TNC3 BID DOCUMENTS R 2-2-2024 5 of 9.pdf
PDF 47 MB Posted
- Attached to
- Y1PC--Tahoma National Cemetery, Ph 3 Federal contract opportunity
- Solicitation number
- 36C10F24R0011
About this file
This document appears to be a set of bid documents related to Solicitation Number 36C10F24R0011 for the Tahoma National Cemetery, Phase 3 project. The solicitation is issued by the Department of Veterans Affairs Office of Construction and Facilities Management.
The key details include:
- This is a solicitation for construction services for the Tahoma National Cemetery, Phase 3 project (Project Number 919-010).
- The solicitation number is 36C10F24R0011.
- The anticipated contract type is not specified in the information provided.
- No details are provided on any set-asides, pricing terms, award dates, or incumbent contractors.
View the file
Other files for this federal contract opportunity
Show all 37
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
T
T
T
G
H
A
A.
A.
E
B.1
B.2
B.3
B.4
H
C.1 C.3
3 D
D.1
I.1
I
C co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co
D 10.5
D 10.5
D 10.5
D 10.5
D 10.5
D 10.5
D 10.5
D 10.5
D 10.5
D 10.5
D 10.5
D 10.5
D 10.5
D 10.5
D 10.5
D 10.5
D 10.5
D 10.5
D 10.5
D 10.5
D 10.5
D 10.5
D 10.5
D 10.5
D10.5
D10.5
D10.5 D10.5
D10.5 D10.5
D10.5 D10.5
D10.5 D10.5
D10.5D10.5D10.5D10.5D10.5D10.5D10.5D10.5
D10.5D10.5D10.5D10.5D10.5D10.5D10.5D10.5
D10.5D10.5D10.5D10.5D10.5D10.5D10.5D10.5
D10.5D10.5D10.5D10.5D10.5D10.5D10.5D10.5
D10.5 D10.5
D .5
D .5
D .5
D .5
D
.5 D
.5
D10.5 D10.5
D10.5 D10.5
D10.5 D10.5
D10.5 D10.5
D10.5 D10.5D10.5
D10.5
D10.5 D10.5
D10.5 D10.5
D10.5 D10.5
D.5
D.5
S10.5S10.5 S.5
S10.5 S10.5
B
B.5
F
G
C18
S.5C15
ST
ST
SB
SB
ST2
ST2
SB2
SB2
ST1ST1 SB1SB1
S.5
S8.4
S8.4
S8.4
S8.4
S10.5
S8.4
S8.4
S10.5
S10.5
S10.5
S8.4
S8.4
S8.4 S8.4
S10.5 S10.5
S10.5 S10.5
S10.5 S10.5
S10.5 S10.5
S10.5 S10.5
S.5
S.5
S8.4
S10.5
S8.4
S8.4
S8.4
S10.5
S10.5
S10.5
S.5
S.5 S.5 S10.5
S10.5 S10.5
S10.5 S10.5
S10.5 S10.5
S10.5 S10.5
S10.5
S8.4 S8.4
S8.4
S8.4
S10.5
S10.5
S10.5
S10.5
S8.4
S8.4
S8.4
S8.4
S8.4
S8.4
A.3
A.2
A.1
A
A.4
D 10.5
D 10.5
D 10.5
D 10.5
D 10.5
D 10.5
D 10.5
D 10.5
D 10.5
D 10.5
D 10.5
D 10.5
D 10.5
D 10.5
D 10.5
D 10.5
D 10.5
D 10.5
D 10.5
D 10.5
D 10.5
D 10.5
D 10.5
D 10.5
D 10.5
D 10.5
D 10.5
D 10.5
D 10.5
D 10.5
D 10.5
D 10.5
D 10.5
D 10.5
D 10.5
D 10.5
D 10.5
D 10.5
D 10.5
D 10.5
D 10.5
D 10.5
D 10.5
D 10.5
D.5
D10.5 D10.5
D10.5 D10.5
D10.5 D10.5
D10.5 D10.5
D.5
D10.5 D10.5
D10.5 D10.5
D10.5 D10.5
D10.5 D10.5
D.5
D10.5 D10.5
D10.5 D10.5
D10.5 D10.5
D10.5 D10.5
D.5
D10.5 D10.5
D10.5 D10.5
D10.5 D10.5
D10.5D10.5
D10.5D10.5
D.5
D10.5D10.5D10.5D10.5D10.5D10.5
D10.5D10.5
D.5
D10.5D10.5D10.5D10.5D10.5D10.5
D.5
D10.5D10.5
D10.5D10.5
D10.5D10.5
D10.5D10.5
D.5
D10.5D10.5
D10.5D10.5
D10.5D10.5
D10.5D10.5
D10.5D10.5D10.5D10.5
D10.5D10.5D10.5D10.5
D10.5D10.5D10.5D10.5
D10.5D10.5
D10.5D10.5
D10.5D10.5
D10.5D10.5
D10.5D10.5
D10.5D10.5
D10.5 D10.5
D10.5 D10.5
D8.4
D10.5 D10.5
D10.5 D10.5
D8.4
D10.5 D10.5
D10.5 D10.5
D8.4
D10.5 D10.5
D10.5 D10.5
D8.4 D8.4
D8.4
D8.4
D8.4
C10
F
E.6
E.5
E.4
E
D.1
D
C.2 C.1
C
C.3 C.4
B.4
B.5 B.6
B.7
B.8
B.3
B.2
B.1
B
E.2
B.9
C12
C11
C
R1 R1
R1R1
R3
R1 R1 R1 R1 R1R1
C
SB1
SB1
ST1
ST1
ST3
SB3
SB3
SB3
ST3
ST3
S.5
S10.5
S10.5
S10.5
S10.5
S10.5
S10.5
S8.4
S8.4 S10.5
S10.5
S10.5
S10.5
S10.5
S10.5
S10.5
S10.5
S10.5
S10.5 S8.4
S8.4 S8.4
S8.4
S8 .4
S8 .4
S8 .4
S8 .4
S1 0.
S1 0.
S1 0.
S1 0.
S1 0.
S1 0.
S1 0.
S1 0.
S1 0.
S1 0.
S1 0.
S1 0.
S8 .4
S8 .4
S8 .4
S8 .4
S10.5
S10.5
S.5
C7
S1 0.
S1 0.
S8 .4
S8 .4
S8 .4
S8 .4
S1 0.5
S1 0.5
S1 0.5
S1 0.5
S8 .4
S8 .4
S1 0.5
S1 0.5
S1 0.5
S1 0.5
S1 0.5
S1 0.5
S1 0.5
S1 0.5
S10.5
C6
S10.5
S10.5
S10.5
S10.5
S10.5
S10.5
S10.5
S10.5
S10.5
R1
R1 R1
R1 R1
R1 R1
R1 R1
R1R1 R1
R1R1 R1 R1 R1
R2 R2R8
R2 R9
A
A.1
A.2
A.3
A.4
A.5
B
B.3
B.4
B.5
B.1
B.2
D10.5 D10.5
D10.5 D10.5
D10.5 D10.5
D10.5 D10.5
D10.5 D10.5
D10.5 D10.5
D10.5 D10.5
D10.5 D10.5
D10.5 D10.5
D10.5 D10.5
D10.5 D10.5
D10.5 D10.5
D10.5 D10.5
D10.5 D10.5
D10.5 D10.5
D10.5 D10.5
D10.5 D10.5
D10.5 D10.5
D10.5 D10.5
D10.5 D10.5
D10.5 D10.5
D10.5 D10.5
D10.5 D10.5
D1 0.
D1
0.
D1 0.
D1
0.
D1 0.
D1
0.
C13
C13
SB
SB
SB
SB5
SB5
ST
ST
ST
ST5
ST5
SB
SB
ST
ST
SB1
SB1
ST1
ST1
S10.5
S.5
S10.5
S10.5
S10.5
S10.5
S10.5
S10.5
S10.5
S10.5
S10.5
S10.5
S10.5
S10.5
S10.5
S10.5
S10.5
S10.5
S10.5
S10.5
S10.5
S10.5
S10.5
S.5
S10.5
S10.5
S10.5
S10.5
S10.5
S10.5
S10.5
S10.5
S10.5
S10.5
S10.5
S10.5
S10.5
S10.5
S10.5
S10.5
S10.5
S10.5
CO
CO
CO
CO CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
COCOCO
COCO
CO
CO
CO
CO
CO
N
SCALE:1
OVERALL UTILITY PLAN
1" = 150' (30" x 42" PAPER SIZE)
0 150' 300'
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fil e P ath : y
:\1
\16
2 t ah om a n c p h3 \_0
7 c ivi l\_ ca d f ile s\_ sh ee ts\
2_ c_ uti l.d wg e dit
:jri ch ne r sa ve d:2
/1/
3:
P
M p lot
:2/ 2/2
4 7
:37 A
M
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
SECURITY:
IMEG, INC.
TEMPE, AZ 85281
309.793.3421
PETE MCGHEE
Project Director
Revisions:
1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 16362
TAHOMA NATIONAL CEMETERY
PHASE 3 DEVELOPMENT
919PC2010
FEBRUARY 2, 2024
18600 SE 240TH ST, KENT, WA 98042
BID DOCUMENTS
Date:
GEOTECHNICAL:
TERRACON
21905 64TH AVE W SUITE 100
MOUNTLAKE, WA 98043
425.771.3304
DENNIS STETTLER, PE
OF 449
KEY MAP
(N.T.S.)
IRRIGATION:
EC DESIGN GROUP,
LTD
400 5TH STREET
WEST DES MOINES, IA 50265
515.225.6365
LISA ESSY, ASIC
COST ESTIMATING:
LELAND SAYLOR
1777 OAKLAND BLVD #103
WALNUT CREEK, CA 94596
415.291.3200
JEFF SAYLOR
STRUCTURAL:
KPFF
1601 5TH AVE. SUITE 1600
SEATTLE, WA 98101
206.926.0455
JEFF CREAGAN, SE
COMMISSIONING:
CHARLOTTE ENGINEERS,
LLP
5838 MONROE RD. #100
CHARLOTTE, NC 28212
704.531.3000
BRIAN ANNICHARICO, PE
ARCHITECTURAL/MEP:
TOLAND MIZELL MOLNAR
INC.
590 MEANS ST. NW
ATLANTA, GA 30318
404.214.9774
RICK MASSEY, AIA
WASTEWATER:
ADC WASTEWATER
INC.
PO BOX 486
TACOMA, WA 98401
253.203.1200
ROCKY ANDERSON
N
Office of Construction and Facilities Management1600 N. DESERT DR. SUITE 230
BASE BID
BID DOCUMENTS
LEGEND
PROPERTY LIMITS
CONSTRUCTION LIMITS
WETLAND #
EXISTING WETLANDS
RETENTION BASIN
DRAINAGE DIRECTION/FLOW
LOW POINT
HIGH POINT
MATCH POINT
EXISTING GROUND
HEADSTONE DIRECTION
KEY NOTES
NEW PRIMARY DRAINFIELD LOCATION. NO
GRADING WITHIN THIS AREA.
RESERVE DRAINFIELD OR DRIPFIELD
LOCATION. NO GRADING WITHIN THIS AREA.
