TNC3 BID DOCUMENTS R 2-2-2024 2 of 9.pdf
PDF 32 MB Posted
- Attached to
- Y1PC--Tahoma National Cemetery, Ph 3 Federal contract opportunity
- Solicitation number
- 36C10F24R0011
About this file
This document is the TNC3 Bid Documents for the Tahoma National Cemetery, Phase 3 project under Solicitation Number 36C10F24R0011. The U.S. Department of Veterans Affairs Office of Construction and Facilities Management is seeking proposals for this construction project, Project Number 919-010, at the Tahoma National Cemetery. The project involves work at the cemetery, though the specific requirements are not detailed in this file. The bid documents contain pricing templates and other materials for contractors to prepare and submit their proposals in response to the solicitation. Responses to this solicitation are due by 2-2-2024.
View the file
Other files for this federal contract opportunity
Show all 37
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
G
H
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fil e P ath : y
:\1
\16
2 t ah om a n c p h3 \_0
7 c ivi l\_ ca d f ile s\_ sh ee ts\
2_ c_ de mo
.dw g ed it:d am ing a sa ve d:1
/26 /20
3:
P
M p lot
:2/ 1/2
4 4
:12 P
M
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
SECURITY:
IMEG, INC.
TEMPE, AZ 85281
309.793.3421
PETE MCGHEE
Project Director
Revisions:
1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 16362
TAHOMA NATIONAL CEMETERY
PHASE 3 DEVELOPMENT
919PC2010
FEBRUARY 2, 2024
18600 SE 240TH ST, KENT, WA 98042
BID DOCUMENTS
Date:
GEOTECHNICAL:
TERRACON
21905 64TH AVE W SUITE 100
MOUNTLAKE, WA 98043
425.771.3304
DENNIS STETTLER, PE
OF 449
KEY MAP
(N.T.S.)
IRRIGATION:
EC DESIGN GROUP,
LTD
400 5TH STREET
WEST DES MOINES, IA 50265
515.225.6365
LISA ESSY, ASIC
COST ESTIMATING:
LELAND SAYLOR
1777 OAKLAND BLVD #103
WALNUT CREEK, CA 94596
415.291.3200
JEFF SAYLOR
STRUCTURAL:
KPFF
1601 5TH AVE. SUITE 1600
SEATTLE, WA 98101
206.926.0455
JEFF CREAGAN, SE
COMMISSIONING:
CHARLOTTE ENGINEERS,
LLP
5838 MONROE RD. #100
CHARLOTTE, NC 28212
704.531.3000
BRIAN ANNICHARICO, PE
ARCHITECTURAL/MEP:
TOLAND MIZELL MOLNAR
INC.
590 MEANS ST. NW
ATLANTA, GA 30318
404.214.9774
RICK MASSEY, AIA
WASTEWATER:
ADC WASTEWATER
INC.
PO BOX 486
TACOMA, WA 98401
253.203.1200
ROCKY ANDERSON
N
Office of Construction and Facilities Management1600 N. DESERT DR. SUITE 230
BASE BID
BID DOCUMENTS
CD101
OVERALL DEMOLITION PLAN -
NORTH
N
SCALE:1
OVERALL DEMOLITION PLAN - NORTH
1" = 80' (30" x 42" PAPER SIZE)
0 60' 120'
LEGEND
PROPERTY LIMITS
CONSTRUCTION LIMITS
WETLAND #
DELINEATED WETLAND
EXISTING TREE LINE
EXISTING BITUMINOUS PAVEMENT
EXISTING WATERLINE
EXISTING UNDERGROUND ELECTRIC
EXISTING SEWER
REMOVE BITUMINOUS PAVEMENT
MILL ASPHALT
CONCRETE REMOVAL
TREE REMOVAL
SIGNAGE REMOVAL
GENERAL DEMOLITION NOTES
· EXISTING SECTION MARKERS TO REMAIN (TYP.)
· PHASE 2 SITE AMENITIES TO REMAIN (TYP.) UNLESS
OTHERWISE NOTED
· COMPLETE REMOVAL OF FLOWER WATER STATION
INCLUDES DISPOSAL OF RECEPTACLES, HARDWARE,
PRECAST POST, WATER SPIGOT, CONCRETE PAD, AND
SUB BASE.
· FOR EACH INSTANCE OF FLOWER WATER STATION
REMOVAL, SALVAGE EXISTING CONNECTION STUB FOR
USE IN INSTALLATION OF NEW FLOWER WATER
STATION AT SAME LOCATION.
MATCHLINE - SHEET CD102
PROTECT WATER
VAULTS/EQUIPMENT TO REMAIN
PROTECT WETLAND. NO FILL, NO
CLEARING, NO GRADING.
(TYPICAL)
ASSEM
BLY
AREA
M A
TC
H
LI
N
E
S H
E E
T C
D
2 20
27ABAT
KEY NOTES
PROTECT EXISTING UTILITY TO REMAIN
REMOVE BITUMINOUS PAVEMENT AND SUB BASE
REMOVE CONCRETE CURB TO NEAREST JOINT
REMOVE CONCRETE WALL
REMOVE QUANSET BUILDING/STRUCTURE
CONCRETE FOUNDATION
REMOVE STORM PIPE
REMOVE RUBBLE/DIRT STOCKPILE
REMOVE GRAVEL SURFACING
REMOVE SANITARY SEWER PIPE
SAWCUT AND REMOVE 3' ASPHALT PAVEMENT
NO CONSTRUCTION EQUIPMENT OR PERSONNEL
ALLOWED IN FUTURE SEPTIC AREA
MILL 2" THICK ASPHALT PAVEMENT (ENTIRE
CONSTRUCTION ACCESS ROUTE)
REMOVE STORM MANHOLE/INLET
PROTECT EXISTING STORM PIPE FOR
RECONNECTION
REMOVE 6" WATER MAIN
REMOVE SIGNAGE
KEEP SUPPLY STUB FOR USE WITH NEW
FLOWER WATERING STATION
REMOVE BENCH AND/OR TRASH RECEPTACLE
SAWCUT AND REMOVE CONCRETE PAVEMENT
SALVAGE AND REINSTALL CONICAL CONCRETE
BOLLARDS (TYPICAL)
PROTECT EXISTING FLAG POLE AND LIGHTS
REMOVE CONRETE STRUCTURES AND VAULTS
APPROXIMATE LIMITS OF UNCONSOLIDATED FILL
REMOVAL. REMOVE AND DISPOSE FULL DEPTH
TO UNDERLYING NATIVE SOILS. DISPOSE OF
UNSUITABLE MATERIAL OFFSITE. APPROXIMATE
DEPTH OF REMOVAL 15'. SEE GEOTECHNICAL
REPORT AND BORINGS.
SALVAGE AND REINSTALL EXISTING BENCH.
BEGIN
END
COLUMBARIUM 5
EXISTING
SECTION 9
EXISTING
SECTION 8
BEGIN
END
3 BEGIN
END
PROTECT EXISTING
WALL IN PLACE
TO NEAREST JOINT
TO NEAREST
JOINT
ADDITIVE ITEM 2
SEE "AI2" SHEETS
NOT IN BASE BID
3 BEGIN
3 END
CD104
CD103
CD101
CD102
ADDITIVE ITEM 5
SEE "AI5" SHEETS
NOT IN BASE BID
REFER TO CG104 - AI5 FOR
SIGNIFICANT TREES TO
REMAIN IF AI5 IS SELECTED
T
T
T
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fil e P ath : y
:\1
\16
2 t ah om a n c p h3 \_0
7 c ivi l\_ ca d f ile s\_ sh ee ts\
2_ c_ de mo
.dw g ed it:d am ing a sa ve d:1
/26 /20
3:
P
M p lot
:2/ 1/2
4 4
:12 P
M
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
SECURITY:
IMEG, INC.
TEMPE, AZ 85281
309.793.3421
PETE MCGHEE
Project Director
Revisions:
1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 16362
TAHOMA NATIONAL CEMETERY
PHASE 3 DEVELOPMENT
919PC2010
FEBRUARY 2, 2024
18600 SE 240TH ST, KENT, WA 98042
BID DOCUMENTS
Date:
GEOTECHNICAL:
TERRACON
21905 64TH AVE W SUITE 100
MOUNTLAKE, WA 98043
425.771.3304
DENNIS STETTLER, PE
OF 449
KEY MAP
(N.T.S.)
IRRIGATION:
EC DESIGN GROUP,
LTD
400 5TH STREET
WEST DES MOINES, IA 50265
515.225.6365
LISA ESSY, ASIC
COST ESTIMATING:
LELAND SAYLOR
1777 OAKLAND BLVD #103
WALNUT CREEK, CA 94596
415.291.3200
JEFF SAYLOR
STRUCTURAL:
KPFF
1601 5TH AVE. SUITE 1600
SEATTLE, WA 98101
206.926.0455
JEFF CREAGAN, SE
COMMISSIONING:
CHARLOTTE ENGINEERS,
LLP
5838 MONROE RD. #100
CHARLOTTE, NC 28212
704.531.3000
BRIAN ANNICHARICO, PE
ARCHITECTURAL/MEP:
TOLAND MIZELL MOLNAR
INC.
590 MEANS ST. NW
ATLANTA, GA 30318
404.214.9774
RICK MASSEY, AIA
WASTEWATER:
ADC WASTEWATER
INC.
PO BOX 486
TACOMA, WA 98401
253.203.1200
ROCKY ANDERSON
N
Office of Construction and Facilities Management1600 N. DESERT DR. SUITE 230
BASE BID
BID DOCUMENTS
N
SCALE:1
OVERALL DEMOLITION PLAN - SOUTH
1" = 80' (30" x 42" PAPER SIZE)
0 60' 120'
CD102
OVERALL DEMOLITION PLAN -
SOUTH
LEGEND
PROPERTY LIMITS
CONSTRUCTION LIMITS
WETLAND #
DELINEATED WETLAND
EXISTING TREE LINE
EXISTING BITUMINOUS PAVEMENT
EXISTING WATERLINE
EXISTING UNDERGROUND ELECTRIC
EXISTING SEWER
REMOVE BITUMINOUS PAVEMENT
MILL ASPHALT
CONCRETE REMOVAL
TREE REMOVAL
SIGNAGE REMOVAL
MATCHLINE - SHEET CD101
COORDINATE ELECTRIC, FIBER OPTIC,
AND GAS UTILITY LINES WITH ELECTRIC
DEMO PLANS & NEW TRANSFORMER
INSTALLATION. SEE SHEET ED-100-1301.
