This document is a Request for Proposal (RFP) for the Federal Deposit Insurance Corporation's (FDIC) National Conference Room Audio Visual Basic Ordering Agreement (BOA). The solicitation seeks a contractor to transform conference rooms across multiple FDIC regional offices, with an initial Task Order focused on the Atlanta location at 10 10th Street NE. The BOA covers hardware, software, and services for audio/visual upgrades in conference rooms, with pricing structured across five years and multiple room configurations (Mobile, Small, Medium, Large), and requires detailed pricing submissions in an Excel workbook.

Key solicitation details include a proposal due date of 1 p.m. EDT on October 15, 2025, with a site visit for the Atlanta Regional Office scheduled for August 26-27, 2025. The procurement involves comprehensive audio/visual system upgrades, requiring offerors to provide labor rates for key personnel categories including Program Manager, Solution Architect, Installer/Engineer, and Programmer across eight FDIC locations. Offerors must complete specific pricing templates, with potential task orders spanning multiple years and room configurations, and must comply with detailed site-specific requirements for installation, staging, and workplace conduct across various FDIC regional offices.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION/AWARD

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30

1. REQUISITION NUMBER PAGE 1 OF

2. CONTRACT NO. 3. AWARD/EFFECTIVE

DATE

4. ORDER NUMBER 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE

DATE

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME b. CONTACT INFORMATION 8. OFFER DUE DATE/

LOCAL TIME

9. ISSUED BY

13b. N/A

14. METHOD OF SOLICITATION

CODE

15. DELIVER TO 16. ADMINISTERED BY CODE

18a. PAYMENT WILL BE MADE BY CODE17a. CONTRACTOR/

OFFEROR

CODE

FACILITY

CODE

CODE

TELEPHONE NO.

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN

OFFER

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK

BELOW IS CHECKED

RFQ RFP

Price only

SEE ADDENDUM

19.

ITEM NO.

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QTY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

(Use Reverse and/or Attach Additional Sheets as Necessary)

25. N/A 26. TOTAL AWARD AMOUNT (For Govt. Use Only)

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL

SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED

29. AWARD OF CONTRACT: REF.

YOUR OFFER ON SOLICITATION

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE SET FORTH

HEREIN, IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR

30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED

31a. FEDERAL DEPOSIT INSURANCE CORPORATION (SIGNATURE OF CO)

31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED

FDIC 3700/55 (3-08)

10. SOCIO-ECONOMIC STATUS

NO

NAICS:

ETHNICITY:

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

OFFER

13a. SUB-CONTRACTING

PERMITTED/APPROVED

YES

SDB

MWOB

SERVICE-DISABLED VETERAN-

OWNED SMALL BUSINESS

11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

12. DISCOUNT TERMS

YES NO

YES NO

27a. SOLICITATION INCLUDES ATTACHMENTS 27b. AWARD INCLUDES ATTACHMENTS

RFI RFP

Best Value

CORHQ-25-R-0121

19.

ITEM NO.

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QTY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

40. PAID BY

32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f. TELPHONE NUMBER OF AUTHORZED GOVERNMENT REPRESENTATIVE

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

33. SHIP NUMBER 34. VOUCHER NUMBER 35. AMOUNT VERIFIED

CORRECT FOR

PARTIAL FINAL

37. CHECK NUMBER

38. S/R ACCOUNT NO. 39. S/R VOUCHER NUMBER

36. PAYMENT

COMPLETE PARTIAL FINAL

FDIC 3700/55 (3-08)

Section B - Supplies or Services and Prices/Costs

CLIN # Description Quantity Unit Unit Price Total Price

0001 HW/SW/Services for National Conference

Room A/V BOA

1 EA

Attachments for this section start after this page.

Section B - Supplies or Services and Prices/Costs PAGE 3 OF 141

CONTROLLED//FDIC INTERNAL ONLY#

1. General Instructions Do not modify the structure of this Excel file.

Offeror shall only enter data in the green-shaded cells. All other cells and tabs have calculated fields or contain data entered by FDIC.

Any proposal failing to complete ANY portion with the exception of the "Labor Rates" tab of this pricing workbook may be considered non-responsive.

2. "Labor Rates" Tab

3. Room Configuration "Mobile - Large" Tabs 3-6.

Offerors are required to complete all tabs (Mobile, Small, Medium, and Large), for all years (Year 1 - Year 5). Offerors will be required to provide all equipment associated with each standard room confiugration in the appropriate tabs. Offerors can add or remove rows as needed, but are not allowed to change the other structure of the price workbook (For example; deleting columns). Due to the nature of the rooms, a standard kit (for example; Medium) kit may be modified (add or remove items to fit the requirements of a given room. Offerors will propose yearly Operation and Maintenace (O&M) price in all years (1-5) for the BOA. However, O&M will be will be prorated at the task order level from the installation completion date. Pricing for Specialized Rooms will be done at the Task Order level due to their unique and complex nature.

Offerors are to input labor rates inthe eight locations for all years (1-5). Offeror(s) who are awarded the BOA, but did not propose labor rates in any given location may not be considered for Task Orders in that location. The first four labor rates (Program Manager, System Architech, Installer/Engineer, Programmer) are from the SOO. Use the "Optional" rows for any additional labor rates. If Offeror is not proposing additional labor categories may remove the "Optional" rows. Offerors are also required to provide shipping cost for each standard kit for all locations.

Section B - Supplies or Services and Prices/Costs PAGE 4 OF 141

NONPUBLIC//FDIC BUSINESS#

Labor Category Year 1 Year 2 Year 3 Year 4 Year 5 Program Manager Solution Archtect Installer/Engineer Programmer Optional Optional Optional Room Configuration Mobile - Shipping Room Configuration Small - Shipping Room Configuration Medium - Shipping Room Configuration Large - Shipping

Labor Category Year 1 Year 2 Year 3 Year 4 Year 5 Program Manager Solution Archtect Installer/Engineer Programmer Optional Optional Optional Room Configuration Mobile - Shipping Room Configuration Small - Shipping Room Configuration Medium - Shipping Room Configuration Large - Shipping

Labor Category Year 1 Year 2 Year 3 Year 4 Year 5 Program Manager Solution Archtect Installer/Engineer Programmer Optional Optional Optional Room Configuration Mobile - Shipping Room Configuration Small - Shipping Room Configuration Medium - Shipping Room Configuration Large - Shipping

Labor Category Year 1 Year 2 Year 3 Year 4 Year 5 Program Manager Solution Archtect Installer/Engineer Programmer Optional Optional Optional Room Configuration Mobile - Shipping Room Configuration Small - Shipping Room Configuration Medium - Shipping Room Configuration Large - Shipping

HQ - Virgina Square (VASQ)

Atlanta

Boston

Chicago

Section B - Supplies or Services and Prices/Costs PAGE 5 OF 141

Labor Category Year 1 Year 2 Year 3 Year 4 Year 5 Program Manager Solution Archtect Installer/Engineer Programmer Optional Optional Optional Room Configuration Mobile - Shipping Room Configuration Small - Shipping Room Configuration Medium - Shipping Room Configuration Large - Shipping

Labor Category Year 1 Year 2 Year 3 Year 4 Year 5 Program Manager Solution Archtect Installer/Engineer Programmer Optional Optional Optional Room Configuration Mobile - Shipping Room Configuration Small - Shipping Room Configuration Medium - Shipping Room Configuration Large - Shipping

Labor Category Year 1 Year 2 Year 3 Year 4 Year 5 Program Manager Solution Archtect Installer/Engineer Programmer Optional Optional Optional Room Configuration Mobile - Shipping Room Configuration Small - Shipping Room Configuration Medium - Shipping Room Configuration Large - Shipping

Labor Category Year 1 Year 2 Year 3 Year 4 Year 5 Program Manager Solution Archtect Installer/Engineer Programmer Optional Optional Optional Room Configuration Mobile - Shipping Room Configuration Small - Shipping Room Configuration Medium - Shipping Room Configuration Large - Shipping