LP
HP
MP
EG
CU101
OVERALL UTILITY PLAN
CU102
CU104
CU106
CU109
CU103
CU105
CU107
CU110
CU112
CU114
CU108
CU111
CU113
CU115
UTILITY NOTES
1. PROTECT ALL EXISTING UTILITIES LINES IN PLACE
UNLESS OTHERWISE NOTED.
RO
AD
A
ROAD A
PPC
COLUMBARIUM
'6'
COLUMBARIUM
'8'
GREEN
ADMINISTRATION /
MAINTENANCE
FACILITY
COLUMBARIUM
'7'
TRAD
ADMINISTRATION /
MAINTENANCE
FACILITY ADDITION
MAINTENANCE
IGC
IGC
IGC
IGC
TRAD
OVERSIZED
PPC
ADDITIVE ITEM 2
SEE "AI2" SHEETS
NOT IN BASE BID
ADDITIVE ITEM 1
SEE "AI1" SHEETS
NOT IN BASE BID
1" TYPE "K"
COPPER PIPE
WET TAP
DOMESTIC
WATER MAIN
SEE 4/CU501
YARD HYDRANT,
SEE DETAIL
71 LF 12" HDPE @ 3.82%
159 LF 12" HDPE @ 2.38%
81 LF 12" HDPE @ 2.35%
27 LF 12" HDPE @ 3.01%
81 LF 12" HDPE @ 2.47%
26 LF 12" PERF. HDPE @ 3.81%FES-101
N: 147315.15
E: 1326681.33
INV 528.22
FES-102
N: 147315.79 E: 1326752.40
INV 525.50
CBMH-110
STA 14+21.49
-13.25L
RIM 533.08
INV 528.20 (12" OUT)
INV 528.20 (12" IN)
CB-110A
STA 14+19.17
13.25R
RIM 533.02
INV 529.00 (12" OUT) CBMH-111
STA 12+60.77
-13.00L
RIM 529.06
INV 524.40 (12" IN)
INV 524.40 (12" OUT)
INV 525.00 (12" IN)
CB-111A
STA 12+60.77
13.25R
RIM 529.05
INV 526.00 (12" OUT)
CBMH-112
STA 11+73.27
-13.25L
RIM 528.31
INV 522.40 (12" OUT)
INV 522.40 (12" IN)
N
SCALE:1
UTILITY PLAN
1" = 30' (30" x 42" PAPER SIZE)
0 30' 60'
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fil e P ath : y
:\1
\16
2 t ah om a n c p h3 \_0
7 c ivi l\_ ca d f ile s\_ sh ee ts\
2_ c_ uti l.d wg e dit
:jri ch ne r sa ve d:2
/1/
3:
P
M p lot
:2/ 2/2
4 7
:37 A
M
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
SECURITY:
IMEG, INC.
TEMPE, AZ 85281
309.793.3421
PETE MCGHEE
Project Director
Revisions:
1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 16362
TAHOMA NATIONAL CEMETERY
PHASE 3 DEVELOPMENT
919PC2010
FEBRUARY 2, 2024
18600 SE 240TH ST, KENT, WA 98042
BID DOCUMENTS
Date:
GEOTECHNICAL:
TERRACON
21905 64TH AVE W SUITE 100
MOUNTLAKE, WA 98043
425.771.3304
DENNIS STETTLER, PE
OF 449
KEY MAP
(N.T.S.)
IRRIGATION:
EC DESIGN GROUP,
LTD
400 5TH STREET
WEST DES MOINES, IA 50265
515.225.6365
LISA ESSY, ASIC
COST ESTIMATING:
LELAND SAYLOR
1777 OAKLAND BLVD #103
WALNUT CREEK, CA 94596
415.291.3200
JEFF SAYLOR
STRUCTURAL:
KPFF
1601 5TH AVE. SUITE 1600
SEATTLE, WA 98101
206.926.0455
JEFF CREAGAN, SE
COMMISSIONING:
CHARLOTTE ENGINEERS,
LLP
5838 MONROE RD. #100
CHARLOTTE, NC 28212
704.531.3000
BRIAN ANNICHARICO, PE
ARCHITECTURAL/MEP:
TOLAND MIZELL MOLNAR
INC.
590 MEANS ST. NW
ATLANTA, GA 30318
404.214.9774
RICK MASSEY, AIA
WASTEWATER:
ADC WASTEWATER
INC.
PO BOX 486
TACOMA, WA 98401
253.203.1200
ROCKY ANDERSON
N
Office of Construction and Facilities Management1600 N. DESERT DR. SUITE 230
BASE BID
BID DOCUMENTS
CU102
UTILITY PLAN
MATCHLINE - SHEET CU104
M A
TC
H
LI
N
E
S H
E E
T C
U
SCALE:2
YARD HYDRANT LAYOUT
1" = 5' (30" x 42" PAPER SIZE)
CU501
CU501
CU102
CU104
CU106
CU109
CU103
CU105
CU107
CU110
CU112
CU114
CU108
CU111
CU113
CU115
REMOVABLE BOLLARD
REMOVABLE BOLLARD
3'
2'
4" YARD HYDRANT, FROST PROOF,
SHUT OFF VALVE 18 INCHES BELOW GRADE
CU102
MAINTENANCE
BUILDING
KEY NOTES
STUB STORM SEWER FOR RAINGARDEN OUTLET
CONNECTION. SEE COLUMBARIA DRAINAGE PLANS
FOR MORE INFO.
CONSTRUCT INLET STRUCTURE ON EXISTING
CULVERT END & CONNECT NEW STORM SEWER.
INSTALL 6" SCH 40 PVC SANITARY PIPE IN 10" STEEL
CASING PIPE. ENDS OF CASING PIPE SHALL EXTEND
A MINIMUM OF 5' BEYOND EXTENTS OF BUILDING
FOOTINGS. SEE 7/CU501.
CONNECT TO EXISTING SEPTIC TANK. CONTRACTOR
TO VERIFY EXISTING PIPE INVERT & NOTIFY
ENGINEER OF ANY DISCREPANCY BETWEEN EXISTING
& NEW.
4" SANITARY CONNECTION, SEE PLUMBING PLANS.
DRAINTILE CONNECTION FROM COLUMBARIA COURT.
WSDOT TYPE 1 CATCH BASIN, SEE 1/CU501.
WSDOT TYPE 2 CATCH BASIN, SEE 2/CU501.
SEE 5/CU502 FOR UNDERGROUND STORMWATER
MANAGEMENT FACILITY EXTENTS
VALLEY GRATE, SEE 5/CU503.
RAIN GARDEN EXTERIOR TO PLAZA, SEE 3/CU501.
RAIN GARDEN WITHIN PLAZA, SEE 6/CU501
30" NYLOPLAST BASIN WITH PEDESTRIAN GRATE
HEAT PUMP, SEE MECHANICAL PLANS
CONNECT TO EXISTING SANITARY SEWER AT
CLEANOUT
LEGEND
PROPERTY LIMITS
CONSTRUCTION LIMITS
WETLAND #
EXISTING WETLANDS
EXISTING 8" HDPE IRRIGATION
MAIN
EXISTING 4" DOMESTIC WATER
MAIN
EXISTING UNDERGROUND
ELECTRIC LINE
RETENTION BASIN
NEW STORM SEWER
NEW FLARED END
NEW CATCH BASIN
NEW WATER LINE
SANITARY SEWER
PERFORATED UNDERDRAIN
CLEAN OUT
PROPOSED UNDERGROUND
ELECTRIC LINE
PROPOSED IRRIGATION MAIN
UTILITY NOTES
1. PROTECT ALL EXISTING UTILITIES LINES IN PLACE
UNLESS OTHERWISE NOTED.
2. STORM STRUCTURE DIAMETER IS 48" UNLESS
OTHERWISE NOTED.
CO
ROAD A
6'
CU502
D10.5 D10.5
D10.5 D10.5
D10.5
D1 0.
D1
0.
D1 0.
D1
0.
D1 0.
D1
0.
SB
SB
ST
ST
S10.5
S10.5
S10.5
S10.5
S10.5
S10.5
S10.5
S10.5
S10.5
LF
2" H
D
PE
.0 0%
82 LF 12" HDPE @ 0.00%
27 LF 12" PERF. HDPE @ 0.00%
CB-114A
STA 10+85.89
13.25R
RIM 527.60
INV 520.40 (12" OUT)
CBMH-115
STA 9+97.35
-13.25L
RIM 526.90
INV 520.50 (12" IN)
INV 520.50 (12" OUT)
CBMH-114
STA 10+85.89
-13.25L
RIM 527.60
INV 520.50 (12" IN)
INV 520.50 (12" OUT)
INV 520.40 (12" IN)
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fil e P ath : y
:\1
\16
2 t ah om a n c p h3 \_0
7 c ivi l\_ ca d f ile s\_ sh ee ts\
2_ c_ uti l.d wg e dit
:jri ch ne r sa ve d:2
/1/
3:
P
M p lot
:2/ 2/2
4 7
:38 A
M
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
SECURITY:
IMEG, INC.
TEMPE, AZ 85281
309.793.3421
PETE MCGHEE
Project Director
Revisions:
1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 16362
TAHOMA NATIONAL CEMETERY
PHASE 3 DEVELOPMENT
919PC2010
FEBRUARY 2, 2024
18600 SE 240TH ST, KENT, WA 98042
BID DOCUMENTS
Date:
GEOTECHNICAL:
TERRACON
21905 64TH AVE W SUITE 100
MOUNTLAKE, WA 98043
425.771.3304
DENNIS STETTLER, PE
OF 449
KEY MAP
(N.T.S.)
IRRIGATION:
EC DESIGN GROUP,
LTD
400 5TH STREET
WEST DES MOINES, IA 50265
515.225.6365
LISA ESSY, ASIC
COST ESTIMATING:
LELAND SAYLOR
1777 OAKLAND BLVD #103
WALNUT CREEK, CA 94596
415.291.3200
JEFF SAYLOR
STRUCTURAL:
KPFF
1601 5TH AVE. SUITE 1600
SEATTLE, WA 98101
206.926.0455
JEFF CREAGAN, SE
COMMISSIONING:
CHARLOTTE ENGINEERS,
LLP
5838 MONROE RD. #100
CHARLOTTE, NC 28212
704.531.3000
BRIAN ANNICHARICO, PE
ARCHITECTURAL/MEP:
TOLAND MIZELL MOLNAR
INC.
590 MEANS ST. NW
ATLANTA, GA 30318
404.214.9774
RICK MASSEY, AIA
WASTEWATER:
ADC WASTEWATER
INC.
PO BOX 486
TACOMA, WA 98401
253.203.1200
ROCKY ANDERSON
N
Office of Construction and Facilities Management1600 N. DESERT DR. SUITE 230
BASE BID
BID DOCUMENTS
N
SCALE:1
UTILITY PLAN
1" = 30' (30" x 42" PAPER SIZE)
0 30' 60'
CU103
UTILITY PLAN
MATCHLINE - SHEET CU105
M A
TC
H
LIN
E
- S H
E E
T C U
CU102
CU104
CU106
CU109
CU103
CU105
CU107
CU110
CU112
CU114
CU108
CU111
CU113
CU115
KEY NOTES
STUB STORM SEWER FOR RAINGARDEN OUTLET
CONNECTION. SEE COLUMBARIA DRAINAGE PLANS
FOR MORE INFO.
