24-162 Pre-bid meeting sign in.xlsx

XLSX spreadsheet 12 KB Posted

Attached to
WRC: Walnut Lake No. 2 Conveyance CAP Phase II
Solicitation number
Oak-0000000922
Issued by
Michigan

About this file

The document is a pre-bid meeting sign-in sheet for the Walnut Lake No. 2 Conveyance CAP Phase II project, involving multiple engineering and construction firms such as FKE, ASI, HRC, Jay Dee, L. D'Agostini, OCWRC, Z Contractors, and state agencies including EGLE (Environmental Great Lakes and Energy). The pre-bid meeting was attended by representatives from at least 10 companies, with both in-person and remote participants, indicating significant industry interest in the project. The sign-in sheet includes contact information for attendees, including names, companies, phone numbers, and email addresses.

The associated contract opportunity is a complex sewer infrastructure project in Michigan, specifically focused on renovating and replacing sewer infrastructure in the Detroit Water and Sewerage Department (DWSD) and Great Lakes Water Authority (GLWA) jurisdictions. The project involves extensive sewer system modifications, including siphon pipe removal, slip lining, bypass conduit construction, chamber modifications, new sewer tunnel construction, and abandonment of existing sewer lines. The project scope includes structural, electrical, and telemetry components, with specific technical requirements such as installing a new 96-inch sluice gate, constructing new sanitary sewers of varying diameters, and completing site concrete work, asphalt paving, grading, and landscaping.

View the file

Other files

File Type Posted
SAN-1600EV-CP-PP-SHT1327.TIF TIF image
DC-117.pdf PDF
DC-123 (1).pdf PDF
SAN-1233EV-RD-PP-CONT3-SHT17OF17.TIF TIF image
EQP1451-Equivalency-Projects-Contract-Boilerplate-Language.pdf PDF
SAN-1233EV-RD-CO-CONT3.TIF TIF image
19880901_PCI-41 EF Relief Outlet Sewer Section II - Complete Set.pdf PDF
SAN-1600EV-CP-SD-SHT1335.TIF TIF image
SAN-1233EV-RD-PP-CONT3-SHT2OF17.TIF TIF image
Addendum 3 attachments (1).pdf PDF
SAN-1600EV-CP-PP-SHT1321.TIF TIF image
SAN-1600EV-CP-PP-SHT1326.TIF TIF image
SAN-1233EV-RD-PP-CONT3-SHT9OF17.TIF TIF image
SAN-1600EV-CP-PP-SHT1323.TIF TIF image
SAN-1233EV-RD-MI-CONT3-SHT14OF17.TIF TIF image
SAN-1233EV-RD-SD-CONT3-SHT13AOF17.TIF TIF image
01 22 00 - measurement and payment.pdf PDF
SAN-1600EV-CP-PP-SHT1322.TIF TIF image
SAN-1233EV-RD-MI-CONT3-SHT14AOF17.TIF TIF image
SAN-1600EV-CP-PP-SHT1328.TIF TIF image
SAN-1600EV-CP-PP-SHT1325.TIF TIF image
SAN-1233EV-RD-PP-CONT3-SHT4OF17.TIF TIF image
PCI-41 EF Relief Outlet Sewer Section II - Complete Set Final Connection (1).pdf PDF
VIDEO Help.pdf PDF
SAN-1233EV-RD-PP-CONT3-SHT7OF17.TIF TIF image
OCWRC_Walnut CAP1 EFSD 21 inch Sewer Abandonment_FKE Geotech Data Report_24-162_04-27-2025.pdf PDF
VR-14 and EFSD Outlet Schematics (1).pdf PDF
SAN-1600EV-CP-PP-SHT1320.TIF TIF image
SAN-1233EV-RD-PP-CONT3-SHT1OF17.TIF TIF image
DC-123.pdf PDF
SAN-1600EV-CP-PP-SHT1319.TIF TIF image
24-162 Pre-bid meeting sign in.pdf PDF
SAN-1233EV-RD-PP-CONT3-SHT6OF17.TIF TIF image
SAN-1600EV-CP-SD-SHT1334.TIF TIF image
Updated Davis Bacon.pdf PDF
SAN-1233EV-RD-PP-CONT3-SHT10OF17.TIF TIF image
SAN-1233EV-RD-SD-CONT3-SHT12OF17.TIF TIF image
SAN-1600EV-CP-PP-SHT1329.TIF TIF image
OCWRC_Walnut CAP1 EFSD Siphon Removal_FKE Geotech Inv Report_24-162_04-27-2025.pdf PDF
FLow Control Pages from OCWRC_Walnut 1 CAP_EFSD Outlet Siphon Phase 2_IFB Specifications_ASI.pdf PDF
SAN-1600EV-CP-PP-SHT1324.TIF TIF image
OCWRC_Walnut 1 CAP_EFSD Outlet Siphon Phase 2_IFB Plans (1) (1).pdf PDF
SAN-1233EV-RD-PP-CONT3-SHT3OF17.TIF TIF image
SAN-1233EV-RD-PP-CONT3-SHT5OF17.TIF TIF image
SAN-1233EV-RD-MI-CONT3-SHT15OFR17.TIF TIF image
OCWRC Walnut 1 CAP EFSD Outlet Siphon Phase 2 IFB Plans_Addendum 3.pdf PDF
SAN-1233EV-RD-SD-CONT3-SHTA.TIF TIF image
DC-675.pdf PDF
Siphons Phase 2 Presentation Slides.pdf PDF
Walnut Lake No.1 Conveyance CAP Phase II Specs 5-21-2025 (1).pdf PDF
Show 40 more

Latest 50 of 61 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

NameCompanyPhone NoEmail
In PersonZach CarrFKE313-304-6737zcarr@fkengineering.com
Tim MinorASI313-215-4777tminor@asi-eng.com
Matt HughesHRC248-535-7078mhughes@hrcengr.com
Phil BackersJay Dee734-591-3400pbackers@jaydee.us.com
Aaron CarrL. D'Agostini906-371-0169aaronc@ldagostini.com
Evans BantiosOCWRC248-724-6617bantiose@oakgov.com
Jim SurhighHRC248-535-3493jsurhigh@hrcengr.com
Rob HerrickZCI586-850-4877rherrick@z-contractors.com
Tommy CoonanFKE248-686-6248tcoonan@fkengineering.com
Joe MulvilleZ Contractors586-850-8399jmulville@zcontractors.com
Nick BassettFKE231-250-5052nbassett@fkengineering.com
RemoteRod ShouldersJay Dee
James Undicelli
Curits RozelleJay Dee
Zak KraussMarra
Chelsea WalshEGLE
David Best
Alex Tribuzio
Hala BaroudiEGLE
Brian CarrickRic-Man
Pete WenderskiFKE734-536-2670pwenderski@fkengineering.com
Caitlynn Morris
Donita Creek
Kevin Macklin
Vince D'AngeloD'Angelo Brothers
Megan Kaer

mailto:zcarr@fkengineering.commailto:jmulville@zcontractors.commailto:nbassett@fkengineering.commailto:pwenderski@fkengineering.commailto:tminor@asi-eng.commailto:mhughes@hrcengr.commailto:pbackers@jaydee.us.commailto:aaronc@ldagostini.commailto:bantiose@oakgov.commailto:jsurhigh@hrcengr.commailto:rherrick@z-contractors.commailto:tcoonan@fkengineering.com

File details come from the government source that posted it. Updated .