CSS-FD SIR J-4 CDRL Requirements_DRAFT_v2.0_2024-11-15 clean.xlsx

XLSX spreadsheet 251 KB Posted

Attached to
Draft Screening Information Request (SIR) Common Support Services-Flight Data (CSS-FD) Federal contract opportunity
Solicitation number
693KA8-24-Presoliciation_CSS-FD_2nd_Draft_SIR
Issued by
Department of Transportation Federal Aviation Administration Headquarters

About this file

This document is a Contract Data Requirements List (CDRL) for the Federal Aviation Administration's (FAA) Common Support Services - Flight Data (CSS-FD) program. The CDRL outlines the required deliverables, including a Program Management Plan, Monthly Status Reports, Configuration Audit Plan, Software Development Plan, Test Reports, System Security Plan, and various other technical and programmatic documents. The CDRL specifies the approval code, frequency, initial submission date, subsequent submission dates, and electronic format requirements for each deliverable. The related federal contract opportunity is a pre-solicitation for the CSS-FD program, which is currently in the draft Screening Information Request (SIR) stage. The FAA is not seeking or accepting unsolicited proposals at this time, and any costs associated with responding to the draft SIR are the responsibility of interested vendors.

View the file

Other files for this federal contract opportunity

Other files attached to Draft Screening Information Request (SIR) Common Support Services-Flight Data (CSS-FD), newest first.
File Type Posted
CSS-FD Question Matrix-DRAFT SIR_v2.0.xlsx XLSX spreadsheet
CSS-FD SIR Section E - DRAFT_v2.0.pdf PDF
CSS-FD SIR Section H - DRAFT_v2.0.pdf PDF
CSS-FD SIR Section I - DRAFT_v2.0.pdf PDF
CSS-FD SIR J-1 Functional and Performance Spec_DRAFT_v2.0.pdf PDF
CSS-FD SIR J-6 CSS-FD Labor Category Qualifications_DRAFT_v2.pdf PDF
CSS-FD SIR J-8 AES Technical Architecture_DRAFT_v2.0.pdf PDF
CSS-FD SIR J-9 FAA Cloud Architecture_DRAFT_v2.0.pdf PDF
CSS-FD SIR Section L - DRAFT_v2.0.pdf PDF
CSS-FD SIR J-2 Security Controls_DRAFT_v2.3_2024-11-15 clean.xlsx XLSX spreadsheet
CSS-FD SIR Section B - DRAFT_v2.0.pdf PDF
CSS-FD SIR Section C - PWS_DRAFT_v2.0.pdf PDF
CSS-FD SIR Section D - DRAFT_v2.0.pdf PDF
CSS-FD SIR Section G - DRAFT_v2.0.pdf PDF
CSS-FD SIR J-0 CSS-FD Strategy DRAFT_v2.0.pdf PDF
CSS-FD SIR J-12 Flight Object_DRAFT_v0.009-09-16-2024.xlsx XLSX spreadsheet
CSS-FD SIR Section F - DRAFT_v2.0.pdf PDF
CSS-FD SIR Section J - DRAFT_v1.0.pdf PDF
CSS-FD SIR Section K - DRAFT_v2.0.pdf PDF
CSS-FD SIR Section M - DRAFT_v2.0.pdf PDF
CSS-FD SIR J-11 Performance Reqts Summary_DRAFT_v1.0_2024-11-15 clean.xlsx XLSX spreadsheet
Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Title Page Federal Aviation Administration (FAA) Common Support Services - Flight Data (CSS-FD) Solicitation #

Attachment J-4: Contract Data Requirements Listing (CDRLs)

