e-a372-4479-ad38-a55320c29de6%22%7d___.YXAzOm9ha2dvdjphOm86YTQ3MDc3MzMxNDY2ZTJlMWNiNDA4ZWI1YjQzYzE0MjU6Nzo4YzE2OmM1Yjg1NjI4Mzk2MmFkMTkyNzljMmQ3OGYzYmY5ZGU5NmYyOWI1ZGNkOTRlOTgyNDExNzAyNDk1M2NjNTBlYmE6aDpUOk4 https://url.avanan.click/v2/r01/___https:/teams.microsoft.com/l/meetup-join/19%3ameeting_ODEzYjNlZjItOGI5My00ZmU3LWI0NTUtYzk1MGUzZGNlYzg0*40thread.v2/0?context=%7b%22Tid%22%3a%2244983d42-ab66-49ff-b1e6-1ad889673644%22%2c%22Oid%22%3a%2283703c7e-a372-4479-ad38-a55320c29de6%22%7d___.YXAzOm9ha2dvdjphOm86YTQ3MDc3MzMxNDY2ZTJlMWNiNDA4ZWI1YjQzYzE0MjU6Nzo4YzE2OmM1Yjg1NjI4Mzk2MmFkMTkyNzljMmQ3OGYzYmY5ZGU5NmYyOWI1ZGNkOTRlOTgyNDExNzAyNDk1M2NjNTBlYmE6aDpUOk4
OAKLAND COUNTY WATER RESOURCES COMMISSIONER
Page ADV-3 of ADV-3 4-23-2024
1. Build America, Buy America
2. Prohibition on Certain Telecommunications and Video Surveillance Services or Equipment
3. Davis-Bacon and Related Acts/Prevailing Federal Wages
4. Labor Standards Provisions for Federally Assisted Projects
5. Disadvantaged Business Enterprise (DBE) Requirements / Good Faith Efforts (GFE) Worksheet
6. Certification Regarding Debarment, Suspension, and Other Responsibility Matters
File details come from the government source that posted it. Updated .