M A
TC
H
LI
N
E
S H
E E
T C
D
PROTECT EXISTING SEPTIC TANK(S)
AND PIPING TO REMAIN
MILL ROAD HALF
WIDTH ON SIDE OF
CURB INSTALL
MILL ROAD HALF
WIDTH ON SIDE OF
CURB INSTALL
MATCHLINE - SHEET CD104
GENERAL DEMOLITION NOTES
· EXISTING SECTION MARKERS TO REMAIN (TYP.)
· PHASE 2 SITE AMENITIES TO REMAIN (TYP.) UNLESS
OTHERWISE NOTED
· COMPLETE REMOVAL OF FLOWER WATER STATION
INCLUDES DISPOSAL OF RECEPTACLES, HARDWARE,
PRECAST POST, WATER SPIGOT, CONCRETE PAD, AND
SUB BASE.
· FOR EACH INSTANCE OF FLOWER WATER STATION
REMOVAL, SALVAGE EXISTING CONNECTION STUB FOR
USE IN INSTALLATION OF NEW FLOWER WATER
STATION AT SAME LOCATION.
28ABAT
KEY NOTES
PROTECT EXISTING UTILITY TO REMAIN
REMOVE BITUMINOUS PAVEMENT AND SUB BASE
REMOVE CONCRETE CURB TO NEAREST JOINT
REMOVE CONCRETE WALL
REMOVE QUANSET BUILDING/STRUCTURE
CONCRETE FOUNDATION
REMOVE STORM PIPE
REMOVE RUBBLE/DIRT STOCKPILE
REMOVE GRAVEL SURFACING
REMOVE SANITARY SEWER PIPE
SAWCUT AND REMOVE 3' ASPHALT PAVEMENT
NO CONSTRUCTION EQUIPMENT OR PERSONNEL
ALLOWED IN FUTURE SEPTIC AREA
MILL 2" THICK ASPHALT PAVEMENT (ENTIRE
CONSTRUCTION ACCESS ROUTE)
REMOVE STORM MANHOLE/INLET
PROTECT EXISTING STORM PIPE FOR
RECONNECTION
REMOVE 6" WATER MAIN
REMOVE SIGNAGE
KEEP SUPPLY STUB FOR USE WITH NEW
FLOWER WATERING STATION
REMOVE BENCH AND/OR TRASH RECEPTACLE
SAWCUT AND REMOVE CONCRETE PAVEMENT
SALVAGE AND REINSTALL CONICAL CONCRETE
BOLLARDS (TYPICAL)
PROTECT EXISTING FLAG POLE AND LIGHTS
REMOVE CONRETE STRUCTURES AND VAULTS
APPROXIMATE LIMITS OF UNCONSOLIDATED FILL
REMOVAL. REMOVE AND DISPOSE FULL DEPTH
TO UNDERLYING NATIVE SOILS. DISPOSE OF
UNSUITABLE MATERIAL OFFSITE. APPROXIMATE
DEPTH OF REMOVAL 15'. SEE GEOTECHNICAL
REPORT AND BORINGS.
SALVAGE AND REINSTALL EXISTING BENCH.
REMOVE GRASS ISLAND TO SUBGRADE
EXISTING
SECTION 5
EXISTING
SECTION 6
REMOVE &
DISPOSE
ADDITIVE ITEM 1
SEE "AI1" SHEETS
NOT IN BASE BID
CD104
CD103
CD101
CD102
END
REMOVE 120 LF
EXISTING SANITARY
SEWER PIPE, BEGIN
T
T
T
T
T
T
T
T T
T
T
T
T
T
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fil e P ath : y
:\1
\16
2 t ah om a n c p h3 \_0
7 c ivi l\_ ca d f ile s\_ sh ee ts\
2_ c_ de mo
.dw g ed it:d am ing a sa ve d:1
/26 /20
3:
P
M p lot
:2/ 1/2
4 4
:13 P
M
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
SECURITY:
IMEG, INC.
TEMPE, AZ 85281
309.793.3421
PETE MCGHEE
Project Director
Revisions:
1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 16362
TAHOMA NATIONAL CEMETERY
PHASE 3 DEVELOPMENT
919PC2010
FEBRUARY 2, 2024
18600 SE 240TH ST, KENT, WA 98042
BID DOCUMENTS
Date:
GEOTECHNICAL:
TERRACON
21905 64TH AVE W SUITE 100
MOUNTLAKE, WA 98043
425.771.3304
DENNIS STETTLER, PE
OF 449
KEY MAP
(N.T.S.)
IRRIGATION:
EC DESIGN GROUP,
LTD
400 5TH STREET
WEST DES MOINES, IA 50265
515.225.6365
LISA ESSY, ASIC
COST ESTIMATING:
LELAND SAYLOR
1777 OAKLAND BLVD #103
WALNUT CREEK, CA 94596
415.291.3200
JEFF SAYLOR
STRUCTURAL:
KPFF
1601 5TH AVE. SUITE 1600
SEATTLE, WA 98101
206.926.0455
JEFF CREAGAN, SE
COMMISSIONING:
CHARLOTTE ENGINEERS,
LLP
5838 MONROE RD. #100
CHARLOTTE, NC 28212
704.531.3000
BRIAN ANNICHARICO, PE
ARCHITECTURAL/MEP:
TOLAND MIZELL MOLNAR
INC.
590 MEANS ST. NW
ATLANTA, GA 30318
404.214.9774
RICK MASSEY, AIA
WASTEWATER:
ADC WASTEWATER
INC.
PO BOX 486
TACOMA, WA 98401
253.203.1200
ROCKY ANDERSON
N
Office of Construction and Facilities Management1600 N. DESERT DR. SUITE 230
BASE BID
BID DOCUMENTS
N
SCALE:1
OVERALL DEMOLITION PLAN - SOUTHEAST
1" = 10' (30" x 42" PAPER SIZE)
0 60' 120'
CD103
OVERALL DEMOLITION PLAN -
SOUTHEAST
SCALE:2
EXISTING CONCRETE PUMP HOUSE - BUILDING 3W01
N.T.S. (FOR REFERENCE ONLY)
SECTION
CONCRETE
VAULT/METER PITS
BUILDING 3W01:
REMOVE CONCRETE BUILDING AND STEPS.
REMOVE STORM STRUCTURES ADJACENT TO BUILDING.
REMOVE ALL STORM SEWER PIPE TO CATCH BASIN ON
VETERANS MEMORIAL DRIVE.
16 16
18 18 18 18 18
18 18
M A
TC
H
LI
N
E
S H
E E
T C
D
GENERAL DEMOLITION NOTES
· EXISTING SECTION MARKERS TO REMAIN (TYP.)
· PHASE 2 SITE AMENITIES TO REMAIN (TYP.) UNLESS
OTHERWISE NOTED
· COMPLETE REMOVAL OF FLOWER WATER STATION
INCLUDES DISPOSAL OF RECEPTACLES, HARDWARE,
PRECAST POST, WATER SPIGOT, CONCRETE PAD, AND
SUB BASE.
· FOR EACH INSTANCE OF FLOWER WATER STATION
REMOVAL, SALVAGE EXISTING CONNECTION STUB FOR
USE IN INSTALLATION OF NEW FLOWER WATER
STATION AT SAME LOCATION.
29ABAT
KEY NOTES
PROTECT EXISTING UTILITY TO REMAIN
REMOVE BITUMINOUS PAVEMENT AND SUB BASE
REMOVE CONCRETE CURB TO NEAREST JOINT
REMOVE CONCRETE WALL
REMOVE QUANSET BUILDING/STRUCTURE
CONCRETE FOUNDATION
REMOVE STORM PIPE
REMOVE RUBBLE/DIRT STOCKPILE
REMOVE GRAVEL SURFACING
REMOVE SANITARY SEWER PIPE
SAWCUT AND REMOVE 3' ASPHALT PAVEMENT
NO CONSTRUCTION EQUIPMENT OR PERSONNEL
ALLOWED IN FUTURE SEPTIC AREA
MILL 2" THICK ASPHALT PAVEMENT (ENTIRE
CONSTRUCTION ACCESS ROUTE)
REMOVE STORM MANHOLE/INLET
PROTECT EXISTING STORM PIPE FOR
RECONNECTION
REMOVE 6" WATER MAIN
REMOVE SIGNAGE
KEEP SUPPLY STUB FOR USE WITH NEW
FLOWER WATERING STATION
REMOVE BENCH AND/OR TRASH RECEPTACLE
SAWCUT AND REMOVE CONCRETE PAVEMENT
SALVAGE AND REINSTALL CONICAL CONCRETE
BOLLARDS (TYPICAL)
PROTECT EXISTING FLAG POLE AND LIGHTS
REMOVE CONRETE STRUCTURES AND VAULTS
APPROXIMATE LIMITS OF UNCONSOLIDATED FILL
REMOVAL. REMOVE AND DISPOSE FULL DEPTH
TO UNDERLYING NATIVE SOILS. DISPOSE OF
UNSUITABLE MATERIAL OFFSITE. APPROXIMATE
DEPTH OF REMOVAL 15'. SEE GEOTECHNICAL
REPORT AND BORINGS.
SALVAGE AND REINSTALL EXISTING BENCH.
EXISTING
SECTION 1
EXISTING
SECTION 3
EXISTING
SECTION 2
EXISTING
SECTION 4
EXISTING
SECTION 30
EXISTING
SECTION 28
6END
LEGEND
PROPERTY LIMITS
CONSTRUCTION LIMITS
WETLAND #
DELINEATED WETLAND
EXISTING TREE LINE
EXISTING BITUMINOUS PAVEMENT
EXISTING WATERLINE
EXISTING UNDERGROUND ELECTRIC
EXISTING SEWER
REMOVE BITUMINOUS PAVEMENT
MILL ASPHALT
CONCRETE REMOVAL
TREE REMOVAL
SIGNAGE REMOVAL
CD104
CD103
CD101
CD102
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fil e P ath : y
:\1
\16
2 t ah om a n c p h3 \_0
7 c ivi l\_ ca d f ile s\_ sh ee ts\
2_ c_ de mo
.dw g ed it:d am ing a sa ve d:1
/26 /20
3:
P
M p lot
:2/ 1/2
4 4
:13 P
M
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
SECURITY:
IMEG, INC.
