This document is a Pre-Proposal Inquiry (PPI) form for the Tahoma National Cemetery Phase 3 Development project. The project, solicitation number 36C10F24R0011, is managed by the Department of Veterans Affairs Office of Construction and Facilities Management.

The PPI form contains 66 questions and responses from the government related to the project requirements. Key details include: the site visit date, access to drawings and CAD files, acceptable materials for storm drainage and plumbing systems, direction on door/frame types and hardware, lead times for the medium voltage transformer, requirements for pressure grouting soil stabilization, and specifications for organic soil amendments and plantings. The proposal due date has been extended to July 11, 2024. Offerors must fully conform to the Federal Acquisition Regulation (FAR) Subpart 22.5 Project Labor Agreement requirements. The government will provide the awarded contractor with the CAD files for the project.

View the file

Other files for this federal contract opportunity

Other files attached to Y1PC--Tahoma National Cemetery, Ph 3, newest first.
File Type Posted
36C10F24R0011 0007.pdf PDF
36C10F24R0011 0006.pdf PDF
Pre-Proposal Inquiry Form 36C10F24R0011 updated 07-02-2024.pdf PDF
TNC3 PIC Mech Rm_Image 1.pdf PDF
Spec. Section 261219 PAD-MOUNTED, LIQUID-FILLED, MEDIUM-VOLTAGE TRANSFORMERS.pdf PDF
TNC3 PIC Men Restroom.pdf PDF
Columbaria Detail and Ash urn exhibit. Both Items are in one PDF..pdf PDF
36C10F24R0011 0005.pdf PDF
TNC3 PIC Mech Rm_Image 2.pdf PDF
Site Visit - Attendance Sheet.pdf PDF
TNC3 SHEET 157 OF 449.pdf PDF
Pre-Proposal Inquiry Form 36C10F24R0011 06-10-2024.pdf PDF
Tahoma National Cemetery Phase 3 Contractor Overview.pdf PDF
36C10F24R0011 0004.pdf PDF
Interested Vendors List from SAM.GOV as of 06-10-2024.pdf PDF
36C10F24R0011 0003.pdf PDF
36C10F24R0011 0002.pdf PDF
TNC3 BID DOCUMENTS R 2-2-2024 4 of 9.pdf PDF
TNC3 BID DOCUMENTS R 2-2-2024 2 of 9.pdf PDF
TNC3 BID DOCUMENTS R 2-2-2024 8 of 9.pdf PDF
TNC3 BID DOCUMENTS R 2-2-2024 3 of 9.pdf PDF
TNC3 BID DOCUMENTS R 2-2-2024 1 of 9.pdf PDF
TNC Phase 3 Geotechnical Engineering Report-7-26-2023.pdf PDF
CALCULATION OF SELF PERFORMED WORK.pdf PDF
Small Business Subcontracting Plan Model.pdf PDF
TNC3 BID DOCUMENTS R 2-2-2024 9 of 9.pdf PDF
TNC3 BID DOCUMENTS R 2-2-2024 7 of 9.pdf PDF
TNC3 BID DOCUMENTS R 2-2-2024 5 of 9.pdf PDF
TNC3 SPECIFICATIONS MAY 20 2024.pdf PDF
36C10F24R0011 0001.pdf PDF
TNC3 BID DOCUMENTS R 2-2-2024 6 of 9.pdf PDF
Cost Proposal Breakdown 02.pdf PDF
VAAR 852.219-75 VA Notice of Limitations on Subcontracting - Certification.pdf PDF
Past Performance Questionnaire 36C10F24R0011.pdf PDF
Wage Decision Number WA20240070 dated 03-08-2024.pdf PDF
36C10F24R0011_1.docx DOCX document
Pre-Proposal Inquiry Form 36C10F24R0011.pdf PDF
Show all 37

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36C10F24R0011

PRE-PROPOSAL INQUIRY (PPI) FORM

TAHOMA NATIONAL CEMETERY

PHASE 3 DEVELOPMENT

Question No.

Reference (Sect/Para/Page) QUESTION GOVERNMENT RESPONSE

Site Visit Can you please clarify the date for the organized site visit?

The Site Visit Date is Thursday, June 06, 2024, 10:00 AM Pacific Time.