New York

San Francisco

Dallas

Kansas City

Section B - Supplies or Services and Prices/Costs PAGE 6 OF 141

Item Number

Item # Description Manufacturer Part # Qty Serial # Year 1 Unit Price

(Monthly Price for O&M)

Total Year 1 Price

Year 2 Unit Price (Monthly Price for O&M)

Total Year 2 Price

Year 3 Unit Price (Monthly Price for O&M)

Total Year 3 Price

Year 4 Unit Price (Monthly Price for O&M)

Total Year 4 Price

Year 5 Unit Price (Monthly Price for O&M)

Total Year 5 Price

1 $0.00 $0.00 $0.00 $0.00 $0.00

2 $0.00 $0.00 $0.00 $0.00 $0.00

3 $0.00 $0.00 $0.00 $0.00 $0.00

4 $0.00 $0.00 $0.00 $0.00 $0.00

5 $0.00 $0.00 $0.00 $0.00 $0.00

6 $0.00 $0.00 $0.00 $0.00 $0.00

7 $0.00 $0.00 $0.00 $0.00 $0.00

8 $0.00 $0.00 $0.00 $0.00 $0.00

9 $0.00 $0.00 $0.00 $0.00 $0.00

10 $0.00 $0.00 $0.00 $0.00 $0.00

11 $0.00 $0.00 $0.00 $0.00 $0.00

12 $0.00 $0.00 $0.00 $0.00 $0.00

13 $0.00 $0.00 $0.00 $0.00 $0.00

14 $0.00 $0.00 $0.00 $0.00 $0.00

15 $0.00 $0.00 $0.00 $0.00 $0.00

16 $0.00 $0.00 $0.00 $0.00 $0.00

17 $0.00 $0.00 $0.00 $0.00 $0.00

18 $0.00 $0.00 $0.00 $0.00 $0.00

19 $0.00 $0.00 $0.00 $0.00 $0.00

20 $0.00 $0.00 $0.00 $0.00 $0.00

21 $0.00 $0.00 $0.00 $0.00 $0.00

22 $0.00 $0.00 $0.00 $0.00 $0.00

23 $0.00 $0.00 $0.00 $0.00 $0.00

24 $0.00 $0.00 $0.00 $0.00 $0.00

25 $0.00 $0.00 $0.00 $0.00 $0.00

26 $0.00 $0.00 $0.00 $0.00 $0.00

27 $0.00 $0.00 $0.00 $0.00 $0.00

28 $0.00 $0.00 $0.00 $0.00 $0.00

29 $0.00 $0.00 $0.00 $0.00 $0.00

30 $0.00 $0.00 $0.00 $0.00 $0.00

31 $0.00 $0.00 $0.00 $0.00 $0.00

32 $0.00 $0.00 $0.00 $0.00 $0.00

33 $0.00 $0.00 $0.00 $0.00 $0.00

34 $0.00 $0.00 $0.00 $0.00 $0.00

35 $0.00 $0.00 $0.00 $0.00 $0.00

36 $0.00 $0.00 $0.00 $0.00 $0.00

37 $0.00 $0.00 $0.00 $0.00 $0.00

38 $0.00 $0.00 $0.00 $0.00 $0.00

39 $0.00 $0.00 $0.00 $0.00 $0.00

40 $0.00 $0.00 $0.00 $0.00 $0.00

41 $0.00 $0.00 $0.00 $0.00 $0.00

42 $0.00 $0.00 $0.00 $0.00 $0.00

43 $0.00 $0.00 $0.00 $0.00 $0.00

44 $0.00 $0.00 $0.00 $0.00 $0.00

45 $0.00 $0.00 $0.00 $0.00 $0.00

46 $0.00 $0.00 $0.00 $0.00 $0.00

47 $0.00 $0.00 $0.00 $0.00 $0.00

48 $0.00 $0.00 $0.00 $0.00 $0.00

50 $0.00 $0.00 $0.00 $0.00 $0.00

51 Operations and Maintenance Support - (In accordance with in Section 3.4 of the

SOO)

$0.00 $0.00 $0.00 $0.00 $0.00

Mobile Year 1 Total $0.00 Mobile Year 2 Total $0.00 Mobile Year 3 Total $0.00 Mobile Year 4 Total $0.00 Mobile Year 5 Total $0.00

Year 2 Year 3 Year 4 Year 5 Mobile Configuration

Year 1

Section B - Supplies or Services and Prices/Costs PAGE 7 OF 141

Item # Description Manufacturer Part # Qty Serial # Year 1 Unit Price

(Monthly Price for O&M)

Total Year 1 Price

Year 2 Unit Price (Monthly Price for

O&M)

Total Year 2 Price

Year 3 Unit Price (Monthly Price for

O&M)

Total Year 3 Price

Year 4 Unit Price (Monthly Price for

O&M)

Total Year 4 Price

Year 5 Unit Price (Monthly Price for

O&M)

Total Year 5 Price

1 $0.00 $0.00 $0.00 $0.00 $0.00

2 $0.00 $0.00 $0.00 $0.00 $0.00

3 $0.00 $0.00 $0.00 $0.00 $0.00

4 $0.00 $0.00 $0.00 $0.00 $0.00

5 $0.00 $0.00 $0.00 $0.00 $0.00

6 $0.00 $0.00 $0.00 $0.00 $0.00

7 $0.00 $0.00 $0.00 $0.00 $0.00

8 $0.00 $0.00 $0.00 $0.00 $0.00

9 $0.00 $0.00 $0.00 $0.00 $0.00

10 $0.00 $0.00 $0.00 $0.00 $0.00

11 $0.00 $0.00 $0.00 $0.00 $0.00

12 $0.00 $0.00 $0.00 $0.00 $0.00

13 $0.00 $0.00 $0.00 $0.00 $0.00

14 $0.00 $0.00 $0.00 $0.00 $0.00

15 $0.00 $0.00 $0.00 $0.00 $0.00

16 $0.00 $0.00 $0.00 $0.00 $0.00

17 $0.00 $0.00 $0.00 $0.00 $0.00

18 $0.00 $0.00 $0.00 $0.00 $0.00

19 $0.00 $0.00 $0.00 $0.00 $0.00

20 $0.00 $0.00 $0.00 $0.00 $0.00

21 $0.00 $0.00 $0.00 $0.00 $0.00

22 $0.00 $0.00 $0.00 $0.00 $0.00

23 $0.00 $0.00 $0.00 $0.00 $0.00

24 $0.00 $0.00 $0.00 $0.00 $0.00

25 $0.00 $0.00 $0.00 $0.00 $0.00

26 $0.00 $0.00 $0.00 $0.00 $0.00

27 $0.00 $0.00 $0.00 $0.00 $0.00

28 $0.00 $0.00 $0.00 $0.00 $0.00

29 $0.00 $0.00 $0.00 $0.00 $0.00

30 $0.00 $0.00 $0.00 $0.00 $0.00

31 $0.00 $0.00 $0.00 $0.00 $0.00

32 $0.00 $0.00 $0.00 $0.00 $0.00

33 $0.00 $0.00 $0.00 $0.00 $0.00

34 $0.00 $0.00 $0.00 $0.00 $0.00

35 $0.00 $0.00 $0.00 $0.00 $0.00

36 $0.00 $0.00 $0.00 $0.00 $0.00

37 $0.00 $0.00 $0.00 $0.00 $0.00

38 $0.00 $0.00 $0.00 $0.00 $0.00

39 $0.00 $0.00 $0.00 $0.00 $0.00

40 $0.00 $0.00 $0.00 $0.00 $0.00

41 $0.00 $0.00 $0.00 $0.00 $0.00

42 $0.00 $0.00 $0.00 $0.00 $0.00

43 $0.00 $0.00 $0.00 $0.00 $0.00

44 $0.00 $0.00 $0.00 $0.00 $0.00

45 $0.00 $0.00 $0.00 $0.00 $0.00

46 $0.00 $0.00 $0.00 $0.00 $0.00

47 $0.00 $0.00 $0.00 $0.00 $0.00

48 $0.00 $0.00 $0.00 $0.00 $0.00

50 $0.00 $0.00 $0.00 $0.00 $0.00

51 Operations and Maintenance Support - (In accordance with in Section 3.4 of the

SOO)