TEMPE, AZ 85281
309.793.3421
PETE MCGHEE
Project Director
Revisions:
1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 16362
TAHOMA NATIONAL CEMETERY
PHASE 3 DEVELOPMENT
919PC2010
FEBRUARY 2, 2024
18600 SE 240TH ST, KENT, WA 98042
BID DOCUMENTS
Date:
GEOTECHNICAL:
TERRACON
21905 64TH AVE W SUITE 100
MOUNTLAKE, WA 98043
425.771.3304
DENNIS STETTLER, PE
OF 449
KEY MAP
(N.T.S.)
IRRIGATION:
EC DESIGN GROUP,
LTD
400 5TH STREET
WEST DES MOINES, IA 50265
515.225.6365
LISA ESSY, ASIC
COST ESTIMATING:
LELAND SAYLOR
1777 OAKLAND BLVD #103
WALNUT CREEK, CA 94596
415.291.3200
JEFF SAYLOR
STRUCTURAL:
KPFF
1601 5TH AVE. SUITE 1600
SEATTLE, WA 98101
206.926.0455
JEFF CREAGAN, SE
COMMISSIONING:
CHARLOTTE ENGINEERS,
LLP
5838 MONROE RD. #100
CHARLOTTE, NC 28212
704.531.3000
BRIAN ANNICHARICO, PE
ARCHITECTURAL/MEP:
TOLAND MIZELL MOLNAR
INC.
590 MEANS ST. NW
ATLANTA, GA 30318
404.214.9774
RICK MASSEY, AIA
WASTEWATER:
ADC WASTEWATER
INC.
PO BOX 486
TACOMA, WA 98401
253.203.1200
ROCKY ANDERSON
N
Office of Construction and Facilities Management1600 N. DESERT DR. SUITE 230
BASE BID
BID DOCUMENTS
N
SCALE:1
OVERALL DEMOLITION PLAN - SOUTHWEST
1" = 10' (30" x 42" PAPER SIZE)
0 60' 120'
CD104
OVERALL DEMOLITION PLAN -
SOUTHWEST
M A
TC
H
LI
N
E
S H
E E
T C
D
MATCHLINE - SHEET CD101
LEGEND
PROPERTY LIMITS
CONSTRUCTION LIMITS
WETLAND #
DELINEATED WETLAND
EXISTING TREE LINE
EXISTING BITUMINOUS PAVEMENT
EXISTING WATERLINE
EXISTING UNDERGROUND ELECTRIC
EXISTING SEWER
REMOVE BITUMINOUS PAVEMENT
MILL ASPHALT
CONCRETE REMOVAL
TREE REMOVAL
SIGNAGE REMOVAL
GENERAL DEMOLITION NOTES
· EXISTING SECTION MARKERS TO REMAIN (TYP.)
· PHASE 2 SITE AMENITIES TO REMAIN (TYP.) UNLESS
OTHERWISE NOTED
· COMPLETE REMOVAL OF FLOWER WATER STATION
INCLUDES DISPOSAL OF RECEPTACLES, HARDWARE,
PRECAST POST, WATER SPIGOT, CONCRETE PAD, AND
SUB BASE.
· FOR EACH INSTANCE OF FLOWER WATER STATION
REMOVAL, SALVAGE EXISTING CONNECTION STUB FOR
USE IN INSTALLATION OF NEW FLOWER WATER
STATION AT SAME LOCATION.
30ABAT
KEY NOTES
PROTECT EXISTING UTILITY TO REMAIN
REMOVE BITUMINOUS PAVEMENT AND SUB BASE
REMOVE CONCRETE CURB TO NEAREST JOINT
REMOVE CONCRETE WALL
REMOVE QUANSET BUILDING/STRUCTURE
CONCRETE FOUNDATION
REMOVE STORM PIPE
REMOVE RUBBLE/DIRT STOCKPILE
REMOVE GRAVEL SURFACING
REMOVE SANITARY SEWER PIPE
SAWCUT AND REMOVE 3' ASPHALT PAVEMENT
NO CONSTRUCTION EQUIPMENT OR PERSONNEL
ALLOWED IN FUTURE SEPTIC AREA
MILL 2" THICK ASPHALT PAVEMENT (ENTIRE
CONSTRUCTION ACCESS ROUTE)
REMOVE STORM MANHOLE/INLET
PROTECT EXISTING STORM PIPE FOR
RECONNECTION
REMOVE 6" WATER MAIN
REMOVE SIGNAGE
KEEP SUPPLY STUB FOR USE WITH NEW
FLOWER WATERING STATION
REMOVE BENCH AND/OR TRASH RECEPTACLE
SAWCUT AND REMOVE CONCRETE PAVEMENT
SALVAGE AND REINSTALL CONICAL CONCRETE
BOLLARDS (TYPICAL)
PROTECT EXISTING FLAG POLE AND LIGHTS
REMOVE CONRETE STRUCTURES AND VAULTS
APPROXIMATE LIMITS OF UNCONSOLIDATED FILL
REMOVAL. REMOVE AND DISPOSE FULL DEPTH
TO UNDERLYING NATIVE SOILS. DISPOSE OF
UNSUITABLE MATERIAL OFFSITE. APPROXIMATE
DEPTH OF REMOVAL 15'. SEE GEOTECHNICAL
REPORT AND BORINGS.
SALVAGE AND REINSTALL EXISTING BENCH.
EXISTING
SECTION 7
EXISTING
SECTION 10
EXISTING
SECTION 12
EXISTING
SECTION 13
EXISTING
SECTION 6
EXISTING
SECTION 9
EXISTING
SECTION 10
EXISTING
SECTION 11
COLUMBARIUM 4
CD104
CD103
CD101
CD102
G
H co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fil e P ath : y
:\1
\16
2 t ah om a n c p h3 \_0
7 c ivi l\_ ca d f ile s\_ sh ee ts\
2_ c_ sit e a cc es s & lo gis tic s.d wg e dit :da mi ng a sa ve d:2 /1/
3:
P M p lot :2/
1/2
4 4 :17
P M
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
SECURITY:
IMEG, INC.
TEMPE, AZ 85281
309.793.3421
PETE MCGHEE
Project Director
Revisions:
1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 16362
TAHOMA NATIONAL CEMETERY
PHASE 3 DEVELOPMENT
919PC2010
FEBRUARY 2, 2024
18600 SE 240TH ST, KENT, WA 98042
BID DOCUMENTS
Date:
GEOTECHNICAL:
TERRACON
21905 64TH AVE W SUITE 100
MOUNTLAKE, WA 98043
425.771.3304
DENNIS STETTLER, PE
OF 449
KEY MAP
(N.T.S.)
IRRIGATION:
EC DESIGN GROUP,
LTD
400 5TH STREET
WEST DES MOINES, IA 50265
515.225.6365
LISA ESSY, ASIC
COST ESTIMATING:
LELAND SAYLOR
1777 OAKLAND BLVD #103
WALNUT CREEK, CA 94596
415.291.3200
JEFF SAYLOR
STRUCTURAL:
KPFF
1601 5TH AVE. SUITE 1600
SEATTLE, WA 98101
206.926.0455
JEFF CREAGAN, SE
COMMISSIONING:
CHARLOTTE ENGINEERS,
LLP
5838 MONROE RD. #100
CHARLOTTE, NC 28212
704.531.3000
BRIAN ANNICHARICO, PE
ARCHITECTURAL/MEP:
TOLAND MIZELL MOLNAR
INC.
590 MEANS ST. NW
ATLANTA, GA 30318
404.214.9774
RICK MASSEY, AIA
WASTEWATER:
ADC WASTEWATER
INC.
PO BOX 486
TACOMA, WA 98401
253.203.1200
ROCKY ANDERSON
N
Office of Construction and Facilities Management1600 N. DESERT DR. SUITE 230
BASE BID
BID DOCUMENTS
N
SCALE:1
ACCESS & LOGISTICS OVERALL
1" = 120' (30" x 42" PAPER SIZE)
0 120' 240'
OVERSIZED
PPC
PPC
IGC
IGC
COLUMBARIUM '6'
IGC
COLUMBARIUM '8'
TRAD
GREEN
CO101
31ABMB
BURIAL LEGEND
IN-GROUND CREMAINS
PRE-PLACED CRYPTS
OVERSIZED PRE-PLACED CRYPTS
DIRECT BURIAL TRADITIONAL
COLUMBARIUM COURT
GREEN BURIAL
ACCESS & LOGISTICS OVERALL
MEMORIAL
WALKWAY
COLUMBARIUM
FA - FI
ASSEMBLY
AREA
FLAGPOLE
COLUMBARIUM 5
COLUMBARIUM 4
BARRICK
MEMORIAL CIRCLE
GRAVESITE LOCATOR KIOSK
PUBLIC INFORMATION CENTER AND
RESTROOMS
COLUMBARIUM
AA - T
CORTEGE
ASSEMBLY
COLUMBARIUM 3
ADMINISTRATION /
MAINTENANCE FACILITY
MUNRO
MEMORIAL
DRIVE
COMMITTAL
SHELTER 4
COMMITTAL
SHELTER 2
COMMITTAL
SHELTER 1
BRONSON
MEMORIAL CIRCLE
MAIN ENTRANCES
.E
. 240TH
S
TR
E
E T
SERVICE ENTRANCE
(MAIN CONSTRUCTION ACCESS)
EX.
SEC.
30A
EX.
SEC.
30C
EX.
SEC.
30D
EX.
SEC.
30B
EX.
SEC.
EX.
SEC.
EX.
SEC.
EX.
SEC.
KERSTETTER
MEMORIAL
DRIVE
EX.
SEC.
28B
EX.
SEC.
28C
EX.
SEC.
28A
EX.
SEC.
EX.
SEC.
EX.
SEC.
EX.
SEC.
25A
EX.
SEC.
EX.
SEC.
EX.
SEC.
EX.
SEC.
EX.
SEC.
EX.
SEC.
7 EX.
SEC.
EX.
SEC.
EX.
SEC.
9A
EX.
SEC.