CONSTRUCT INLET STRUCTURE ON EXISTING
CULVERT END & CONNECT NEW STORM SEWER.
INSTALL 6" SCH 40 PVC SANITARY PIPE IN 10" STEEL
CASING PIPE. ENDS OF CASING PIPE SHALL EXTEND
A MINIMUM OF 5' BEYOND EXTENTS OF BUILDING
FOOTINGS. SEE 7/CU501.
CONNECT TO EXISTING SEPTIC TANK. CONTRACTOR
TO VERIFY EXISTING PIPE INVERT & NOTIFY
ENGINEER OF ANY DISCREPANCY BETWEEN EXISTING
& NEW.
4" SANITARY CONNECTION, SEE PLUMBING PLANS.
DRAINTILE CONNECTION FROM COLUMBARIA COURT.
WSDOT TYPE 1 CATCH BASIN, SEE 1/CU501.
WSDOT TYPE 2 CATCH BASIN, SEE 2/CU501.
SEE 5/CU502 FOR UNDERGROUND STORMWATER
MANAGEMENT FACILITY EXTENTS
VALLEY GRATE, SEE 5/CU503.
RAIN GARDEN EXTERIOR TO PLAZA, SEE 3/CU501.
RAIN GARDEN WITHIN PLAZA, SEE 6/CU501
30" NYLOPLAST BASIN WITH PEDESTRIAN GRATE
HEAT PUMP, SEE MECHANICAL PLANS
CONNECT TO EXISTING SANITARY SEWER AT
CLEANOUT
LEGEND
PROPERTY LIMITS
CONSTRUCTION LIMITS
WETLAND #
EXISTING WETLANDS
EXISTING 8" HDPE IRRIGATION
MAIN
EXISTING 4" DOMESTIC WATER
MAIN
EXISTING UNDERGROUND
ELECTRIC LINE
RETENTION BASIN
NEW STORM SEWER
NEW FLARED END
NEW CATCH BASIN
NEW WATER LINE
SANITARY SEWER
PERFORATED UNDERDRAIN
CLEAN OUT
PROPOSED UNDERGROUND
ELECTRIC LINE
PROPOSED IRRIGATION MAIN
UTILITY NOTES
1. PROTECT ALL EXISTING UTILITIES LINES IN PLACE
UNLESS OTHERWISE NOTED.
2. STORM STRUCTURE DIAMETER IS 48" UNLESS
OTHERWISE NOTED.
CO
COLUMBARIUM 7
RO
AD A
A.3
A.2
A.1
A
A.4
D10.5D10.5
D.5
D10.5D10.5D10.5D10.5D10.5D10.5
D10.5D10.5
D.5
D10.5D10.5D10.5D10.5D10.5D10.5
D.5
D10.5D10.5
D10.5D10.5
D10.5D10.5
D10.5D10.5
D.5
D10.5D10.5
D10.5D10.5
D10.5D10.5
D10.5D10.5
D10.5D10.5D10.5D10.5
D10.5D10.5D10.5D10.5
D10.5D10.5
D10.5D10.5
D10.5D10.5
D10.5D10.5
D10.5D10.5
D10.5 D10.5
D10.5 D10.5
D8.4
D10.5 D10.5
D10.5 D10.5
D8.4
D10.5 D10.5
D10.5 D10.5
D8.4
D10.5 D10.5
D10.5 D10.5
D8.4 D8.4
D8.4
D8.4
D8.4
C10
D
B.4
B.5 B.6
B.7
B.8
B.3
B.2
B.1
B
B.9
C12
C11
C8
R1 R1
S1
S1
S1
S1
S1
S1
S1
S1
S1
S1
S1
ST3SB3
SB3
SB3
ST3
ST3
S10.5
S10.5
S10.5
S10.5
S10.5
S10.5
S8.4
S8.4 S10.5
S10.5
S10.5
S10.5
S10.5
S10.5
S10.5
S10.5
S10.5
S10.5 S8.4
S8.4
S8.4
S8.4
S8 .4
S8 .4
S8 .4
S8 .4
S1 0.
S1 0.
S1 0.
S1 0.
S1 0.
S1 0.
S1 0.
S1 0.
S1 0.
S1 0.
S1 0.
S1 0.
S8 .4
S8 .4
S8 .4
S8 .4
S10.5
S10.5
S.5
C7
S1 0.
S1 0.
S8 .4
E1
SC1
E2
E3
SC1
E4
E5
SC2E6
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
27 LF 12" HDPE @ 0.75%
L
F
" H
DP
E
.2
9%
48 LF 18" HDPE @ 0.94%77
L
F
" H D
PE
.6
5%
77 LF 12" HDPE @
1.30%
57 LF 12" HDPE @ 1.42% 20 LF 12" HDPE @ 1.42%
L
F
" H D
P E
.8 8%
58 LF 12" HDPE @ 0.86%
71 LF 12" HDPE @ 0.71%
90 LF 12" HDPE @ 1.26%
LF
2" H
D
PE
.1 5%
26 LF 12" HDPE @ 0.50%
99 LF 12" HDPE @ 1.42%
21 LF 12" RCP @ 2.39%
19 LF 12" HDPE @ -10.81%
CB-129
STA 22+12.35
-13.00L
RIM 536.06
INV 532.50 (12" OUT)
INV 533.00 (8" IN)
CB-121
N: 147021.23
E: 1326701.94
RIM 535.43
INV 532.50 (12" OUT)
CB-132A
STA 18+23.61
-13.00L
RIM 535.75
INV 531.25 (12" OUT)
CB-122
N: 146950.78
E: 1326732.50
RIM 535.02
INV 531.50 (12" IN)
INV 531.50 (12" OUT)
CB-130A
STA 21+17.31
13.25R
RIM 534.72
INV 531.50 (12" OUT)
CBMH-130
STA 21+16.79
-13.12L
RIM 534.72
INV 531.37 (12" IN)
INV 531.27 (12" OUT)
INV 531.37 (12" IN)
CB-123
N: 146946.29 E: 1326788.84
RIM 533.80
INV 530.70 (12" IN)
INV 530.70 (12" OUT)
CBMH-131
STA 19+70.11
-13.25L
RIM 533.00
INV 529.60 (12" IN)
INV 529.60 (12" OUT)
INV 529.60 (12" IN)
CB-131A
STA 19+70.11
13.25R
RIM 533.00
INV 529.80 (12" OUT)
CB-126
N: 146864.43
E: 1326892.31
RIM 531.24
INV 528.50 (12" IN)
INV 528.50 (12" OUT)
CB-127
N: 146806.53
E: 1326891.80
RIM 531.22
INV 528.00 (12" IN)
INV 528.00 (12" OUT)
CB-125
N: 146923.03 E: 1326891.43
RIM 531.19
INV 529.02 (12" OUT)
INV 529.02 (12" IN)
STMH-132
N: 146783.92 E: 1326674.82
RIM 533.00
INV 528.45 (12" IN)
INV 527.95 (18" OUT)
INV 528.45 (12" IN)
OCS - 2
N: 146732.73 E: 1326810.25
RIM 531.02
INV 527.00 (12" IN)
INV 527.50 (12" OUT)
FES-128
N: 146778.22
E: 1326827.06
INV 527.50
FES-133
N: 146768.99 E: 1326720.47
INV 527.50
FES-201
N: 146719.11
E: 1326826.15
INV 527.00
CB-124
N: 146926.96
E: 1326792.66
RIM 533.73
INV 530.42 (12" IN)
INV 530.42 (12" OUT)
FES-200
N: 146745.30
E: 1326796.68
RIM 525.75
INV 525.00 (12" OUT)
N
SCALE:1
UTILITY PLAN
1" = 30' (30" x 42" PAPER SIZE)
0 30' 60'
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fil e P ath : y
:\1
\16
2 t ah om a n c p h3 \_0
7 c ivi l\_ ca d f ile s\_ sh ee ts\
2_ c_ uti l.d wg e dit
:jri ch ne r sa ve d:2
/1/
3:
P
M p lot
:2/ 2/2
4 7
:38 A
M
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
SECURITY:
IMEG, INC.
TEMPE, AZ 85281
309.793.3421
PETE MCGHEE
Project Director
Revisions:
1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 16362
TAHOMA NATIONAL CEMETERY
PHASE 3 DEVELOPMENT
919PC2010
FEBRUARY 2, 2024
18600 SE 240TH ST, KENT, WA 98042
BID DOCUMENTS
Date:
GEOTECHNICAL:
TERRACON
21905 64TH AVE W SUITE 100
MOUNTLAKE, WA 98043
425.771.3304
DENNIS STETTLER, PE
OF 449
KEY MAP
(N.T.S.)
IRRIGATION:
EC DESIGN GROUP,
LTD
400 5TH STREET
WEST DES MOINES, IA 50265
515.225.6365
LISA ESSY, ASIC
COST ESTIMATING:
LELAND SAYLOR
1777 OAKLAND BLVD #103
WALNUT CREEK, CA 94596
415.291.3200
JEFF SAYLOR
STRUCTURAL:
KPFF
1601 5TH AVE. SUITE 1600
SEATTLE, WA 98101
206.926.0455
JEFF CREAGAN, SE
COMMISSIONING:
CHARLOTTE ENGINEERS,
LLP
5838 MONROE RD. #100
CHARLOTTE, NC 28212
704.531.3000
BRIAN ANNICHARICO, PE
ARCHITECTURAL/MEP:
TOLAND MIZELL MOLNAR
INC.
590 MEANS ST. NW
ATLANTA, GA 30318
404.214.9774
RICK MASSEY, AIA
WASTEWATER:
ADC WASTEWATER
INC.
PO BOX 486
TACOMA, WA 98401
253.203.1200
ROCKY ANDERSON
N
Office of Construction and Facilities Management1600 N. DESERT DR. SUITE 230
BASE BID
BID DOCUMENTS
CU104
UTILITY PLAN
MATCHLINE - SHEET CU102
MATCHLINE - SHEET CU106
M A
TC
H
LI
N
E
S H
E E
T C
U
FOR COLUMBARIA
6 DRAINAGE PLAN
SEE SHEET LG101
CU102
CU104
CU106
CU109
CU103
CU105
CU107
CU110
CU112
CU114
CU108
CU111
CU113
CU115
FOR CRYPT SECTION 16
UNDERDRAIN PLAN,
SEE SHEET CU117
KEY NOTES
STUB STORM SEWER FOR RAINGARDEN OUTLET
CONNECTION. SEE COLUMBARIA DRAINAGE PLANS
FOR MORE INFO.
CONSTRUCT INLET STRUCTURE ON EXISTING
CULVERT END & CONNECT NEW STORM SEWER.
INSTALL 6" SCH 40 PVC SANITARY PIPE IN 10" STEEL
CASING PIPE. ENDS OF CASING PIPE SHALL EXTEND
A MINIMUM OF 5' BEYOND EXTENTS OF BUILDING
FOOTINGS. SEE 7/CU501.
CONNECT TO EXISTING SEPTIC TANK. CONTRACTOR
TO VERIFY EXISTING PIPE INVERT & NOTIFY
ENGINEER OF ANY DISCREPANCY BETWEEN
EXISTING & NEW.
4" SANITARY CONNECTION, SEE PLUMBING PLANS.