(See Amendment 0002 dated 05/23/2024 posted on sam.gov).

plan sheet 157 of we noticed that plan sheet 157 of 449 (within plan set 4) is corrupted.

See Amendment 0004 with attached Drawing Page 157 entitled Road A – STA 0+00 to 5+50.

Solicitation Form 1442, page #2, section 28

Can the Government provide a copy of the negotiated agreement for review?

SF 1442, Block 29, Award, is applicable for this procurement. No award has been made, and the VA is in the solicitation process.

spec section 32 31 13 Part 2, 2.2D, page

CS501

In spec section 32 31 13 Part 2, 2.2D, top and bottom tension wire is specified. On plans page CS501, it shows top rail and bottom tension wire. Do we follow specs or plans?

Plan details govern construction, while Part 2 of specs governs materials. Top tension wire will be required for the construction fence where the top rail is not specified (areas not receiving plastic privacy slats).

page LS304 By the plans on page LS304, it is not clear how the ornamental fence is set. Is it plated with a cover? Or are the posts set in concrete?

The ornamental fence has a plated cover at the top of the natural stone.

The fencepost will be core drilled and grouted at the Sq. Post Corners per section detail on 1/LS304

N/A Will the VA consider extending the Q&A period by two weeks?

Amendment 0003 extended the RFI due date. No additional RFI extension.

N/A Will the VA consider a two-week extension to the proposal due date?

Given the size and complexity, a longer advertisement period will allow for higher quality proposals to the project owner

Proposal due date is extended to 11 July 2024 at 1:00 PM EDT.

N/A Are the project CAD Files available?

CAD is to be sent to the awarded contractor

N/A Does phase 3 include the reroof on the existing Committal Shelter? If so, what is the existing?

Existing SSMR with concealed fasteners to be replaced in entirety with new SSMR with concealed fasteners.

Roof demolition plan Key Note 3 states existing SSMR to be removed.

Roof plan Key Note 2 identifies SSMR with concealed fasteners.

The SSMR is to replace the existing SSMR that is noted to be removed on the roof demolition plan.

2/A-102-CSS identifies Shelters 1, 3 and 4. Change the label “SHELTERS 1, 3, 4” to read

“SHELTERS 1, 2, 4”.

Page LK403-

AI1

On plan page LK403 - AI1, Ash Urn are indicated as detail 3/LK507. Not able to locate this detail. LK507 does not include detail 3.

See attached exhibit for ASH URN DETAIL to be added to sheet LK507

Spec Section 01 32 17 Part 1, 1.1A

In Spec Section 01 32 17 Part 1, 1.1A, Microsoft Project 2003 or later is indicated as the required scheduling software. Is Primavera P6 Projects Software an acceptable alternative?

Spec Section 01 32 17 Part 1 is deleted, Primavera P6 is the required scheduling software.

See Amendment 0003, dated 12 Jun 2024.

LK502 Precast and Cast stone posts. On LK502, Precast Posts are indicated. On LK501-LK504, Cast Stone Masonry Posts are indicated. Can they all be one method (Precast) for a uniform appearance?

Sign details on sheets LK 501-LK- 504, except the temporary Construction Signs and the Accessible Parking Sign, are to be uniform and of Precast Concrete for both the Post and the Signpost Collar.

N/A Can the contractors PM, Superintendent or QC Manager have additional duties as the contractors commissioning manager?

The PM and Superintendent must be independent to the commissioning manager as they have conflicting priorities.

The QC Manager may provide the duties of the commissioning manager as no conflict is apparent.

Spec Section 01 00 01, Part 1, 1.1F

In Spec Section 01 00 01, Part 1, 1.1F states:

All employees of general contractor and subcontractors shall comply with VA security management program.

Please provide the VA security management program.

Site is unrestricted and there is not a local badging requirement for Tahoma National Cemetery.

Members must wear “uniform” that identifies them as a member of their company.

Is the government able to extend the bid RFI question date as well as the bid due date by two weeks due to the change in site visit?

See VA Response to RFI No. 6.

The proposal due date is extended to 11 July 2024 at 1:00 PM EDT.

Is it Mandatory to sign the PLA as the Prime Contractor?

