DC-675.pdf

PDF 82 KB Posted

Attached to
WRC: Walnut Lake No. 2 Conveyance CAP Phase II
Solicitation number
Oak-0000000922
Issued by
Michigan

About this file

The document is a set of Supplementary Conditions for the Walnut Lake No. 1 Pump Station Conveyance Corrective Action Plan Phase 2 project, issued by the Oakland County Water Resources Commissioner dated 4-23-2024. The supplementary conditions provide additional details and modifications to the standard contract terms, covering areas such as permits, testing, safety protocols, work hours, insurance requirements, and project-specific guidelines. The project involves complex infrastructure work, including sewer system modifications, with specific requirements for COVID-19 safety, work hour limitations (7:00 AM to 7:00 PM, Monday through Saturday), and restoration of existing site features like sprinkler systems and fencing.

The document includes specific insurance requirements mandating that the contractor add multiple entities as additional insureds, including Oakland County, the City of Southfield, Michigan Department of Environment, Great Lakes, and Energy, and several other governmental and consulting organizations. The project is considered an equivalency project requiring compliance with Build America, Buy America (BABA) requirements, and alternative products must be approved by the Engineer and Owner. Geotechnical and historical documents related to the project are available upon request, and the contractor will be responsible for obtaining necessary permits, with the owner reimbursing permit fees via an allowance. The supplementary conditions also outline measurement standards, payment terms, and specify that any work not explicitly mentioned in the proposal will be considered incidental to the project.

View the file

Other files

File Type Posted
01 22 00 - measurement and payment.pdf PDF
DC-117.pdf PDF
FLow Control Pages from OCWRC_Walnut 1 CAP_EFSD Outlet Siphon Phase 2_IFB Specifications_ASI.pdf PDF
OCWRC_Walnut CAP1 EFSD Siphon Removal_FKE Geotech Inv Report_24-162_04-27-2025.pdf PDF
SAN-1233EV-RD-PP-CONT3-SHT10OF17.TIF TIF image
SAN-1233EV-RD-PP-CONT3-SHT5OF17.TIF TIF image
SAN-1233EV-RD-PP-CONT3-SHT6OF17.TIF TIF image
SAN-1233EV-RD-SD-CONT3-SHT12OF17.TIF TIF image
SAN-1600EV-CP-PP-SHT1322.TIF TIF image
SAN-1600EV-CP-PP-SHT1324.TIF TIF image
SAN-1600EV-CP-PP-SHT1327.TIF TIF image
SAN-1600EV-CP-PP-SHT1329.TIF TIF image
Updated Davis Bacon.pdf PDF
VIDEO Help.pdf PDF
VR-14 and EFSD Outlet Schematics (1).pdf PDF
33 40 00 - Temporary Flow Diversion and Bypass Pumping (1).pdf PDF
ADDENDUM #3 922.pdf PDF
Addendum #1.pdf PDF
DC-116.pdf PDF
DC-123 (1).pdf PDF
EQP1451-Equivalency-Projects-Contract-Boilerplate-Language Project.pdf PDF
PC-637 (1).pdf PDF
SAN-1233EV-RD-PP-CONT3-SHT11OF17.TIF TIF image
SAN-1233EV-RD-PP-CONT3-SHT16OF17.TIF TIF image
SAN-1233EV-RD-PP-CONT3-SHT17OF17.TIF TIF image
SAN-1233EV-RD-PP-CONT3-SHT8OF17.TIF TIF image
SAN-1233EV-RD-SD-CONT3-SHT12AOF17.TIF TIF image
SAN-1233EV-RD-SD-CONT3-SHT13OF17.TIF TIF image
Siphons Phase 2 Presentation Slides.pdf PDF
Walnut Lake No.1 Conveyance CAP Phase II Specs 5-21-2025 (1).pdf PDF
24-162 Pre-bid meeting sign in.pdf PDF
24-162 Pre-bid meeting sign in.xlsx XLSX spreadsheet
DC-123.pdf PDF
OCWRC Walnut 1 CAP EFSD Outlet Siphon Phase 2 IFB Plans_Addendum 3.pdf PDF
SAN-1233EV-RD-MI-CONT3-SHT14AOF17.TIF TIF image
SAN-1233EV-RD-MI-CONT3-SHT14OF17.TIF TIF image
SAN-1233EV-RD-MI-CONT3-SHT15OFR17.TIF TIF image
SAN-1233EV-RD-PP-CONT3-SHT1OF17.TIF TIF image
SAN-1233EV-RD-PP-CONT3-SHT9OF17.TIF TIF image
SAN-1233EV-RD-SD-CONT3-SHT13AOF17.TIF TIF image
SAN-1600EV-CP-PP-SHT1319.TIF TIF image
SAN-1600EV-CP-PP-SHT1320.TIF TIF image
SAN-1600EV-CP-PP-SHT1323.TIF TIF image
SAN-1600EV-CP-PP-SHT1325.TIF TIF image
SAN-1600EV-CP-PP-SHT1328.TIF TIF image
SAN-1600EV-CP-SD-SHT1334.TIF TIF image
19880901_PCI-41 EF Relief Outlet Sewer Section II - Complete Set.pdf PDF
Addendum 3 attachments (1).pdf PDF
EQP1451-Equivalency-Projects-Contract-Boilerplate-Language.pdf PDF
OCWRC_Walnut 1 CAP_EFSD Outlet Siphon Phase 2_IFB Plans (1) (1).pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DC-675 SUPPLEMENTARY CONDITIONS

