24-162 Pre-bid meeting sign in.pdf

PDF 20 KB Posted

Attached to
WRC: Walnut Lake No. 2 Conveyance CAP Phase II
Solicitation number
Oak-0000000922
Issued by
Michigan

About this file

The document is a pre-bid meeting sign-in sheet for the WRC: Walnut Lake No. 2 Conveyance CAP Phase II project, involving multiple engineering and construction firms. The sign-in sheet captures attendees from companies including FKE, ASI, HRC, Jay Dee, L. D'Agostini, ZCI, OCWRC, Marra, EGLE, and Ric-Man, with participants attending both in-person and remotely. The sheet includes each attendee's name, company, phone number, and email address, indicating a comprehensive bidder's conference for this complex infrastructure project.

The sign-in sheet does not provide specific pricing, funding details, or contract terms, but is associated with a significant sanitary sewer infrastructure project in Michigan involving the Detroit Water and Sewerage Department (DWSD) and Great Lakes Water Authority (GLWA). The project encompasses extensive sewer system modifications, including siphon pipe removal, bypass conduit construction, slip lining, chamber modifications, new sewer line construction, and abandonment of existing sewer infrastructure along the Southfield Freeway and West Eight Mile Road.

View the file

Other files

File Type Posted
01 22 00 - measurement and payment.pdf PDF
DC-117.pdf PDF
FLow Control Pages from OCWRC_Walnut 1 CAP_EFSD Outlet Siphon Phase 2_IFB Specifications_ASI.pdf PDF
OCWRC_Walnut CAP1 EFSD Siphon Removal_FKE Geotech Inv Report_24-162_04-27-2025.pdf PDF
SAN-1233EV-RD-PP-CONT3-SHT10OF17.TIF TIF image
SAN-1233EV-RD-PP-CONT3-SHT5OF17.TIF TIF image
SAN-1233EV-RD-PP-CONT3-SHT6OF17.TIF TIF image
SAN-1233EV-RD-SD-CONT3-SHT12OF17.TIF TIF image
SAN-1600EV-CP-PP-SHT1322.TIF TIF image
SAN-1600EV-CP-PP-SHT1324.TIF TIF image
SAN-1600EV-CP-PP-SHT1327.TIF TIF image
SAN-1600EV-CP-PP-SHT1329.TIF TIF image
Updated Davis Bacon.pdf PDF
VIDEO Help.pdf PDF
VR-14 and EFSD Outlet Schematics (1).pdf PDF
19880901_PCI-41 EF Relief Outlet Sewer Section II - Complete Set.pdf PDF
Addendum 3 attachments (1).pdf PDF
EQP1451-Equivalency-Projects-Contract-Boilerplate-Language.pdf PDF
OCWRC_Walnut 1 CAP_EFSD Outlet Siphon Phase 2_IFB Plans (1) (1).pdf PDF
OCWRC_Walnut CAP1 EFSD 21 inch Sewer Abandonment_FKE Geotech Data Report_24-162_04-27-2025.pdf PDF
PCI-41 EF Relief Outlet Sewer Section II - Complete Set Final Connection (1).pdf PDF
SAN-1233EV-RD-CO-CONT3.TIF TIF image
SAN-1233EV-RD-PP-CONT3-SHT2OF17.TIF TIF image
SAN-1233EV-RD-PP-CONT3-SHT3OF17.TIF TIF image
SAN-1233EV-RD-PP-CONT3-SHT4OF17.TIF TIF image
SAN-1233EV-RD-PP-CONT3-SHT7OF17.TIF TIF image
SAN-1233EV-RD-SD-CONT3-SHTA.TIF TIF image
SAN-1600EV-CP-PP-SHT1321.TIF TIF image
SAN-1600EV-CP-PP-SHT1326.TIF TIF image
SAN-1600EV-CP-SD-SHT1335.TIF TIF image
24-162 Pre-bid meeting sign in.xlsx XLSX spreadsheet
DC-123.pdf PDF
OCWRC Walnut 1 CAP EFSD Outlet Siphon Phase 2 IFB Plans_Addendum 3.pdf PDF
SAN-1233EV-RD-MI-CONT3-SHT14AOF17.TIF TIF image
SAN-1233EV-RD-MI-CONT3-SHT14OF17.TIF TIF image
SAN-1233EV-RD-MI-CONT3-SHT15OFR17.TIF TIF image
SAN-1233EV-RD-PP-CONT3-SHT1OF17.TIF TIF image
SAN-1233EV-RD-PP-CONT3-SHT9OF17.TIF TIF image
SAN-1233EV-RD-SD-CONT3-SHT13AOF17.TIF TIF image
SAN-1600EV-CP-PP-SHT1319.TIF TIF image
SAN-1600EV-CP-PP-SHT1320.TIF TIF image
SAN-1600EV-CP-PP-SHT1323.TIF TIF image
SAN-1600EV-CP-PP-SHT1325.TIF TIF image
SAN-1600EV-CP-PP-SHT1328.TIF TIF image
SAN-1600EV-CP-SD-SHT1334.TIF TIF image
33 40 00 - Temporary Flow Diversion and Bypass Pumping (1).pdf PDF
ADDENDUM #3 922.pdf PDF
Addendum #1.pdf PDF
DC-116.pdf PDF
DC-123 (1).pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Name Company Phone No Email

Zach Carr FKE 313-304-6737 zcarr@fkengineering.com

Tim Minor ASI 313-215-4777 tminor@asi-eng.com

Matt Hughes HRC 248-535-7078 mhughes@hrcengr.com

Phil Backers Jay Dee 734-591-3400 pbackers@jaydee.us.com

Aaron Carr L. D'Agostini 906-371-0169 aaronc@ldagostini.com

Evans Bantios OCWRC 248-724-6617 bantiose@oakgov.com

Jim Surhigh HRC 248-535-3493 jsurhigh@hrcengr.com

Rob Herrick ZCI 586-850-4877 rherrick@z-contractors.com

Tommy Coonan FKE 248-686-6248 tcoonan@fkengineering.com

Joe Mulville Z Contractors 586-850-8399 jmulville@zcontractors.com

Nick Bassett FKE 231-250-5052 nbassett@fkengineering.com

Rod Shoulders Jay Dee

James Undicelli

Curits Rozelle Jay Dee

Zak Krauss Marra

Chelsea Walsh EGLE

David Best

Alex Tribuzio

Hala Baroudi EGLE

Brian Carrick Ric-Man

Pete Wenderski FKE 734-536-2670 pwenderski@fkengineering.com

Caitlynn Morris

Donita Creek

Kevin Macklin

Vince D'Angelo D'Angelo Brothers

Megan Kaer

Remote

In Person

File details come from the government source that posted it. Updated .