DRAINTILE CONNECTION FROM COLUMBARIA COURT.
WSDOT TYPE 1 CATCH BASIN, SEE 1/CU501.
WSDOT TYPE 2 CATCH BASIN, SEE 2/CU501.
SEE 5/CU502 FOR UNDERGROUND STORMWATER
MANAGEMENT FACILITY EXTENTS
VALLEY GRATE, SEE 5/CU503.
RAIN GARDEN EXTERIOR TO PLAZA, SEE 3/CU501.
RAIN GARDEN WITHIN PLAZA, SEE 6/CU501
30" NYLOPLAST BASIN WITH PEDESTRIAN GRATE
LEGEND
PROPERTY LIMITS
CONSTRUCTION LIMITS
WETLAND #
EXISTING WETLANDS
EXISTING 8" HDPE IRRIGATION
MAIN
EXISTING 4" DOMESTIC WATER
MAIN
EXISTING UNDERGROUND
ELECTRIC LINE
RETENTION BASIN
NEW STORM SEWER
NEW FLARED END
NEW CATCH BASIN
NEW WATER LINE
SANITARY SEWER
PERFORATED UNDERDRAIN
CLEAN OUT
PROPOSED UNDERGROUND
ELECTRIC LINE
PROPOSED IRRIGATION MAIN
UTILITY NOTES
1. PROTECT ALL EXISTING UTILITIES LINES IN PLACE
UNLESS OTHERWISE NOTED.
2. STORM STRUCTURE DIAMETER IS 48" UNLESS
OTHERWISE NOTED,
CO
CU502
CU502
CU502
GREEN
R O
AD
A
CU503
TRADITIONAL
A
A.
A.
E
B.1
B.2
B.3
B.4
H
C.1 C.3
3 D
D.1
I.1
I
C co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co
D 10.5
D 10.5
D 10.5
D 10.5
D 10.5
D 10.5
D 10.5
D 10.5
D 10.5
D 10.5
D 10.5
D 10.5
D 10.5
D 10.5
D 10.5
D 10.5
D 10.5
D 10.5
D 10.5
D 10.5
D 10.5
D 10.5
D 10.5
D 10.5
D10.5
D10.5
D8.4
D10.5 D10.5
D10.5 D10.5
D10.5 D10.5
D10.5 D10.5
D8.4D10.5D10.5D10.5D10.5D10.5D10.5D10.5D10.5
D8.4D10.5D10.5D10.5D10.5D10.5D10.5D10.5D10.5
D8.4D10.5D10.5D10.5D10.5D10.5D10.5D10.5D10.5
D8.4D10.5D10.5D10.5D10.5D10.5D10.5D10.5D10.5
D 8.4D8.4
D 8.4D8.4
D 8.4D8.4
D 8.4D8.4
D8.4
D8.4
D8.4
D8.4
D10.5 D10.5 D8.4D8.4
D .5
D .5
D .5
D .5
D8.4D8.4D8.4D8.4D8.4D8.4
D
.5 D
.5 D
8.
4D 8.
4D 8.
4D 8.
4D 8.
4D 8.
4D 8.
4D 8.
D8.4D8.4
D10.5 D10.5
D10.5
D10.5
D10.5
D10.5
D8.4D8.4
D10.5 D10.5
D10.5 D10.5D10.5
D10.5
D8.4
D8.4
D10.5 D10.5
D10.5 D10.5
D10.5 D10.5
D8.4
D.5
D.5
S10.5S10.5S8.4S8.4S.5
S10.5 S10.5S8.4S8.4S8.4S8.4S8.4S8.4
B
B.5
F
G
C19
C18
S.5
R
R
R
R
R
R
R
R
R
R
R
R
R 4R4 R4 R4 R4
C1
C16
C1
C17
C
C15
R 4R
S1 S1 S1 S1
S1 S1
S1S1
S1
S1
S1
S1 S1
S1 S1
S1 S1
S1
S1S1
S1
S1 S1
ST
ST
SB
SB
ST2
ST2
SB2
SB2
ST1ST1 SB1SB1
S.5
S8.4
S8.4
S8.4
S8.4
S10.5
S8.4
S8.4
S10.5
S10.5
S10.5
S8.4
S8.4
S8.4 S8.4
S10.5 S10.5
S10.5 S10.5
S10.5 S10.5
S10.5 S10.5
S10.5 S10.5
S.5
S.5
S8.4
S10.5
S8.4
S8.4
S8.4
S10.5
S10.5
S10.5
S.5
S.5 S.5 S10.5
S10.5 S10.5
S10.5 S10.5
S10.5 S10.5
S10.5 S10.5
S10.5
S8.4S8.4
S8.4
S8.4
S10.5
S10.5
S10.5
S10.5
S8.4
S8.4
S8.4
S8.4
S8.4
S8.4
R 5R
R6 R
E10
SC1
E11
E13
E1
SC
E16
SC4 E17
E18
SC2 E17
E14
E1
SC4
SC3
E1
E19
A
A.1
A.2
A.3
A.4
A.5
B
B.3
B.4
B.5
B.1
B.2
D10.5 D10.5
D10.5 D10.5
D10.5 D10.5
D10.5 D10.5
D10.5 D10.5
D10.5 D10.5
D10.5 D10.5
D10.5 D10.5
D10.5 D10.5
D10.5 D10.5
D10.5 D10.5
D10.5 D10.5
D10.5 D10.5
D10.5 D10.5
D10.5 D10.5
D10.5 D10.5
D10.5 D10.5
D10.5 D10.5
D10.5 D10.5
D10.5 D10.5
D10.5 D10.5
C13
C13
SB
SB
SB
SB5
SB5
ST
ST
ST
ST5
ST5
SB1
SB1
ST1
ST1
S10.5
S.5
S10.5
S10.5
S10.5
S10.5
S10.5
S10.5
S10.5
S10.5
S10.5
S10.5
S10.5
S10.5
S10.5
S10.5
S10.5
S10.5
S10.5
S10.5
S10.5
S10.5
S10.5
S.5
S10.5
S10.5
S10.5
S10.5
S10.5
S10.5
S10.5
S10.5
S10.5
S10.5
R10R10
CO
27 LF 18" HDPE @ 0.38%
36 LF 18" HDPE @ 0.42%
137 LF 12" HDPE @
5.12%
78 LF 12" HDPE @
0.00%
27 LF 12" HDPE @ 0.57%
LF
2" H
D
PE
.0 1%
33 LF 18" HDPE @ 2.77%
45 LF 8" HDPE @ 2.50%
47 LF 8" HDPE @ 8.50%
79 LF 12" HDPE @
5.69%
49 LF 12" HDPE @ 1.23%
26 LF 12" HDPE @ 0.00%
6 L
F 12 " H
DPE @
0.
58 LF 8" HDPE @
2.69%
45 LF 8" HDPE @ 3.34%
26 LF 12" PERF. HDPE @ 0.00%
L
F
" H D
PE
.0
3%
95 LF 12" H
D
PE @
0.00%
79 LF 12" HDPE @ 5.10%
71 LF 12" HDPE @
3.51%
LF
2" H
D
PE
.9 7%
18 LF 12" RCP @ 5.00%
CB-139
N: 146873.89
E: 1327191.98
RIM 524.17
INV 521.55 (12" OUT)
OCS-3
STA 6+98.60
26.54R
RIM 524.31
INV 519.42 (12" OUT)
INV 520.50 (12" IN)
CBMH-116
STA 8+65.68
-13.00L
RIM 525.85
INV 520.50 (12" IN)
INV 520.50 (12" OUT)
INV 520.50 (12" IN)
INV 521.00 (8" IN)
CB-116A
STA 8+66.03
13.25R
RIM 525.85
INV 520.50 (12" OUT)
CBMH-117
STA 7+74.60
-13.00L
RIM 525.12
INV 520.50 (12" IN)
INV 520.50 (12" OUT)
INV 521.00 (6" IN)
FES-120
N: 147069.50 E: 1327333.66
INV 518.00
CBMH-119
STA 7+00.00
13.25R
RIM 524.19
INV 520.50 (12" IN)
INV 520.50 (12" OUT)
CBMH-118
STA 7+00.00
-13.25L
RIM 524.19
INV 520.50 (12" OUT)
INV 520.50 (12" IN)
STMH-140
STA 5+80.47
-6.02L
RIM 521.68
INV 517.50 (12" IN)
INV 517.50 (12" OUT)
STMH-141
STA 5+08.53
-6.36L
RIM 518.38
INV 515.00 (12" IN)
INV 513.30 (12" OUT)
CB-146
N: 146983.47 E: 1327290.93
RIM 519.54
INV 516.20 (8" OUT)
CB-134A
STA 5+18.12
13.25R
RIM 518.71
INV 515.00 (12" OUT)
CB-147
N: 146951.44 E: 1327323.23
RIM 518.33
INV 515.06 (8" IN)
INV 515.06 (8" OUT)
CB-148
N: 146910.51 E: 1327364.51
RIM 516.82
INV 513.50 (8" IN)
INV 513.50 (8" OUT)
CBMH-134
STA 4+64.62
-13.25L
RIM 516.15
INV 512.00 (12" OUT)
INV 513.00 (8" IN)
INV 512.00 (12" IN)
CB-149
N: 146878.91 E: 1327396.39
RIM 515.64
INV 512.00 (8" IN)
INV 512.00 (8" OUT)
CB-150
N: 146834.15 E: 1327411.01
RIM 514.70
INV 508.00 (8" IN)
INV 506.00 (12" OUT)
FES-142
N: 146674.69
E: 1327333.15
INV 505.00
STMH-156
N: 146420.60
E: 1327340.52
RIM 510.86
INV 505.70 (18" IN)
INV 505.60 (18" OUT)
CBMH-136
STA 3+23.51
13.27R
RIM 509.41
INV 501.65 (18" IN)
INV 501.65 (18" OUT)
CBMH-135
STA 3+23.53
-13.25L
RIM 509.40
INV 505.00 (12" IN)
INV 501.75 (18" OUT)
INV 502.00 (12" IN)
CBMH-138
STA 2+16.02
-13.25L
RIM 506.60
INV 503.05 (12" IN)
INV 503.05 (12" OUT)
FES-157
N: 146449.11
E: 1327356.18
INV 504.70
OCS - 4
N: 146659.63 E: 1327510.00
RIM 503.79
INV 498.10 (12" OUT)
INV 498.10 (12" IN)
FES-151
N: 146762.85 E: 1327445.27
INV 501.50
FES-137
N: 146652.28 E: 1327449.36
INV 501.50
FES-401
N: 146627.65 E: 1327547.04
INV 497.50
FES-400
N: 146672.33 E: 1327497.24
INV 499.00
CB-138A
STA 2+16.02
13.25R
RIM 506.60
INV 503.20 (12" OUT)
CB-139A
N: 146846.10
E: 1327125.91
RIM 524.20
N
SCALE:1
UTILITY PLAN
1" = 30' (30" x 42" PAPER SIZE)
0 30' 60'
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fil e P ath : y
:\1
\16
2 t ah om a n c p h3 \_0
7 c ivi l\_ ca d f ile s\_ sh ee ts\
2_ c_ uti l.d wg e dit
:jri ch ne r sa ve d:2
/1/
3:
P
M p lot
:2/ 2/2
4 7
:38 A
M
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
SECURITY:
IMEG, INC.