$0.00 $0.00 $0.00 $0.00 $0.00

Small Year 1 Total $0.00 Small Year 2 Total $0.00 Small Year 3 Total $0.00 Small Year 4 Total $0.00 Small Year 5 Total $0.00

Year 5 Small Configuration

Year 1 Year 2 Year 3 Year 4

Section B - Supplies or Services and Prices/Costs PAGE 8 OF 141

Item # Description Manufacturer Part # Qty Serial # Year 1 Unit Price

(Monthly Price for O&M)

Total Year 1 Price

Year 2 Unit Price (Monthly Price for

O&M)

Total Year 2 Price

Year 3 Unit Price (Monthly Price for

O&M)

Total Year 3 Price

Year 4 Unit Price (Monthly Price for

O&M)

Total Year 4 Price

Year 5 Unit Price (Monthly Price for

O&M)

Total Year 5 Price

1 $0.00 $0.00 $0.00 $0.00 $0.00

2 $0.00 $0.00 $0.00 $0.00 $0.00

3 $0.00 $0.00 $0.00 $0.00 $0.00

4 $0.00 $0.00 $0.00 $0.00 $0.00

5 $0.00 $0.00 $0.00 $0.00 $0.00

6 $0.00 $0.00 $0.00 $0.00 $0.00

7 $0.00 $0.00 $0.00 $0.00 $0.00

8 $0.00 $0.00 $0.00 $0.00 $0.00

9 $0.00 $0.00 $0.00 $0.00 $0.00

10 $0.00 $0.00 $0.00 $0.00 $0.00

11 $0.00 $0.00 $0.00 $0.00 $0.00

12 $0.00 $0.00 $0.00 $0.00 $0.00

13 $0.00 $0.00 $0.00 $0.00 $0.00

14 $0.00 $0.00 $0.00 $0.00 $0.00

15 $0.00 $0.00 $0.00 $0.00 $0.00

16 $0.00 $0.00 $0.00 $0.00 $0.00

17 $0.00 $0.00 $0.00 $0.00 $0.00

18 $0.00 $0.00 $0.00 $0.00 $0.00

19 $0.00 $0.00 $0.00 $0.00 $0.00

20 $0.00 $0.00 $0.00 $0.00 $0.00

21 $0.00 $0.00 $0.00 $0.00 $0.00

22 $0.00 $0.00 $0.00 $0.00 $0.00

23 $0.00 $0.00 $0.00 $0.00 $0.00

24 $0.00 $0.00 $0.00 $0.00 $0.00

25 $0.00 $0.00 $0.00 $0.00 $0.00

26 $0.00 $0.00 $0.00 $0.00 $0.00

27 $0.00 $0.00 $0.00 $0.00 $0.00

28 $0.00 $0.00 $0.00 $0.00 $0.00

29 $0.00 $0.00 $0.00 $0.00 $0.00

30 $0.00 $0.00 $0.00 $0.00 $0.00

31 $0.00 $0.00 $0.00 $0.00 $0.00

32 $0.00 $0.00 $0.00 $0.00 $0.00

33 $0.00 $0.00 $0.00 $0.00 $0.00

34 $0.00 $0.00 $0.00 $0.00 $0.00

35 $0.00 $0.00 $0.00 $0.00 $0.00

36 $0.00 $0.00 $0.00 $0.00 $0.00

37 $0.00 $0.00 $0.00 $0.00 $0.00

38 $0.00 $0.00 $0.00 $0.00 $0.00

39 $0.00 $0.00 $0.00 $0.00 $0.00

40 $0.00 $0.00 $0.00 $0.00 $0.00

41 $0.00 $0.00 $0.00 $0.00 $0.00

42 $0.00 $0.00 $0.00 $0.00 $0.00

43 $0.00 $0.00 $0.00 $0.00 $0.00

44 $0.00 $0.00 $0.00 $0.00 $0.00

45 $0.00 $0.00 $0.00 $0.00 $0.00

46 $0.00 $0.00 $0.00 $0.00 $0.00

47 $0.00 $0.00 $0.00 $0.00 $0.00

48 $0.00 $0.00 $0.00 $0.00 $0.00

50 $0.00 $0.00 $0.00 $0.00 $0.00

51 Operations and Maintenance Support - (In accordance with in Section 3.4 of the

SOO)

$0.00 $0.00 $0.00 $0.00 $0.00

Medium Year 1 Total $0.00 Medium Year 2 Total $0.00 Medium Year 3 Total $0.00 Medium Year 4 Total $0.00 Medium Year 5 Total $0.00

Year 5 Medium Configuration

Year 1 Year 2 Year 3 Year 4

Section B - Supplies or Services and Prices/Costs PAGE 9 OF 141

Item # Description Manufacturer Part # Qty Serial # Year 1 Unit Price

(Monthly Price for O&M)

Total Year 1 Price

Year 2 Unit Price (Monthly Price for

O&M)

Total Year 2 Price

Year 3 Unit Price (Monthly Price for

O&M)

Total Year 3 Price

Year 4 Unit Price (Monthly Price for

O&M)

Total Year 4 Price

Year 5 Unit Price (Monthly Price for

O&M)

Total Year 5 Price

1 $0.00 $0.00 $0.00 $0.00 $0.00

2 $0.00 $0.00 $0.00 $0.00 $0.00

3 $0.00 $0.00 $0.00 $0.00 $0.00

4 $0.00 $0.00 $0.00 $0.00 $0.00

5 $0.00 $0.00 $0.00 $0.00 $0.00

6 $0.00 $0.00 $0.00 $0.00 $0.00

7 $0.00 $0.00 $0.00 $0.00 $0.00

8 $0.00 $0.00 $0.00 $0.00 $0.00

9 $0.00 $0.00 $0.00 $0.00 $0.00

10 $0.00 $0.00 $0.00 $0.00 $0.00

11 $0.00 $0.00 $0.00 $0.00 $0.00

12 $0.00 $0.00 $0.00 $0.00 $0.00

13 $0.00 $0.00 $0.00 $0.00 $0.00

14 $0.00 $0.00 $0.00 $0.00 $0.00

15 $0.00 $0.00 $0.00 $0.00 $0.00

16 $0.00 $0.00 $0.00 $0.00 $0.00

17 $0.00 $0.00 $0.00 $0.00 $0.00

18 $0.00 $0.00 $0.00 $0.00 $0.00

19 $0.00 $0.00 $0.00 $0.00 $0.00

20 $0.00 $0.00 $0.00 $0.00 $0.00

21 $0.00 $0.00 $0.00 $0.00 $0.00

22 $0.00 $0.00 $0.00 $0.00 $0.00

23 $0.00 $0.00 $0.00 $0.00 $0.00

24 $0.00 $0.00 $0.00 $0.00 $0.00

25 $0.00 $0.00 $0.00 $0.00 $0.00

26 $0.00 $0.00 $0.00 $0.00 $0.00

27 $0.00 $0.00 $0.00 $0.00 $0.00

28 $0.00 $0.00 $0.00 $0.00 $0.00

29 $0.00 $0.00 $0.00 $0.00 $0.00

30 $0.00 $0.00 $0.00 $0.00 $0.00

31 $0.00 $0.00 $0.00 $0.00 $0.00

32 $0.00 $0.00 $0.00 $0.00 $0.00

33 $0.00 $0.00 $0.00 $0.00 $0.00

34 $0.00 $0.00 $0.00 $0.00 $0.00

35 $0.00 $0.00 $0.00 $0.00 $0.00

36 $0.00 $0.00 $0.00 $0.00 $0.00

37 $0.00 $0.00 $0.00 $0.00 $0.00

38 $0.00 $0.00 $0.00 $0.00 $0.00

39 $0.00 $0.00 $0.00 $0.00 $0.00

40 $0.00 $0.00 $0.00 $0.00 $0.00

41 $0.00 $0.00 $0.00 $0.00 $0.00

42 $0.00 $0.00 $0.00 $0.00 $0.00

43 $0.00 $0.00 $0.00 $0.00 $0.00

44 $0.00 $0.00 $0.00 $0.00 $0.00

45 $0.00 $0.00 $0.00 $0.00 $0.00

46 $0.00 $0.00 $0.00 $0.00 $0.00

47 $0.00 $0.00 $0.00 $0.00 $0.00

48 $0.00 $0.00 $0.00 $0.00 $0.00

50 $0.00 $0.00 $0.00 $0.00 $0.00

51 Operations and Maintenance Support - (In accordance with in Section 3.4 of the

SOO)