9B
EX.
SEC.
9C
EX.
SEC.
9D
EX.
SEC.
9E
EX.
SEC.
9F
EX.
SEC.
8A
EX.
SEC.
8B
EX.
SEC.
8C
EX.
SEC.
8D
EX.
SEC.
8E
OSSUARY &
MEMORIAL WALL
EX.
SEC.
10A
EX.
SEC.
10B
EX.
SEC.
EX.
SEC.
EX.
SEC.
11C
EX.
SEC.
11A
EX.
SEC.
11B
MAINTENANCE
SITE LEGEND
PROPERTY LIMITS
CONSTRUCTION LIMITS
WETLAND #
DELINEATED WETLAND
CONSTRUCTION ACCESS ROUTE
IGC
PPC
OVERSIZED
TRAD
COL
GREEN
CO102
SITE ACCESS
1. CONSTRUCTION TRAFFIC TO USE MONEGAN MEMORIAL DRIVE ENTRANCE
ONLY.
2. CONSTRUCTION WORKER PERSONAL VEHICLES SHALL PARK IN PHASE 3
EXPANSION ZONE. ALL DAMAGE TO BOULEVARD SHALL BE REPAIRED BY
CONTRACTOR AT NO COST TO GOVERNMENT.
3. CONSTRUCTION TRAFFIC TO FOLLOW MONEGAN MEMORIAL DRIVE TO
MUNRO MEMORIAL DRIVE TO VETERANS DRIVE FOR ALL DELIVERIES AND
EXPORTING.
4. PHASE 3 EXPANSION ZONE AVAILABLE FOR IMMEDIATE ACCESS.
5. P.I.C. AREA WILL HAVE LIMITED ACCESS FOR ONLY 120 CONSECUTIVE
CALENDAR DAYS. THIS ACCESS IS ONLY FOR P.I.C. CONSTRUCTION WORK.
6. CONSTRUCTION VEHICLE PARKING LIMITED TO WORK ZONES ONLY. NO
PARKING ON CEMETERY ROADS.
7. MAINTAIN OPEN ACCESS TO ALL PARTS OF CEMETERY AT ALL TIMES.
SCHEDULE LIMITED ROAD CLOSURES FOR UTILITY WORK WITH SENIOR
RESIDENT ENGINEER AND COORDINATE WITH CEMETERY DIRECTOR.
8. MAINTAIN ALL ROADS IN CLEAR, SAFE CONDITION. ONGOING STREET
SWEEPING SHALL BE EMPLOYED.
9. CONTRACTOR TO EMPLOY TRUCK WASH FACILITY AS PART OF PROJECT.
SEE CE (EROSION CONTROL) SERIES.
STOCKPILES
1. STAGE STOCKPILE IN OPEN AREA TO MINIMIZE DOUBLE HANDLING OF
MATERIAL.
2. DUE TO LIMITED STAGING ZONES AND TIGHT SITE CONSTRAINTS MATERIAL
MAY NEED TO BE EXPORTED OFF-SITE AND REIMPORTED.
DELIVERIES
1. CONTRACTOR TO COORDINATE CRYPT DELIVERY TO PHASE 3 EXPANSION
ZONE.
2. COORDINATE CRYPT STORAGE FOR NORTH EXPANSION ZONE.
CONSTRUCTION CIRCULATION - GENERAL
MONEGAN MEMORIAL DRIVE
VETERANS MEMORIAL DRIVE
YOUNG MEMORIAL DRIVE
CO103
VETERANS
MEMORIAL DRIVE
IGC
KEY NOTES
NO ACCESS/ LIMITED ACCESS.
COORDINATE ACCESS TO COMMITTAL SHELTERS SO
ONLY ONE SHELTER IS OUT OF SERVICE AT A TIME.
LIMITED CONSTRUCTION ACCESS FOR DEMOLITION
AND RESTORATION.
SEE IRRIGATION PLANS FOR MAINLINE IRRIGATION
PIPE REPLACEMENT.
CONTRACTOR'S/RE LAY DOWN YARD.
CONSTRUCTION ACCESS GATE AND FENCE WITH
CONSTRUCTION/SAFETY SIGN.
ACCESS FOR ADMINISTRATION BUILDING
CONSTRUCTION.
ACCESS FOR HONOR GUARD CONSTRUCTION.
ADMINISTRATION CONSTRUCTION LAY DOWN AND
STAGING. COORDINATE WITH COMMITTAL SHELTER
REMODEL.
6COLUMBARIUM '7'
GENERAL NOTES
1. CONTRACTOR TO PROVIDE TRAFFIC CONTROL DURING
CLOSURES. DISCUSS ALL ROAD CLOSURES WITH CEMETERY
STAFF AT LEAST 72 HOURS IN ADVANCE OF CLOSURE.
2. CONTRACTOR REQUIRED TO PROVIDE SAFETY SIGNAGE,
BARRICADES, AND/OR CONSTRUCTION FENCING TO PROTECT
AREAS OF CONSTRUCTION FROM GENERAL PUBLIC ACCESS.
3. ALL CONSTRUCTION SHALL COMPLY WITH RECOMMENDATIONS
OF THE GEOTECHNICAL ENGINEER AND GEOTECHNICAL
REPORT UNLESS DIRECTED OTHERWISE.
4. ALL CONSTRUCTION SHALL COMPLY WITH MOST CURRENT NCA
SPECIFICATIONS UNLESS SPECIFIED OTHERWISE. WHERE
WORK IS NOT COVERED BY NCA SPECIFICATIONS,
CONTRACTOR TO COMPLY WITH 2015 EDITION OF WSDOT
STANDARD CONSTRUCTION SPECIFICATIONS.
5. ALL WORK TO BE PERFORMED IN A LEGAL MANNER AND IN
ACCORDANCE WITH FEDERAL, STATE, AND LOCAL
REGULATIONS.
6. CONTRACTOR SHALL OBTAIN ALL PERMITS PRIOR TO
CONSTRUCTION ACTIVITIES.
7. PHASE DEMOLITION AS NEEDED TO MAINTAIN DRAINAGE AND
UTILITIES FOR MINIMAL DISRUPTION.
8. THE LOCATION AND TYPE OF EXISTING UTILITIES SHOWN ON
THE PLANS ARE FOR GENERAL INFORMATION ONLY. THE
INFORMATION IS NOT WARRANTED TO BE ACCURATE OR
COMPLETE. THE CONTRACTOR, IN COOPERATION WITH THE
APPROPRIATE UTILITY COMPANY OR MUNICIPALITY, IS
RESPONSIBLE FOR VERIFYING THE LOCATION AND DEPTH OF
ALL UNDERGROUND UTILITIES.
9. LOCATE AND PROTECT EXISTING UTILITIES UNLESS
OTHERWISE NOTED.
10. SUBSTITUTIONS FROM INFORMATION SHOWN HEREON SHALL
BE REVIEWED AND APPROVED BY THE COR.
11. EXISTING STORM SEWER SYSTEM TO REMAIN ACTIVE
THROUGHOUT CONSTRUCTION. CONTRACTOR TO PHASE
CONSTRUCTION ACTIVITIES AND PROVIDE DEWATERING AS
NECESSARY.
12. ALL CONSTRUCTION AREAS, INCLUDING CONTRACTOR
STAGING AREAS, TO BE FENCED OFF WITH TEMPORARY CHAIN
LINK FENCE. TEMPORARY FENCING OR GATES ON PAVED
AREAS SHALL BE ON STANDS.
13. RESTORE ALL DISTURBED AREA TO IT ORIGINAL CONDITION.
GREEN
ADDITIVE ITEM 2
SEE "AI2" SHEETS
NOT IN BASE BID
ADDITIVE ITEM 1
SEE "AI1" SHEETS
NOT IN BASE BID
G
H co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co co
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fil e P ath : y
:\1
\16
2 t ah om a n c p h3 \_0
7 c ivi l\_ ca d f ile s\_ sh ee ts\
2_ c_ sit e a cc es s & lo gis tic s.d wg e dit :da mi ng a sa ve d:2 /1/
3:
P M p lot :2/
1/2
4 4 :17
P M
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
SECURITY:
IMEG, INC.
TEMPE, AZ 85281
309.793.3421
PETE MCGHEE
Project Director
Revisions:
1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 16362
TAHOMA NATIONAL CEMETERY
PHASE 3 DEVELOPMENT
919PC2010
FEBRUARY 2, 2024
18600 SE 240TH ST, KENT, WA 98042
BID DOCUMENTS
Date:
GEOTECHNICAL:
TERRACON
21905 64TH AVE W SUITE 100
MOUNTLAKE, WA 98043
425.771.3304
DENNIS STETTLER, PE
OF 449
KEY MAP
(N.T.S.)
IRRIGATION:
EC DESIGN GROUP,
LTD
400 5TH STREET
WEST DES MOINES, IA 50265
515.225.6365
LISA ESSY, ASIC
COST ESTIMATING:
LELAND SAYLOR
1777 OAKLAND BLVD #103
WALNUT CREEK, CA 94596
415.291.3200
JEFF SAYLOR
STRUCTURAL:
KPFF
1601 5TH AVE. SUITE 1600
SEATTLE, WA 98101
206.926.0455
JEFF CREAGAN, SE
COMMISSIONING:
CHARLOTTE ENGINEERS,
LLP
5838 MONROE RD. #100
CHARLOTTE, NC 28212
704.531.3000
BRIAN ANNICHARICO, PE
ARCHITECTURAL/MEP:
TOLAND MIZELL MOLNAR
INC.
590 MEANS ST. NW
ATLANTA, GA 30318
404.214.9774
RICK MASSEY, AIA
WASTEWATER:
ADC WASTEWATER
INC.
PO BOX 486
TACOMA, WA 98401
253.203.1200
ROCKY ANDERSON
N
Office of Construction and Facilities Management1600 N. DESERT DR. SUITE 230
BASE BID
BID DOCUMENTS
N
SCALE:1
ACCESS & LOGISTICS EXPANSION
1" = 60' (30" x 42" PAPER SIZE) 0 60' 120'
VETERANS MEMORIAL DRIVE
B R
O N
S O
N M E M O R I A L C
I R C
L E
EXISTING
MEMORIAL
WALKWAY
COLUMBARIUM
FA - FI
ASSEMBLY
AREA
FLAGPOLE
EXISTING
COLUMBARIUM 5
EXISTING
COLUMBARIUM 4
EX.