The PLA shall fully conform to the Federal Acquisition Regulation (FAR) Subpart 22.5 Project Labor Agreement for Federal Construction Projects. The signed PLA must meet the minimum standards of the solicitation and must be received from the apparent awardee within 30 calendar days after the contract award and as a prerequisite to receiving the Notice to Proceed.

My company provided the masonry work on the last phase at TNC. Can you please provide us with a schedule for this current phase?

VA is in the procurement process now. A walkthrough was held on Thursday, 6/6/2024 at 10:00 AM at the Tahoma National Cemetery.

Proposals from prime contractors are due July 11, 2024.

The solicitation is posted to SAM.gov

Due to the very large quantity of columbarium niches and the fact that most probably won’t be ready

VAAR 852.232-71 PAYMENTS

UNDER FIXED-PRICE

CONSTRUCTION CONTRACTS

for install until at least summer 25, a large inventory of the product will be produced before they are ready. Can we bill for those materials stored offsite in a controlled environment.

(INCLUDING NAS–CPM) (NOV

2018) (ALTERNATE I).

(d) The Contracting Officer will consider for monthly progress payments material and/or equipment procured by the Contractor and stored on the construction site, as space is available, or at a local approved location off the site, under such terms and conditions as the Contracting Officer approves, including but not limited to the following—

(1) The materials or equipment are in accordance with the contract requirements and/or approved samples and shop drawings;

(2) The materials and/or equipment are approved by the resident engineer;

(3) The materials and/or equipment are stored separately and are readily available for inspection and inventory by the resident engineer;

(4) The materials and/or equipment are protected against weather, theft and other hazards and are not subjected to deterioration; and

(5) The Contractor obtains the concurrence of its surety for off-site storage.

specification of 034824 columbarium section 2.15 A “ Anti-Graffiti system”

In the specification of 034824 columbarium section 2.15 A “ Anti-Graffiti system” This is not a requirement on many VA projects.

There has been several projects where the niche covers have adhered themselves to the precast

Section 2.15 A. Anti-Graffiti Coating is required per the project submittal.

due to the Anti-graffiti used. Is this a requirement on the faces of the precast niches?

Page Ls 501 Detail 1

Page Ls 501 Detail 1 plan view of weld plate from single sided precast niche unit to poured in place pilaster shows the weld plate in the center of the niche.

Typically the weld plate is place in the thicker back wall as shown in the previous drawing. The wall in the center of the niche is thinner and the heat from welding could cause some cracking.

See attached exhibit for Single-Sided Precast Concrete Columbarium Unit to End Column Details.

As noted in detail 6/LS501, the Contractor is responsible for providing structural calculations and design of the embeds as a delegated design item.

Part 1 Paragraph 10 Page 15

Ath the site walk on 6/6/24 you stated that RFI submittal deadline is Monday 6/10/24. Is it possible to get the RFI deadline submission date extended?

See VA Response to RFI No. 6.

3.0/Recency/pg.1

Will the government consider increasing the look back from 5 years to 8 years due to Covid-19 restrictions for have of the look-back period?

No – Work continued during COVID-19 for projects of this complexity

3.0/Relevancy/pg.

Will the government consider multiphase land development projects that are 10 acres or larger and exceed $15M in construction costs to meet the relevant complexity?

Rating criteria will not change

3.0/Relevancy/pg.

Will the government consider team member experience to meet the Relevant Experience criteria?

See solicitation Instructions, Conditions and Other Statements to Bidders/Offerors. Part II, Proposal Information. Section 1.0

EVALUATION FACTORS FOR

AWARD.

Storm Sewer Utilities, Spec section 33 40 00, Part 2 products, On the above storm drainage spec, “A.” is butt fused HDPE Pipe & Fittings which normally is not used for storm drainage, and the coupling spec A - 1 does not

Yes, corrugated PE pipe and fittings may be used for sizes 10” and smaller for installation in drainage applications. Pipe meeting AASHTO M252 spec is acceptable.

2.1 PE Pipe &

Fittings

A. Smoothwall PE drainage pipe and fittings, DN 80 to DN 250 (NPS 3 to NPS

10); ASTM F714,

DR 21 with smooth waterway for coupling joints.

