This document appears to be a plan view and profile view for the construction of Road A as part of the Tahoma National Cemetery Phase 3 Development project. The project is being solicited by the Department of Veterans Affairs Office of Construction and Facilities Management under Solicitation Number 36C10F24R0011.

The plan view and profile view provide detailed engineering drawings for the approximately 550 linear feet of Road A, including the horizontal and vertical alignment, stationing, curve data, curb locations, and finish grade elevations. The drawings show the road construction will include new asphalt pavement, concrete pavement, and curb and gutter. Key details such as the beginning and ending stations, low point station and elevation, and vertical curve information are provided. The drawings reference related civil, structural, and utility drawings that are part of the overall bid documents for this project.

View the file

Other files for this federal contract opportunity

Other files attached to Y1PC--Tahoma National Cemetery, Ph 3, newest first.
File Type Posted
36C10F24R0011 0007.pdf PDF
36C10F24R0011 0006.pdf PDF
Pre-Proposal Inquiry Form 36C10F24R0011 updated 07-02-2024.pdf PDF
TNC3 PIC Mech Rm_Image 1.pdf PDF
Pre-Proposal Inquiry Form 36C10F24R0011 dated 06-20-2024.pdf PDF
TNC3 PIC Men Restroom.pdf PDF
Columbaria Detail and Ash urn exhibit. Both Items are in one PDF..pdf PDF
36C10F24R0011 0005.pdf PDF
Spec. Section 261219 PAD-MOUNTED, LIQUID-FILLED, MEDIUM-VOLTAGE TRANSFORMERS.pdf PDF
TNC3 PIC Mech Rm_Image 2.pdf PDF
Site Visit - Attendance Sheet.pdf PDF
Interested Vendors List from SAM.GOV as of 06-10-2024.pdf PDF
Pre-Proposal Inquiry Form 36C10F24R0011 06-10-2024.pdf PDF
Tahoma National Cemetery Phase 3 Contractor Overview.pdf PDF
36C10F24R0011 0004.pdf PDF
36C10F24R0011 0003.pdf PDF
36C10F24R0011 0002.pdf PDF
TNC3 BID DOCUMENTS R 2-2-2024 4 of 9.pdf PDF
TNC3 BID DOCUMENTS R 2-2-2024 2 of 9.pdf PDF
Small Business Subcontracting Plan Model.pdf PDF
TNC3 BID DOCUMENTS R 2-2-2024 9 of 9.pdf PDF
TNC3 BID DOCUMENTS R 2-2-2024 7 of 9.pdf PDF
TNC3 BID DOCUMENTS R 2-2-2024 5 of 9.pdf PDF
TNC3 BID DOCUMENTS R 2-2-2024 8 of 9.pdf PDF
TNC3 BID DOCUMENTS R 2-2-2024 3 of 9.pdf PDF
TNC3 BID DOCUMENTS R 2-2-2024 1 of 9.pdf PDF
TNC Phase 3 Geotechnical Engineering Report-7-26-2023.pdf PDF
CALCULATION OF SELF PERFORMED WORK.pdf PDF
TNC3 SPECIFICATIONS MAY 20 2024.pdf PDF
36C10F24R0011 0001.pdf PDF
TNC3 BID DOCUMENTS R 2-2-2024 6 of 9.pdf PDF
Cost Proposal Breakdown 02.pdf PDF
VAAR 852.219-75 VA Notice of Limitations on Subcontracting - Certification.pdf PDF
Past Performance Questionnaire 36C10F24R0011.pdf PDF
Wage Decision Number WA20240070 dated 03-08-2024.pdf PDF
36C10F24R0011_1.docx DOCX document
Pre-Proposal Inquiry Form 36C10F24R0011.pdf PDF
Show all 37

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

0+00

1+00

2+00

3+00

4+00

5+00

6+00

BP

: 0

+0 0.

PC

: 1

+3 6.

PT: 5+61.77

R 25'

R25'

+8

20+00 co co co co co co co co co co co co co

STA=4+71.70

OFFSET=-13.00

STA=4+79.87

OFFSET=-22.00

GL 516.49

GL 513.76

GL 511.43

R 506.60

R 506.60

R 509.40

R 509.41

R 516.15

R 518.71

R 521.68

FG 517.12

GL 509.61

GL 511.43

GL 510.48

FG 523.17

0+00

1.