SEC.
9A
EXISTING
SECTION 9
EXISTING
SECTION 8
EXISTING
SECTION 13
EXISTING
SECTION 11C
EX.
SEC.
9B
EX.
SEC.
9C
EX.
SEC.
9D
EX.
SEC.
9E
EX.
SEC.
9F
EX.
SEC.
8A
EX.
SEC.
8B
EX.
SEC.
8C
EX.
SEC.
8D
EX.
SEC.
8E
OVERSIZED
PPC
IGC
IGC
COLUMBARIUM
'6'
IGC
GREEN
CO102
32ABMB
ACCESS & LOGISTICS EXPANSION
MAINTENANCE
PUBLIC
RESTROOM - AI2
COLUMBARIUM
'8'
COLUMBARIUM
'7'
YOUNG MEMORIAL DRIVE
IGC
SEPTIC
DRAINFIELDS
TRAD
PPC
BURIAL LEGEND
IN-GROUND CREMAINS
PRE-PLACED CRYPTS
OVERSIZED PRE-PLACED CRYPTS
DIRECT BURIAL TRADITIONAL
COLUMBARIUM COURT
GREEN BURIAL
SITE LEGEND
PROPERTY LIMITS
CONSTRUCTION LIMITS
WETLAND #
DELINEATED WETLAND
PROPOSED STORMWATER BASIN
CONSTRUCTION ACCESS ROUTE
IGC
PPC
OVERSIZED
TRAD
COL
GREEN
KEY NOTES
NO ACCESS/ LIMITED ACCESS.
COORDINATE ACCESS TO COMMITTAL SHELTERS SO
ONLY ONE SHELTER IS OUT OF SERVICE AT A TIME.
LIMITED CONSTRUCTION ACCESS FOR DEMOLITION
AND RESTORATION.
SEE IRRIGATION PLANS FOR MAINLINE IRRIGATION
PIPE REPLACEMENT.
CONTRACTOR'S/RE LAY DOWN YARD.
CONSTRUCTION ACCESS GATE AND FENCE WITH
CONSTRUCTION/SAFETY SIGN.
ACCESS FOR ADMINISTRATION BUILDING
CONSTRUCTION.
ACCESS FOR HONOR GUARD CONSTRUCTION.
ADMINISTRATION CONSTRUCTION LAY DOWN AND
STAGING. COORDINATE WITH COMMITTAL SHELTER
REMODEL.
GENERAL NOTES
1. CONTRACTOR TO PROVIDE TRAFFIC CONTROL DURING
CLOSURES. DISCUSS ALL ROAD CLOSURES WITH CEMETERY
STAFF AT LEAST 72 HOURS IN ADVANCE OF CLOSURE.
2. CONTRACTOR REQUIRED TO PROVIDE SAFETY SIGNAGE,
BARRICADES, AND/OR CONSTRUCTION FENCING TO PROTECT
AREAS OF CONSTRUCTION FROM GENERAL PUBLIC ACCESS.
3. ALL CONSTRUCTION SHALL COMPLY WITH RECOMMENDATIONS
OF THE GEOTECHNICAL ENGINEER AND GEOTECHNICAL
REPORT UNLESS DIRECTED OTHERWISE.
4. ALL CONSTRUCTION SHALL COMPLY WITH MOST CURRENT NCA
SPECIFICATIONS UNLESS SPECIFIED OTHERWISE. WHERE
WORK IS NOT COVERED BY NCA SPECIFICATIONS,
CONTRACTOR TO COMPLY WITH 2015 EDITION OF WSDOT
STANDARD CONSTRUCTION SPECIFICATIONS.
5. ALL WORK TO BE PERFORMED IN A LEGAL MANNER AND IN
ACCORDANCE WITH FEDERAL, STATE, AND LOCAL
REGULATIONS.
6. CONTRACTOR SHALL OBTAIN ALL PERMITS PRIOR TO
CONSTRUCTION ACTIVITIES.
7. PHASE DEMOLITION AS NEEDED TO MAINTAIN DRAINAGE AND
UTILITIES FOR MINIMAL DISRUPTION.
8. THE LOCATION AND TYPE OF EXISTING UTILITIES SHOWN ON
THE PLANS ARE FOR GENERAL INFORMATION ONLY. THE
INFORMATION IS NOT WARRANTED TO BE ACCURATE OR
COMPLETE. THE CONTRACTOR, IN COOPERATION WITH THE
APPROPRIATE UTILITY COMPANY OR MUNICIPALITY, IS
RESPONSIBLE FOR VERIFYING THE LOCATION AND DEPTH OF
ALL UNDERGROUND UTILITIES.
9. LOCATE AND PROTECT EXISTING UTILITIES UNLESS
OTHERWISE NOTED.
10. SUBSTITUTIONS FROM INFORMATION SHOWN HEREON SHALL
BE REVIEWED AND APPROVED BY THE COR.
11. EXISTING STORM SEWER SYSTEM TO REMAIN ACTIVE
THROUGHOUT CONSTRUCTION. CONTRACTOR TO PHASE
CONSTRUCTION ACTIVITIES AND PROVIDE DEWATERING AS
NECESSARY.
12. ALL CONSTRUCTION AREAS, INCLUDING CONTRACTOR
STAGING AREAS, TO BE FENCED OFF WITH TEMPORARY CHAIN
LINK FENCE. TEMPORARY FENCING OR GATES ON PAVED
AREAS SHALL BE ON STANDS.
13. RESTORE ALL DISTURBED AREA TO ITS ORIGINAL CONDITION.
GREEN
AI2
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fil e P ath : y
:\1
\16
2 t ah om a n c p h3 \_0
7 c ivi l\_ ca d f ile s\_ sh ee ts\
2_ c_ sit e a cc es s & lo gis tic s.d wg e dit :da mi ng a sa ve d:2 /1/
3:
P M p lot :2/
1/2
4 4 :17
P M
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
SECURITY:
IMEG, INC.
TEMPE, AZ 85281
309.793.3421
PETE MCGHEE
Project Director
Revisions:
1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 16362
TAHOMA NATIONAL CEMETERY
PHASE 3 DEVELOPMENT
919PC2010
FEBRUARY 2, 2024
18600 SE 240TH ST, KENT, WA 98042
BID DOCUMENTS
Date:
GEOTECHNICAL:
TERRACON
21905 64TH AVE W SUITE 100
MOUNTLAKE, WA 98043
425.771.3304
DENNIS STETTLER, PE
OF 449
KEY MAP
(N.T.S.)
IRRIGATION:
EC DESIGN GROUP,
LTD
400 5TH STREET
WEST DES MOINES, IA 50265
515.225.6365
LISA ESSY, ASIC
COST ESTIMATING:
LELAND SAYLOR
1777 OAKLAND BLVD #103
WALNUT CREEK, CA 94596
415.291.3200
JEFF SAYLOR
STRUCTURAL:
KPFF
1601 5TH AVE. SUITE 1600
SEATTLE, WA 98101
206.926.0455
JEFF CREAGAN, SE
COMMISSIONING:
CHARLOTTE ENGINEERS,
LLP
5838 MONROE RD. #100
CHARLOTTE, NC 28212
704.531.3000
BRIAN ANNICHARICO, PE
ARCHITECTURAL/MEP:
TOLAND MIZELL MOLNAR
INC.
590 MEANS ST. NW
ATLANTA, GA 30318
404.214.9774
RICK MASSEY, AIA
WASTEWATER:
ADC WASTEWATER
INC.
PO BOX 486
TACOMA, WA 98401
253.203.1200
ROCKY ANDERSON
N
Office of Construction and Facilities Management1600 N. DESERT DR. SUITE 230
BASE BID
BID DOCUMENTS
CO103
33ABMB
ACCESS & LOGISTICS MEMORIAL
WALL
N
SCALE:1
ACCESS & LOGISTICS MEMORIAL WALL
1" = 20' (30" x 42" PAPER SIZE)
0 20' 40'
EXISTING
SECTION 10A
EXISTING
SECTION 7
YO
UNG
M
EM
O
RIAL DRIVE
EXISTING
SECTION 9
CEMETERY PROPERTY
BOUNDARY
EXISTING
MEMORIAL WALL
EXISTING
SEAT WALL
EXISTING
RETAINING WALL
EXISTING
STONE WALL
EXISTING BASALT
VENEER WALL
EXISTING
BENCH
EXISTING
OSSUARY
EXISTING
SITE WALL
NEW MEMORIAL
WALL
NEW
PAVEMENT
VETERANS MEMORIAL DRIVE
6' -0
NEW
TEMPORARY
SIDEWALK
EXISTING
COLUMBARIUM 4
MAINTENANCE AISLE /
CONSTRUCTION ACCESS
(EXISTING CONCRETE WALK)
VETERANS MEMORIAL DRIVE
BURIAL LEGEND
IN-GROUND CREMAINS
PRE-PLACED CRYPTS
OVERSIZED PRE-PLACED CRYPTS
DIRECT BURIAL TRADITIONAL
COLUMBARIUM COURT
GREEN BURIAL
SITE LEGEND
PROPERTY LIMITS
CONSTRUCTION LIMITS
WETLAND #
DELINEATED WETLAND
CONSTRUCTION ACCESS ROUTE
IGC
PPC
OVERSIZED
TRAD
COL
GREEN
GENERAL NOTES
1. CONTRACTOR TO PROVIDE TRAFFIC CONTROL DURING
CLOSURES. DISCUSS ALL ROAD CLOSURES WITH CEMETERY
STAFF AT LEAST 72 HOURS IN ADVANCE OF CLOSURE.
2. CONTRACTOR REQUIRED TO PROVIDE SAFETY SIGNAGE,
BARRICADES, AND/OR CONSTRUCTION FENCING TO PROTECT
AREAS OF CONSTRUCTION FROM GENERAL PUBLIC ACCESS.
3. ALL CONSTRUCTION SHALL COMPLY WITH RECOMMENDATIONS
OF THE GEOTECHNICAL ENGINEER AND GEOTECHNICAL
REPORT UNLESS DIRECTED OTHERWISE.