1. Silt-tight Couplings: PE sleeve with

ASTM D1056,

Type 2, Class A, Grade 2 gasket material that mates with tube and fittings.

B. Corrugated PE pipe and fittings, DN 300 to DN 1500 (NPS 12 to

NPS 60);

AASHTO M294,

Type S with smooth waterway for coupling joints. Pipe shall be produced from PE certified by the resin producer as meeting the requirements of ASTM D3350, match up with the Smoothwall PE drainage pipe called out for. For the smaller sizes of storm drain 4”

– 10” can we use spec “B” below which is much more common for the HDPE storm drains, including all the 4” HDPE perf called out for on the plans? The smaller sizes would be AASHTO M252 spec, not M294, which is the spec for the larger sizes.

minimum cell class 335434C.

1. Water tight joints shall be made using a PVC or PE coupling and rubber gaskets as recommended by the pipe manufacturer.

Rubber gaskets shall conform to ASTM F477. Soil tight joints shall conform to requirements in

AASHTO HB-17,

Division II, for soil tightness and shall be as recommended by the manufacture

Plan Page LU101 (along with other plan sheets) there is 4” HDPE underdrain, perforated draintile pipe, and HDPE solid pipe. For the specified materials , Spec section 33 41 13, 2.1 materials B & C, the PE spec is not a drain pipe spec, it’s a service tubing spec. Can we use Corrugated PE pipe and fittings for these pipe runs per the above spec section 33 40 00, Part 2 products, 2.1 PE Pipe & Fittings, “B”. but would be AASHTO M252? Or we can use SDR35 3034 PVC Gasketed Pipe & Fittings, which is the other widely

Yes, corrugated PE pipe and fittings may be used for sizes 10” and smaller for installation in drainage used pipe & fittings for storm drainage?

Specs section 33 40 00

2.5 cleanouts call out for a certain type of cleanout, but plan page CU502 (202 OF 449) Detail 1 shows a different type of cleanout.

Which type of cleanout do you want, the one in the detail, or the one in the specs?

2.5 includes cleanouts with and without a cast iron frame and cover.

Details 1 and 2 on CU502 show 2 installation applications (1 for within paved and turf areas, 2 for all other applications)

Do you have a list of the known GC’s bidding on this project?

See the Site Visit Attendance Sheet for the names and contact information of General Contractors that attended the Site Visit.

Bid Form Bid Form CLIN 006 Option 4 is requesting pricing for 18-month or less compressed schedule for the Administration Building construction after Contractor receives NTP. Note, the new transformer at this time is believed to have an 18-month lead time making this compressed schedule unattainable especially considering the long-lead transformer must be installed prior to relocating electrical out of building addition footprint and to be able to power up the temporary staff trailers for the Administration renovations/addition. Based on past experience and discussions at the site walk on 6/6/24, our team understands the intent behind this CLIN option is to reduce the duration that staff is displaced from their existing building.

Similar to Miramar National Cemetery, our team recommends the government consider starting the 18 month or less time when contractor takes

Intent is to disrupt the Administration staff for no more than 18-months.

From start – Move out of the staff to End date – Staff moves into the new facility should be within the 18-month time frame to meet the intent of the CLIN.

possession of the building to start the renovations and building addition.

Section 01 50 10 Section 01 50 10 3.2.8c states to provide "cellular telephones for each employee." This requirement seems unusual based on our past experience so please confirm whether or not indeed required. If required, please provide quantity.

Cellular phones are not required for VA employees.

Phone connections transfer will be required in the temporary office space.

Section 01 50 10 Section 01 50 10 3.2.6 contains requirements for printer(s) to be furnished in the temporary trailer(s) by the contractor. Please confirm this is indeed necessary and if so specify which trailer(s) this is applicable to. Based on past cemetery renovation experience at Miramar National Cemetery, the existing printer(s) from the various buildings should be utilized at the temporary trailers. Please review and advise.

Existing printers will be transferred for the temporary trailers for the office space.

A printer/scanner will be required for the RE office to manage the efforts per spec section for RE trailer.

Section 01 50 10, Sheet TS102, and Sheets AT101 thru AT106

Section 01 50 10 3.2.8 contains information about the communications infrastructure but does not contain quantity of data drops per trailer.