TEMPE, AZ 85281
309.793.3421
PETE MCGHEE
Project Director
Revisions:
1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 16362
TAHOMA NATIONAL CEMETERY
PHASE 3 DEVELOPMENT
919PC2010
FEBRUARY 2, 2024
18600 SE 240TH ST, KENT, WA 98042
BID DOCUMENTS
Date:
GEOTECHNICAL:
TERRACON
21905 64TH AVE W SUITE 100
MOUNTLAKE, WA 98043
425.771.3304
DENNIS STETTLER, PE
OF 449
KEY MAP
(N.T.S.)
IRRIGATION:
EC DESIGN GROUP,
LTD
400 5TH STREET
WEST DES MOINES, IA 50265
515.225.6365
LISA ESSY, ASIC
COST ESTIMATING:
LELAND SAYLOR
1777 OAKLAND BLVD #103
WALNUT CREEK, CA 94596
415.291.3200
JEFF SAYLOR
STRUCTURAL:
KPFF
1601 5TH AVE. SUITE 1600
SEATTLE, WA 98101
206.926.0455
JEFF CREAGAN, SE
COMMISSIONING:
CHARLOTTE ENGINEERS,
LLP
5838 MONROE RD. #100
CHARLOTTE, NC 28212
704.531.3000
BRIAN ANNICHARICO, PE
ARCHITECTURAL/MEP:
TOLAND MIZELL MOLNAR
INC.
590 MEANS ST. NW
ATLANTA, GA 30318
404.214.9774
RICK MASSEY, AIA
WASTEWATER:
ADC WASTEWATER
INC.
PO BOX 486
TACOMA, WA 98401
253.203.1200
ROCKY ANDERSON
N
Office of Construction and Facilities Management1600 N. DESERT DR. SUITE 230
BASE BID
BID DOCUMENTS
CU105
UTILITY PLAN
MATCHLINE - SHEET CU103
M A
TC
H
LIN
E
- S H
E E
T C U
MATCHLINE - SHEET CU107
FOR COLUMBARIA 8
UTILITY PLAN SEE
SHEET LU103
FOR COLUMBARIA 7
UTILITY PLAN
SEE SHEET LU102
CU102
CU104
CU106
CU109
CU103
CU105
CU107
CU110
CU112
CU114
CU108
CU111
CU113
CU115
STORMWATER
POND HWL
KEY NOTES
STUB STORM SEWER FOR RAINGARDEN OUTLET
CONNECTION. SEE COLUMBARIA DRAINAGE PLANS
FOR MORE INFO.
CONSTRUCT INLET STRUCTURE ON EXISTING
CULVERT END & CONNECT NEW STORM SEWER.
INSTALL 6" SCH 40 PVC SANITARY PIPE IN 10" STEEL
CASING PIPE. ENDS OF CASING PIPE SHALL EXTEND
A MINIMUM OF 5' BEYOND EXTENTS OF BUILDING
FOOTINGS. SEE 7/CU501.
CONNECT TO EXISTING SEPTIC TANK. CONTRACTOR
TO VERIFY EXISTING PIPE INVERT & NOTIFY
ENGINEER OF ANY DISCREPANCY BETWEEN EXISTING
& NEW.
4" SANITARY CONNECTION, SEE PLUMBING PLANS.
DRAINTILE CONNECTION FROM COLUMBARIA COURT.
WSDOT TYPE 1 CATCH BASIN, SEE 1/CU501.
WSDOT TYPE 2 CATCH BASIN, SEE 2/CU501.
SEE 5/CU502 FOR UNDERGROUND STORMWATER
MANAGEMENT FACILITY EXTENTS
VALLEY GRATE, SEE 5/CU503.
RAIN GARDEN EXTERIOR TO PLAZA, SEE 3/CU501.
RAIN GARDEN WITHIN PLAZA, SEE 6/CU501
30" NYLOPLAST BASIN WITH PEDESTRIAN GRATE
LEGEND
PROPERTY LIMITS
CONSTRUCTION LIMITS
WETLAND #
EXISTING WETLANDS
EXISTING 8" HDPE IRRIGATION
MAIN
EXISTING 4" DOMESTIC WATER
MAIN
EXISTING UNDERGROUND
ELECTRIC LINE
RETENTION BASIN
NEW STORM SEWER
NEW FLARED END
NEW CATCH BASIN
NEW WATER LINE
SANITARY SEWER
PERFORATED UNDERDRAIN
CLEAN OUT
PROPOSED UNDERGROUND
ELECTRIC LINE
PROPOSED IRRIGATION MAIN
UTILITY NOTES
1. PROTECT ALL EXISTING UTILITIES LINES IN PLACE
UNLESS OTHERWISE NOTED.
2. STORM STRUCTURE DIAMETER IS 48" UNLESS
OTHERWISE NOTED.
CO
186JRMB
CU502
CU502
CU502
CU502
CU502
RO
AD A
CU503
CU503
CU502
co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co
CO
co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co
DRAIN FIELD
SEE CW503 -AI2 FOR
SANITARY/SEPTIC
CB-139
N: 146873.89
E: 1327191.98
INV 521.55
OCS-3
STA 6+98.60
26.54R
RIM 524.31
INV 519.42 (12" OUT)
INV 520.50 (12" IN)
CBMH-116
STA 8+65.68
-13.00L
RIM 525.85
INV 520.50 (12" IN)
INV 520.50 (12" OUT)
INV 520.50 (12" IN)
INV 521.00 (8" IN)
CB-116A
STA 8+66.03
13.25R
RIM 525.85
INV 520.50 (12" OUT)
CBMH-117
STA 7+74.60
-13.00L
RIM 525.12
INV 520.50 (12" IN)
INV 520.50 (12" OUT)
INV 521.00 (6" IN)
FES-120
N: 147069.50 E: 1327333.66
INV 518.00
CBMH-119
STA 7+00.00
13.25R
RIM 524.19
INV 520.50 (12" IN)
INV 520.50 (12" OUT)
STMH-140
STA 5+80.47
-6.02L
RIM 521.68
INV 517.50 (12" IN)
INV 517.50 (12" OUT)
STMH-141
STA 5+08.53
-6.36L
RIM 518.38
INV 515.00 (12" IN)
INV 513.30 (12" OUT)
CB-146
N: 146983.47 E: 1327290.93
RIM 519.54
INV 516.20 (8" OUT)
CB-134A
STA 5+18.12
13.25R
RIM 518.71
INV 515.00 (12" OUT)
CB-147
N: 146951.44 E: 1327323.23
RIM 518.33
INV 515.06 (8" IN)
INV 515.06 (8" OUT)
CB-148
N: 146910.51 E: 1327364.51
RIM 516.82
INV 513.50 (8" IN)
INV 513.50 (8" OUT)
CBMH-134
STA 4+64.62
-13.25L
RIM 516.15
INV 512.00 (12" OUT)
INV 513.00 (8" IN)
INV 512.00 (12" IN)
CB-149
N: 146878.91 E: 1327396.39
RIM 515.64
INV 512.00 (8" IN)
INV 512.00 (8" OUT)
CB-150
N: 146834.15 E: 1327411.01
RIM 514.70
INV 508.00 (8" IN)
INV 506.00 (12" OUT)
FES-142
N: 146674.69
E: 1327333.15
INV 505.00
STMH-156
N: 146420.60
E: 1327340.52
RIM 510.86
INV 505.70 (18" IN)
INV 505.60 (18" OUT)
CBMH-136
STA 3+23.51
13.27R
RIM 509.41
INV 501.65 (18" IN)
INV 501.65 (18" OUT)
CBMH-135
STA 3+23.53
-13.25L
RIM 509.40
INV 505.00 (12" IN)
INV 501.75 (18" OUT)
INV 502.00 (12" IN)
CB-138A
STA 2+16.02
13.25R
RIM 506.60
INV 503.20 (12" OUT)
CBMH-138
STA 2+16.02
-13.25L
RIM 506.60
INV 503.05 (12" IN)
INV 503.05 (12" OUT)
FES-157
N: 146449.11
E: 1327356.18
INV 504.70
OCS - 4
N: 146659.63 E: 1327510.00
RIM 503.79
INV 498.10 (12" OUT)
INV 498.10 (12" IN)
FES-151
N: 146762.85 E: 1327445.27
INV 501.50
FES-137
N: 146652.28 E: 1327449.36
INV 501.50
FES-401
N: 146627.65 E: 1327547.04
INV 497.50
27 LF 18" HDPE @ 0.38%
36 LF 18" HDPE @ 0.42%
137 LF 12" HDPE @
5.12%
78 LF 12" HDPE @
0.00%
27 LF 12" HDPE @ 0.57%
LF
2" H
D
PE
.0 1%
33 LF 18" HDPE @ 2.77%
45 LF 8" HDPE @ 2.50%
47 LF 8" HDPE @ 8.50%
79 LF 12" HDPE @
5.69%
49 LF 12" HDPE @ 1.23%
26 LF 12" HDPE @ 0.00%
6 L
F 12 " H
DPE @
0.
58 LF 8" HDPE @
2.69%
45 LF 8" HDPE @ 3.34%
26 LF 12" PERF. HDPE @ 0.00%
L
F
" H D
PE
.0
3%
95 LF 12" H
D
PE @
0.00%
79 LF 12" HDPE @ 5.10%
71 LF 12" HDPE @
3.51%
LF
2" H
D
PE
.9 7%
FES-400
N: 146672.33 E: 1327497.24
INV 499.00
18 LF 12" RCP @ 5.00%
CBMH-118
STA 7+00.00
-13.25L
RIM 524.19
INV 520.50 (12" OUT)
INV 520.50 (12" IN)
2" DOMESTIC WET TAP AI2
SEE 4/CU501
TYPE K COPPER PIPE
CO
36 LF 18" HDPE @ 0.42%
137 LF 12" HDPE @
5.12%
47 LF 8" HDPE @ 8.50%
79 LF 12" HDPE @
5.69%
L
F
" H D
PE
.0
3%
71 LF 12" HDPE @
3.51%
LF
2" H
D
PE
.9 7%
2" DOMESTIC WET TAP AI2
SEE 4/CU501
TYPE K COPPER PIPE
N
SCALE:1
UTILITY PLAN
1" = 30' (30" x 42" PAPER SIZE)
0 30' 60'
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fil e P ath : y
:\1
\16
2 t ah om a n c p h3 \_0
7 c ivi l\_ ca d f ile s\_ sh ee ts\ ad dit ive \16
2_ c_ uti l_a dd itiv e i tem s..
dw g ed it:j ric hn er s av ed
:2/ 1/2
4 2
:55 P
M p lot
:2/ 2/2
4 7
:42 A
M
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
SECURITY:
IMEG, INC.
TEMPE, AZ 85281
309.793.3421
PETE MCGHEE
Project Director
Revisions:
1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 16362
TAHOMA NATIONAL CEMETERY
PHASE 3 DEVELOPMENT
919PC2010
FEBRUARY 2, 2024
18600 SE 240TH ST, KENT, WA 98042
BID DOCUMENTS
Date:
GEOTECHNICAL:
TERRACON
21905 64TH AVE W SUITE 100
MOUNTLAKE, WA 98043
425.771.3304
DENNIS STETTLER, PE
OF 449
KEY MAP
(N.T.S.)