$0.00 $0.00 $0.00 $0.00 $0.00

Large Year 1 Total $0.00 Large Year 2 Total $0.00 Large Year 3 Total $0.00 Large Year 4 Total $0.00 Large Year 5 Total $0.00

Year 5 Large Configuration

Year 1 Year 2 Year 3 Year 4

Section B - Supplies or Services and Prices/Costs PAGE 10 OF 141

Number

Item # Description Manufacturer Part # Qty Serial # Unit Price Total Price

1 $0.00

2 $0.00

3 $0.00

4 $0.00

5 $0.00

6 $0.00

7 $0.00

8 $0.00

9 $0.00

10 $0.00

11 $0.00

12 $0.00

13 $0.00

14 $0.00

15 $0.00

16 $0.00

17 $0.00

18 $0.00

19 $0.00

20 $0.00

21 $0.00

22 $0.00

23 $0.00

24 $0.00

25 $0.00

26 $0.00

27 $0.00

28 $0.00

29 $0.00

30 $0.00

31 $0.00

32 $0.00

33 $0.00

34 $0.00

35 $0.00

36 $0.00

37 $0.00

38 $0.00

39 $0.00

40 $0.00

41 $0.00

42 $0.00

43 $0.00

44 $0.00

45 $0.00

46 $0.00

47 $0.00

48 $0.00

50 $0.00

Operations and Maintenance Support - (In accordance with in Section 3.4 of the SOO) $0.00

Specialized Base Period Total (Hardware, Software Support Only) $0.00

Task Order 1 - Atlanta Specialized Room - Base Period

Section B - Supplies or Services and Prices/Costs PAGE 11 OF 141

Labor Category Hours Hourly Rate Program Manager Solution Architect Installer/Engineer Programmer Optional Optional Optional

$0.00

Item Number

Item # Description Manufacturer Part # Qty Serial # Unit Price Total Price

Operations and Maintenance Support - (In accordance with in Section 3.4 of the SOO)

$0.00

Specialized Option Period 1 Total $0.00

Item Number

Item # Description Manufacturer Part # Qty Serial # Unit Price Total Price

Operations and Maintenance Support - (In accordance with in Section 3.4 of the SOO) $0.00

Specialized Option Period 2 Total $0.00

Item Number

Item # Description Manufacturer Part # Qty Serial # Unit Price Total Price

Operations and Maintenance Support - (In accordance with in Section 3.4 of the SOO)

$0.00

Specialized Option Period 3 Total $0.00

Item Number

Item # Description Manufacturer Part # Qty Serial # Unit Price Total Price

Operations and Maintenance Support - (In accordance with in Section 3.4 of the SOO)

$0.00

Specialized Optional 4 Total $0.00

$0.00Atlanta Task Order 1 Total

$0.00

Specialized - Option Period 1

Specialized - Option Period 2

Specialized - Option Period 3

Specialized - Option Period 4

Base Period Labor Specialized - Shipping Total

Base Period (All Items)

$0.00

Labor Total $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Section B - Supplies or Services and Prices/Costs PAGE 12 OF 141

Section C - Description/Specifications/Work Statement

Attachments for this section start after the clauses.

Clauses Incorporated By Reference

Clause # Title Date

7.3.2-34 Duty to Deliver or Perform July 2008

Full Text Clauses

7.3.2-21 - Description/Specifications/Work Statement - October 2008 The name/description of the goods or services being acquired is as follows:

National Conference Rooms Audio Visual Upgrades

The specifications for and the description of the work to be performed under this award are fully detailed in a

Statement of Objectives (SOO), which is included as Attachment C-1 to this solicitation.

Section C - Description/Specifications/Work Statement PAGE 13 OF 141

Section C - Description/Specifications/Work Statement PAGE 14 OF 141

Section C - Description/Specifications/Work Statement PAGE 15 OF 141

Section C - Description/Specifications/Work Statement PAGE 16 OF 141 o o o

Section C - Description/Specifications/Work Statement PAGE 17 OF 141

Section C - Description/Specifications/Work Statement PAGE 18 OF 141

Section C - Description/Specifications/Work Statement PAGE 19 OF 141

Section C - Description/Specifications/Work Statement PAGE 20 OF 141

Section C - Description/Specifications/Work Statement PAGE 21 OF 141

Section C - Description/Specifications/Work Statement PAGE 22 OF 141

Section C - Description/Specifications/Work Statement PAGE 23 OF 141

Section C - Description/Specifications/Work Statement PAGE 24 OF 141

Principal Duties and Responsibilities

Section C - Description/Specifications/Work Statement PAGE 25 OF 141

• Leads the design, implementation, and optimization of the architecture of complex audio/video systems that include construction projects.

• Collaborates with multi-disciplinary teams to translates complex business processes and strategy into technical audio video solutions through requirements definition and design.

• Responsible for the design and management of the end to end architecture of the solution and ensure that all the components of the solution integrate together (includes existing audio/video solutions).

• Conceptualize solutions that address customer opportunities and issues.

• Provides overall strategic vision and creates architecture proposals based on audio/video requirements.

• Provide architectural advice, planning guidance, quality assurance, safety regulation and industry standard compliance, and guidance to the project team on project approach and solution

• Adheres to FDIC's enterprise architecture standards.

Qualifications

• BA/BS in Computer Science or related field or an equivalent combination of education and/or experience.

• 3-5 years of progressive experience as a solution architect.

• Minimum 2 years of experience in other technical roles such as developer or systems analyst.

• Strong consultative skills at a cross functional level.

• Demonstrates experience with analysis level UML, activity diagrams, business use cases, business rules, and system level features.

• Demonstrates experience in enterprise architecture frameworks (TOGAF is preferred).

• Demonstrates broad based platform and technical exposure and complete software development lifecycle perspective.

• Demonstrates understanding of latest architecture, technology, solutions, and industry trends.

Section C - Description/Specifications/Work Statement PAGE 26 OF 141

Section C - Description/Specifications/Work Statement PAGE 27 OF 141

Section C - Description/Specifications/Work Statement PAGE 28 OF 141

Region

Address

Washington DC (Head Quarters)

550 17th Street, NW Washington, DC 20429

Atlanta 10 10th Street NE, Suite 900, Atlanta, GA 30309-3849

Section C - Description/Specifications/Work Statement PAGE 29 OF 141 https://www.fdic.gov/about/organization-directory-regional-offices#boston

Boston 15 Braintree Hill Office Park, Suite 200, Braintree, MA 02184-8701

Chicago 300 South Riverside Plaza, Suite 1700, Chicago, IL 60606-3447

Dallas 600 North Pearl Street, Suite 700, Dallas, TX 75201

Kansas City 1100 Walnut St, Suite 2100 Kansas City, MO 64106-2180

New York 1166 Sixth Avenue New York, NY 10036

San Francisco 25 Jessie Street at Ecker Square, Suite 2300, San Francisco, CA, 94105-2780

Section C - Description/Specifications/Work Statement PAGE 30 OF 141

Federal Deposit Insurance Corporation

CONTROLLED//FDIC INTERNAL ONLY

Attachment A - PROJECT SITE REQUIREMENTS

This section applies to all FDIC sites unless otherwise specified in the ensuing sections specific to each site.

1. Work Restrictions

The Contractor shall survey the entire worksite and review existing documentation to be familiar with the existing conditions. This includes all areas of the building, structure, and site affected by the work prior to initiation of work.