Please redline the trailer plans with drop and quantity of ports or provide overall quantities to assume for bidding purposes.

Government expects all workstations in temporary trailers to be connected to local area network (wired) connection through a temporary fiber back to the telecom room in the Admin/Maint Building. See TS-102 for pathway and fiber requirements.

It is understood that internal trailer cabling will be provided by the Temporary Trailer manufacturer.

Contractor to coordinate with Trailer manufacturer to supply connection sufficient for the programed areas identified.

Section 01 50 10 Section 01 50 10 3.2.8 contains requirements for the contractor to

Handled by service provider connection to the Temporary trailer furnish and pay for internet which seems unusual based on our past experience for temporary staff trailers. It seems the way the plans are drawn the internet service is to be extended from the existing building.

Please review and advise.

by the temporary Fiber. See TS-102 for pathway. See Detail 2 TS-400.

Contractor to coordinate with local VA/Cem and service provider to coordinate switchover and phasing.

Section 08 71 00 Section 087100-1.7.B specifies the Cylinders be keyed into existing Grand Master Key System. In order to bid accurately, our team needs to know the following:

a. Provide manufacturer of existing cylinders and key system.

b. Are cylinders are to be interchangeable core or conventional?

c. Does the existing system use a restricted keyway and/or higher security level than manufacturer's standards?

a. Keying information to be provided by the Government.

b. Cylinders are to be interchangeable into core housings. Refer to 08 71 00, 2.7 A.

c. Restricted keyway requirements to be provided by the Government.

Sheet A-611 The wood frames on Sheet A-611 have conflicts between Frame Type/Matl, the Frame Details, and the STC Rating. All of the interior doors (except Door 202) are specified on the Door Schedule Frame Type and MATL columns as Wood, however, the frame Details are showing HM frames.

In addition, there are 9 Doors with STC 45 specified, but wood frames are not available with STC

45. Please review and advise regarding the following:

a. If Frame Details should be revised to Detail H5/A-611, or if the Frame Type and Mat’l should be changed to HM. If Frames are

Administration Building:

All interior doors and door frames are to be wood to match existing species, grain, color and finish. Running trim including wall base, door and window casings will match existing.

Detail H5 is applicable for heads and frames of all interior doors, except Door 202. Door 202 is a 3/4-hour C Label steel door assembly and requires a hollow metal frame.

Honor Guard Building:

All interior doors, door frames, and trim are to match the Administration Building, except for Gun Storage Door 130. The frame for the gun to be changed to HM, advise on the following:

i. If any frames need a Frame Face at Head to be larger than 2”.

ii. If any frames need Punch and Dimple for existing CMU walls.

b. If frames at STC 45 Doors are OK as non-STC Wood Frame, or if these frames should be changed to HM frame.

storage door will be hollow metal.

Details H1, J1, and S1 are applicable.

The door is to be made of wood to match the other interior doors.

Provide solid core (mineral fiber) wood doors with gaskets set in wood frames. STC 35 – 40.

Section 08 14 00 Please provide species, cut, and color for wood doors and frames.

Match existing in Administration Building.

Section 08 71 00 and Sheet A-611

Hardware Set 5G and 15A are used on the Door Schedule, but are not listed in Section 08 71 00-3.4.

Please advise what Hardware should be included for Doors 202, and Honor Guard Door 131.

Change “5G” to read “5F”. Admn Door 202 is a C Label, 45 Minute door. Hardware as follows:

Lockset F07, Cylinder, Butts (3 pair), Closer, Floor Stop, Edge Guard, Self- Adhesive Seals.

Door 131 services a multi-occupant restroom. Change “15A” to read “15”. Refer to not in Section 08 71

00, 3.4 – HW-15:

“Delete threshold, weatherstrip door bottom seal and mortise deadlock on Honor Guard Men’s Restroom and Locker Room doors.”

Sheet A-611 Door Frame Type B is specified at Admin 105. Frame Type B show 3” face at jambs & head, however, the frame details appear to be a 2” face, which is standard. Advise if 3” Face is required at jambs and head.

Change Jamb & head to read “2”.