IRRIGATION:
EC DESIGN GROUP,
LTD
400 5TH STREET
WEST DES MOINES, IA 50265
515.225.6365
LISA ESSY, ASIC
COST ESTIMATING:
LELAND SAYLOR
1777 OAKLAND BLVD #103
WALNUT CREEK, CA 94596
415.291.3200
JEFF SAYLOR
STRUCTURAL:
KPFF
1601 5TH AVE. SUITE 1600
SEATTLE, WA 98101
206.926.0455
JEFF CREAGAN, SE
COMMISSIONING:
CHARLOTTE ENGINEERS,
LLP
5838 MONROE RD. #100
CHARLOTTE, NC 28212
704.531.3000
BRIAN ANNICHARICO, PE
ARCHITECTURAL/MEP:
TOLAND MIZELL MOLNAR
INC.
590 MEANS ST. NW
ATLANTA, GA 30318
404.214.9774
RICK MASSEY, AIA
WASTEWATER:
ADC WASTEWATER
INC.
PO BOX 486
TACOMA, WA 98401
253.203.1200
ROCKY ANDERSON
N
Office of Construction and Facilities Management1600 N. DESERT DR. SUITE 230
BID DOCUMENTS
CU105 - AI2
UTILITY PLAN
MATCHLINE - SHEET CU103
M A
TC
H
LIN
E
- S H
E E
T C U
MATCHLINE - SHEET CU107
FOR COLUMBARIA 8
DRAINAGE PLAN SEE
SHEET LG103
FOR COLUMBARIA 7
DRAINAGE PLAN
SEE SHEET LG102
CU102
CU104
CU106
CU109
CU103
CU105
CU107
CU110
CU112
CU114
CU108
CU111
CU113
CU115
STORMWATER
POND HWL
ADDITIVE ITEM 2 - NFC
187----
N
SCALE:2
SATELLITE RESTROOM
1" = 20' (30" x 42" PAPER SIZE)
0 20' 40'
LEGEND
KEY NOTES
LEGEND
PROPERTY LIMITS
CONSTRUCTION LIMITS
WETLAND #
EXISTING WETLANDS
EXISTING 8" HDPE IRRIGATION
MAIN
EXISTING 4" DOMESTIC WATER
MAIN
EXISTING UNDERGROUND
ELECTRIC LINE
RETENTION BASIN
NEW STORM SEWER
NEW FLARED END
NEW CATCH BASIN
NEW WATER LINE
SANITARY SEWER
PERFORATED UNDERDRAIN
CLEAN OUT
PROPOSED UNDERGROUND
ELECTRIC LINE
PROPOSED IRRIGATION MAIN
CO
STUB STORM SEWER FOR RAINGARDEN OUTLET
CONNECTION. SEE COLUMBARIA DRAINAGE PLANS
FOR MORE INFO.
CONSTRUCT INLET STRUCTURE ON EXISTING
CULVERT END & CONNECT NEW STORM SEWER.
INSTALL 6" SCH 40 PVC SANITARY PIPE IN 10" STEEL
CASING PIPE. ENDS OF CASING PIPE SHALL EXTEND
A MINIMUM OF 5' BEYOND EXTENTS OF BUILDING
FOOTINGS. SEE 7/CU501.
CONNECT TO EXISTING SEPTIC TANK. CONTRACTOR
TO VERIFY EXISTING PIPE INVERT & NOTIFY
ENGINEER OF ANY DISCREPANCY BETWEEN EXISTING
& NEW.
4" SANITARY CONNECTION, SEE PLUMBING PLANS.
DRAINTILE CONNECTION FROM COLUMBARIA COURT.
WSDOT TYPE 1 CATCH BASIN, SEE 1/CU501.
WSDOT TYPE 2 CATCH BASIN, SEE 2/CU501.
SEE 5/CU502 FOR UNDERGROUND STORMWATER
MANAGEMENT FACILITY EXTENTS
VALLEY GRATE, SEE 5/CU503.
RAIN GARDEN EXTERIOR TO PLAZA, SEE 3/CU501.
RAIN GARDEN WITHIN PLAZA, SEE 6/CU501
30" NYLOPLAST BASIN WITH PEDESTRIAN GRATE
UTILITY NOTES
1. PROTECT ALL EXISTING UTILITIES LINES IN PLACE
UNLESS OTHERWISE NOTED.
2. STORM STRUCTURE DIAMETER IS 48" UNLESS
OTHERWISE NOTED.
FOR COLUMBARIA 7
UTILITY PLAN
SEE SHEET LU102
STORMWATER
POND HWL
G
H
D
10.5 D
10.5 D
10.5 D
10.5 D
10.5 D
10.5 D
10.5 D
10.5
D 10.5
D 10.5
D 10.5
D 10.5
D 10.5
D 10.5
D 10.5
D 10.5
D 10.5
D 10.5
D 10.5
D 10.5
D 10.5
D 10.5
D 10.5
D 10.5
D 10.5
D 10.5
D 10.5
D 10.5
D 10.5
D 10.5
D 10.5
D 10.5
D 10.5
D 10.5
D 10.5
D 10.5
D 10.5
D 10.5
D 10.5
D 10.5
D 10.5
D 10.5
D 10.5
D 10.5
D.5
D10.5 D10.5
D10.5 D10.5
D10.5 D10.5
D10.5 D10.5
D.5
D10.5 D10.5
D10.5 D10.5
D10.5 D10.5
D10.5 D10.5
D.5
D10.5 D10.5
D10.5 D10.5
D10.5 D10.5
D10.5 D10.5
D.5
D10.5 D10.5
D10.5 D10.5
D10.5 D10.5
D10.5 D10.5
D10.5D10.5D10.5D10.5
D10.5D10.5
D10.5D10.5
F
E.6
E.5
E.4
E
D.1
C.2 C.1
C
C.3 C.4
E.212
R1
R1R1
R3 R1 R1 R1 R1 R1R1
C9
S1
S1 S1
S1 S1
S1 S1
S1 S1
S1
S1
S1
S1
SB1
SB1
ST1
ST1
S.5
S8 .4
S8 .4
S8 .4
S8 .4
S10 .5
S10 .5
S10 .5
S10 .5
S8.4
S8.4
S10 .5
S1 0.5
S10 .5
S10 .5
S10 .5
S1 0.5
S10 .5
S10 .5
S10.5
C6
S10.5
S10.5
S10.5
S10.5
S10.5
S10.5
S10.5
S10.5
S10.5
R1
R1 R1
R1 R1
R1 R1
R1 R1
R1 R1
R1 R1R1 R1 R1 R1
R2 R2R8
R2 R9
E7
SC1
E8
E9 E9
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
0+00
BP: 0+00.00
78 LF 12" HDPE @
2.58%
60 LF 12" HDPE @
3.32%
28 LF 12" HDPE @ 0.71%
26 LF 12" HDPE @ 0.83%
51 LF 12" HDPE @ 2.95%
43 LF 8" HDPE @ 4.46%
16 LF 12" RCP @ -12.79%
31 LF 12" HDPE @ 2.27%
CB-142A
STA 23+82.73
-13.25L
RIM 534.61
INV 528.70 (12" OUT)
INV 528.75 (6" IN)
CBMH-142
STA 23+98.45
13.25R
RIM 534.18
INV 528.00 (12" IN)
INV 528.00 (12" OUT)
CBMH-143
STA 24+76.91
13.25R
RIM 531.38
INV 526.00 (12" OUT)
INV 526.00 (12" IN)
CBMH-144
STA 25+40.13
13.25R
RIM 527.33
INV 524.00 (12" IN)
INV 523.80 (12" IN)
INV 523.80 (12" OUT)
CBMH -144A
STA 25+49.69
-13.25L
RIM 526.78
INV 524.00 (12" OUT)
INV 524.10 (8" IN)
OCS - 1
N: 146001.89
E: 1326440.48
RIM 526.01
INV 523.00 (12" OUT)
INV 523.00 (12" IN)
FES-145
N: 146205.59
E: 1326695.49
INV 523.58
FES-301
N: 145957.30
E: 1326464.89
INV 521.50
FES-152
N: 146229.39
E: 1326968.46
INV 521.00
FES-300
N: 146014.49 E: 1326431.22
RIM 523.25
INV 521.00 (12" OUT)
FES-300
N: 146014.49
E: 1326431.22
RIM 523.25
INV 521.00 (12" OUT)
STMH- 144B
N: 146254.5801 E: 1326728.8209
RIM 529.43
INV 526.50 (6" IN)
INV 526.00 (8" OUT)
N
SCALE:1
UTILITY PLAN
1" = 30' (30" x 42" PAPER SIZE)
0 30' 60'
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fil e P ath : y
:\1
\16
2 t ah om a n c p h3 \_0
7 c ivi l\_ ca d f ile s\_ sh ee ts\
2_ c_ uti l.d wg e dit
:jri ch ne r sa ve d:2
/1/
3:
P
M p lot
:2/ 2/2
4 7
:44 A
M
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
SECURITY:
IMEG, INC.
TEMPE, AZ 85281
309.793.3421
PETE MCGHEE
Project Director
Revisions:
1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 16362
TAHOMA NATIONAL CEMETERY
PHASE 3 DEVELOPMENT
919PC2010
FEBRUARY 2, 2024
18600 SE 240TH ST, KENT, WA 98042
BID DOCUMENTS
Date:
GEOTECHNICAL:
TERRACON
21905 64TH AVE W SUITE 100
MOUNTLAKE, WA 98043
425.771.3304
DENNIS STETTLER, PE
OF 449
KEY MAP
(N.T.S.)
IRRIGATION:
EC DESIGN GROUP,
LTD
400 5TH STREET
WEST DES MOINES, IA 50265
515.225.6365
LISA ESSY, ASIC
COST ESTIMATING:
LELAND SAYLOR
1777 OAKLAND BLVD #103
WALNUT CREEK, CA 94596
415.291.3200
JEFF SAYLOR
STRUCTURAL:
KPFF
1601 5TH AVE. SUITE 1600
SEATTLE, WA 98101
206.926.0455
JEFF CREAGAN, SE
COMMISSIONING:
CHARLOTTE ENGINEERS,
LLP
5838 MONROE RD. #100
CHARLOTTE, NC 28212
704.531.3000
BRIAN ANNICHARICO, PE
ARCHITECTURAL/MEP:
TOLAND MIZELL MOLNAR
INC.
590 MEANS ST. NW
ATLANTA, GA 30318
404.214.9774
RICK MASSEY, AIA
WASTEWATER:
ADC WASTEWATER
INC.
PO BOX 486
TACOMA, WA 98401
253.203.1200
ROCKY ANDERSON
N
Office of Construction and Facilities Management1600 N. DESERT DR. SUITE 230
BASE BID
BID DOCUMENTS
CU106
UTILITY PLAN
MATCHLINE - SHEET CU104
MATCHLINE - SHEET CU109
M A
TC
H
LI
N
E
S H
E E
T C
U
FOR COLUMBARIA 6
UTILITY PLAN SEE
SHEET LU101
CU102
CU104
CU106
CU109
CU103
CU105
CU107
CU110
CU112
CU114
CU108
CU111
CU113
CU115
FOR SECTION 14 & 15
CRYPT UNDERDRAIN PLAN,
SEE SHEET CU116
KEY NOTES
STUB STORM SEWER FOR RAINGARDEN OUTLET
CONNECTION. SEE COLUMBARIA DRAINAGE PLANS
FOR MORE INFO.
