This is a Cooling Towers Checklist and Condition Assessment form for use by contractors performing preventive maintenance services for Pinellas County, Florida's comprehensive HVAC Systems and Related Services program. The document serves as an annual inspection and maintenance checklist that contractors must complete for each cooling tower asset and associated components covered under the contract. The checklist encompasses 31 cooling towers across the county's approximately 4.5 million square feet of facilities spanning more than 150 locations. Contractors must perform three annual preventive maintenance services per cooling tower unit, with services conducted during regular business hours (Monday-Friday, 7:00 AM-5:00 PM) and a mandatory three-hour emergency response time requirement. The initial contract term is 36 months from the award date with two optional 12-month renewal periods, with proposals due April 9, 2026, at 3:00 PM EST.
The checklist requires contractors to complete specific maintenance tasks including inspecting interior and exterior surfaces, checking drift eliminators and spray nozzles, cleaning fill components, servicing the ball float valve assembly, performing vibration analysis on tower fans, conducting motor insulation testing via Megger test, measuring motor voltage and amperage, and lubricating bearings with manufacturer-specified oil changes for gearboxes. The form explicitly excludes responsibility for equipment room conditions, water treatment and acid cleaning, corrosion or erosion damage, disconnect switches and circuit breakers, and complementary equipment such as cabinets and supply lines. Contractors must rate each component using a five-tier condition scale (Very Good, Good, Fair, Poor, and Failed) and submit completed documentation within 30 days of service completion as part of the Annual Preventive Maintenance documentation package, which supports Pinellas County's formal Condition Assessment and Remaining Useful Life projections for asset lifecycle planning.
View the file
Other files
Show all 44
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Page 2 of 2 Cooling Towers
INSTRUCTIONS FOR COMPLETING – CHECKLIST AND CONDITION ASSESSMENT The Contractor shall complete for each asset and its associated components covered under this contract. This form must be completed annually and submitted as part of the Annual Preventive Maintenance documentation package. Check off next to each completed task.
Location
Description
Inspect the condition/cleanliness of all interior and exterior surfaces.
Check the integrity of drift eliminators.
Check spray nozzles water distribution. Clean nozzles and remove debris.
Check fill for physical damage.
Remove sump strainer, clean and re-install.
Check condition and operation of ball float valve assembly (of electronic assembly). Reset to correct operational height allowing for pull down volume.
Coordinate with water treatment provider to check bleed flow rate and reset if required.
Check unit for unusual sound or vibration. Perform vibration analysis on tower fan.
Check for any water leaks.
Check fan motor, shaft and bearing operation.
Check vibration cut-out switch.
Lubricate bearings.
Change oil in gear box using manufacturer specified lubricant.
Perform Megger Insulation Test of motor per manufacturer’s specifications and schedule.
Notes
Start Value
Finish Value
Measure and record motor voltage and amperage and record the voltage and current imbalance. Compare amperage with rated amperage.
Notes
It is understood that the service and maintenance provided for herein DOES NOT include the following:
1) Responsibility for equipment room conditions or overall system performance.
2) Water treatment and acid cleaning.
3) Corrosion or erosion damage to the water side of equipment.
4) Disconnect switches and circuit breakers.
5) Complementary equipment (for example, but not confined to, the following: cabinets, fixtures, boxes, water supply lines, and drain lines).
Date:
Signature:
County Representative Signature:
Condition Rating Scale
Notes
| Scale |
| Description of Condition Rating Scale |
| Very Good |
| Component is in new or like-new condition with full performance capability. No corrective actions are required beyond routine preventive maintenance. |
| Good |
| Component is in acceptable operating condition, performing as intended, with no immediate corrective work required outside of scheduled preventive maintenance. |
| Fair |
| Component remains functional but is degraded or showing measurable wear. Increased monitoring and prioritization for future capital planning is required. |
| Poor |
| Component condition is unacceptable or nearing failure. Significant deterioration or recurring issues exist and near‑term replacement must be planned. |
| Failed |
| Component is nonfunctional, inoperable, or unsafe to operate. Immediate replacement or major corrective repair is required. |