Pumps_Checklist_&_Condition_Assesment.docx

DOCX document 19 KB Posted

Attached to
HVAC-Systems and Related Services
Solicitation number
26-0009-RFP
Issued by
Pinellas County, Florida

About this file

This is a Pumps Checklist and Condition Assessment document for Pinellas County, Florida's HVAC Systems and Related Services contract, which establishes a comprehensive preventive maintenance and condition assessment program for water-cooled chillers, air-cooled chillers, pumps, and cooling towers. The contractor must complete the checklist and condition assessment annually for each pump asset and submit the documentation as part of the Annual Preventive Maintenance package. The required maintenance tasks include inspecting pump condition and operation for wear, corrosion, or damage; recording flow, discharge, and suction readings; evaluating associated valves and flexible connections; inspecting pump-to-motor connections; cleaning and repainting exposed surfaces; verifying anchor and mounting security; tightening electrical terminals and cleaning contacts; performing Megger Insulation Tests on motors per manufacturer specifications; inspecting and cleaning strainers; lubricating bearings; and performing vibration analysis on all condenser, primary, and secondary pumps. All results and observations must be recorded on a log sheet, with documentation signed by both the contractor and County representative.

The condition assessment utilizes a standardized five-tier rating scale—Very Good, Good, Fair, Poor, and Failed—to classify component condition and guide maintenance prioritization and capital planning decisions. Very Good indicates new or like-new condition requiring only routine preventive maintenance, while Good denotes acceptable operating condition with no immediate corrective action needed. Fair indicates degraded or worn components requiring increased monitoring and prioritization for future capital planning. Poor signifies unacceptable condition nearing failure requiring near-term replacement planning, and Failed indicates nonfunctional or unsafe components requiring immediate replacement or major corrective repair. The contract requires contractors to submit a complete Annual Reporting Package including inspection documentation, test results, and formal Condition Assessment with Remaining Useful Life projections, along with participation in quarterly vendor performance meetings to ensure accountability and timely service delivery.

View the file

Other files

File Type Posted
HVAC-Systems_and_Related_Services.pdf PDF
HVAC-Systems_and_Related_Services.pdf PDF
HVAC-Systems_and_Related_Services.pdf PDF
26-0009_-_Insurance_Requirements_-_HVAC_Systems_and_Related_Services.docx DOCX document
26-0009_-_Insurance_Requirements_-_HVAC_Systems_and_Related_Services.docx DOCX document
26-0009_-_Insurance_Requirements_-_HVAC_Systems_and_Related_Services.docx DOCX document
Air_Cooled_Chillers_Checklist_&_Condition_Assesment.docx DOCX document
Cooling_Towers_Checklist_&_Condition_Assesment.docx DOCX document
Eddy_Current_Checklist_&_Condition_Assesment.docx DOCX document
Human_Trafficking_Affidavit_11.20.25.pdf PDF
Non-Competitive_Oversight_Committee_Justification_Form.docx DOCX document
Water_Cooled_Chillers_Checklist_&_Condition_Assesment.docx DOCX document
Foreign_Countries_of_Concern_Affidavit_12.11.2025.pdf PDF
Human_Trafficking_Affidavit_11.20.25.pdf PDF
Pumps_Checklist_&_Condition_Assesment.docx DOCX document
Cooling_Towers_Checklist_&_Condition_Assesment.docx DOCX document
Eddy_Current_Checklist_&_Condition_Assesment.docx DOCX document
Non-Competitive_Oversight_Committee_Justification_Form.docx DOCX document
Foreign_Countries_of_Concern_Affidavit_12.11.2025.pdf PDF
HVAC_Pricing.xlsx XLSX spreadsheet
HVAC_Systems_and_Related_Services_Scope.docx DOCX document
(26-0009-REQ)_CPM_HVAC_Systems_New_Contract_Fiscal_Review.docx DOCX document
Human_Trafficking_Affidavit_11.20.25.pdf PDF
Notice_of_Intent_to_Sole_Source_07-25-2023.pdf PDF
Water_Cooled_Chillers_Checklist_&_Condition_Assesment.docx DOCX document
HVAC_Pricing.xlsx XLSX spreadsheet
HVAC_Systems_and_Related_Services_Scope.docx DOCX document
(26-0009-REQ)_CPM_HVAC_Systems_New_Contract_Fiscal_Review.docx DOCX document
Common_Carrier_Attestation_02.05.2025.pdf PDF
Cooling_Towers_Checklist_&_Condition_Assesment.docx DOCX document
Notice_of_Intent_to_Sole_Source_07-25-2023.pdf PDF
Air_Cooled_Chillers_Checklist_&_Condition_Assesment.docx DOCX document
Common_Carrier_Attestation_02.05.2025.pdf PDF
HVAC_Pricing.xlsx XLSX spreadsheet
Pumps_Checklist_&_Condition_Assesment.docx DOCX document
(26-0009-REQ)_CPM_HVAC_Systems_New_Contract_Fiscal_Review.docx DOCX document
Common_Carrier_Attestation_02.05.2025.pdf PDF
Notice_of_Intent_to_Sole_Source_07-25-2023.pdf PDF
Air_Cooled_Chillers_Checklist_&_Condition_Assesment.docx DOCX document
Eddy_Current_Checklist_&_Condition_Assesment.docx DOCX document
Non-Competitive_Oversight_Committee_Justification_Form.docx DOCX document
Water_Cooled_Chillers_Checklist_&_Condition_Assesment.docx DOCX document
Foreign_Countries_of_Concern_Affidavit_12.11.2025.pdf PDF
HVAC_Systems_and_Related_Services_Scope.docx DOCX document
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Page 2 of 2 Pumps

INSTRUCTIONS FOR COMPLETING – CHECKLIST AND CONDITION ASSESSMENT The Contractor shall complete for each asset and its associated components covered under this contract. This form must be completed annually and submitted as part of the Annual Preventive Maintenance documentation package. Check off next to each completed task.

Location

Description

Check condition and operation of pump especially for signs of wear, corrosion or damage.

Check and record flow, discharge and suction readings or pump shut off head against performance curve.

Check condition and operation of associated valves and flexible connection especially for deterioration or leaks.

Check condition and operation of connection between pump and motor.

Check and clean exposed surfaces and touchup paint or protective coatings as required.

Check condition and security of all anchors and mountings.

Check and tighten all electrical terminals and check contacts for wear. Clean contacts with approved cleaner or replace if required.

Perform Megger Insulation Test of motor per manufacturer’s specifications and schedule.

Check condition of and clean strainer.

Lubricate motor and pump bearings as required.

Record all results (including observations) on a log sheet.

Perform vibration analysis on all condenser, primary, and secondary pumps.

Date:

Signature:

County Representative Signature:

Condition Rating Scale

Notes

Scale
Description of Condition Rating Scale
Very Good
Component is in new or like-new condition with full performance capability. No corrective actions are required beyond routine preventive maintenance.
Good
Component is in acceptable operating condition, performing as intended, with no immediate corrective work required outside of scheduled preventive maintenance.
Fair
Component remains functional but is degraded or showing measurable wear. Increased monitoring and prioritization for future capital planning is required.
Poor
Component condition is unacceptable or nearing failure. Significant deterioration or recurring issues exist and near‑term replacement must be planned.
Failed
Component is nonfunctional, inoperable, or unsafe to operate. Immediate replacement or major corrective repair is required.

File details come from the government source that posted it. Updated .