During the installation period, the Contractor shall have full use of the designated premises for work, including full use of the indicated work site, limited only by the FDIC's right to perform work, or retain other contractors to perform work, on portions of the project. The Contractor shall limit the use of the premises to the work areas indicated, and to allow for FDIC occupancy and public use.

Each building is to remain fully operational throughout the entirety of the project, with no disruption to tenant operations during FDIC Occupied Hours (2.1). All work areas must be cleaned at the end of every workday.

The work shall be sequenced to minimize disruption to building occupants, visitors, and maintenance activities. To the greatest extent feasible, work should not take place until complete supplies are on hand to perform work.

The Contractor shall coordinate all work activities with the FDIC Oversight Manager (OM) and Technical Monitor (TM) to ensure that proper security and access arrangements are made without impact on the ’schedule.

2. Working Hours

2.1 FDIC Occupied Hours

Each FDIC building is operated at all times and is constantly manned by a guard force and building engineer. At least one means of vehicle access, and one means of pedestrian access must be maintained at all times. The standard working hours for FDIC employees is 6:00 a.m. to 7:00 p.m.

Monday through Friday except Federal Holidays. All work that will produce noise, dust, odors or service disruption detectable within the building interior would preferably be scheduled outside the standard FDIC working hours.

FDIC will occupy the building during the entire project period. Contractors shall cooperate with FDIC and FDIC’s building services to minimize conflicts and facilitate FDIC usage. Contractors shall perform the work so as not to interfere with FDIC's operations.

2.2 Contractor's Working Hours

The following work shall be performed outside of FDIC Occupied Hours:

All work that produces excessive noise, vibration, dust, or odors that may disrupt tenant operations in adjacent spaces. FDIC has the right to request to stop work due to noise, odor, or

Section C - Description/Specifications/Work Statement PAGE 31 OF 141 other concerns, and not be held financially liable for any cost incurred due to a request to stop work during occupied hours.

Keep driveways and entrances serving premises clear and available to FDIC, FDIC's employees, and emergency vehicles at all times. Do not use these areas for parking or storage of materials

• Schedule deliveries to minimize use of driveways and entrances.

• Schedule deliveries to minimize space and time requirements for storage of materials and equipment on-site.

Work accomplished outside of FDIC Occupied Hours shall be performed at no additional cost to the FDIC. The Contractor shall submit a proposed schedule and gain OM and TM approval at least 72 hours before proceeding with any work during FDIC Unoccupied Hours. Note: All noisy work (hammer drilling, etc.) must be completed before 7:00 a.m. Monday – Friday, excluding Federal Holidays.

3. Loading Dock

Use of any existing loading dock facilities shall be shared with FDIC activities on a first-come-first-served, wait-your-turn basis. Any early-morning delivery of cafeteria supplies and trash removal on FDIC working days have priority. Loading dock activities shall be coordinated with the OM and TM a minimum of 72 hours in advance. Acceptance of deliveries shall be the Contractor’s responsibility.

No storage is available on the loading dock. Storage will be coordinated with the OM and TM.

4. Deliveries and Parking

Deliveries of material must be coordinated and scheduled to avoid encumbering any loading dock, all hallways, or any freight elevator during standard working hours.

4.1 Transportation and Parking

Contractor is responsible for transportation of its employees to and from job site, and parking of vehicles of Contractor or its subcontractors. Parking of vehicles on-site during standard working hours is not permissible. After hours parking may be provided at the discretion of FDIC and coordinated with the OM and TM.

4.2 Seventy-two (72) Hours Advance Notification of Deliveries

The Contractor shall provide seventy-two (72) hours advance notification of all significant deliveries to provide time to schedule inspections of all materials upon delivery prior to unloading.

4.3 Shipping

The contractor shall ship all equipment and materials to the final destination based on the rooms and locations identified under the task order, where FDIC will provide space to store, stage, test, and verify equipment functionality.

Section C - Description/Specifications/Work Statement PAGE 32 OF 141

4.4 Inspection for Transportation Damage

Before any materials are unloaded, all items shall be inspected for damage, water stains, discoloration, or other evidence of moisture acquired at the point of manufacture or in transit or temporary storage.

4.5 Vehicular Traffic

Contractor shall be responsible for obtaining any required permits for blocking streets or curb parking for trucks, etc. as applicable.

4.6 Barricades, Warning Signs, Lights, and Traffic Controls

Provide and maintain barricades, warning signs and lights, and traffic controls. Provide traffic control as necessary for work vehicles entering and leaving site, and for non-work vehicles on or near site. Comply with requirements of public authorities having jurisdiction for erecting structurally adequate barricades, including warning signs and lighting.

5. Staging and Storage

The Contractor may be provided a staging area within the building, contingent upon FDIC approval, and provided that its use will not interfere with operations of the FDIC. Contractor to identify area required for staging for FDIC review. No FDIC employees will assist with unloading/loading of vehicles(s). The Contractor shall provide all personnel and equipment needed for unloading, moving, and assembling the materials. Pallets shall not be brought into the building; items shall be taken off pallets. FDIC can provide some carts if needed.

6. Clean-Up

Contractor shall ensure all routes of travel through the building interior are free of debris, tools, equipment, supplies, and materials at the conclusion of each work session in order to return the affected space to its original occupied condition.

6.1 During completion of work:

Clean site and work areas daily, including common areas. Enforce requirements strictly. The site is to be kept clean and safe from fire or tripping hazards daily. Separate waste materials per safe handling requirements and dispose of legally.

• Trash Containers - The Contractor shall provide trash bags or containers for all trash, debris, and material residue. Trash includes material containers, wrappers, and covers in addition to food containers, drinking cups, paper bags, and all other trash of any kind resulting from on-going work. Trash is to be removed from the site daily.

• Do not bury or burn waste materials, debris, or rubbish on-site. Do not discharge or wash waste materials, debris, or rubbish down sewers or into waterways.

Site: Maintain site and surrounding areas free of waste materials, debris, and rubbish from work

Section C - Description/Specifications/Work Statement PAGE 33 OF 141 and personnel.

Work Areas: Clean areas where work is in progress to level of cleanliness necessary for proper execution of work.

• Remove liquid spills promptly.

Installed work: Keep installed work clean. Clean installed surfaces according to written instructions of manufacturer or fabricator of product installed, using only cleaning materials specifically recommended. If specific cleaning materials are not recommended, use cleaning materials that are not hazardous to health or property and that will not damage exposed surfaces.

Handle waste materials, debris, and rubbish in a controlled manner with as few handlings as possible. Do not throw from heights.

During handling and installation, clean and protect work. Apply protective covering where required to ensure protection from damage or deterioration.

6.2 After completing work (prior to inspection):

• Clean spillage and soiling from adjacent surfaces using cleaning agents and procedures recommended by manufacturer of affected surface. Exercise care to avoid scratching or damage to surfaces.

• Repair surfaces stained, marred, or otherwise damaged during work.

• Clean up debris and surplus materials and remove from site. Leave all areas around job site free of debris, materials, equipment and related items after completion of job.

• Collect surplus materials that cannot be reused and deliver to recycling or disposal facility.

Limiting Exposures: Supervise work to assure that no part of work, completed or in progress, is subject to harmful, dangerous, damaging, or otherwise deleterious exposure during project period.

In areas disturbed by work activities, complete the following cleaning before requesting inspection. Clean surfaces, complying with manufacturer's written instructions.

• Remove tools, construction equipment, machinery, and surplus material from site.

• Clean site of rubbish, waste materials, litter, and other foreign substances.

Remove labels that are not permanent.

Remove debris and surface dust from limited access spaces, including roofs, plenums, shafts, trenches, equipment vaults, manholes, attics, and similar spaces.

After completing work after inspection:

Leave area clean and ready for occupancy.

Section C - Description/Specifications/Work Statement PAGE 34 OF 141

7. Dumpster

Limited space (e.g. 2 or 3 boxes) is available on-site for a dumpster. Material is expected to be hauled off at the end of each work shift. Stockpiling of debris for more than one calendar day or over use of existing building dumpsters and trash bins is strictly prohibited.