4. ALL CONSTRUCTION SHALL COMPLY WITH MOST CURRENT NCA
SPECIFICATIONS UNLESS SPECIFIED OTHERWISE. WHERE
WORK IS NOT COVERED BY NCA SPECIFICATIONS,
CONTRACTOR TO COMPLY WITH 2015 EDITION OF WSDOT
STANDARD CONSTRUCTION SPECIFICATIONS.
5. ALL WORK TO BE PERFORMED IN A LEGAL MANNER AND IN
ACCORDANCE WITH FEDERAL, STATE, AND LOCAL
REGULATIONS.
6. CONTRACTOR SHALL OBTAIN ALL PERMITS PRIOR TO
CONSTRUCTION ACTIVITIES.
7. PHASE DEMOLITION AS NEEDED TO MAINTAIN DRAINAGE AND
UTILITIES FOR MINIMAL DISRUPTION.
8. THE LOCATION AND TYPE OF EXISTING UTILITIES SHOWN ON
THE PLANS ARE FOR GENERAL INFORMATION ONLY. THE
INFORMATION IS NOT WARRANTED TO BE ACCURATE OR
COMPLETE. THE CONTRACTOR, IN COOPERATION WITH THE
APPROPRIATE UTILITY COMPANY OR MUNICIPALITY, IS
RESPONSIBLE FOR VERIFYING THE LOCATION AND DEPTH OF
ALL UNDERGROUND UTILITIES.
9. LOCATE AND PROTECT EXISTING UTILITIES UNLESS
OTHERWISE NOTED.
10. SUBSTITUTIONS FROM INFORMATION SHOWN HEREON SHALL
BE REVIEWED AND APPROVED BY THE COR.
11. EXISTING STORM SEWER SYSTEM TO REMAIN ACTIVE
THROUGHOUT CONSTRUCTION. CONTRACTOR TO PHASE
CONSTRUCTION ACTIVITIES AND PROVIDE DEWATERING AS
NECESSARY.
12. ALL CONSTRUCTION AREAS, INCLUDING CONTRACTOR
STAGING AREAS, TO BE FENCED OFF WITH TEMPORARY CHAIN
LINK FENCE. TEMPORARY FENCING OR GATES ON PAVED
AREAS SHALL BE ON STANDS.
13. RESTORE ALL DISTURBED AREA TO IT ORIGINAL CONDITION.
ALL DAMAGED SIDEWALK
TO BE REPLACED IN-KIND.
CHAINLINK
CONST. FENCE
STANDING SEAM METAL ROOFING
HEMLOCK GREEN, MATCH EXIST COMMITTAL SHELTER
1'-6" 1'-6"24'-0"
1' -6
1'
-6
'-0
'-0
AS101
AS101
24'-0"
'-0
STEEL COLUMN,
TYP, PAINT.
LINE OF ROOF ABOVE
STANDING SEAM METAL ROOFING
HEMLOCK GREEN, MATCH EXIST COMMITTAL SHELTER
PRE-FINISHED
METAL FASCIA
STEEL COLUMNS,
PAINT9'
-0
STANDING SEAM METAL ROOFING
HEMLOCK GREEN, MATCH EXIST COMMITTAL SHELTER
9' -0
1. DRAWINGS AND DETAILS FOR TEMPORARY
COMMITTAL SHELTER SERVE AS A BASIS OF
DESIGN.
2. SYSTEMS-ENGINEERED METAL BUILDINGS SHALL
FOLLOW WASHINGTON ADMINISTRATIVE CODE
CHAPTER 296-155-711.
3. TEMPORARY COMMITTAL SHELTER STRUCTURE,
SLAB, FOUNDATION AND FOOTINGS SHALL BE A
DELEGATED DESIGN. CONTRACTOR SHALL
PROCURE DESIGN SERVICES AND CERTIFICATIONS
NECESSARY TO SATISFACTORILY COMPLETE THE
WORK FROM A LICENSED DESIGN PROFESSIONAL.
THE SIGNATURE AND SEAL OF CONTRACTOR'S
DESIGN PROFESSIONAL SHALL APPEAR ON ALL
DRAWINGS, CALCULATIONS, SPECIFICATIONS,
CERTIFICATIONS, SHOP DRAWINGS, AND OTHER
SUBMITTALS RELATED TO THE WORK DESIGNED OR
CERTIFIED BY CONSTRUCTOR'S DESIGN
PROFESSIONAL.
4. SHELTER FABRICATOR/MANUFACTURER SHALL BE
THE DESIGNER OF RECORD.
5. ALL CONSTRUCTION, MATERIALS AND
INSTALLATION SHALL BE IN ACCORDANCE WITH
CURRENT BUILDING CODES AND LAWS. ALL
PARTIES EMPLOYED BY THE MANUFACTURER
RESPONSIBLE FOR DESIGN WORK SHALL BE
QUALIFIED AND LICENSED AS REQUIRED BY THE
JURISDICTION HAVING AUTHORITY OR SHALL
RETAIN QUALIFIED AND LICENSED ENTITIES TO
PERFORM SUCH WORK.
6. ALL MATERIALS TO BE UV/WEATHER RESISTANT.
7. PROVIDE TOTAL ASSEMBLY FROM ONE
FABRICATOR/MANUFACTURER.
8. TRANSPORTATION, ERECTION, REMOVAL, AND SITE
RESTORATION FOLLOWING REMOVAL OF THIS
STRUCTURE SHALL BE INCLUDED IN THE CONTRACT
AND SHALL COMPLY WITH THE REQUIREMENTS OF
THE NATIONAL CEMETERY.
10. FOR ADDITIONAL INFORMATION SEE
SPECIFICATIONS SECTION 13 34 19 METAL
BUILDING SYSTEMS.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fil e P ath : y
:\1
\16
2 t ah om a n c p h3 \_0
7 c ivi l\_ ca d f ile s\_ sh ee ts\
2_ a_ tem p c ss .dw g ed it:e ma rkf or t sa ve d:1
/31 /20
:32 A
M p lot
:1/
/20
:37
A M
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
SECURITY:
IMEG, INC.
TEMPE, AZ 85281
309.793.3421
PETE MCGHEE
Project Director
Revisions:
1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 16362
TAHOMA NATIONAL CEMETERY
PHASE 3 DEVELOPMENT
919PC2010
FEBRUARY 2, 2024
18600 SE 240TH ST, KENT, WA 98042
BID DOCUMENTS
Date:
GEOTECHNICAL:
TERRACON
21905 64TH AVE W SUITE 100
MOUNTLAKE, WA 98043
425.771.3304
DENNIS STETTLER, PE
OF 449
IRRIGATION:
EC DESIGN GROUP,
LTD
400 5TH STREET
WEST DES MOINES, IA 50265
515.225.6365
LISA ESSY, ASIC
COST ESTIMATING:
LELAND SAYLOR
1777 OAKLAND BLVD #103
WALNUT CREEK, CA 94596
415.291.3200
JEFF SAYLOR
STRUCTURAL:
KPFF
1601 5TH AVE. SUITE 1600
SEATTLE, WA 98101
206.926.0455
JEFF CREAGAN, SE
COMMISSIONING:
CHARLOTTE ENGINEERS,
LLP
5838 MONROE RD. #100
CHARLOTTE, NC 28212
704.531.3000
BRIAN ANNICHARICO, PE
ARCHITECTURAL/MEP:
TOLAND MIZELL MOLNAR
INC.
590 MEANS ST. NW
ATLANTA, GA 30318
404.214.9774
RICK MASSEY, AIA
WASTEWATER:
ADC WASTEWATER
INC.
PO BOX 486
TACOMA, WA 98401
253.203.1200
ROCKY ANDERSON
Office of Construction and Facilities Management1600 N. DESERT DR. SUITE 230
BASE BID
BID DOCUMENTS
AS101
34ABEM
COMMITTAL SERVICE SHELTER
TEMPORARY BUILDING
SCALE:1
TEMPORARY COMMITTAL SERVICE SHELTER - FLOOR PLAN
1/4" = 1'-0" (30" x 42" PLAN SHEET) SCALE:2
TEMPORARY COMMITTAL SERVICE SHELTER - ROOF PLAN
1/4" = 1'-0" (30" x 42" PLAN SHEET)
SCALE:3
TEMPORARY COMMITTAL SERVICE SHELTER - ELEVATION
1/4" = 1'-0" (30" x 42" PLAN SHEET) SCALE:4
TEMPORARY COMMITTAL SERVICE SHELTER - BUILDING SECTION
1/4" = 1'-0" (30" x 42" PLAN SHEET)
I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Architect under the laws of the State of Minnesota.
Edward J. Markfort
Date: 02/02/2024
License Number: MN# 54479 34 of 449
1. DRAWINGS AND DETAILS FOR TEMPORARY
COMMITTAL SHELTER SERVE AS A BASIS OF
DESIGN.
2. SYSTEMS-ENGINEERED METAL BUILDINGS SHALL
FOLLOW WASHINGTON ADMINISTRATIVE CODE
CHAPTER 296-155-711.
3. TEMPORARY COMMITTAL SHELTER STRUCTURE,
SLAB, FOUNDATION AND FOOTINGS SHALL BE A
DELEGATED DESIGN. CONTRACTOR SHALL
PROCURE DESIGN SERVICES AND CERTIFICATIONS
NECESSARY TO SATISFACTORILY COMPLETE THE
WORK FROM A LICENSED DESIGN PROFESSIONAL.
THE SIGNATURE AND SEAL OF CONTRACTOR'S
DESIGN PROFESSIONAL SHALL APPEAR ON ALL
DRAWINGS, CALCULATIONS, SPECIFICATIONS,
CERTIFICATIONS, SHOP DRAWINGS, AND OTHER
SUBMITTALS RELATED TO THE WORK DESIGNED OR
CERTIFIED BY CONSTRUCTOR'S DESIGN
PROFESSIONAL.
4. SHELTER FABRICATOR/MANUFACTURER SHALL BE
THE DESIGNER OF RECORD.
5. ALL CONSTRUCTION, MATERIALS AND
INSTALLATION SHALL BE IN ACCORDANCE WITH
CURRENT BUILDING CODES AND LAWS. ALL
PARTIES EMPLOYED BY THE MANUFACTURER
RESPONSIBLE FOR DESIGN WORK SHALL BE
QUALIFIED AND LICENSED AS REQUIRED BY THE
JURISDICTION HAVING AUTHORITY OR SHALL
RETAIN QUALIFIED AND LICENSED ENTITIES TO
PERFORM SUCH WORK.