Sheet A-611 Frame Type A (Wood) is specified at Admin 124, 202. However, Hollow metal frames are required at Admin doors 124 and 202. Jamb & heads to be 2” material is specified as hollow metal. Advise if wood frame or hollow metal frames is required at 124 &

202. If hollow metal is required, advise if 2” or 3” Face at jambs, and 2” or 3” or larger at Head.

Sheet A-611 Frame Type B is specified at Honor Guard 134, and Satellite Restroom 101, 102, 103, 104 & 105.

However, Frame Type B is for a Pair. Advise if we should adapt Frame Type B to be a single at single doors. Also, advise if 2” or 3” Face at jambs, and 2” or 3” or larger at Head.

Frame Type B is not designated a pair on the elevated frame types. The elevated frame types refer to the schedule for frame width and height.

Honor Guard Door 134 is insulated metal with a hollow metal frame as scheduled.

All Satellite Restroom doors are singles set in hollow metal frames as scheduled.

Sheet A-611 Frame Type B is specified at Admin 116A & C102A. However, these doors have a Note 1, which specifies the Existing Door & Frame to Remain. Confirm these will be existing frames.

Door A116A is to be replaced as noted. Existing frame is to remain.

Existing C102A door and frame are to remain.

Sheet A-611 Satellite Restroom Door 102 has Frame Elev B (which is not correct as it’s a pair), which is a 3 Sided Frame. However, the building elevation on A-201 shows a Louver above the frame, and it appears to be in a transom section of the frame. Please advise if we are to make the louver part of the frame or if the louver will be a wall louver.

Satellite Restroom Door 102 is a single door at 3’-6” x 8’-0” x 1-3/4”.

The louver is to be a wall louver.

Refer to Mechanical Drawing Sheet M101-1501-A12.

Sheet A-611 Administration Door 124 is specified with Hollow Metal Door and Wood Frame. We can do this, but it’s unusual. Please advise if this is correct, or if the door should be Wood, or if the Frame should be Hollow Metal.

Admin Door 124 is scheduled as a wood door in a hollow metal frame.

Sheet A-611 Honor Guard Door 130 is also specified with Hollow Metal Door and Wood Frame. However, details H1 & J1 shows this opening requires a HM Frame with a 6” Head. Please advise if the frame should be HM Frame with a 6” Head.

Honor Guard Door 130 is to be set in 6” concrete block wall. Door frame is to be hollow metal with 4” head to meet CMU coursing. Jamb face to measure standard 2”.

Section 08 71 00 Hardware Set 1 in 087100-3.4 specifies an F04 Mortise Lock.

This would require a wide stile storefront door to use this. Please review and advise if hardware is to be adjusted or storefront door to be wide stile.

Storefront door to have wide stile to accommodate F04.

Section 22 11 00 Section 22 11 00 2.3.A specifies that Above Ground Domestic Water 6” and greater shall be Schedule 10 Stainless Steel. Please confirm that Schedule 10 Stainless Steel is an acceptable material for 2 ½” and larger Domestic Water Piping.

For internal piping to plumbing fixtures, use type L copper piping, and for underground service five feet outside the building, use type K copper.

No water piping is 6” or larger, so stainless steel does not apply.

Section 22 11 00 Section 22 11 00 2.5.A specifies material to be used for Trap Primer Water Piping Pipe is to be Copper tube, ASTM B88, type K, hard drawn.

Please confirm type L soft copper is acceptable for underground Trap

Type K copper piping shall be use for underground installation, type L copper for above ground.

Primer Piping.

Section 22 13 00 Section 22 13 00 2.9.A specifies a sleeve flashing device shall be provided at points where pipes pass through membrane waterproofed floors or walls.

Please confirm it would be acceptable to install pipe through walls and caulk with acoustical sealant in annular space between pipe/ pipe insulation and wall, in lieu of sleeve. At fire rated wall partitions, please confirm it would be acceptable to utilize UL Listed fire caulk application, in lieu of sleeve.

Piping that passes through the wall (except for the exterior) will require fire-rated caulking. Sleeve can be omitted. Any penetration through flooring shall require sleeves plus fireproof caulking. Any penetration through the exterior wall shall require sleeve and waterproof caulking.

Yes. UL Listed fire caulk application is acceptable. Sleeve to be installed as stated above.