Federal Aviation Administration 800 Independence Avenue, SW Washington, DC 20591

CDRLs

CDRL NumberCDRL TitlePWS ReferenceApproval CodeFrequencyInitial SubmissionSubsequent SubmissionsFAA Review PeriodUpdate in Response to FAA CommentsElectronic FormatSpecial Delivery Requirements
CSS-FD-PM01Program Management Plan (PMP)C.4.1.1AOne/R30 DACA15 DARCMS Word
CSS-FD-PM02Monthly Status Report (MSR)C.4.1.1.1.1IMonthly60 DACAN/AMS Word
CSS-FD-PM03Integrated Program Management Report (IPMR)C.4.1.1.1.2AMonthly90 DACAN/AMS Office Compatible
CSS-FD-PM04Integrated Master Schedule (IMS)C.4.1.1.1.4AMonthly60 DACAN/AMS Project Compatible
CSS-FD-CM01Configuration Audit Plan (CAP)C.4.1.4.1AAsReqSee Special Delivery Requirements15 DARCMS Office CompatibleInitial submission 60 days before FCA/PCA.
CSS-FD-CM02Configuration Audit Summary Report (CASR)C.4.1.4.1AAsReqSee Special Delivery Requirements15 DARCMS Office CompatibleInitial submission 15 days after completion of FCA/PCA.
CSS-FD-CM03Configuration Status Accounting Report (CSAR)C.4.1.4.2N/AMonthlySee Special Delivery RequirementsSee Special Delivery RequirementsMS Office CompatibleInitial submission 15 days prior to FCA/PCA.
CSS-FD-CM04Engineering Change Proposal (ECP)C.4.1.4.4AAsReqN/A15 DARCMS Office Compatible
CSS-FD-SE01Systems Engineering Management Plan (SEMP)C.4.2.1AOne/R45 DACA15 DARCMS Office Compatible
CSS-FD-SE02Data Management Plan (DMP)C.4.2.1AOne/R45 DACA15 DARCMS Office Compatible
CSS-FD-SD01Software Development Plan (SDP)C.4.2.3AOne/R45 DACA15 DARCMS Office Compatible
CSS-FD-SD02Software Requirements Specification (SRS)C.4.2.3.1AAsReqTBP15 DARCMS Office CompatibleTBP for each phase, consistent with Contractor's proposed approach.
CSS-FD-SD03Interface Requirements Specification (IRS)C.4.2.3.2AAsReqTBP15 DARCMS Office CompatibleTBP for each phase, consistent with Contractor's proposed approach.
CSS-FD-SD04Service Requirements Document (SRD)C.4.2.3.3AAsReqTBP15 DARCMS Office CompatibleTBP for each phase, consistent with Contractor's proposed approach.
CSS-FD-SD05Web Service Description Documents (WSDD)C.4.2.3.3AAsReqTBP15 DARCMS Office CompatibleTBP for each phase, consistent with Contractor's proposed approach.
CSS-FD-SD06Java Messaging Service Description Documents (JMSDD)C.4.2.3.3AAsReqTBP15 DARCMS Office CompatibleTBP for each phase, consistent with Contractor's proposed approach.
CSS-FD-SD07Software Design Description (SDD)C.4.2.3.4AAsReqTBP15 DARCMS Office CompatibleTBP for each phase, consistent with Contractor's proposed approach.
CSS-FD-CD01Business Rules DocumentC.4.2.5.2.1AAsReqTBP15 DARCMS Office CompatibleTBP for each phase, consistent with Contractor's proposed approach.
CSS-FD-CD02Flight Object (FO) WorkbookC.4.2.5.2.2AAsReqTBP15 DARCMS Office CompatibleTBP for each phase, consistent with Contractor's proposed approach.
CSS-FD-HF01Human Factors Program Plan (HFPP)C.4.2.5.3AOne/R90 DACA30 DARCMS Office Compatible
CSS-FD-TE01Contractor Master Test Plan (CMTP)C.4.2.6.2AAsReqTBP30 DARCMS Office CompatibleTBP consistent with Contractor's proposed approach. Must allow Fifteen (15) days for Government Review. Updates to the Final CMTP are due Thirty (30) DARC.
CSS-FD-TE02Verification Requirements Traceability Matrix (VRTM)C.4.2.6.2AAsReqTBP30 DARCMS Office CompatibleTBP consistent with Contractor's proposed approach. Must allow Fifteen (15) days for Government Review. Updates to the Final VRTM are due Thirty (30) DARC.
CSS-FD-TE03Acceptance Test Procedures (ATP)C.4.2.6.5.1APTETBPSee Special Delivery RequirementsMS Office CompatibleTBP consistent with Contractor's proposed approach. Final approval NLT Ten (10) days prior to Test Readiness Review (TRR). Red-lined Test Proccedures must be submitted within 5 DATC.
CSS-FD-TE04Test ReportsC.4.2.6.5.1APTETBP30 DARCMS Office CompatibleTBP consistent with Contractor's proposed approach. Test Report due No Later Than Fifteen (15) DATC.
CSS-FD-SRM01System Safety Program Plan (SSPP)C.4.2.7AAsReqTBP30 DARCMS Office Compatible
CSS-FD-SRM02Sub-System Hazard Analysis (SSHA)C.4.2.7AAsReqTBP30 DARCMS Office Compatible
CSS-FD-SRM03System Hazard Analysis (SHA)C.4.2.7AAsReqTBP30 DARCMS Office Compatible
CSS-FD-SRM04Operating and Support Hazard Analysis (O&SHA)C.4.2.7AAsReqTBP30 DARCMS Office Compatible
CSS-FD-ISS01System Security Plan (SSP)C.4.3.3AAnnuallyTBP15 DARCvia ATOM/SMARTInitial submission TBP consistent with Contractor's proposed approach, NLT 180 days prior to Security Assessment.
CSS-FD-ISS02System Characterization Document (SCD)C.4.3.3AAnnuallyTBP15 DARCvia ATOM/SMARTInitial submission TBP consistent with Contractor's proposed approach, NLT 180 days prior to Security Assessment.