6. ALL MATERIALS TO BE UV/WEATHER RESISTANT.
7. PROVIDE TOTAL ASSEMBLY FROM ONE
FABRICATOR/MANUFACTURER.
8. TRANSPORTATION, ERECTION, REMOVAL, AND SITE
RESTORATION FOLLOWING REMOVAL OF THIS
STRUCTURE SHALL BE INCLUDED IN THE CONTRACT
AND SHALL COMPLY WITH THE REQUIREMENTS OF
THE NATIONAL CEMETERY.
10. FOR ADDITIONAL INFORMATION SEE
SPECIFICATIONS SECTION 13 34 19 METAL
BUILDING SYSTEMS.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fil e P ath : y
:\1
\16
2 t ah om a n c p h3 \_0
7 c ivi l\_ ca d f ile s\_ sh ee ts\
2_ a_ tem p c ss .dw g ed it:e ma rkf or t sa ve d:1
/31 /20
:32 A
M p lot
:1/
/20
:37
A M
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
SECURITY:
IMEG, INC.
TEMPE, AZ 85281
309.793.3421
PETE MCGHEE
Project Director
Revisions:
1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 16362
TAHOMA NATIONAL CEMETERY
PHASE 3 DEVELOPMENT
919PC2010
FEBRUARY 2, 2024
18600 SE 240TH ST, KENT, WA 98042
BID DOCUMENTS
Date:
GEOTECHNICAL:
TERRACON
21905 64TH AVE W SUITE 100
MOUNTLAKE, WA 98043
425.771.3304
DENNIS STETTLER, PE
OF 449
IRRIGATION:
EC DESIGN GROUP,
LTD
400 5TH STREET
WEST DES MOINES, IA 50265
515.225.6365
LISA ESSY, ASIC
COST ESTIMATING:
LELAND SAYLOR
1777 OAKLAND BLVD #103
WALNUT CREEK, CA 94596
415.291.3200
JEFF SAYLOR
STRUCTURAL:
KPFF
1601 5TH AVE. SUITE 1600
SEATTLE, WA 98101
206.926.0455
JEFF CREAGAN, SE
COMMISSIONING:
CHARLOTTE ENGINEERS,
LLP
5838 MONROE RD. #100
CHARLOTTE, NC 28212
704.531.3000
BRIAN ANNICHARICO, PE
ARCHITECTURAL/MEP:
TOLAND MIZELL MOLNAR
INC.
590 MEANS ST. NW
ATLANTA, GA 30318
404.214.9774
RICK MASSEY, AIA
WASTEWATER:
ADC WASTEWATER
INC.
PO BOX 486
TACOMA, WA 98401
253.203.1200
ROCKY ANDERSON
Office of Construction and Facilities Management1600 N. DESERT DR. SUITE 230
BASE BID
BID DOCUMENTS
AS102
35EMEM
COMMITTAL SERVICE SHELTER
TEMPORARY BUILDING
REFERENCE DRAWING. PROVIDE DETAIL FOR DELEGATED DESIGN. REFERENCE DRAWING. PROVIDE DETAIL FOR DELEGATED DESIGN. REFERENCE DRAWING. PROVIDE DETAIL FOR DELEGATED DESIGN.
I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Architect under the laws of the State of Minnesota.
Edward J. Markfort
License Number: MN# 54479 35 of 449
CONFERENCE
ROOM
OFFICE
DIRECTOR
OFFICE
ASST DIRECTOR
OFFICE
BUDGET ANALYST
TOILET
TOILET
TOILET
TOILET
HAC
OPS
CENTER
OFFICE
FOREMAN
OFFICE
ADMIN
OPEN
OFFICE
DN
DN
DN
OFFICE
M&P ANALYST
(COR)
1. THIS TEMPORARY FACILITY IS DESIGNED FOR USE BY EMPLOYEES AND IS INTENDED FOR USE
BY OR SERVICE TO THE PUBLIC. THE PRIMARY ENTRANCE AND REQUIRED EXITS MUST BE
ACCESSIBLE. ALL FACILITY ELEMENTS INCLUDING FIXTURES, CONTROLS, AND ACCESSORIES,
SHALL BE ACCESSIBLE IN ACCORDANCE WITH REFERENCED ACCESSIBILITY STANDARDS,
ARCHITECTURAL BARRIERS ACT (ABA) STANDARDS 2015.
2. ALL EXTERIOR DOORS TO BE INSULATED 20 GA. HOLLOW METAL DOORS WITH 2'-0” X 2'-0”
SAFETY LAMINATE INSULATING GLASS WITH GLASS BOTTOM AT 43” AFF. ALL EXTERIOR
FRAMES TO BE 18 GA. THERMALLY BROKEN HOLLOW METAL. ALL DOORS SHALL BE 3'-0” X 7'X
0” WITH ACCESSIBLE HARDWARE INCLUDING LEVER HANDLES.
ALL INTERIOR DOORS TO BE PAINTED SOLID CORE WOOD WITH WOOD FRAMES.
3. REQUIRED ACCESSIBLE TOILET SIGNAGE SHALL BE PROVIDED AND SITE INSTALLED BY
CONTRACTOR PRIOR TO OCCUPATION. PORTABLE FIRE EXTINGUISHER SHALL BE PROVIDED
AND INSTALLED BY CONTRACTOR PRIOR TO OCCUPATION WHERE INDICATED ON DRAWINGS.
4. ALL CONSTRUCTION, MATERIALS AND INSTALLATION SHALL BE IN ACCORDANCE WITH
CURRENT BUILDING CODES AND LAWS. FACTORY-BUILT HOUSING AND COMMERCIAL
STRUCTURES SHALL FOLLOW WASHINGTON ADMINISTRATIVE CODE CHAPTER 296-150F.
CONTRACTOR SHALL PROCURE DESIGN SERVICES AND CERTIFICATIONS NECESSARY TO
SATISFACTORILY COMPLETE THE WORK FROM A LICENSED DESIGN PROFESSIONAL. THE
SIGNATURE AND SEAL OF CONTRACTOR'S DESIGN PROFESSIONAL SHALL APPEAR ON ALL
DRAWINGS, CALCULATIONS, SPECIFICATIONS, CERTIFICATIONS, SHOP DRAWINGS, AND
OTHER SUBMITTALS RELATED TO THE WORK DESIGNED OR CERTIFIED BY CONSTRUCTOR'S
DESIGN PROFESSIONAL.
5. THE FLOOR PLAN INCLUDES DESIGN INFORMATION FOR THE FACTORY BUILT PORTION OF
THE MODULAR TRAILER STRUCTURE AND PORTIONS OF THE SITE BUILT CONSTRUCTION
INCLUDING RAMPS, STAIRS AND GENERAL ACCESS TO THE BUILDING BY THE CONTRACTOR.
DELEGATED DESIGN INCLUDING MANUFACTURER SUBMITTAL SHALL COORDINATE AND
CLARIFY DESIGN.
6. PROVIDE STRUCTURAL AND AESTHETIC INTERCONNECTIONS BETWEEN MODULES.
7. ANY AIR GAPS BETWEEN MODULES AT FLOOR AND CEILING LINES AND ANY OTHER
PENETRATIONS THROUGH THE BUILDING ENVELOPE SHALL BE GASKETED,
WEATHER-STRIPPED, WRAPPED OR OTHERWISE SEALED WITH APPROPRIATE SEALANT TO
LIMIT UNCONTROLLED AIR MOVEMENT
8. TRANSPORTATION, ERECTION AND REMOVAL OF THIS MODULAR TRAILER STRUCTURES IS
INCLUDED IN THE CONTRACT, AS WELL AS USE CHARGES FOR THE TEMPORARY FACILITIES.
ANY TRANSPORTATION AND/OR LIFTING AND PLACING REQUIREMENTS MUST BE EVALUATED
BY TRANSPORTATION AND ERECTION DESIGNER FOR SUITABILITY. TRANSPORTATION OF THE
MODULAR TRAILERS TO AND FROM SITE, INCLUDING ACCEPTABLE CAMPUS ROUTES, SHALL
COMPLY WITH THE REQUIREMENTS OF THE NATIONAL CEMETERY.
9. RODENT PROOFING WILL BE PROVIDED BY THE CONTRACTOR, SITE INSTALLED AND SUBJECT
TO THE APPROVAL OF THE AUTHORITY HAVING JURISDICTION (AHJ).
10. FOR ADDITIONAL INFORMATION SEE SPECIFICATIONS SECTION 01 50 10 TEMPORARY
FACILITIES.
11. HONOR GUARD TRAILER IS EXISTING AND PROPOSED TEMPORARY TRAILERS IN THE
ADMINISTRATION BUILDING SITE AREA SHALL ACCOMMODATE HONOR GUARD ENTRY
ACCESS, ACCESSIBILITY, AND UTILITY CONNECTIONS, U.N.O.
1. OFFICE AND CONFERENCE ROOM FLOOR COVERINGS TO BE CARPET. ALL OTHER SPACES TO HAVE
COMMERCIAL GRADE FLOOR TILE. BASE MATERIAL TO BE 4” CONTINUOUS VINYL COVE.
2. TOILET ROOMS AND HAC WALLS WILL BE WHITE FIBERGLASS REINFORCED PANELS INSTALLED
OVER ½” WATER RESISTANT GYPSUM BOARD. ALL OTHER WALLS TO BE VINYL COVERED ½”
GYPSUM BOARD WITH WRAPPED BATTENS.
3. CEILING TO BE STANDARD 2 X 4 T-GRID AT 8'-0” AFF INSTALLED AT THE FACTORY.
ACT TO BE ACT-1.
4. WOOD DOORS AND FRAMES SHALL BE PAINTED.
1. CONFIRM WITH OWNER, CONTRACTOR TO RELOCATE EXISTING FURNITURE FROM
ADMINISTRATION BUILDING AND INSTALL IN TEMPORARY FACILITIES.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fil e P ath : y
:\1
\16
2 t ah om a n c p h3 \_0
7 c ivi l\_ ca d f ile s\_ sh ee ts\
2_ a_ tra ile rs.
dw g ed it:e ma rkf or t sa ve d:1
/25 /20
4:
P
M p lot
:1/
/20
:37
A M
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
SECURITY:
IMEG, INC.