OAKLAND COUNTY WATER RESOURCES COMMISSIONER

Page SC-1 of SC-4 4-23-2024

1. GENERAL

These Supplementary Conditions are a part of the Contract Documents for the Walnut Lake No.

1 Pump Station Conveyance Corrective Action Plan Phase 2 project. The requirements herein specified supplement and/or supersede those contained elsewhere in the Contract Documents.

A. General Conditions, Article 7, Permits and Regulations

The Contractor is responsible for making all arrangements for inspection and the payment of fees to permitting agencies. Owner will reimburse Contractor for permitting fees via the Allowance for Permit Fees in the Proposal. Permits required for this project include the following:

MDOT Individual Construction Permit No.

Michigan Department of EGLE Part 41 Permit No.

City of Southfield Permit No.

Oakland County Water Resources Commissioner Soil Erosion Permit No.

Copies of the permits obtained prior to bid are included in these specifications.

B. General Conditions, Article 11, Testing and Sampling

Add the following:

The Owner will arrange to have all soil compaction tests and concrete quality control tests, including concrete compression tests, performed by an independent testing laboratory, in accordance with the specifications. Copies of test reports shall be furnished to the Owner and distributed to parties designated by the Owner, including the Contractor.

C. General Conditions, Article 19 Safety and Protection

Paragraph R

Contractor is required to have a Covid-19 Safety program in place. Prior to starting Work, Contractor shall provide a copy of their Covid-19 Safety Program for review by the Owner’s Safety Representative. Contractor is required to comply with all Federal, State, County, and City laws, rules, mandates, and other requirements regarding Covid-19.

D. General Conditions, Article 32, Clean Up and Restoration

While no specific bid item has been created for repair of sprinkler systems, decorative fences, railroad ties, decorative plantings, under drains, drain tiles, electronic pet fencing, etc., the Contractor shall be responsible to locate, protect and restore those areas equal to what existed prior to the start of construction at no additional cost to the project. The Contractor shall promptly restore sprinkler systems to working order by making temporary or permanent repairs within five days of the initial disruption and electronic pet fencing shall be repaired within 24 hours of being damaged.

Page SC-2 of SC-4 4-23-2024

E. General Conditions, Article 38, Sunday, Holiday, and Night Work

The Contractor shall limit the hours of operation from 7:00 A.M. to 7:00 P.M., Monday through Saturday. Prior authorization shall be obtained from the City of Southfield and the Owner to extend these working hours and/or to continue work on Sundays. Contractor shall notify Owner’s on-site representative, RPR, and Resident Engineer of Saturday work by no later than 12:00 PM noon on Friday.