1.

9.

0.

1+00

7.

8.

6.

6.

2+00

7.

7.

8.

8.

3+00

0.

0.

3.

2.

4+00

5.

4.

8.

7.

5+00

0.

9.

5+50

P V

IS

: 0

+2 5.

P

V

IE

: 5

.5

-3.76%

4.78%

PVI STA = 2+26.50

PVI ELEV = 505.03

A.D. = 8.54% K = 20.50

175.00' VC

B V

C S

: 1 +3

9.

B V

C E

: 5

.3

E V

C S

: 3 +1

4.

E V

C E

: 5

.2

LOW PT. STA = 2+16.02

LOW PT ELEV = 506.87

FINISH GRADE

EXISTING GRADE

BEGIN ROAD "A"

STA: 0+25

ELEV: 512.57

R 506.60

R 509.40

R 516.15

R 518.71

LINE TABLE: ALIGNMENT ROAD A

LINE #

L15

L16

L17

L18

L19

L20

L21

L22

LENGTH

136.14

155.07

58.50

142.67

30.97

135.02

59.03

133.33

BEARING

N 06° 27' 21.25" E

N 45° 25' 54.51" W

N 10° 52' 58.90" W

S 68° 55' 21.44" W

S 26° 21' 15.67" E

S 22° 24' 38.43" W

S 48° 16' 21.80" E

S 25° 45' 52.68" E

START POINT

(N 146312.71, E 1327405.21)

(N 146835.66, E 1327283.33)

(N 147062.30, E 1327109.79)

(N 147268.61, E 1326830.42)

(N 146969.43, E 1326600.73)

(N 146727.14, E 1326621.87)

(N 146320.43, E 1326635.11)

(N 146187.64, E 1326749.67)

END POINT

(N 146447.98, E 1327420.52)

(N 146944.49, E 1327172.85)

(N 147119.75, E 1327098.75)

(N 147217.30, E 1326697.29)

(N 146941.68, E 1326614.48)

(N 146602.32, E 1326570.39)

(N 146281.14, E 1326679.17)

(N 146067.57, E 1326807.62)

CURVE TABLE: ALIGNMENT ROAD A

CURVE #

C14

C15

C16

C17

C18

C19

C20

RADIUS

470.00

225.00

200.00

180.00

260.00

250.00

300.00

LENGTH

425.64

135.67

349.74

299.32

221.29

308.41

117.85

CHORD DIRECTION

N 19° 29' 16.63" W

N 28° 09' 26.70" W

N 60° 58' 48.73" W

S 21° 17' 02.88" W

S 01° 58' 18.62" E

S 12° 55' 51.68" E

S 37° 01' 07.24" E

START POINT

(N 146447.9801, E 1327420.5215)

(N 146944.4852, E 1327172.8516)

(N 147119.7481, E 1327098.7483)

(N 147217.2967, E 1326697.2912)

(N 146941.6847, E 1326614.4796)

(N 146602.3175, E 1326570.3898)

(N 146281.1386, E 1326679.1657)

END POINT

(N 146835.6616, E 1327283.3281)

(N 147062.2977, E 1327109.7938)

(N 147268.6063, E 1326830.4196)

(N 146969.4336, E 1326600.7325)

(N 146727.1420, E 1326621.8660)

(N 146320.4265, E 1326635.1122)

(N 146187.6448, E 1326749.6661)

CURB LOCATION TABLE (ROAD A)

STATION TYPE SIDE OF ROAD

4+71.70 TO 6+44.42 VALLEY LEFT

7+62.84 TO 9+91.47 VALLEY LEFT

11+91.57 TO 14+15.61 VALLEY LEFT

16+68.74 TO 19+13.44 VALLEY LEFT

21+52.40 TO 23+57.99 VALLEY LEFT

N

SCALE:1

ROAD A - STA 0+00 TO 5+50 - PLAN VIEW

1" = 20'

0 20' 40'

CR105

157DAMB

ROAD A - STA 0+00 TO 5+50

SCALE:2

ROAD A - STA 0+00 TO 5+50 - PROFILE VIEW

V: 1"= 10' H: 1" = 20'

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fil e P ath : y

:\1

\16

2 t ah om a n c p h3 \_0

7 c ivi l\_ ca d f ile s\_ sh ee ts\

2_ c_ ro ad

.dw g ed it:d am ing a sa ve d:2

/5/

2:

P

M p lot

:5/

/20

:46

A M

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

SECURITY:

IMEG, INC.