CONSTRUCT INLET STRUCTURE ON EXISTING
CULVERT END & CONNECT NEW STORM SEWER.
INSTALL 6" SCH 40 PVC SANITARY PIPE IN 10" STEEL
CASING PIPE. ENDS OF CASING PIPE SHALL EXTEND
A MINIMUM OF 5' BEYOND EXTENTS OF BUILDING
FOOTINGS. SEE 7/CU501.
CONNECT TO EXISTING SEPTIC TANK. CONTRACTOR
TO VERIFY EXISTING PIPE INVERT & NOTIFY
ENGINEER OF ANY DISCREPANCY BETWEEN EXISTING
& NEW.
4" SANITARY CONNECTION, SEE PLUMBING PLANS.
DRAINTILE CONNECTION FROM COLUMBARIA COURT.
WSDOT TYPE 1 CATCH BASIN, SEE 1/CU501.
WSDOT TYPE 2 CATCH BASIN, SEE 2/CU501.
SEE 5/CU502 FOR UNDERGROUND STORMWATER
MANAGEMENT FACILITY EXTENTS
VALLEY GRATE, SEE 5/CU503.
RAIN GARDEN EXTERIOR TO PLAZA, SEE 3/CU501.
RAIN GARDEN WITHIN PLAZA, SEE 6/CU501
30" NYLOPLAST BASIN WITH PEDESTRIAN GRATE
HEAT PUMP, SEE MECHANICAL PLANS
CONNECT TO EXISTING SANITARY SEWER AT
CLEANOUT
LEGEND
PROPERTY LIMITS
CONSTRUCTION LIMITS
WETLAND #
EXISTING WETLANDS
EXISTING 8" HDPE IRRIGATION
MAIN
EXISTING 4" DOMESTIC WATER
MAIN
EXISTING UNDERGROUND
ELECTRIC LINE
RETENTION BASIN
NEW STORM SEWER
NEW FLARED END
NEW CATCH BASIN
NEW WATER LINE
SANITARY SEWER
PERFORATED UNDERDRAIN
CLEAN OUT
PROPOSED UNDERGROUND
ELECTRIC LINE
PROPOSED IRRIGATION MAIN
UTILITY NOTES
1. PROTECT ALL EXISTING UTILITIES LINES IN PLACE
UNLESS OTHERWISE NOTED.
2. STORM STRUCTURE DIAMETER IS 48" UNLESS
OTHERWISE NOTED.
CO
CU502
CU502
RO
AD A
CU503
CO
CO
64 LF 18" H
DPE @ 4.74%
66 LF 18" HDPE @ 2.29%
119 LF 18" HDPE @ 2.02%
170 LF 18" H
DPE @
4.73%
33 LF 12" HDPE @ 1.52%
CO
CO
CB-180
STA 18+50.00
0.99R
RIM 501.32
INV 497.50 (12" OUT)
CB-181
STA 18+41.82
-30.99L
RIM 500.40
INV 497.00 (12" IN)
CBMH-155
N: 146334.84
E: 1327193.70
RIM 524.70
INV 513.85 (18" IN)
INV 513.75 (18" OUT)
INV 513.83 (12" IN)
INV 518.00 (6" IN)
CBMH-153
N: 146261.42
E: 1327024.21
RIM 523.11
INV 517.95 (18" IN)
INV 517.85 (18" OUT)
CBMH-154
N: 146287.85 E: 1327084.30
RIM 524.54
INV 516.35 (18" IN)
INV 516.25 (18" OUT)
INV 518.00 (6" IN)
INV 516.30 (12" IN)
N
SCALE:1
UTILITY PLAN
1" = 30' (30" x 42" PAPER SIZE)
0 30' 60'
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fil e P ath : y
:\1
\16
2 t ah om a n c p h3 \_0
7 c ivi l\_ ca d f ile s\_ sh ee ts\
2_ c_ uti l.d wg e dit
:jri ch ne r sa ve d:2
/1/
3:
P
M p lot
:2/ 2/2
4 7
:45 A
M
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
SECURITY:
IMEG, INC.
TEMPE, AZ 85281
309.793.3421
PETE MCGHEE
Project Director
Revisions:
1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 16362
TAHOMA NATIONAL CEMETERY
PHASE 3 DEVELOPMENT
919PC2010
FEBRUARY 2, 2024
18600 SE 240TH ST, KENT, WA 98042
BID DOCUMENTS
Date:
GEOTECHNICAL:
TERRACON
21905 64TH AVE W SUITE 100
MOUNTLAKE, WA 98043
425.771.3304
DENNIS STETTLER, PE
OF 449
KEY MAP
(N.T.S.)
IRRIGATION:
EC DESIGN GROUP,
LTD
400 5TH STREET
WEST DES MOINES, IA 50265
515.225.6365
LISA ESSY, ASIC
COST ESTIMATING:
LELAND SAYLOR
1777 OAKLAND BLVD #103
WALNUT CREEK, CA 94596
415.291.3200
JEFF SAYLOR
STRUCTURAL:
KPFF
1601 5TH AVE. SUITE 1600
SEATTLE, WA 98101
206.926.0455
JEFF CREAGAN, SE
COMMISSIONING:
CHARLOTTE ENGINEERS,
LLP
5838 MONROE RD. #100
CHARLOTTE, NC 28212
704.531.3000
BRIAN ANNICHARICO, PE
ARCHITECTURAL/MEP:
TOLAND MIZELL MOLNAR
INC.
590 MEANS ST. NW
ATLANTA, GA 30318
404.214.9774
RICK MASSEY, AIA
WASTEWATER:
ADC WASTEWATER
INC.
PO BOX 486
TACOMA, WA 98401
253.203.1200
ROCKY ANDERSON
N
Office of Construction and Facilities Management1600 N. DESERT DR. SUITE 230
BASE BID
BID DOCUMENTS
CU107
UTILITY PLAN
MATCHLINE - SHEET CU105
M A
TC
H
LIN
E
- S H
E E
T C U
MATCHLINE - SHEET CU110
M A
TC
H
LI
N
E
S H
E E
T C
U
CU102
CU104
CU106
CU109
CU103
CU105
CU107
CU110
CU112
CU114
CU108
CU111
CU113
CU115
KEY NOTES
STUB STORM SEWER FOR RAINGARDEN OUTLET
CONNECTION. SEE COLUMBARIA DRAINAGE PLANS
FOR MORE INFO.
CONSTRUCT INLET STRUCTURE ON EXISTING
CULVERT END & CONNECT NEW STORM SEWER.
INSTALL 6" SCH 40 PVC SANITARY PIPE IN 10" STEEL
CASING PIPE. ENDS OF CASING PIPE SHALL EXTEND
A MINIMUM OF 5' BEYOND EXTENTS OF BUILDING
FOOTINGS. SEE 7/CU501.
CONNECT TO EXISTING SEPTIC TANK. CONTRACTOR
TO VERIFY EXISTING PIPE INVERT & NOTIFY
ENGINEER OF ANY DISCREPANCY BETWEEN EXISTING
& NEW.
4" SANITARY CONNECTION, SEE PLUMBING PLANS.
DRAINTILE CONNECTION FROM COLUMBARIA COURT.
WSDOT TYPE 1 CATCH BASIN, SEE 1/CU501.
WSDOT TYPE 2 CATCH BASIN, SEE 2/CU501.
SEE 5/CU502 FOR UNDERGROUND STORMWATER
MANAGEMENT FACILITY EXTENTS
VALLEY GRATE, SEE 5/CU503.
RAIN GARDEN EXTERIOR TO PLAZA, SEE 3/CU501.
RAIN GARDEN WITHIN PLAZA, SEE 6/CU501
30" NYLOPLAST BASIN WITH PEDESTRIAN GRATE
HEAT PUMP, SEE MECHANICAL PLANS
CONNECT TO EXISTING SANITARY SEWER AT
CLEANOUT
LEGEND
PROPERTY LIMITS
CONSTRUCTION LIMITS
WETLAND #
EXISTING WETLANDS
EXISTING 8" HDPE IRRIGATION
MAIN
EXISTING 4" DOMESTIC WATER
MAIN
EXISTING UNDERGROUND
ELECTRIC LINE
RETENTION BASIN
NEW STORM SEWER
NEW FLARED END
NEW CATCH BASIN
NEW WATER LINE
SANITARY SEWER
PERFORATED UNDERDRAIN
CLEAN OUT
PROPOSED UNDERGROUND
ELECTRIC LINE
PROPOSED IRRIGATION MAIN
UTILITY NOTES
1. PROTECT ALL EXISTING UTILITIES LINES IN PLACE
UNLESS OTHERWISE NOTED.
2. STORM STRUCTURE DIAMETER IS 48" UNLESS
OTHERWISE NOTED.
CO
EX.
SEC. 9
EX.
SEC. 9
EX.
SEC. 8
EX.
SEC. 23
EX.
SEC. 24
EX.
SEC. 25
95 LF 6" PERFORATED HDPE
94 LF 6" PERFORATED HDPE
39 LF 6" PERFORATED HDPE
CLEANOUT
INV 523.00
INV 522.50 (6" IN)
CLEANOUT
INV 523.50
CLEANOUT
INV 523.50
(EX.)
37 LF 6" PERFORATED HDPE
CLEANOUT
INV 523.00
(EX.)
90° BEND
22.5°
BEND
SEE CW402 - AI2 FOR
SANITARY/SEPTIC
2" TYPE K COPPER
DOMESTIC WATER
TO HONOR GUARD
WET TAP, SEE 4/CU501
CBMH-154
N: 146287.85 E: 1327084.30
RIM 524.54
INV 516.35 (18" IN)
INV 516.25 (18" OUT)
INV 518.00 (6" IN)
INV 516.30 (12" IN)
CB-180
STA 18+50.00
0.99R
RIM 501.32
INV 497.50 (12" OUT)
CB-181
N: 146170.78
E: 1327582.04
RIM 500.40
INV 497.00 (12" IN)
CBMH-155
N: 146334.84
E: 1327193.70
RIM 524.70
INV 513.85 (18" IN)
INV 513.75 (18" OUT)
INV 513.83 (12" IN)
INV 518.00 (6" IN)
64 LF 18" H
DPE @ 4.74%
66 LF 18" HDPE @ 2.29%
119 LF 18" HDPE @ 2.02%
170 LF 18" H
DPE @
4.73%
33 LF 12" HDPE @ 1.52%
CBMH-153
N: 146261.424
E: 1327024.206
RIM 523.11
INV 517.95 (18" IN)
INV 517.85 (18" OUT)
90° BEND
CO
CO
CO
CO
CO
CO
N
SCALE:1
UTILITY PLAN
1" = 30' (30" x 42" PAPER SIZE)
0 30' 60'
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fil e P ath : y
:\1
\16
2 t ah om a n c p h3 \_0
7 c ivi l\_ ca d f ile s\_ sh ee ts\ ad dit ive \16
2_ c_ uti l_a dd itiv e i tem s..
dw g ed it:j ric hn er s av ed
:2/ 1/2
4 2
:55 P
M p lot
:2/ 2/2
4 7
:48 A
M
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
SECURITY:
IMEG, INC.