CSS-FD-ISS03Privacy Threshold Assessment (PTA)C.4.3.3AEvery 3 YearsTBP15 DARCMS Office CompatibleInitial submission TBP consistent with Contractor's proposed approach, NLT 180 days prior to Security Assessment.
CSS-FD-ISS04Privacy Impact Assessment (PIA)C.4.3.3AEvery 3 YearsTBP15 DARCMS Office CompatibleInitial submission 30 days after PTA DOT Adjudication.
CSS-FD-ISS05Privacy Continuous Monitoring (PCM) DocumentationC.4.3.3AAnnuallyTBP15 DARCMS Office CompatibleInitial submission TBP consistent with Contractor's proposed approach, NLT 180 days prior to Security Assessment.
CSS-FD-ISS06Records Management ScheduleC.4.3.3AEvery 3 YearsTBP15 DARCMS Office CompatibleInitial submission TBP consistent with Contractor's proposed approach, NLT 180 days prior to Security Assessment.
CSS-FD-ISS07Information System Contingency Plan (ISCP)C.4.3.3AAnnuallyTBP15 DARCMS Office CompatibleTBP consistent with Contractor's proposed approach.
CSS-FD-ISS08Information System Contingency Test PlanC.4.3.3AAnnuallyTBP15 DARCMS Office CompatibleTBP consistent with Contractor's proposed approach. Final approval NLT 60 days prior to Test Readiness Review.
CSS-FD-ISS09Information System Contingency Test Results ReportC.4.3.3APTETBP15 DARCMS Office CompatibleTBP consistent with Contractor's proposed approach. Final approval NLT 60 days prior to Test Readiness Review.
CSS-FD-ISS10System Authorization Briefing (SAB)C.4.3.3AAsReqTBP15 DARCMS Office CompatibleInitial submission TBP consistent with Contractor's proposed approach, NLT 180 days prior to Security Assessment.
CSS-FD-IM01Implementation and Integration PlanC.4.4AOne/RTBP15 DARCMS Office CompatibleTBP consistent with Contractor's proposed approach.
CSS-FD-ISM01Software Maintenance Plan (SMP)C.4.5.1AOne/RTBP15 DARCMS Office CompatibleTBP consistent with Contractor's proposed approach, NLT 90 days prior to FCA/PCA.
CSS-FD-ISM02Software Version DescriptionC.4.5.3AAsReqTBP15 DARCTBPTBP consistent with Contractor's proposed approach, NLT 30 days prior to FCA/PCA for first delivery and all subsequent revisions.
CSS-FD-ISM03CSS-FD Reference ManualC.4.5.5AOne/RTBP15 DARCMS Office Compatible
CSS-FD-ISM04Technical Instruction ManualC.4.5.5AOne/RTBP15 DARCMS Office CompatibleTBP consistent with Contractor's proposed approach, NLT 30 days prior to FCA/PCA for first delivery and all subsequent revisions.
CSS-FD-TNG01Personnel Qualification Report (PQR)C.4.5.6.1AOne/RSee Special Delivery Requirements15 DARCMS Office CompatibleNLT 30 days after Training Guidance Conference.
CSS-FD-TNG02Training Development Plan (TDP)C.4.5.6.1AOne/RSee Special Delivery Requirements15 DARCMS Office CompatibleNLT 60 days after Training Guidance Conference.
CSS-FD-TNG03Task and Skills Analysis ReportC.4.5.6.2AOne/RSee Special Delivery Requirements15 DARCMS Office CompatibleInitial draft for each course ordered NLT 30 days after TDP completion.
CSS-FD-TNG04Course Design Guide (CDG)C.4.5.6.2AOne/RSee Special Delivery Requirements15 DARCMS Office Compatible90 days after Training Guidance Conference.
CSS-FD-TNG05Web-Based CSS-FD System Monitoring and Management Training ContentC.4.5.6.2AOne/RSee Special Delivery Requirements15 DARCTBPTBP based on Contractor's proposed approach, NLT 60 days prior to FCA/PCA for first delivery and all subsequent revisions.
CSS-FD-TNG06Web-Based SWIM Enterprise Data Services (EDS) Training ContentC.4.5.6.2AOne/RSee Special Delivery Requirements15 DARCTBPTBP based on Contractor's proposed approach, NLT 60 days prior to FCA/PCA for first delivery and all subsequent revisions.
CSS-FD-TNG07Contractor's Presentation MaterialC.4.5.6.2AOne/RSee Special Delivery Requirements15 DARCMS Office Compatible15 days prior to Operational Tryout event.
CSS-FD-TNG08Operational Tryout ReportC.4.5.6.2AOne/RSee Special Delivery Requirements15 DARCMS Office Compatible15 days after Operational Tryout event.
CSS-FD-TNG09First Course Conduct ReportC.4.5.6.2AOne/RSee Special Delivery Requirements15 DARCMS Office Compatible15 days after First Course Conduct.
All delivery specifications contained in this Attachment are mandatory requirements.
All references to days are calendar days, unless otherwise specified.
For all CDRLs requiring Government approval, if the Contractor does not receive the Government's comments after 45 calendar days of document delivery and the Contractor is not notified that comments are pending, the document will be considered to be approved.
CDRLs must be provided without restrictions that would prevent the Government from editing or reproducing the information.

