CR232410_Backup_Exhibit C PARE Engineering Sanitary Sewer System Plan.pdf

PDF 2 MB Posted

Attached to
PERMANENT PFAS WATER TREATMENT FACILITY, University of Rhode Island
Solicitation number
RFP27007069
Issued by
Providence County, Rhode Island

About this file

This is an engineering exhibit document prepared by PARE Engineering for the University of Rhode Island, detailing the sanitary sewer system plan associated with the permanent PFAS water treatment facility project. The document provides technical specifications and design considerations for the sanitary sewer infrastructure that will support the new water treatment facility at URI. The exhibit serves as a supporting document for the design, build, and construct contract opportunity for the permanent PFAS water treatment facility, establishing the baseline requirements and system specifications necessary to accommodate wastewater from the facility's operations.

The sanitary sewer system plan outlines the engineering requirements, system capacity, connection points, and operational considerations for managing wastewater generated by the PFAS treatment facility. This technical exhibit functions as a binding reference document for bidders and contractors responding to the contract opportunity, ensuring that all proposed designs and construction methodologies align with the established sanitary sewer infrastructure parameters. The plan provides essential engineering data that contractors must incorporate into their comprehensive project proposals for the design and construction of the permanent water treatment facility at the University of Rhode Island.

View the file

Other files

File Type Posted
RFP27007069_Oct_28_26_solicitation_doc.pdf PDF
CR232410 Backup Exhibit B Interim Facility As Builts by Woodard Curran.pdf PDF
ISBE Form - RFP Appendix B - Modified Version.pdf PDF
CR232410_Backup_OSP RFP Final Resubmitted 20261014.pdf PDF
RFP27007069_Oct_21_26_solicitation_doc.pdf PDF
RFP27007069_Oct_23_26_solicitation_doc.pdf PDF
CR232410_Backup_Exhibit A Weston and Sampson Bridging Documents_Part2.pdf PDF
RFP27007069_Oct_22_26_solicitation_doc.pdf PDF
CR232410_Backup_Exhibit I Design Build Compensation Matrix.pdf PDF
RFP27007069_Oct_16_26_solicitation_doc.pdf PDF
CR232410_Backup_Exhibit G Project Schedule.pdf PDF
CR232410_Backup_Exhibit E AIA A141.pdf PDF
CR232410_Backup_Exhibit H Specifications.pdf PDF
CR232410_Backup_Exhibit A Weston and Sampson Bridging Documents_Part1.pdf PDF
RFP27007069_Oct_30_26_solicitation_doc.pdf PDF
RFP27007069_Oct_29_26_solicitation_doc.pdf PDF
RFP27007069_Nov_16_26_solicitation_doc.pdf PDF
CR232410_Backup_Exhibit D Bid Form Resubmitted 20261014.pdf PDF
CR232410_ ackup Exhibit F AIA A141 Exhibit B Insurance and Bonds.pdf PDF
RFP27007069_Nov_3_26_solicitation_doc.pdf PDF
Supplemental Bidder Attestation - 12-01-2025.pdf PDF
CR232410_Backup_Exhibit E AIA A141 Exhibit A Design Build Amendment.pdf PDF
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP Exhibit C - PARE Engineering sanitary sewer system plan

IR/TRV CAP(set)

N: 148117.913 E: 316495.366

EL: 116.803

MAG NL(set) FND

N: 148130.961 E: 316261.070

EL: 116.746

PROJECT BENCHMARK

NL UP 1 BENT

ELEV=118.16'

PROJECT BENCHMARK

PUNCH IN SPINDLE

ELEV=119.03'

PROJECT BENCHMARK

SPK SET UP 1 FT

ELEV=117.89'

16"W DI

16"W DI

24+66.47

22+00

23+00

24+00

SMH-09

STA: 22+29

RIM: 115.77

INV IN (NW): 108.39

INV OUT (E): 108.23

SMH-10

STA: 23+44

RIM: 117.07

INV IN (W): 108.94

INV IN (N): 108.94

INV OUT (SE): 108.84

111' OF 8" SDR 35 PVC

S=0.40%

103' OF 8" SDR 35 PVC

S=2.61%

SMH-11

STA: 24+51

RIM: 116.27

INV IN (SW): 112.03

INV IN (W): 112.03

INV OUT (E): 111.73

62' OF 8" SDR 35 PVC

S=0.39%

PL

AI

NS

R

OA

D

THIRTY ACRE POND ROAD

TP

TP

TH

IR

TY

A

C R

E

PO

N D

R O

A D

INSTALL 4" DI PIPE STUB WITH

CAP FOR FUTURE CONNECTION

6" DUCTILE IRON GRAVITY

SEWER CONNECTION

LENGTH: 85 LF ±

SLOPE = 3.2% FT/FT ±

SEWER CROSSING TO BE

ENCASED IN CONCRETE

(SEE DETAIL SHEET C2.3)

CONTRACTOR TO CONNECT TO EXISTING SEWER LATERAL

WITH 6" SDR 35 PVC AND TRANSITION TO 6" DI PIPE FOR

CROSSING OF 30 ACRE POND. PROVIDE SHIELDED REPAIR

COUPLING SUITABLE FOR MATING PVC AND DI PIPE

CONTRACTOR TO PUMP OUT, CLEAN, AND R&D OFF-SITE

EXISTING SEPTIC TANK AND APPURTENANT MATERIALS AS

NECESSARY TO FACILITATE INSTALLATION OF NEW GRAVITY

SERVICE CONNECTION. EXISTING SEPTIC SYSTEM LEACH

FIELD TO BE PERMANENTLY ABANDONED IN-PLACE. OPEN

PIPES ABANDONED IN-PLACE SHALL BE CAPPED

PENDING TEST PIT INFORMATION, CONTRACTOR TO INSTALL

SEWER CLEANOUTS AT DIRECTION OF ENGINEER

(SEE DETAIL ON SHEET C2.2).

PROVIDE SHIELDED REPAIR COUPLING SUITABLE FOR MATING

EXISTING SANITARY SERVICE PIPING TO NEW PIPING

(SEE DETAIL ON SHEET 2.1)

SKOGLEY TURF

RESEARCH CENTER

GARDNER CROPS

RESEARCH CENTER

("AGRONOMY")

CONTRACTOR TO CONDUCT TEST PIT AS NECESSARY TO CONFIRM THE SIZE,

LOCATION, DEPTH AND CONFIGURATION OF EXISTING SEPTIC TANK AND

SANITARY SERVICE PIPING FOR THE PROPERTY/BUILDING. CONTRACTOR TO

REFERENCE CONTRACT SPECIFICATIONS APPENDIX C - SEPTIC SYSTEM RECORD

DRAWINGS. TEST PITS SHALL BE COORDINATED WITH THE OWNER AND ENGINEER

CONTRACTOR TO R&D EXISTING

TREE AND STUMP OFF-SITE

(SEE SHEET C0.2)

CONTRACTOR TO CONDUCT TEST PIT AS NECESSARY

TO CONFIRM THE SIZE, LOCATION, DEPTH OF

EXISTING WATER MAIN. TEST PITS SHALL BE

COORDINATED WITH THE OWNER AND ENGINEER

CAREFULLY REMOVE, STOCKPILE, AND

RESET EXISTING WOODEN RAILROAD TIES

AS NECESSARY (TYP. ALL LOCATIONS)

EXISTING SHRUBS TO BE

REMOVED AND DISPOSED

AS NECESSARY (TYP OF 2)

EXISTING GROUNDWATER MONITORING WELL (SHOWN

(APPROXIMATELY. CONTRACTOR TO REMOVE SECTIONS OF

MONITORING WELL WITHIN LIMITS OF TRENCH EXCAVATION.

REMAINING SECTIONS OF MONITORING WELL TO BE FILLED

WITH BENTONITE PRIOR TO BACKFILL OF TRENCH

4' DIAMETER SANITARY

SEWER MANHOLE (TYP)

22+0023+0024+0025+00

SM

H

-0

ST

A

+2

R

IM

.7

IN

V

IN

.3

(N W

IN

V O

U T

8.

(E

SM

H

-1

ST

A

+4

R

IM

.0

IN

V

IN

.9

(W

IN

V

IN

.9

(N

IN

V O

U T

8.

(S

E)

111LF OF 8" SDR 35 PVC

S=0.40%

103LF OF 8" SDR 35 PVC

S=2.61%

SM

H

-1

ST

A

+5

R

IM

.2

IN

V

IN

.0

(S W

IN

V

IN

.0

(W

IN

V

O U

T

1.

(E

EXISTING

GROUND

SURFACE

P2 4-

EOB=10 FEET

ROCK DEPTH - NOT ENCOUNTERED

GROUNDWATER DEPTH - NOT ENCOUNTERED

16" DI WATER

ELEC DUCTBANK2" CU WATER6" DI WATER

CONCRETE

ENCASEMENT

SCALE: 1"=20' HOR.

SCALE: 1"=4' VER.

WEST ALUMNI AVE GRAVITY SEWER PROFILE

REVISIONS:

PROJECT NO.:

APPROVED BY:

DRAWN BY:

DESIGNED BY:

CHECKED BY:

SCALE:

DATE:

DRAWING NO.:

SHEET NO.

DRAWING TITLE:

OF

1"

SCALE ADJUSTMENT GUIDE

0"

ORIGINAL DRAWING

BAR IS ONE INCH ON

20002.00

JANUARY 2025

AS NOTED

MGM

BKW

MGM / AKL

C1.5

PLAN & PROFILE 5

0 10' 20' 40'

Scale: 1"=20'

M

AT

C H

LI

N

E

- S

EE

S

H

EE

T C

1.

MATCHLINE - SEE SHEET C1.6

S=0.40%

File details come from the government source that posted it. Updated .