Construction_Cost_Estimate_-_ALC_EMCOR_CVG_Airport_Master_Network_Install.pdf

PDF 201 KB Posted

Attached to
HVAC Controls and Infrastructure Upgrades
Solicitation number
26-003-ITB
Issued by
Bell County, Kentucky

About this file

This construction cost estimate is a proposal from EMCOR Services Automated Controls to the Kenton County Airport Board for HVAC Controls and Infrastructure Upgrades at Cincinnati/Northern Kentucky Airport (CVG Airport). The project involves the provision and installation of control panels across three airport locations: the Terminal, Concourse A, and Concourse B. Specifically, the scope includes eighteen control panels with associated power supplies and G5CE controllers for the Terminal; thirteen control panels with equivalent equipment for Concourse A; and sixteen control panels with equivalent equipment for Concourse B. The deliverables encompass power and communication cabling, programming, graphics generation, drawing and bill of materials updates, checkout procedures, alarming setup, scheduling and trending configurations, technical checkout, commissioning, air-balance support, as-built drawings, operation and maintenance manuals, and a one-year warranty. A pre-bid meeting and site visit were scheduled for Thursday, January 29, 2026 at 10:00 am at the Main Terminal Ticketing area. Questions were due by 11:59 pm on Monday, February 9, 2026 with answers posted by Thursday, February 12, 2026. Bids were required by Thursday, February 19, 2026 at 2:00 pm.

The total project cost is $542,265.00, comprised of $207,665.00 for Terminal panels, $150,000.00 for Concourse A panels, and $184,600.00 for Concourse B panels. EMCOR's general conditions specify that all work be performed during normal business hours Monday through Friday excluding holidays, with invoices rendered net fifteen days based on labor and material progress. A late payment charge of 1% per month applies to unpaid balances after thirty days. The quotation was subject to revision if not accepted within thirty days. The proposal explicitly excludes air balance costs, allowance costs, bonds, variable frequency drives, valve installation, smoke detectors, fire alarm scope, and taxes.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LEXINGTON

1165 Brock McVey Dr.

Lexington, KY 40509

P: 859.266.5300

CINCINNATI HQ

3976 Southern Ave

Cincinnati, OH 45227

P: 513.527.8040

COLUMBUS

1762 Dividend Dr.

Columbus, OH 43228

P: 614.529.7500

INDIANAPOLIS

3940 Pendleton Way

Indianapolis, IN 46226

P: 317.402.8039

EVANSVILLE

1321 Virginia St.

Evansville, IN 47711

P: 812.475.8665

LOUISVILLE

1833 Taylor Ave.

Louisville, KY 40213

P: 502.368.0454

MEMPHIS

485 E. South St.

Collierville, TN 38017

P: 502.368.0454

October 7, 2025

Todd Beuke

Master Industrial Maintenance Technician

Cincinnati/Northern Kentucky Airport tbeuke@cvgairport.com

RE: MW25-0220 – Master Network Layout Panel Installation

EMCOR is pleased to provide pricing for the equipment and labor as outlined below. This proposal is formatted to be as detailed and complete as possible so that the scope of work is clear and unambiguous. If there are any questions regarding this proposal, please do not hesitate to call.

Scope of Work:

Provide and install control panels for the Terminal:

o Eighteen (18) control panel and associated power supplies o Eighteen (18) G5CE, or equivalent, controller o Power and communication cabling o IP address defined by CVG IT

Provide and install control panels for Concourse A:

o Thirteen (13) control panel and associated power supplies o Thirteen (13) G5CE, or equivalent, controller o Power and communication cabling o IP address defined by CVG IT

Provide and install controls panels for Concourse B:

o Sixteen (16) control panel and associated power supplies o Sixteen(16) G5CE, or equivalent, controller o Power and communication cabling o IP address defined by CVG IT

Programming

Graphics

Drawing/BOM update

Checkout

Alarming

Control system devices/communication bus

Scheduling setup

Trending setup

Alarming setup

Technical checkout

Commissioning

Air-balance support

As-built drawings

O&M manuals

One-year warranty

General Notes & Exceptions:

o No air balance cost included o No allowance cost included o No bond cost included o No VFDs are included o No valve installation is included o No smoke detectors included o No fire alarm scope included o No taxes are included

Quotation:

Total for Terminal panels ...................................................................................... $207,665.00

Total for Concourse A panels ................................................................................ $150,000.00

Total for Concourse B panels ................................................................................. $184,600.00

Total for all .......................................................................................................... $542,265.00

General Conditions:

This proposal is based on all work being performed during normal working hours, Monday through Friday, excluding holidays.

Invoices are net fifteen days and rendered as labor and material progress on the job.

A late payment charge of 1½% per month (annual percentage rate of 18%) shall be added to the unpaid past due balance after 30 days.

This quotation is subject to revision if not accepted within 30 days.

To signify your acceptance, please sign below and return a copy of this proposal with your purchase order.

If you have any questions regarding this proposal, please contact me at (513) 484-4544.

Sincerely, EMCOR Services Automated Controls

Zachary Brown, CEM

Midwest Operations Manager, Controls

File details come from the government source that posted it. Updated .