Approval Code This block indicates requirement for Government approval of the data item. Requirements are indicated by a one or two character code as follows:

CodeMeaning
AFormal, written approval is required prior to final acceptance of the data item by the Government. If it is determined that certain of the contractual requirements for this data item are not satisfied, the Government will notify the Contractor of each deficient area and will withhold final acceptance pending corrections of all deficiencies by the Contractor. Any revisions to approved documents shall also require formal written approval. In the event of conflict between the approved document(s) and the contract, including the SOW and all referenced specifications, the contract shall take precedence.
IInformational. No Government approval required, although CDRL must comply with DID content/format specifications

Frequency This block specifies the frequency of submittal for the data item. Data of a recurring type shall be submitted at the end of the reporting period established in this field unless otherwise indicated. Codes are as follows:

CodeMeaning
AsReqAs required
One/ROne time and revisions
PTEPer Testing Event

Date for First Submittal This block contains the date that the initial data submission is to be delivered to the Government. This date may be an actual calendar date or keyed to an event. Codes are as follows:

CodeMeaning
DACADays After Contract Award
DARCDays After Receipt of Comments
DATCDays After Test Completion
DARODays After Receipt of Order
NLTNo Later Than
TBPTo Be Proposed
Numbers used with review abbreviations indicate that the document is due X months after the specified formal review. For example, 30 DACA means that the document is due 30 days after contract award. All references to days are calendar days unless otherwise specified.

Date of Subsequent Submission For data that is submitted more than once, this block contains the requirements for all submissions after the initial submittal. Codes used are the same as those used for Column F.

Distribution and Addresses Unless otherwise indicated on the CDRL, the electronic format will be delivered via email, KSN or FTP server, compatible with Microsoft Windows/Office Suite of products and as approved by the Government. All CDRLs must be delivered in both editable and non-editable format. Electronic submissions must be in accordance with FAA Order 1600.75. The designation "LT" indicates that a copy of the Letter of Transmittal is required for that addressee. All Electronic submissions will be the property of the FAA and the FAA reserves the right to reproduce all documents for FAA use.