Section 22 13 00 Section 22 13 00 2.1 specifies cast iron for waste vent piping. During the walk through, our team noticed that existing vents were PVC.

Please confirm that PVC is an acceptable material for vent piping.

Confirmed. PVC is acceptable for Venting.

Site Visit During the walk through, we were unable to get access to Mechanical /Electrical Space 1219, and the Women’s Bathroom 1222 in the Public Information Center. Would you please provide us photos of the piping and plumbing fixtures in those spaces?

Attached: photos for PIC mechanical Room, one of the Men’s Restroom

Women’s is mirror of men’s sans urinal. Look at PIC Demo Plan

P-001-1401 P-001-1401 General Note Q states:

Pitch underfloor sanitary waste piping at 1/8" per foot, unless noted otherwise. Please confirm that ¼” per foot of slope for sanitary waste piping is acceptable.

For drainage piping 3” or large slope pipe at a minimum of 1/8” per foot.

For drainage pipe 2 ½” of less slope pipe of a minimum of 1/4” per foot slope

Section 22 13 00 Section 22 13 00 2.7.A, Traps shall be provided on all sanitary branch

Slip joints on the sewer side are prohibited.

waste connections from fixtures or equipment not provided with traps.

Exposed brass shall be polished brass chromium plated with nipple and set screw escutcheons.

Concealed traps may be rough cast brass or same material as the piping they are connected to. Slip joints are prohibited on sewer side of trap. Traps shall correspond to fittings on cast iron soil pipe or steel pipe respectively, and size shall be as required by connected service or fixture. On site walk we noticed existing fixture traps utilize slip joints on the sewer side of the trap.

Please confirm if slip joints are acceptable.

Section 08 51 13 Section 08 51 13 1.5 D. 1 - The Kawneer windows we propose, 8225TL, meet or exceed the AAMA requirements per the specifications, but Kawneer does not offer physical labels as requested in 1.5 D. 1. Per the manufacturer, AAMA labels are typically required for residential windows: not commercial. They can offer test reports for the condensation resistance and forced entry testing. Please confirm acceptable.

Provide copies of current applicable test reports for review.

Section 08 51 13 Section 08 51 13 1.5 D. 2 - The Kawneer windows we propose are in the FGIA certified product directory: certification numbers 7166 and 13973. Our team noted Kawneer follows the testing agency's requirements for the age

If testing certification was within 4 years of initial manufacturing, specifications have not changed, and manufacture does not require additional certifications, certification is acceptable.

of test reports as the governing factor and only update reports when required or when product changes necessitate retesting. Therefore, test reports of not more than 4 years old will not be guaranteed. They can offer a report/certification showing good standing with the testing agency. Please confirm acceptable.

Section 08 51 13 Confirmation of primary voltage for the “New Utility Medium Voltage transformer”, current assumptions are that it is 12.47KV based off the existing MV transformer to be removed, we are using 12.47KV as a baseline for current lead time estimate. Is that a correct assumption?

In addition to verification of the voltage we will require clarification on the ownership of the primary conduit and feeders (owner or PSE), who is responsible for providing and installing transformer, conduits and primary feeders? Note, there are no specifications for medium voltage, transformer, etc. in the specifications.

The listed section is for aluminum windows.

The existing transformer is 12.47kV and that is the primary voltage for the new transformer. The existing primary feeder will be reused for the new transformer. Extend as necessary. The contractor is responsible for the installation, procurement, and feeders regarding the transformer. We will add the specification for a medium voltage transformer. *** SEE attached for Med Voltage Transformer Specification 26 12 19 for incorporation into Project Specifications.

Section 33 40 00 Section 33 40 00-5 states that Storm Sewer pipe NPS 3 to 10 pipe shall be ASTM F714, DR 21 and Silt-Tight Couplings. This is not commonly used in this application and DR 21 fittings are not referred to as silttight.

Yes, corrugated PE pipe and fittings may be used for sizes 10” and smaller for installation in drainage

Is material conforming to AASHTO M252 acceptable?

Section 33 34 13 Septic tanks is referenced but is not included in the project specifications. Please provide Spec Section 33 34 13 Septic Tanks.