TEMPE, AZ 85281
309.793.3421
PETE MCGHEE
Project Director
Revisions:
1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 16362
TAHOMA NATIONAL CEMETERY
PHASE 3 DEVELOPMENT
919PC2010
FEBRUARY 2, 2024
18600 SE 240TH ST, KENT, WA 98042
BID DOCUMENTS
Date:
GEOTECHNICAL:
TERRACON
21905 64TH AVE W SUITE 100
MOUNTLAKE, WA 98043
425.771.3304
DENNIS STETTLER, PE
OF 449
IRRIGATION:
EC DESIGN GROUP,
LTD
400 5TH STREET
WEST DES MOINES, IA 50265
515.225.6365
LISA ESSY, ASIC
COST ESTIMATING:
LELAND SAYLOR
1777 OAKLAND BLVD #103
WALNUT CREEK, CA 94596
415.291.3200
JEFF SAYLOR
STRUCTURAL:
KPFF
1601 5TH AVE. SUITE 1600
SEATTLE, WA 98101
206.926.0455
JEFF CREAGAN, SE
COMMISSIONING:
CHARLOTTE ENGINEERS,
LLP
5838 MONROE RD. #100
CHARLOTTE, NC 28212
704.531.3000
BRIAN ANNICHARICO, PE
ARCHITECTURAL/MEP:
TOLAND MIZELL MOLNAR
INC.
590 MEANS ST. NW
ATLANTA, GA 30318
404.214.9774
RICK MASSEY, AIA
WASTEWATER:
ADC WASTEWATER
INC.
PO BOX 486
TACOMA, WA 98401
253.203.1200
ROCKY ANDERSON
Office of Construction and Facilities Management1600 N. DESERT DR. SUITE 230
BASE BID
BID DOCUMENTS
SCALE:1
TEMPORARY TRAILER - FLOOR PLAN, ADMINISTRATION
NTS
AT101
36ABEM
ADMIN TEMPORARY TRAILER
I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Architect under the laws of the State of Minnesota.
Edward J. Markfort
License Number: MN# 54479 36 of 449
DN
DN
LUNCH
ROOM
MENS
LOCKER
WOMENS
LOCKER
HAC
WOMENS
TOILET
MENS
TOILET
105 OFFICE
1. THIS TEMPORARY FACILITY IS DESIGNED FOR USE BY EMPLOYEES AND IS INTENDED FOR USE
BY OR SERVICE TO THE PUBLIC. THE PRIMARY ENTRANCE AND REQUIRED EXITS MUST BE
ACCESSIBLE. ALL FACILITY ELEMENTS INCLUDING FIXTURES, CONTROLS, AND ACCESSORIES,
SHALL BE ACCESSIBLE IN ACCORDANCE WITH REFERENCED ACCESSIBILITY STANDARDS,
ARCHITECTURAL BARRIERS ACT (ABA) STANDARDS 2015.
2. ALL EXTERIOR DOORS TO BE INSULATED 20 GA. HOLLOW METAL DOORS WITH 2'-0” X 2'-0”
SAFETY LAMINATE INSULATING GLASS WITH GLASS BOTTOM AT 43” AFF. ALL EXTERIOR
FRAMES TO BE 18 GA. THERMALLY BROKEN HOLLOW METAL. ALL DOORS SHALL BE 3'-0” X 7'X
0” WITH ACCESSIBLE HARDWARE INCLUDING LEVER HANDLES.
ALL INTERIOR DOORS TO BE PAINTED SOLID CORE WOOD WITH WOOD FRAMES.
3. REQUIRED ACCESSIBLE TOILET SIGNAGE SHALL BE PROVIDED AND SITE INSTALLED BY
CONTRACTOR PRIOR TO OCCUPATION. PORTABLE FIRE EXTINGUISHER SHALL BE PROVIDED
AND INSTALLED BY CONTRACTOR PRIOR TO OCCUPATION WHERE INDICATED ON DRAWINGS.
4. ALL CONSTRUCTION, MATERIALS AND INSTALLATION SHALL BE IN ACCORDANCE WITH
CURRENT BUILDING CODES AND LAWS. FACTORY-BUILT HOUSING AND COMMERCIAL
STRUCTURES SHALL FOLLOW WASHINGTON ADMINISTRATIVE CODE CHAPTER 296-150F.
CONTRACTOR SHALL PROCURE DESIGN SERVICES AND CERTIFICATIONS NECESSARY TO
SATISFACTORILY COMPLETE THE WORK FROM A LICENSED DESIGN PROFESSIONAL. THE
SIGNATURE AND SEAL OF CONTRACTOR'S DESIGN PROFESSIONAL SHALL APPEAR ON ALL
DRAWINGS, CALCULATIONS, SPECIFICATIONS, CERTIFICATIONS, SHOP DRAWINGS, AND
OTHER SUBMITTALS RELATED TO THE WORK DESIGNED OR CERTIFIED BY CONSTRUCTOR'S
DESIGN PROFESSIONAL.
5. THE FLOOR PLAN INCLUDES DESIGN INFORMATION FOR THE FACTORY BUILT PORTION OF
THE MODULAR TRAILER STRUCTURE AND PORTIONS OF THE SITE BUILT CONSTRUCTION
INCLUDING RAMPS, STAIRS AND GENERAL ACCESS TO THE BUILDING BY THE CONTRACTOR.
DELEGATED DESIGN INCLUDING MANUFACTURER SUBMITTAL SHALL COORDINATE AND
CLARIFY DESIGN.
6. PROVIDE STRUCTURAL AND AESTHETIC INTERCONNECTIONS BETWEEN MODULES.
7. ANY AIR GAPS BETWEEN MODULES AT FLOOR AND CEILING LINES AND ANY OTHER
PENETRATIONS THROUGH THE BUILDING ENVELOPE SHALL BE GASKETED,
WEATHER-STRIPPED, WRAPPED OR OTHERWISE SEALED WITH APPROPRIATE SEALANT TO
LIMIT UNCONTROLLED AIR MOVEMENT
8. TRANSPORTATION, ERECTION AND REMOVAL OF THIS MODULAR TRAILER STRUCTURES IS
INCLUDED IN THE CONTRACT, AS WELL AS USE CHARGES FOR THE TEMPORARY FACILITIES.
ANY TRANSPORTATION AND/OR LIFTING AND PLACING REQUIREMENTS MUST BE EVALUATED
BY TRANSPORTATION AND ERECTION DESIGNER FOR SUITABILITY. TRANSPORTATION OF THE
MODULAR TRAILERS TO AND FROM SITE, INCLUDING ACCEPTABLE CAMPUS ROUTES, SHALL
COMPLY WITH THE REQUIREMENTS OF THE NATIONAL CEMETERY.
9. RODENT PROOFING WILL BE PROVIDED BY THE CONTRACTOR, SITE INSTALLED AND SUBJECT
TO THE APPROVAL OF THE AUTHORITY HAVING JURISDICTION (AHJ).
10. FOR ADDITIONAL INFORMATION SEE SPECIFICATIONS SECTION 01 50 10 TEMPORARY
FACILITIES.
11. HONOR GUARD TRAILER IS EXISTING AND PROPOSED TEMPORARY TRAILERS IN THE
ADMINISTRATION BUILDING SITE AREA SHALL ACCOMMODATE HONOR GUARD ENTRY
ACCESS, ACCESSIBILITY, AND UTILITY CONNECTIONS, U.N.O.
1. OFFICE AND CONFERENCE ROOM FLOOR COVERINGS TO BE CARPET. ALL OTHER SPACES TO HAVE
COMMERCIAL GRADE FLOOR TILE. BASE MATERIAL TO BE 4” CONTINUOUS VINYL COVE.
2. TOILET ROOMS AND HAC WALLS WILL BE WHITE FIBERGLASS REINFORCED PANELS INSTALLED
OVER ½” WATER RESISTANT GYPSUM BOARD. ALL OTHER WALLS TO BE VINYL COVERED ½”
GYPSUM BOARD WITH WRAPPED BATTENS.
3. CEILING TO BE STANDARD 2 X 4 T-GRID AT 8'-0” AFF INSTALLED AT THE FACTORY.
ACT TO BE ACT-1.
4. WOOD DOORS AND FRAMES SHALL BE PAINTED.
1. CONFIRM WITH OWNER, CONTRACTOR TO SALVAGE LOCKERS FROM EXISTING MAINTENANCE
BUILDING LOCKEROOMS AND INSTALL IN TEMPORARY FACILITIES ON SITE. CONTRACTOR TO
RELOCATE EXISTING TABLES, CHAIRS, MICROWAVES, AND REFRIGERATORS FROM EXISTING
MAINTENANCE BUILDING LUNCHROOM AND INSTALL IN TEMPORARY FACILITIES.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fil e P ath : y
:\1
\16
2 t ah om a n c p h3 \_0
7 c ivi l\_ ca d f ile s\_ sh ee ts\
2_ a_ tra ile rs.
dw g ed it:e ma rkf or t sa ve d:1
/25 /20
4:
P
M p lot
:1/
/20
:37
A M
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
SECURITY:
IMEG, INC.
TEMPE, AZ 85281
309.793.3421
PETE MCGHEE
Project Director
Revisions:
1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 16362
TAHOMA NATIONAL CEMETERY
PHASE 3 DEVELOPMENT
919PC2010
FEBRUARY 2, 2024
18600 SE 240TH ST, KENT, WA 98042
BID DOCUMENTS
Date:
GEOTECHNICAL:
TERRACON
21905 64TH AVE W SUITE 100
MOUNTLAKE, WA 98043
425.771.3304
DENNIS STETTLER, PE
OF 449
IRRIGATION:
EC DESIGN GROUP,
LTD
400 5TH STREET
WEST DES MOINES, IA 50265
515.225.6365
LISA ESSY, ASIC
COST ESTIMATING:
LELAND SAYLOR
1777 OAKLAND BLVD #103
WALNUT CREEK, CA 94596
415.291.3200
JEFF SAYLOR
STRUCTURAL:
KPFF
1601 5TH AVE. SUITE 1600
SEATTLE, WA 98101
206.926.0455
JEFF CREAGAN, SE
COMMISS…