About this file

This file contains plumbing design drawings and specifications for water treatment and distribution infrastructure at a Coldwater facility, prepared by Jones & Henry Engineers, Ltd. The documents detail the installation of a new water softening system in a treatment building and associated piping modifications at an existing welcome center. The project includes the removal of existing chemical feed, filters, softeners, and brine equipment, with replacement of a complete water softening setup featuring filters, softeners, brine tanks, backwash holding tanks, control panels, and associated mechanical components. Key specifications include 3-inch and 4-inch galvanized steel piping with pressure gauges, backflow preventers, air release valves, and emergency eyewash stations. The drawings indicate detailed elevation specifications, pipe sizing requirements, support systems using galvanized steel brackets and stanchion pipes at maximum 6-foot centers, and comprehensive plumbing connections for raw water intake, softened water distribution, backwash waste handling, and sanitary drain integration.

The project involves relocation of an existing water heater, expansion tank, and domestic hot water recirculation pump at the welcome center, with new 3-inch cold water piping connecting the treatment building to the welcome center system. Design specifications mandate 3-foot insulation requirements for exposed piping below grade, vacuum relief valve installation, and Type F wall sleeves positioned as close to finished floor as possible. All piping materials are specified as Schedule 80 PVC for raw water and galvanized steel for supported runs. The drawings include plan views with precise dimensional layouts, schematic diagrams of existing and new piping configurations, and detailed notes regarding installation requirements, material specifications, and support methodology. No pricing, bidding information, contract terms, or project timeline details are provided in these technical specification documents.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PLAN VIEW

Scale: 3/8" = 1'-0"

FDFD

BRINE TANK

3" SOFTENED

WATER

4" BACKWASH

WASTE TO LAGOON

BACKWASH

PUMP

MOP SINK

3" FINISHED WATER TO

EXIST. MECH ROOM

3" RAW WATER

FROM WELL

3" SCH. 80 PVC RAW WATER

℄ EL. 999.01

4" BACKWASH SUPPLY

℄ EL. 998.51

4" FILTER EFFLUENT TO

SOFTENERS ℄ EL. 989.22

42'-0"

'-0

SOFTENERS

EMERGENCY EYE

WASH & HOSE

3" OVERFLOW/VENT.

PIPE TO EXTERIOR.

PROVIDE 3" TYPE C

WALL SLEEVE AND

TURNDOWN ELBOW

WITH INSECT SCREEN

7'-0" x 2'-6" x 4"

DEEP SUMP FOR

SPILL CONTAINMENT

AA

PRESSURE

GAUGE

CHEMICAL METERING

PUMP STAND. SEE

DETAIL ON SHEET PD-1

4" MERCER RUBBER SERIES

500 FLEXIBLE CONNECTION

4"x3"

REDUCER

3" BACKFLOW PREVENTER

ON FINISHED WATER LINE

BB

FILTERS

STATIC MIXER

PRESSURE

TRANSDUCER

SOFTENER

CONTROL PANEL

1 1/2" SOFTENER

BACKWASH OUTLET TO

SANITARY. SEE DETAIL

THIS SHEET

BACKWASH

CONTROL PANEL

48"Ø BLADDER TANK

1'-0"

'-6

1'-6"16'-8"

'-1

1'-0"

'-3

2'-0"8'-4"

'-2

'-6

6"

3" RAW WATER TO WASTE

℄ EL. 999.01

BFV-319

B-1

B-2

B-3

1/2" AIR RELEASE VALVE

PIPE DRAIN TO FLOOR DRAIN

1/2" AIR RELEASE VALVE ON

SOFTENED WATER LINE AND

BACKFLOW SUPPLY LINE.

PIPE DRAINS TO MOP SINK

BACKWASH

HOLDING TANK

3" FINISHED

WATER ℄ EL. 989.97

48"x40"

SALT PALLET

BACKWASH TANK

FILL CONTROL VALVE

EXTEND WALL BRACKETS OFF

WALL TO SUPPORT PIPING

AT BEND LOCATIONS

HANG PIPES FROM WOOD

BLOCKING BETWEEN THE TRUSSES

AT 6'-0" C/C MAXIMUM, TYP.

REFER TO DETAIL 10 ON SHEET

S501. PROVIDE THE LATERAL

ANGLE SUPPORT AT EACH END OF

EACH PIPE RUN, TYP.

SUPPORT 3" AND 4" PIPING ALONG

WALLS WITH GALV. STEEL WALL

BRACKETS AND ZINC PLATED

ANCHORS AT 6'-0" C/C MAXIMUM,

TYP. PIPES SHALL BE GALV. STEEL

U-BOLTED TO BRACKETS.

NOTE:

PROVIDE GALVANIZED STANCHION PIPE SUPPORT WITH

SADDLE, U-BOLT TO PIPE AND ZINC PLATED ANCHORS

TO FLOOR AT 6'-0" MAXIMUM SPACING FOR 3" AND 4"

PIPES THAT ARE NEAR THE FLOOR. 1-1/2" BACKWASH

OUTLET FROM

SOFTENERS

8"x6" PVC REDUCER

6" SANITARY, SEE

PLUMBING PLAN

3" AIR GAP

BACKWASH OUTLET DETAIL

Scale: 1-1/2" = 1'-0"

Jones & Henry Engineers, Ltd.

Fluid thinking...

www.JHeng.com

R

Scott Goodsell Rectangle

Scott Goodsell Typewritten Text

WELCOME CENTER - EXISTING ENLARGED MECH FLOOR PLAN

SCALE: 1/4" = 1'-0"

WELCOME CENTER - EXISTING WATER SOFTENER PIPING SCHEMATIC

NTS

REMOVE PIPING AND CONNECT EXISTING 2" RAW

WATER PIPING TO EXISTING 2" BYPASS PIPE

REMOVE EXISTING CHEMICAL FEED, FILTERS,

SOFTENER, AND BRINE EQUIPMENT

EXISTING 2" RAW WATER INTO BUILDING

EXISTING 2" BYPASS

EXISTING 2" CW

FROM WELL

WELCOME CENTER - NEW PIPING PLAN

SCALE: 1/4" = 1'-0"

3" CW FROM

TREATMENT BUILDING

1" CW AND

SAMPLE TAP

3" CW

1-1/4" HW

1" LP GAS LINE TO RELOCATED WATER HEATER

EXPANSION TANK

WATER HEATER

3/4" RHW

DHWR PUMP

CUTAND CAP

EXISTING LP GAS LINE

TYPE F WALL SLEEVE. INSTALL AS

CLOSE TO FF AS POSSIBLE. INSULATE

EXPOSED PIPE TO 3'-0" BELOW GRADE.

RELOCATE EXISTING

WATER HEATER,

EXPANSION TANK,

AND DHWR PUMP

CONNECT 3" CW TO

SYSTEM PIPING IN ATTIC

EXISTING WATER HEATER PIPING DIAGRAM

NTS

(CONNECT NEW 3"

TO EXISTING)

NOTES:

1.) RUN VACUUM RELIEF VALVE PIPE

TO FLOOR DRAIN.

2.) REPIPE EXISTING PIPING

CONNECTIONS FOR RELOCATION.

NEW 3'-0" MAN DOOR

Jones & Henry Engineers, Ltd.

Fluid thinking...

www.JHeng.com

R

Scott Goodsell Rectangle

Scott Goodsell Typewritten Text

COLDWATER DWGS VOL 2 - PLUMB PT 1
COLDWATER DWGS VOL 3 - PLUMB PT 2

File details come from the government source that posted it. Updated .