8. Dust and Fume Control

Prevent dust, dirt, fumes, and odors from entering occupied areas. The Contractor shall implement dust control measures to reduce the amount of airborne dust and debris on the site. Air emissions from Contractor equipment shall be minimized to the greatest extent possible and shall not be discharged near air intakes and openings where airborne emissions could be drawn into the building. At no time shall building occupants be exposed to hazardous conditions as a result of work.

• Protect and filter existing air intakes as required.

• Comply with OSHA requirements.

9. Use of Existing Stairs, Elevator, or Freight Elevator

The use of FDIC’s existing stairs and freight elevator is available for use at the site, to be shared with other service providers. Limited periods of exclusive use may be requested with advance notice to the OM and TM. The Contractor shall be responsible for a reasonable duty of care to avoid damage to the freight elevator finishes or for exceeding load limitations.

• Coordinate daily usage with the OM and TM and with requirements for facility operations.

• Provide protective coverings, barriers, devices, signs, or other procedures to protect stairs, elevator cars, and entrance doors and frame, and to maintain means of egress.

• If a freight elevator is available, the Contractor shall use this means.

10. Smoking Restrictions

Contractor shall comply with the FDIC policy of "NO SMOKING" in any FDIC property. This includes restrooms, machine rooms, electrical rooms, roof areas, parking garages, elevators, loading docks, entranceways, etc.

11. Other Prohibited Activities

The possession or use of alcoholic beverages, illegal drugs, firearms, weapons or explosives by Contractor personnel while at an FDIC location is strictly forbidden and any violation shall be cause for an immediate removal of the offender(s) from further work involving the contract.

12. Conservation

Contractor personnel shall comply with all general-use energy conservation and recyclable programs as practiced at the facility in which the work is being performed.

Section C - Description/Specifications/Work Statement PAGE 35 OF 141

LOCATION

FDIC

Head Quarters (Main) 550 17th Street, NW Washington, DC 20429

• FDIC will provide padding in the freight elevator; the dimensions of the elevator are 51” D x 80” W x 110” H and the weight capacity is 2500 lbs.

• Delivery trucks must adhere to municipal restrictions for use of 17th Street when traveling to or from the site.

Section C - Description/Specifications/Work Statement PAGE 36 OF 141

FDIC

Virginia Square (includes Student Residence Center) 3501 Fairfax Drive Arlington, VA 22201

• Hours of delivery/operation:

o Monday through Friday, 7:00 AM – 5:00 PM (accessible 24/7, 7 days per week if some work needs to be conducted after hours) o The standard working hours for FDIC employees is 6:00 a.m. to 6:00 p.m. Monday through Friday except Federal Holidays.

• Lobby marble floors require Masonite protection and corner guards.

• Throughout the course of the project, use the freight elevator designated by the OM and TM for Contractor use. Provide protection pads hung to protect the interior walls and floor protection to cover the elevator floor. Only use the designated protected elevator to carry size appropriate materials and tools. Elevator must be maintained clean daily to prevent debris tracks. Freight elevator access is on P-1 is adjacent to the loading dock.

Section C - Description/Specifications/Work Statement PAGE 37 OF 141

FDIC

Atlanta Regional Office (Main) 10 10th Street NE, Suite 900 Atlanta GA 30309

To be determined.

Section C - Description/Specifications/Work Statement PAGE 38 OF 141

FDIC

Boston Regional Office (Main) 15 Braintree Hill Office Park, Suite 200 Braintree MA 02184

Section C - Description/Specifications/Work Statement PAGE 39 OF 141

FDIC

Chicago Regional Office (Main) 300 South Riverside Plaza, Suite 1700 Chicago IL 60606

Section C - Description/Specifications/Work Statement PAGE 40 OF 141

FDIC

Dallas Regional Office (Main) 600 North Pearl Street, Suite 700 Dallas TX 75201

Section C - Description/Specifications/Work Statement PAGE 41 OF 141

FDIC

Kansas City Regional Office (Main) 1100 Walnut St, Suite 2100 Kansas City MO 64106

Section C - Description/Specifications/Work Statement PAGE 42 OF 141

FDIC

New York Regional Office (Main) 1166 Sixth Avenue New York, NY 10036

Section C - Description/Specifications/Work Statement PAGE 43 OF 141

FDIC

San Francisco Regional Office (Main) 25 Jessie Street at Ecker Square Suite 2300 San Francisco, CA 94105-2780

• Hours of delivery/operation:

o Monday through Friday, 7:00 AM – 5:00 PM (accessible 24/7, 7 days per week if some work needs to be conducted after hours) o The standard working hours for FDIC employees is 6:00 a.m. to 6:00 p.m. Monday through Friday except Federal Holidays.

• Lobby marble floors require Masonite protection and corner guards

• FDIC will provide padding in the freight elevator; the dimensions of the elevator are 51” D x 80”

W x 110” H and the weight capacity is 2500 lbs.

• Address is located in a construction zone, one-way alley on Jessie St. with barricades.

Security will assist in moving the barricades for deliveries and short-term parking. On some days FDIC will have a lot of contractors working in the building, and that section will quickly fill up with service vehicles; accordingly, the contractor will be responsible for its own parking.

• Two business day advance notice for 2 hour delivery window recommended. The contractor shall call main Security Desk 5-10 minutes or more prior to arrival as they can provide updates on parking or deliveries (415-808-8100).

• Truck size limit is 24’ in length given the two lane street access and tight turn in front of the building.

• NO Loading Dock L-gate required for delivery.

Section C - Description/Specifications/Work Statement PAGE 44 OF 141

National Conference Room AV Task Order 1 Statement of Objectives

Section C - Description/Specifications/Work Statement PAGE 45 OF 141

1. Introduction

2. Objectives

3. Scope

3.1 Training and Collaboration Centers

3.2 Equipment, Materials, and Licenses

3.3. System/Solution Acceptance

3.4 Installation Warranty and On-site Support

3.5 Training

4. Prerequisite for Task Order

5. Documentation

6. Key Personnel

7. Schedule and Deliverables

8. Place of Performance

9. Attachments

Section C - Description/Specifications/Work Statement PAGE 46 OF 141

1. Introduction The Federal Deposit Insurance Corporation (“FDIC”) is an independent agency of the U.S.

government that was established by Congress in 1933 to insure bank deposits and help maintain sound conditions in our banking system. In its unique role as deposit insurer of banks and savings associations and primary supervisor of state non-member banks, the FDIC promotes the safety and soundness of insured depository institutions.

2. Objectives

The FDIC is seeking a National Conference Room AV BOA holder to transform two rooms in Atlanta (10 10th Street NE, Suite 900, Atlanta, GA 30309-3849) into a Specialized room type.

This Task Order is for a Specialized room only; all other requirements at Section 2 of the BOA SOO apply.

3. Scope

This Task Order is for a Specialized room only; all other requirements at Section 3 of the BOA SOO apply.

3.1 Training and Collaboration Centers

All requirements at Section 3.1 of the BOA SOO apply.

3.2 Equipment, Materials, and Licenses

All requirements at Section 3.2 of the BOA SOO apply.

3.3. System/Solution Acceptance

All requirements at Section 3.3 of the BOA SOO apply.

3.4 Installation Warranty and On-site Support

All requirements at Section 3.4 of the BOA SOO apply.

3.5 Training

All requirements at Section 3.5 of the BOA SOO apply.

4. Prerequisite for Task Order

All requirements at Section 4 of the BOA SOO apply.

5. Documentation All requirements at Section 5 of the BOA SOO apply.

6. Key Personnel

All requirements at Section 6 of the BOA SOO apply.

Section C - Description/Specifications/Work Statement PAGE 47 OF 141

7. Schedule and Deliverables

The anticipated deliverables for each room include, but are not limited to the requirements at Section 7 of the BOA SOO.