TEMPE, AZ 85281

309.793.3421

PETE MCGHEE

Project Director

Revisions:

1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 16362

TAHOMA NATIONAL CEMETERY

PHASE 3 DEVELOPMENT

919PC2010

FEBRUARY 2, 2024

18600 SE 240TH ST, KENT, WA 98042

BID DOCUMENTS

Date:

GEOTECHNICAL:

TERRACON

21905 64TH AVE W SUITE 100

MOUNTLAKE, WA 98043

425.771.3304

DENNIS STETTLER, PE

OF 449

KEY MAP

(N.T.S.)

IRRIGATION:

EC DESIGN GROUP,

LTD

400 5TH STREET

WEST DES MOINES, IA 50265

515.225.6365

LISA ESSY, ASIC

COST ESTIMATING:

LELAND SAYLOR

1777 OAKLAND BLVD #103

WALNUT CREEK, CA 94596

415.291.3200

JEFF SAYLOR

STRUCTURAL:

KPFF

1601 5TH AVE. SUITE 1600

SEATTLE, WA 98101

206.926.0455

JEFF CREAGAN, SE

COMMISSIONING:

CHARLOTTE ENGINEERS,

LLP

5838 MONROE RD. #100

CHARLOTTE, NC 28212

704.531.3000

BRIAN ANNICHARICO, PE

ARCHITECTURAL/MEP:

TOLAND MIZELL MOLNAR

INC.

590 MEANS ST. NW

ATLANTA, GA 30318

404.214.9774

RICK MASSEY, AIA

WASTEWATER:

ADC WASTEWATER

INC.

PO BOX 486

TACOMA, WA 98401

253.203.1200

ROCKY ANDERSON

N

Office of Construction and Facilities Management1600 N. DESERT DR. SUITE 230

BASE BID

BID DOCUMENTS

ROAD "A"

M

UNRO

M

EMO

R

IA

L

DR

IV

E

PULL-OFF PARKING

C

R

2CR301

MATCHLINE SHEET CR114

COLUMBARIA

COURT 8

M

ATCHLINE - SEE SHEET CR106

SEE CU-SERIES FOR STORM SEWER

STRUCTURE AND PIPE DATA.

XXX.XX

LEGEND

PROPERTY LIMITS

CONSTRUCTION LIMITS

WETLAND #

NEW CURB & GUTTER

NEW ASPHALT PAVEMENT

NEW CONCRETE PAVEMENT

2" MILL & OVERLAY EXISTING

ASPHALT PAVEMENT

SPOT ELEVATION

GUTTER LINE

TOP OF CURB

FINISHED GRADE

TOP OF WALL

BOTTOM OF WALL

HIGH POINT

LOW POINT

EMERGENCY OVERFLOW

GL

TC

FG

TW

BW

HP

LP

EOF

0 20' 40'

(HORIZONTAL)

0 10' 20'

(VERTICAL)

AutoCAD SHX Text

EDGE OF GRAVEL

AutoCAD SHX Text

EDGE OF BITUMINOUS

AutoCAD SHX Text

EDGE OF BITUMINOUS

AutoCAD SHX Text 8"

AutoCAD SHX Text 8"

AutoCAD SHX Text 4"

AutoCAD SHX Text

8" WATER MAIN FOR IRRIGATION

AutoCAD SHX Text

4" WATER MAIN

AutoCAD SHX Text

8" WATER MAIN FOR IRRIGATION

AutoCAD SHX Text

4" WATER MAIN

AutoCAD SHX Text

6" WATER

AutoCAD SHX Text

2.5" WATER MAIN

AutoCAD SHX Text 8"

AutoCAD SHX Text 6"

AutoCAD SHX Text 8"

Sheets and Views
CR105 ROAD A - STA 0+00 TO 5+50