Work shall be suspended during the following days listed unless pre-approved:

New Years Day Martin Luther King Jr. Day President’s Day Memorial Day Juneteenth Day Independence Day Labor Day Veterans Day Thanksgiving Day Friday After Thanksgiving Day Christmas Eve Christmas Day New Year’s Eve

F. General Conditions, Article 50 Insurance-Other Requirements

Paragraph C.3)

Contractor shall include the following as Additional Insureds in their Commercial General Liability Insurance, Automobile Liability Insurance, Umbrella Liability Insurance, and Owners and Contractors Protective (OCP) Liability policy:

Jim Nash, Oakland County Water Resources Commissioner

County of Oakland, its employees, agents, and/or authorized representatives

Evergreen-Farmington Sanitary Drain Drainage District, One Public Works Drive, Building 95 West, Waterford, MI 4828 and its consultants, agents, and employees.

The City of Southfield, its employees, agents, and/or authorized representatives

Michigan Department of Environment, Great Lakes, and Energy, its employees, agents, and/or authorized representatives

Michigan Department of Transportation, its employees, agents, and/or authorized representatives

Page SC-3 of SC-4 4-23-2024

Hubbell, Roth & Clark, Inc., 555 Hulet Drive, Bloomfield Hills, MI 48302, and its consultants, agents and employees

FK Engineering Associates, 30425 Stephenson Hwy, Madison Heights, MI 48071, and its consultants, agents and employees

Applied Science, Inc., 21455 Melrose Ave., Bldg R, Suite 12, Southfield, MI 48075, and its consultants, agents and employees

Great Lakes Water Authority, and its consultants, agents, and employees

City of Detroit, and its consultants, agents, and employees

County of Wayne, and its consultants, agents, and employees

State of Michigan, and its consultants, agents, and employees.

G. General Conditions, Section 50, Insurance and Indemnification, Subsection A.a.vii.

Railroad Protective Liability

Delete this paragraph in its entirety.

H. Build America, Buy America (BABA)

This project is considered an equivalency project, which means compliance with Build America, Buy America requirements, unless a waiver is received.

I. Specified Products Technical Specifications

An alternative product will be allowed but must be approved by the Engineer and Owner where specific products are specified in the technical specifications without a reference to an alternative product.

J. Bid Items

The method of measurement and the basis of payment for each bid item in the Proposal will be as specified in the Contract Documents. The items are generally grouped by the section of the Specifications under which the unit of work is detailed. There will be no payment allowed for any unit of work not specifically mentioned in the Proposal as a Bid Item, and any such unit of work not mentioned in the Proposal, but necessary for the completion of the Project, shall be considered as incidental and the cost shall be included in other prices bid in the Proposal.

K. Measurement

Quantities of work completed under the Contract will be measured by the Engineer according to the United States standard measures. When measurements are stated in miles, stations, acres, feet, they will be ground level measurements unless specified otherwise. Where measurements are specified to be “in place,” they will be taken along the actual surface of the completed item to obtain linear, area, or volume measurements.

Page SC-4 of SC-4 4-23-2024

L. Geotechnical Information

Added the following geotechnical reports for reference:

“Geotechnical Investigation Report Walnut Lake Pump Station No. 1 Corrective Action Plan EFSD Siphon Removal” by FK Engineering dated April 27, 2025

“Geotechnical Investigation Report Walnut Lake Pump Station No. 1 Corrective Action Plan 21-inch Sewer Abandonment” by FK Engineering dated April 27, 2025

Documents are available on request.

M. Historical Information

Added the following historical documents for reference:

VR-14 and EFSD Outlet Schematics

DWSD PCI-41 EF Relief Outlet Sewer Section II Plan Set

DWSD PC-637 Plan Set

MDOT Job No. 76902A (1600 EV) Plan Set

OCWRC Eight Mile Road Interceptor Sanitary Relief Sewer Contract No. 3 Plan Set

Documents are available on request.