8. Place of Performance The place of performance is Atlanta (10 10th Street NE, Suite 900, Atlanta, GA 30309-3849. This Task Order is for Atlanta only; all other requirements at Section 8 of the BOA SOO apply.

9. Attachments All requirements at Section 9 of the BOA SOO apply.

Section C - Description/Specifications/Work Statement PAGE 48 OF 141

$'()�)*+��,��'-)�+-.�*�)*-+(/0��1�2��34��(/5��6(/0��7*-6�+-.�*��8��1��6�+-.�*)�(/�.-59� Section C - Description/Specifications/Work Statement PAGE 49 OF 141

��������������������������� �!!"� #$%&�$'()�)*+��,�'-)�+-.�*�)*-+(/0�1�2��3����(/4��5(/0�6*-5�+-.�*��7(+'�1��5�+-.�*)�(/�.-48�

Section C - Description/Specifications/Work Statement PAGE 50 OF 141

./012�������������������������������������3�405678�� �Section C - Description/Specifications/Work Statement PAGE 51 OF 141

���������������������������� �!!"� #$%&�$'()�)*+�,-��'�)�+�.�*�)*�+(/0��������1�(/2�,3(/0���*�3�+�.�*�-*��������4�����3�+�.�*)�(/�.�25�

#6+���2'�(�)�2�/�.*�-��2*3����/0�.�25�7���8�9�

Section C - Description/Specifications/Work Statement PAGE 52 OF 141

��������������������������� !���������"#�$$�%%&�$'()*�(+,���-.�!/��+���0�,�������-�1+�+����-�.,�2�3�4�5�/-�/�-6���7��(�.����������1��-�8-�9,.+��4�9,.+�!.��:-���.�8�-���;,.+�3����.�8�-��,��8�1<�

Section C - Description/Specifications/Work Statement PAGE 53 OF 141

����������������������������� !"�������#$�%%�&&'�%()*+�),-���./�01��,���2�-�������.�3,�,����.�/-�4�5���6�1.�1�.7���"�)�/����.�3,�����7�������3��.��8.�9-/,����9-/,�0/��:.���/�8�.���;��5����/�8�.��-�� ����

Section C - Description/Specifications/Work Statement PAGE 54 OF 141

������������������������ !����"��#$���%&&'��()�*�)�+,�,�-�.�����,�-�/0��,��-+12���3���!����4150.6+12��7��6�-�/0����668�9�����0���3�����5�����"���:��3��6�-�/0�,�+1�/�5;�

Section C - Description/Specifications/Work Statement PAGE 55 OF 141

����������������������� �!""#�$%���!&&'��()�*�)�+,�,�-�������,�,��-+./�0"1��2��3+-��4��5�-�6 ����7"�0""5�-�6 �,�+.�6�89�

Section C - Description/Specifications/Work Statement PAGE 56 OF 141

���������������������������� !�"#����$$%�&��''�(()�'*+,-�+./0�0���#1��.�0�0���/���2$���3���4$�2$$5���6��0�/��6��7��*8�����.�/�0�����6��1�������$#�5�$��0$%��9���0���5����6��7�$2��$$%:� � �

Section C - Description/Specifications/Work Statement PAGE 57 OF 141

FDIC - ATLANTA RO/FO

10 10TH STREET NW #900 & 10000

ATLANTA, GEORGIA 30309

VOICE/DATA SYSTEMS

SHEET LEGEND

SHEET

NUMBER TITLE REVISED

VOICE/DATA SYSTEMS

LV-00 INDEX/TITLE SHEET 01-11-2024

LV-01 LEVEL 09 - VOICE/DATA FLOOR PLAN 01-11-2024

LV-02 LEVEL 10 - VOICE/DATA FLOOR PLAN 01-11-2024

VOICE/DATA SYMBOL LEGEND

SYMBOL DESCRIPTION CABLING

REQUIREMENTS

ROUGH-IN

REQUIREMENTS

ROUGH-IN ELEVATION

SHEET# DETAIL# ELEVATION#

SINGLE DATA STATION (1) CAT6 - - - -

MULTI-DATA STATION (2) CAT6 UNLESS NOTED

OTHERWISE - - - -

CEILING DATA, WIRELESS ACCESS POINT (1) CAT6 UNLESS NOTED

OTHERWISE - - - -

SINGLE DATA FLOORBOX (1) CAT6 - - - -

MULTI-DATA FLOORBOX DATA (2) CAT6 UNLESS NOTED

OTHERWISE - - - -

WALL FURNITURE FEED SEE FLOORPLAN - - - -

FLOOR CORE FURNITURE FEED SEE FLOORPLAN - - - -

PROJECT

INDEX

LV-00

FD

IC

AT

LA

NT

A

RO

/F O

TH

S

TR

EE

T

NW

AT

LA

NT

A, G

EO

RG

IA

VO

IC

E/

DA

TA

S

YS

TE

M S

DATE:

DRAWN BY:

CHECKED BY:

APPROVED BY:

JLB

JL

JL

JOB NUMBER:

REV# DATE:

REVISION TABLE

DESCRIPTION:

ASBUILTS

0000000

01-11-2024

01-11-2024

PRINTED SHEET SIZE: Arch E1 - 30" x 42"

Pu bl ish ed b y:

J L B

CO

PY

RI

GH

T

T

HI

S

IS

C

OP

YR

IG

HT

ED

A

ND

M

AY

N

OT

B E

US

ED

W

IT

HO

UT

W

RI

TT

EN

P

ER

M

IS

SI

ON

Ó

4825 RIVER GREEN PKWY

DULUTH, GEORGIA 30096

Phone: 770-495-0798 www.ncicabling.com

Section C - Description/Specifications/Work Statement PAGE 58 OF 141

CORHQ-25-R-0121

AutoCAD SHX Text

FF

AutoCAD SHX Text

FF

OFFICE_120

09-034

OFFICE_225

09-036

OFFICE_225

09-038

OFFICE_120

09-040

OFFICE_120

09-042

OFFICE_120

09-044

OFFICE_120

09-046

LARGE

CONFERENCE

09-048

OPEN COLLAB.

09-032

OFFICE_280

09-030

MAIL/COPY RM.

09-049

OFFICE_250

09-026

OFFICE_225

09-024

STORAGE

09-011

OFFICE_225

09-022 MED. CONF.

09-023

OFFICE_325

09-020

OFFICE_120

09-014

OFFICE_225

09-012

OFFICE_150

09-010

OFFICE_150

09-008

OFFICE_120

09-006

OFFICE_120

09-004

OFFICE_120

09-002

OFFICE_120

09-104

OFFICE_225

09-102

OFFICE_120

09-100

OFFICE_120

09-098

OFFICE_120

09-096

OFFICE_120

09-094

OFFICE_120

09-092

OFFICE_120

09-090

OFFICE_150

09-088

OFFICE_150

09-086

OFFICE_225

09-018 OFFICE_225

09-016

COPY/PRINT

09-009

EXEC. CONF.

09-007

DOC. ROOM

09-108

OPEN COLLAB.

09-084

HUDDLE

09-005

HUDDLE

09-003

FILE ROOM

09-105

OFFICE_120

09-110

OFFICE_120

09-111

OFFICE_120

09-112

OFFICE_150

09-082

RECEPTION

09-001 BADGING OFFICE

09-106

STO. ROOM

09-107

FILE ROOM

09-109

ADMIN FILE / STO.

RM

09-122 OFFICE_150

09-080

OPEN COLLAB.

09-021

MED. CONF.

09-025

OFFICE_150

09-078

ELEV. LOBBY

09-000

FILE/ WRK RM

09-089

OFFICE_150

09-076

OFFICE_225

09-028

NURSE STAT.

09-051

SUPPLIES

09-057

EXAM ROOM

09-055

RESTROOM

09-053

LARGE CONF.

09-059

BREAKROOM

09-061

SERVER ROOM

09-069

OFFICE_150

09-074

OFFICE_150

09-072

FILE ROOM

09-063

TECH CAFE

09-065

OFFICE_120

09-067

COPY/PRINT

09-071

OFFICE_150

09-070

EQ3

OPEN COLLAB.