Ignore or delete any reference to 33 34 13. All tank specifications are located in 33 30 00, 2.3 Vaults.

Can I get a plan holders list for Notice ID 36C10F24R0011, Tahoma National Cemetery. We were contracted by a contractor to bid the landscape & irrigation work. If I’m going to bid to one, I’d like to be able to bid to all of them

VA is in the procurement process now. A walkthrough was held on Thursday, 6/6/2024 at 10:00 AM at the Tahoma National Cemetery.

Proposals from prime contractors are due July 11, 2024.

Section 31 32 33 Pressure Grouting Soil Stabilization states that lime slurry application shall be complete on either side of new road for entire length of the new road. Is this limited to Road A or is the paved portion of the service drive included? Please provide layout information on Road A between Sta 8+80 and 12+62 where the stormwater storage facility is located. Is it possible to get a plan of the required treatment areas?

Include Road A and Paved portion of Service Drive for limits of Soil Stabilization.

Not sure what “layout information” is referring to. See CR106 and Detail 5

CU502

CS109, CS110 CS109, CS110 have a general note: “ANY DAMAGED STONE

SHALL BE REPLACED NEW

OR RESET IF ACCEPTABLE

TO NCA REPRESENTATIVES.

STONE SHALL MATCH THAT

OF EXISTING ADJACENT

STONEWORK.” Can you confirm if this applies to only damage caused by the contractor during repairs and improvements, or is there damaged stone that needs to

Note applies to damage caused by the contractor during repairs and improvements.

be replaced as part of the repairs and improvements?

Are the "natural stone" caps granite or limestone? If the former, would you accept Indiana Limestone as an alternate? We do probably two of these projects per year and they all seem to be Indiana. Also, do you have a bidders list?

See specification 04 43 00;

VA is in the procurement process now. A walkthrough was held on Thursday, 6/6/2024 at 10:00 AM at the Tahoma National Cemetery.

Proposals from prime contractors are due July 11, 2024.

page Signage Details page

LK502

there are layouts for signage that we are unable to locate on the Signage layout drawings (LK400s). Specifically, Layouts J (Authorized Vehicles Only), Layout M (No Left Turn) and Layout N (No Right Turn). Should out proposal include all signs or just those that are scheduled to be installed?

Signage Layouts J (Authorized Vehicles Only), Layout M (No Left Turn) and Layout N (No Right Turn) are not in project; Include all signs that are scheduled to be installed.

specification 32 00 00

Please confirm specification 32 00 00 item Products 2.2 B. is the Minimum Material Requirements for Organic Soil Amendment. If not, please provide the Minimum Material Requirements for Organic Soil Amendment

Minimum Materials Requirement per Specification 32 90 00 2.2 B Table

Planting

00 00 2.2 C

Planting specification 32 00 00 2.2 C. states that “Topsoil stripped and stockpiled on project site is acceptable provided, after testing and addition of necessary additives, meets above specification”. Please confirm that

2.2 B. is the Minimum Material

Requirement. If not please provide the Minimal Material Requirement that stripped, stockpiled and additive added topsoil must meet.

Minimum Materials Requirement per Specification 32 90 00 2.2 B

Planting

00 00 2.2 E

Planting specification 32 00 00 2.2 E. calls for spreading and incorporating organic soil amendment into finished subgrade at depth indicated on drawing to raise soil organic content. Plans do not indicate locations or depths for organic soil amendment placement and incorporation.

Please provide locations and depth of soil amendment to be incorporated into subgrades or the Minimum Material Requirement subgrades must meet.

See specification 32 90 00 2.2-D specifying requirements for location.

Depth of amendments to finished subgrade per specification 32 90 00 2.2-E

Restored areas within planting beds shall receive a minimum of 18” deep topsoil. Areas to be restored with turf and seeding shall follow the process outlined in 32 90 00 Part 3.

See response to RFI question #64 for minimum material requirement subgrades.

Please provide clarification on whether “Ornamental Plantings” are or are not part of the “Restoration and Planting” scope of work.

Ornamental Plantings are part of the ‘Restoration and Planting’ scope of work. See LP-series plans for information on restoration and planting locations.

PRE-PROPOSAL INQUIRY (PPI) FORM