Eddy_Current_Checklist_&_Condition_Assesment.docx

DOCX document 18 KB Posted

Attached to
HVAC-Systems and Related Services
Solicitation number
26-0009-RFP
Issued by
Pinellas County, Florida

About this file

This is an Eddy Current Checklist and Condition Assessment document for Pinellas County, Florida's comprehensive Chiller Preventive Maintenance and Condition Assessment program for HVAC systems and related services. The checklist establishes standardized inspection and testing procedures that contractors must complete annually for water-cooled chiller assets and their associated components. Specific maintenance tasks include brushing 100 percent of condenser tubes, brushing 100 percent of evaporator tubes, and performing Eddy Current testing on 100 percent of evaporator tubes to proactively monitor internal tube integrity and prevent failure. The document requires contractors to complete the checklist annually and submit it as part of the Annual Preventive Maintenance documentation package, with certification through both contractor and County representative signatures and accompanying dates.

The Condition Rating Scale provided establishes five assessment levels for evaluating component status: Very Good (new or like-new condition requiring only routine preventive maintenance), Good (acceptable operating condition with no immediate corrective work needed), Fair (functional but degraded, requiring increased monitoring and capital planning prioritization), Poor (unacceptable condition nearing failure requiring near-term replacement planning), and Failed (nonfunctional, inoperable, or unsafe requiring immediate replacement or major repair). This structured assessment framework supports the County's long-term asset lifecycle planning and ensures documentation consistency across the chiller preventive maintenance program. Contractors must submit comprehensive Annual Reporting Packages including inspection documentation, test results, and formal Condition Assessments with Remaining Useful Life projections, with performance accountability maintained through quarterly vendor performance meetings and measurable service delivery metrics.

View the file

Other files

File Type Posted
HVAC-Systems_and_Related_Services.pdf PDF
HVAC-Systems_and_Related_Services.pdf PDF
HVAC-Systems_and_Related_Services.pdf PDF
26-0009_-_Insurance_Requirements_-_HVAC_Systems_and_Related_Services.docx DOCX document
26-0009_-_Insurance_Requirements_-_HVAC_Systems_and_Related_Services.docx DOCX document
26-0009_-_Insurance_Requirements_-_HVAC_Systems_and_Related_Services.docx DOCX document
Foreign_Countries_of_Concern_Affidavit_12.11.2025.pdf PDF
HVAC_Pricing.xlsx XLSX spreadsheet
HVAC_Systems_and_Related_Services_Scope.docx DOCX document
(26-0009-REQ)_CPM_HVAC_Systems_New_Contract_Fiscal_Review.docx DOCX document
Human_Trafficking_Affidavit_11.20.25.pdf PDF
Notice_of_Intent_to_Sole_Source_07-25-2023.pdf PDF
Water_Cooled_Chillers_Checklist_&_Condition_Assesment.docx DOCX document
Air_Cooled_Chillers_Checklist_&_Condition_Assesment.docx DOCX document
Cooling_Towers_Checklist_&_Condition_Assesment.docx DOCX document
Human_Trafficking_Affidavit_11.20.25.pdf PDF
Non-Competitive_Oversight_Committee_Justification_Form.docx DOCX document
Water_Cooled_Chillers_Checklist_&_Condition_Assesment.docx DOCX document
Foreign_Countries_of_Concern_Affidavit_12.11.2025.pdf PDF
Human_Trafficking_Affidavit_11.20.25.pdf PDF
Pumps_Checklist_&_Condition_Assesment.docx DOCX document
Cooling_Towers_Checklist_&_Condition_Assesment.docx DOCX document
Eddy_Current_Checklist_&_Condition_Assesment.docx DOCX document
Non-Competitive_Oversight_Committee_Justification_Form.docx DOCX document
HVAC_Pricing.xlsx XLSX spreadsheet
HVAC_Systems_and_Related_Services_Scope.docx DOCX document
(26-0009-REQ)_CPM_HVAC_Systems_New_Contract_Fiscal_Review.docx DOCX document
Common_Carrier_Attestation_02.05.2025.pdf PDF
Cooling_Towers_Checklist_&_Condition_Assesment.docx DOCX document
Notice_of_Intent_to_Sole_Source_07-25-2023.pdf PDF
Air_Cooled_Chillers_Checklist_&_Condition_Assesment.docx DOCX document
Common_Carrier_Attestation_02.05.2025.pdf PDF
HVAC_Pricing.xlsx XLSX spreadsheet
Pumps_Checklist_&_Condition_Assesment.docx DOCX document
(26-0009-REQ)_CPM_HVAC_Systems_New_Contract_Fiscal_Review.docx DOCX document
Common_Carrier_Attestation_02.05.2025.pdf PDF
Notice_of_Intent_to_Sole_Source_07-25-2023.pdf PDF
Pumps_Checklist_&_Condition_Assesment.docx DOCX document
Air_Cooled_Chillers_Checklist_&_Condition_Assesment.docx DOCX document
Eddy_Current_Checklist_&_Condition_Assesment.docx DOCX document
Non-Competitive_Oversight_Committee_Justification_Form.docx DOCX document
Water_Cooled_Chillers_Checklist_&_Condition_Assesment.docx DOCX document
Foreign_Countries_of_Concern_Affidavit_12.11.2025.pdf PDF
HVAC_Systems_and_Related_Services_Scope.docx DOCX document
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Page 2 of 2 Eddy Current Checklist

INSTRUCTIONS FOR COMPLETING – CHECKLIST AND CONDITION ASSESSMENT The Contractor shall complete for each asset and its associated components covered under this contract. This form must be completed annually and submitted as part of the Annual Preventive Maintenance documentation package. Check off next to each completed task.

Location

Description

Test 100% of the condenser tubes

Brush 100% of the evaporator tubes

Brush 100% of the condenser tubes

Eddy Current Test 100% of the evaporator tubes

Date:

Signature:

County Representative Signature:

Condition Rating Scale

Notes

Scale
Description of Condition Rating Scale
Very Good
Component is in new or like-new condition with full performance capability. No corrective actions are required beyond routine preventive maintenance.
Good
Component is in acceptable operating condition, performing as intended, with no immediate corrective work required outside of scheduled preventive maintenance.
Fair
Component remains functional but is degraded or showing measurable wear. Increased monitoring and prioritization for future capital planning is required.
Poor
Component condition is unacceptable or nearing failure. Significant deterioration or recurring issues exist and near‑term replacement must be planned.
Failed
Component is nonfunctional, inoperable, or unsafe to operate. Immediate replacement or major corrective repair is required.

File details come from the government source that posted it. Updated .