TEMPE, AZ 85281
309.793.3421
PETE MCGHEE
Project Director
Revisions:
1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 16362
TAHOMA NATIONAL CEMETERY
PHASE 3 DEVELOPMENT
919PC2010
FEBRUARY 2, 2024
18600 SE 240TH ST, KENT, WA 98042
BID DOCUMENTS
Date:
GEOTECHNICAL:
TERRACON
21905 64TH AVE W SUITE 100
MOUNTLAKE, WA 98043
425.771.3304
DENNIS STETTLER, PE
OF 449
KEY MAP
(N.T.S.)
IRRIGATION:
EC DESIGN GROUP,
LTD
400 5TH STREET
WEST DES MOINES, IA 50265
515.225.6365
LISA ESSY, ASIC
COST ESTIMATING:
LELAND SAYLOR
1777 OAKLAND BLVD #103
WALNUT CREEK, CA 94596
415.291.3200
JEFF SAYLOR
STRUCTURAL:
KPFF
1601 5TH AVE. SUITE 1600
SEATTLE, WA 98101
206.926.0455
JEFF CREAGAN, SE
COMMISSIONING:
CHARLOTTE ENGINEERS,
LLP
5838 MONROE RD. #100
CHARLOTTE, NC 28212
704.531.3000
BRIAN ANNICHARICO, PE
ARCHITECTURAL/MEP:
TOLAND MIZELL MOLNAR
INC.
590 MEANS ST. NW
ATLANTA, GA 30318
404.214.9774
RICK MASSEY, AIA
WASTEWATER:
ADC WASTEWATER
INC.
PO BOX 486
TACOMA, WA 98401
253.203.1200
ROCKY ANDERSON
N
Office of Construction and Facilities Management1600 N. DESERT DR. SUITE 230
BID DOCUMENTS
CU107 - AI1
UTILITY PLAN
MATCHLINE - SHEET CU105
M A
TC
H
LIN
E
- S H
E E
T C U
MATCHLINE - SHEET CU110
M A
TC
H
LI
N
E
S H
E E
T C
U
H O
N O
R G
U
AR
D
CU102
CU104
CU106
CU109
CU103
CU105
CU107
CU110
CU112
CU114
CU108
CU111
CU113
CU115
ADDITIVE ITEM 1 - NFC
LEGEND
KEY NOTES
LEGEND
PROPERTY LIMITS
CONSTRUCTION LIMITS
WETLAND #
EXISTING WETLANDS
EXISTING 8" HDPE IRRIGATION
MAIN
EXISTING 4" DOMESTIC WATER
MAIN
EXISTING UNDERGROUND
ELECTRIC LINE
RETENTION BASIN
NEW STORM SEWER
NEW FLARED END
NEW CATCH BASIN
NEW WATER LINE
SANITARY SEWER
PERFORATED UNDERDRAIN
CLEAN OUT
PROPOSED UNDERGROUND
ELECTRIC LINE
PROPOSED IRRIGATION MAIN
CO
STUB STORM SEWER FOR RAINGARDEN OUTLET
CONNECTION. SEE COLUMBARIA DRAINAGE PLANS
FOR MORE INFO.
CONSTRUCT INLET STRUCTURE ON EXISTING
CULVERT END & CONNECT NEW STORM SEWER.
INSTALL 6" SCH 40 PVC SANITARY PIPE IN 10" STEEL
CASING PIPE. ENDS OF CASING PIPE SHALL EXTEND
A MINIMUM OF 5' BEYOND EXTENTS OF BUILDING
FOOTINGS. SEE 7/CU501.
CONNECT TO EXISTING SEPTIC TANK. CONTRACTOR
TO VERIFY EXISTING PIPE INVERT & NOTIFY
ENGINEER OF ANY DISCREPANCY BETWEEN EXISTING
& NEW.
4" SANITARY CONNECTION, SEE PLUMBING PLANS.
DRAINTILE CONNECTION FROM COLUMBARIA COURT.
WSDOT TYPE 1 CATCH BASIN, SEE 1/CU501.
WSDOT TYPE 2 CATCH BASIN, SEE 2/CU501.
SEE 5/CU502 FOR UNDERGROUND STORMWATER
MANAGEMENT FACILITY EXTENTS
VALLEY GRATE, SEE 5/CU503.
RAIN GARDEN EXTERIOR TO PLAZA, SEE 3/CU501.
RAIN GARDEN WITHIN PLAZA, SEE 6/CU501
30" NYLOPLAST BASIN WITH PEDESTRIAN GRATE
UTILITY NOTES
1. PROTECT ALL EXISTING UTILITIES LINES IN PLACE
UNLESS OTHERWISE NOTED.
2. STORM STRUCTURE DIAMETER IS 48" UNLESS
OTHERWISE NOTED.
94 LF 6" PERFORATED HDPE
39 LF 6" PERFORATED HDPE
CLEANOUT
INV 523.00
INV 522.50 (6" IN)
CLEANOUT
INV 523.50
CLEANOUT
INV 523.50
(EX.)
37 LF 6" PERFORATED HDPE
CLEANOUT
INV 523.00
(EX.)
95 LF 6" PERFORATED HDPE
CO
34 LF 12" HDPE @ 5.37%
CBMH-190
N: 145684.50 E: 1328171.25
RIM 502.08
INV 499.50 (8" OUT)
SAN CO-1
N: 145689.65
E: 1328090.55
RIM 501.43
INV 497.40 (6" OUT)
CB-182
STA 13+89.64
1.25R
RIM 493.64
INV 491.34 (12" OUT)
CBMH-183
N: 146074.63 E: 1328024.93
RIM 491.86
INV 489.50 (12" IN)
N
SCALE:1
UTILITY PLAN
1" = 30' (30" x 42" PAPER SIZE)
0 30' 60'
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fil e P ath : y
:\1
\16
2 t ah om a n c p h3 \_0
7 c ivi l\_ ca d f ile s\_ sh ee ts\
2_ c_ uti l.d wg e dit
:jri ch ne r sa ve d:2
/1/
3:
P
M p lot
:2/ 2/2
4 7
:50 A
M
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
SECURITY:
IMEG, INC.
TEMPE, AZ 85281
309.793.3421
PETE MCGHEE
Project Director
Revisions:
1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 16362
TAHOMA NATIONAL CEMETERY
PHASE 3 DEVELOPMENT
919PC2010
FEBRUARY 2, 2024
18600 SE 240TH ST, KENT, WA 98042
BID DOCUMENTS
Date:
GEOTECHNICAL:
TERRACON
21905 64TH AVE W SUITE 100
MOUNTLAKE, WA 98043
425.771.3304
DENNIS STETTLER, PE
OF 449
KEY MAP
(N.T.S.)
IRRIGATION:
EC DESIGN GROUP,
LTD
400 5TH STREET
WEST DES MOINES, IA 50265
515.225.6365
LISA ESSY, ASIC
COST ESTIMATING:
LELAND SAYLOR
1777 OAKLAND BLVD #103
WALNUT CREEK, CA 94596
415.291.3200
JEFF SAYLOR
STRUCTURAL:
KPFF
1601 5TH AVE. SUITE 1600
SEATTLE, WA 98101
206.926.0455
JEFF CREAGAN, SE
COMMISSIONING:
CHARLOTTE ENGINEERS,
LLP
5838 MONROE RD. #100
CHARLOTTE, NC 28212
704.531.3000
BRIAN ANNICHARICO, PE
ARCHITECTURAL/MEP:
TOLAND MIZELL MOLNAR
INC.
590 MEANS ST. NW
ATLANTA, GA 30318
404.214.9774
RICK MASSEY, AIA
WASTEWATER:
ADC WASTEWATER
INC.
PO BOX 486
TACOMA, WA 98401
253.203.1200
ROCKY ANDERSON
N
Office of Construction and Facilities Management1600 N. DESERT DR. SUITE 230
BASE BID
BID DOCUMENTS
CU108
UTILITY PLAN
M A
TC
H
LIN
E
- S H
E E
T C U
MATCHLINE - SHEET CU111
CU102
CU104
CU106
CU109
CU103
CU105
CU107
CU110
CU112
CU114
CU108
CU111
CU113
CU115
KEY NOTES
STUB STORM SEWER FOR RAINGARDEN OUTLET
CONNECTION. SEE COLUMBARIA DRAINAGE PLANS
FOR MORE INFO.
CONSTRUCT INLET STRUCTURE ON EXISTING
CULVERT END & CONNECT NEW STORM SEWER.
INSTALL 6" SCH 40 PVC SANITARY PIPE IN 10" STEEL
CASING PIPE. ENDS OF CASING PIPE SHALL EXTEND
A MINIMUM OF 5' BEYOND EXTENTS OF BUILDING
FOOTINGS. SEE 7/CU501.
CONNECT TO EXISTING SEPTIC TANK. CONTRACTOR
TO VERIFY EXISTING PIPE INVERT & NOTIFY
ENGINEER OF ANY DISCREPANCY BETWEEN EXISTING
& NEW.
4" SANITARY CONNECTION, SEE PLUMBING PLANS.
DRAINTILE CONNECTION FROM COLUMBARIA COURT.
WSDOT TYPE 1 CATCH BASIN, SEE 1/CU501.
WSDOT TYPE 2 CATCH BASIN, SEE 2/CU501.
SEE 5/CU502 FOR UNDERGROUND STORMWATER
MANAGEMENT FACILITY EXTENTS
VALLEY GRATE, SEE 5/CU503.
RAIN GARDEN EXTERIOR TO PLAZA, SEE 3/CU501.
RAIN GARDEN WITHIN PLAZA, SEE 6/CU501
30" NYLOPLAST BASIN WITH PEDESTRIAN GRATE
HEAT PUMP, SEE MECHANICAL PLANS
CONNECT TO EXISTING SANITARY SEWER AT
CLEANOUT
LEGEND
PROPERTY LIMITS
CONSTRUCTION LIMITS
WETLAND #
EXISTING WETLANDS
EXISTING 8" HDPE IRRIGATION
MAIN
EXISTING 4" DOMESTIC WATER
MAIN
EXISTING UNDERGROUND
ELECTRIC LINE
RETENTION BASIN
NEW STORM SEWER
NEW FLARED END
NEW CATCH BASIN
NEW WATER LINE
SANITARY SEWER
PERFORATED UNDERDRAIN
CLEAN OUT
PROPOSED UNDERGROUND
ELECTRIC LINE
PROPOSED IRRIGATION MAIN
UTILITY NOTES
1. PROTECT ALL EXISTING UTILITIES LINES IN PLACE
UNLESS OTHERWISE NOTED.
2. STORM STRUCTURE DIAMETER IS 48" UNLESS
OTHERWISE NOTED.
CO
PROTECT EXISTING STORM
DURING BUILDING ADDITION.
FIELD VERIFY
LOCATION/ELEVATION.
EX. SEC. 25A
EX. SEC. 25
EX. SEC. 24
COMMITTAL SHELTER 4
COMMITTAL SHELTER 2
MUNRO MEMORIAL DRIVE
14 (TYP.)
N
SCALE:1
UTILITY PLAN
1" = 30' (30" x 42" PAPER SIZE)
0 30' 60'