Eddy_Current_Checklist_&_Condition_Assesment.docx
DOCX document 18 KB Posted
- Attached to
- HVAC-Systems and Related Services
- Solicitation number
- 26-0009-RFP
- Issued by
- Pinellas County, Florida
About this file
This is an Eddy Current Checklist and Condition Assessment document for Pinellas County, Florida's comprehensive Chiller Preventive Maintenance and Condition Assessment program for HVAC systems and related services. The checklist establishes standardized inspection and testing procedures that contractors must complete annually for water-cooled chiller assets and their associated components. Specific maintenance tasks include brushing 100 percent of condenser tubes, brushing 100 percent of evaporator tubes, and performing Eddy Current testing on 100 percent of evaporator tubes to proactively monitor internal tube integrity and prevent failure. The document requires contractors to complete the checklist annually and submit it as part of the Annual Preventive Maintenance documentation package, with certification through both contractor and County representative signatures and accompanying dates.
The Condition Rating Scale provided establishes five assessment levels for evaluating component status: Very Good (new or like-new condition requiring only routine preventive maintenance), Good (acceptable operating condition with no immediate corrective work needed), Fair (functional but degraded, requiring increased monitoring and capital planning prioritization), Poor (unacceptable condition nearing failure requiring near-term replacement planning), and Failed (nonfunctional, inoperable, or unsafe requiring immediate replacement or major repair). This structured assessment framework supports the County's long-term asset lifecycle planning and ensures documentation consistency across the chiller preventive maintenance program. Contractors must submit comprehensive Annual Reporting Packages including inspection documentation, test results, and formal Condition Assessments with Remaining Useful Life projections, with performance accountability maintained through quarterly vendor performance meetings and measurable service delivery metrics.
View the file
Other files
Show all 44
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Page 2 of 2 Eddy Current Checklist
INSTRUCTIONS FOR COMPLETING – CHECKLIST AND CONDITION ASSESSMENT The Contractor shall complete for each asset and its associated components covered under this contract. This form must be completed annually and submitted as part of the Annual Preventive Maintenance documentation package. Check off next to each completed task.
Location
Description
Test 100% of the condenser tubes
Brush 100% of the evaporator tubes
Brush 100% of the condenser tubes
Eddy Current Test 100% of the evaporator tubes
Date:
Signature:
County Representative Signature:
Condition Rating Scale
Notes
| Scale |
| Description of Condition Rating Scale |
| Very Good |
| Component is in new or like-new condition with full performance capability. No corrective actions are required beyond routine preventive maintenance. |
| Good |
| Component is in acceptable operating condition, performing as intended, with no immediate corrective work required outside of scheduled preventive maintenance. |
| Fair |
| Component remains functional but is degraded or showing measurable wear. Increased monitoring and prioritization for future capital planning is required. |
| Poor |
| Component condition is unacceptable or nearing failure. Significant deterioration or recurring issues exist and near‑term replacement must be planned. |
| Failed |
| Component is nonfunctional, inoperable, or unsafe to operate. Immediate replacement or major corrective repair is required. |