09-068

OFFICE_120

09-050

OFFICE_225

09-052

OFFICE_150

09-054

OFFICE_150

09-056

OFFICE_120

09-058

OFFICE_120

09-060

OFFICE_120

09-062

OFFICE_150

09-064

OFFICE_150

09-066

H P

Pl ot te r

Ac cu rio Pr es s

Bi z

H ub

C

9-020

9-021

9-023

9-022

9-024

9-025

9-195

9-026 9-192

9-0279-133

9-019 9-018

9-088

9-0879-086

9-092 9-093

9-0919-095

9-089

9-090

9-098

9-099

9-097

9-100

9-096

9-108

9-109

9-110

9-111

9-112

9-113

9-117

9-107

9-114

9-076 9-199

9-080

9-078 9-079

9-084 9-085

9-083

9-094

ATL

WAP

09-21

ATL

WAP

09-20

ATL

WAP

09-17

W13 W14

W11 W12

ATL

WAP

09-19

W09 W10

ATL

WAP

09-02

9-076

ATL

WAP

09-18

W17 W18

9-118

9-119

9-120

9-028

9-103

9-104

9-102

9-105

9-101

9-106

9-029 9-030 9-031 9-032 9-034 9-035 9-124 9-036

9-121

9-183 9-184

9-125

W25 W26

9-017 9-016 9-015 9-014 9-013 9-012 9-010 9-009 9-008 9-007 9-005 9-004 9-003 9-002 9-0019-0069-011

9-071 9-070

9-073

9-072

9-074

9-187 9-188 9-065 9-064

9-068

9-186

9-065

9-066

W05 W06 9-063

9-062 9-060 9-059

9-173 9-174 9-175 9-176

9-180 9-179 9-178 9-177

9-193 9-194 9-168 9-169

9-172 9-171 9-170

9-160 9-161 9-162

9-165 9-164 9-163

9-152 9-153 9-154 9-155

9-159 9-158 9-157 9-156

9-061

9-058

9-057

9-056

9-055

9-054

9-053

9-052

9-166

9-050 9-0519-048 9-0499-0479-045 9-0469-043 9-044 9-039 9-042

9-0389-189

9-128

9-130

9-126

9-127

9-134 9-135

9-136 9-137

9-138 9-139 9-140

9-141

9-142 9-143

9-144 9-145

9-146 9-1479-148

9-149 9-150 9-151

9-132 9-1859-131

W01 W02

ATL

WAP

09-16

W07 W08

W29 W30

W27 W28

W01 W02

W23 W24

ATL

WAP

09-04

W21 W22

ATL

WAP

09-03

ATL

WAP

09-03

ATL

WAP

09-02ATL

WAP

09-04

W21 W22

W19 W20

W15 W16

W03 W04

9-069

VOICE/DATA SYMBOL LEGEND

SYMBOL DESCRIPTION CABLING

REQUIREMENTS

ROUGH-IN

REQUIREMENTS

ROUGH-IN ELEVATION

SHEET# DETAIL# ELEVATION#

SINGLE DATA STATION (1) CAT6 - - - -

MULTI-DATA STATION (2) CAT6 UNLESS NOTED

OTHERWISE - - - -

CEILING DATA, WIRELESS ACCESS POINT (1) CAT6 UNLESS NOTED

OTHERWISE - - - -

SINGLE DATA FLOORBOX (1) CAT6 - - - -

MULTI-DATA FLOORBOX DATA (2) CAT6 UNLESS NOTED

OTHERWISE - - - -

WALL FURNITURE FEED SEE FLOORPLAN - - - -

FLOOR CORE FURNITURE FEED SEE FLOORPLAN - - - -

PROJECT

LEVEL 09

VOICE/DATA

FLOOR PLAN

LV-01

4825 RIVER GREEN PKWY

DULUTH, GEORGIA 30096

Phone: 770-495-0798 www.ncicabling.com

FD

IC

AT

LA

NT

A

RO

/F O

TH

S

TR

EE

T

NW

AT

LA

NT

A, G

EO

RG

IA

VO

IC

E/

DA

TA

S

YS

TE

M S

DATE:

DRAWN BY:

CHECKED BY:

APPROVED BY:

JLB

JL

JL

JOB NUMBER:

REV# DATE:

REVISION TABLE

DESCRIPTION:

ASBUILTS

0000000

01-11-2024

01-11-2024

PRINTED SHEET SIZE: Arch E1 - 30" x 42"

Pu bl ish ed b y:

J L B

CO

PY

RI

GH

T

T

HI

S

IS

C

OP

YR

IG

HT

ED

A

ND

M

AY

N

OT

B E

US

ED

W

IT

HO

UT

W

RI

TT

EN

P

ER

M

IS

SI

ON

Ó

Scale:

LV-01

LEVEL 09 - VOICE/DATA FLOOR PLAN

1/8" = 1'

Section C - Description/Specifications/Work Statement PAGE 59 OF 141

CORHQ-25-R-0121

AutoCAD SHX Text @87"

AutoCAD SHX Text @87"

AutoCAD SHX Text @87"

AutoCAD SHX Text @87"

AutoCAD SHX Text

FF

AutoCAD SHX Text @87"

AutoCAD SHX Text @44"

AutoCAD SHX Text

FF

AutoCAD SHX Text

FF

AutoCAD SHX Text @87"

AutoCAD SHX Text

FF

AutoCAD SHX Text

FF

AutoCAD SHX Text

FF

AutoCAD SHX Text

FF

AutoCAD SHX Text @87"

AutoCAD SHX Text @44"

AutoCAD SHX Text @44"

AutoCAD SHX Text @44"

AutoCAD SHX Text @44"

AutoCAD SHX Text @44"

AutoCAD SHX Text @44"

AutoCAD SHX Text @44"

AutoCAD SHX Text @44"

AutoCAD SHX Text @44"

AutoCAD SHX Text @44"

AutoCAD SHX Text

FF

TRAINING

10-031

OFFICE_150

10-026

OPEN COLLAB

10-027

MEDIUM

CONFERENCE

10-024

OFFICE_120

10-022

OFFICE_120

10-020

OFFICE_150

10-018

COPY/PRINT

10-021

OFFICE_120

10-014

OFFICE_150

10-002

MEDIUM

CONFERENCE

10-000

FILE ROOM

10-017

COFFEE

10-016

IDF

10-019

GUN ROOM

10-015 EQUIP. ROOM

10-013

INTERVIEW RM

10-005

VAULT ROOM

10-011

FILE ROOM

10-009

EQUIP. ROOM

10-007

COPY/PRINT/STG

10-003

VISITORS RM

10-001

10-053

10-050

10-04610-044 10-052

10-03710-035 10-036

W07 W08

10-034

10-033

10-032

10-031 10-030

W09 W10

10-021

10-02010-019

10-018

10-023

10-022

10-024

10-027 10-028

10-025 10-026

W05 W06

10-017 10-016 10-015

10-059 10-012 10-011 10-009 10-00810-010

ATL

WAP

10-06

10-055 10-056

10-049

10-002

10-003 10-001

10-004 10-006

10-005 10-007

ATL

WAP

10-07

ATL

WAP

10-02

10-060

10-051

VOICE/DATA SYMBOL LEGEND

SYMBOL DESCRIPTION CABLING

REQUIREMENTS

ROUGH-IN

REQUIREMENTS

ROUGH-IN ELEVATION

SHEET# DETAIL# ELEVATION#

SINGLE DATA STATION (1) CAT6 - - - -

MULTI-DATA STATION (2) CAT6 UNLESS NOTED

OTHERWISE - - - -

CEILING DATA, WIRELESS ACCESS POINT (1) CAT6 UNLESS NOTED

OTHERWISE - - - -

SINGLE DATA FLOORBOX (1) CAT6 - - - -

MULTI-DATA FLOORBOX DATA (2) CAT6 UNLESS NOTED

OTHERWISE - - - -

WALL FURNITURE FEED SEE…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .