Cost Proposal Breakdown 02.pdf

PDF 124 KB Posted

Attached to
Y1PC--Tahoma National Cemetery, Ph 3 Federal contract opportunity
Solicitation number
36C10F24R0011
Issued by
Department of Veterans Affairs Office of Construction and Facilities Management

About this file

This document is a Cost Proposal Breakdown for Solicitation No. 36C10F24R0011, "Y1PC--Tahoma National Cemetery, Ph 3." This solicitation is issued by the Department of Veterans Affairs Office of Construction and Facilities Management for the Tahoma National Cemetery Phase 3 Development, Project Number 919-010.

The Cost Proposal Breakdown outlines the estimated costs across various construction divisions for the base bid (CLIN 0001) as well as five optional CLINs: CLIN 0002 for the cost of crypts, CLIN 0003 for an Honor Guard building and parking, CLIN 0004 for a satellite public restroom, CLIN 0005 for repair/replacement of irrigation piping, and CLIN 0006 for an 18-month compressed schedule for the admin building area. CLIN 0007 covers 130 green burial plots. The document provides a detailed breakdown of estimated costs by construction division for each CLIN.

View the file

Other files for this federal contract opportunity

Other files attached to Y1PC--Tahoma National Cemetery, Ph 3, newest first.
File Type Posted
36C10F24R0011 0007.pdf PDF
36C10F24R0011 0006.pdf PDF
Pre-Proposal Inquiry Form 36C10F24R0011 updated 07-02-2024.pdf PDF
TNC3 PIC Mech Rm_Image 1.pdf PDF
Spec. Section 261219 PAD-MOUNTED, LIQUID-FILLED, MEDIUM-VOLTAGE TRANSFORMERS.pdf PDF
TNC3 PIC Mech Rm_Image 2.pdf PDF
Pre-Proposal Inquiry Form 36C10F24R0011 dated 06-20-2024.pdf PDF
TNC3 PIC Men Restroom.pdf PDF
Columbaria Detail and Ash urn exhibit. Both Items are in one PDF..pdf PDF
36C10F24R0011 0005.pdf PDF
Site Visit - Attendance Sheet.pdf PDF
TNC3 SHEET 157 OF 449.pdf PDF
Pre-Proposal Inquiry Form 36C10F24R0011 06-10-2024.pdf PDF
Tahoma National Cemetery Phase 3 Contractor Overview.pdf PDF
36C10F24R0011 0004.pdf PDF
Interested Vendors List from SAM.GOV as of 06-10-2024.pdf PDF
36C10F24R0011 0003.pdf PDF
36C10F24R0011 0002.pdf PDF
TNC3 BID DOCUMENTS R 2-2-2024 4 of 9.pdf PDF
TNC3 BID DOCUMENTS R 2-2-2024 2 of 9.pdf PDF
TNC3 BID DOCUMENTS R 2-2-2024 8 of 9.pdf PDF
TNC3 BID DOCUMENTS R 2-2-2024 3 of 9.pdf PDF
TNC3 BID DOCUMENTS R 2-2-2024 1 of 9.pdf PDF
TNC Phase 3 Geotechnical Engineering Report-7-26-2023.pdf PDF
CALCULATION OF SELF PERFORMED WORK.pdf PDF
TNC3 SPECIFICATIONS MAY 20 2024.pdf PDF
36C10F24R0011 0001.pdf PDF
TNC3 BID DOCUMENTS R 2-2-2024 6 of 9.pdf PDF
Small Business Subcontracting Plan Model.pdf PDF
TNC3 BID DOCUMENTS R 2-2-2024 9 of 9.pdf PDF
TNC3 BID DOCUMENTS R 2-2-2024 7 of 9.pdf PDF
TNC3 BID DOCUMENTS R 2-2-2024 5 of 9.pdf PDF
VAAR 852.219-75 VA Notice of Limitations on Subcontracting - Certification.pdf PDF
Past Performance Questionnaire 36C10F24R0011.pdf PDF
Pre-Proposal Inquiry Form 36C10F24R0011.pdf PDF
Wage Decision Number WA20240070 dated 03-08-2024.pdf PDF
36C10F24R0011_1.docx DOCX document
Show all 37

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cost Proposal Breakdown

Offeror: Solicitation No.:

CLIN/

Division Description Cost Totals

CLIN 0001 – Base Bid Tahoma National Cemetery, Phase 3 Development, Project Number 919-010

01 General Requirements 02 Existing Conditions 03 Concrete

04 Masonry

05 Metals

06 Wood, Plastics, And Composites

07 Thermal & Moisture Protection

08 Openings

09 Finishes

10 Specialties

11 Equipment 12 Furnishings

22 Plumbing

23 HVAC

26 Electrical

27 Communications

28 Electronic Safety and Security

31 Earthwork

32 Exterior Improvements

33 Utilities

Sub-Total – CLIN 0001

Division Description Cost Totals

CLIN 0002 – Cost of Crypts (not including placement)

03 Concrete

Sub-Total – CLIN 0002

Division Description Cost Totals

CLIN 0003 – OPTION 1. Honor Guard building and parking with new facility

01 General Requirements 02 Existing Conditions 03 Concrete

04 Masonry

05 Metals

06 Wood, Plastics, And Composites

07 Thermal & Moisture Protection

08 Openings

09 Finishes

10 Specialties

11 Equipment 12 Furnishings

22 Plumbing

23 HVAC

26 Electrical

27 Communications

28 Electronic Safety and Security

31 Earthwork

Sub-Total – CLIN 0003

Description

CLIN 0004 - OPTION 2. Satellite public restroom

01 General Requirements 02 Existing Conditions 03 Concrete

04 Masonry

05 Metals

06 Wood, Plastics, And Composites

07 Thermal & Moisture Protection

08 Openings

09 Finishes

10 Specialties

11 Equipment 12 Furnishings

22 Plumbing

23 HVAC

26 Electrical

27 Communications

28 Electronic Safety and Security

31 Earthwork

Sub-Total – CLIN 0004

Division Description Cost Totals

CLIN 0005 - OPTION 3. Repair/Replace Irrigation piping

01 General Requirements 02 Existing Conditions 03 Concrete

04 Masonry

05 Metals

06 Wood, Plastics, And Composites

07 Thermal & Moisture Protection

08 Openings

09 Finishes

10 Specialties

11 Equipment 12 Furnishings

22 Plumbing

23 HVAC

26 Electrical

27 Communications

28 Electronic Safety and Security

31 Earthwork

Sub-Total – CLIN 0005

Division Description Cost Totals

CLIN 0006 - OPTION 4. 18-month compressed schedule for admin building area

01 General Requirements 02 Existing Conditions 03 Concrete

04 Masonry

05 Metals

06 Wood, Plastics, And Composites

07 Thermal & Moisture Protection

08 Openings

09 Finishes

10 Specialties

11 Equipment 12 Furnishings

22 Plumbing

23 HVAC

26 Electrical

27 Communications

28 Electronic Safety and Security

31 Earthwork

Sub-Total – CLIN 0006

Division Description Cost Totals

CLIN 0007 - OPTION 5. 130 green burial plots

01 General Requirements 02 Existing Conditions 03 Concrete

04 Masonry

05 Metals

06 Wood, Plastics, And Composites

07 Thermal & Moisture Protection

08 Openings

09 Finishes

10 Specialties

11 Equipment 12 Furnishings

22 Plumbing

23 HVAC

26 Electrical

27 Communications

28 Electronic Safety and Security

31 Earthwork

Sub-Total – CLIN 0007

File details come from the government source that posted it. Updated .