Addendum No. 01 Dwgs 2 of 2_20200723.pdf

PDF 4 MB Posted

Attached to
591/19213. CDP; Coldwater WC - Ctr Well & Filtration Sys Rplc
Solicitation number
RFQ 171 200000000290 4
Issued by
Barry County, Michigan

About this file

This is an Addendum document containing detailed electrical and mechanical engineering drawings for a water treatment system installation at a Welcome Center facility. The project involves the installation of a new water filtration and softening system with associated electrical controls and monitoring equipment. Key components include a new Panel-E electrical distribution system (208/120V, 3-phase, 4-wire, 250A main lugs), a Precision Digital PD2-6200 flow totalizer remote display, a Promag W 400 electromagnetic flow meter, filter vessels with associated ball valves and solenoid controls, a Fleck water softener system with two vessels, a backwash supply pump control panel, a well pump control panel with variable frequency drive, and an OmniSite Crystal Ball monitoring system for remote equipment status and alarms. The project requires removal and relocation of existing equipment including a water heater, junction boxes, conduit, and power distribution components, with all new electrical and control wiring to be installed by the contractor or equipment manufacturer as specified.

The drawings provide comprehensive technical specifications including cable gauges (12 AWG and 250 MCM copper conductors), conduit sizes (ranging from 1/2" to 3/4"), signal transmission methods (analog 4-20 mA, digital inputs, and coaxial cables), and equipment locations within the mechanical room 108 and electrical room 106. The addendum specifies that existing panel components are to be removed with the box retained for owner use, that contractor responsibilities include extending power and control wires to relocated equipment locations, and that certain conduit and wiring will be supplied by the filter and softener manufacturer (ADEDGE) while other portions are contractor-installed. The engineering firm Jones & Henry Engineers, Ltd. is identified as the design professional for this project.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PANEL-E SCHEDULE

MDP (EXISTING)

ELECTRICAL ROOM

208/120V 3PH 4W

SIEMENS S4

MAIN BUS

600A 3P

250A 208V 3P

(4) 250 MCM CU + 4 AWG GND

2-1/2" C

PANEL-E

208/120V 3PH 4W

250A MAIN LUGS ONLY

ONE LINE DIAGRAM

Jones & Henry Engineers, Ltd.

Fluid thinking...

www.JHeng.com

R

20A

PANEL-B (EXISTING)

208/120V 3PH 4W

ELECTRIC ROOM 106

(2) 12 AWG CU + 12 AWG GND

1 (+)

2 (-)

6 (mA+)

4 (COM)

2/C 16 AWG TSP

1/2" C

PRECISION DIGITAL PD2-6200

FLOW TOTALIZER

REMOTE DISPLAY

MAIN/MECH ROOM 108

27 (-)

26 (+)+

6 (S1) BROWN

5 (E1) BROWN

7 (E2) WHITE

8 (S2) WHITE

4 (GND) GREEN

5 (E1)BROWN

7 (E2)WHITE

4 (GND)GREEN

37 (E) YELLOW

37 (E)YELLOW

36 (S) YELLOW

GND

GND

1 (L+/L)

2 (L-/N)

FIT/FE

PROLINE PROMAG W 400

WALL MOUNTED

REMOTE VERSION

FLOW METER TRANSMITTER

PROLINE PROMAG W 400

FLOW METER SENSOR

HOUSING

ELECTRODE CABLE

SUPPLIED BY VENDOR

COIL CURRENT CABLE

SUPPLIED BY VENDOR

(2) 12 AWG CU + 12 AWG GND

3/4" C

20A

PANEL-E

208/120V 3PH 4W

FLOW METER DIAGRAM

G N

G

L

20A PANEL-E

208/120V 3PH 4W

COAXIAL CABLE

OMNISITE OUTDOOR PHANTOM

ANTENNA BRACKET KIT W/ COAX

CABLE (S-CBL-CX-ABRK10)

OMNISITE CRYSTAL

BALL MONITOR

MONITOR INPUTS:

WELL PUMP RUNNING

BACKWASH PUMP RUNNING

FLOW METER (PULSE TOTALIZING)

ALARM INPUTS:

FLOOR FLOAT SWITCH

DOOR OPEN

BACKWASH HIGH DIFFERENTIAL PRESSURE

FILTER HIGH DIFFERENTIAL PRESSURE

FILTER CONTROL PANEL SYSTEM ALARM

FILTER (RESERVED - TBD)

SOFTENER HIGH DIFFERENTIAL PRESSURE

SOFTENER CONTROL PANEL SYSTEM ALARM

SOFTENER (RESERVED - TBD)

WELL PUMP FAIL

MONITOR PANEL DIAGRAM

(2) 12 AWG CU + 12 AWG GND

3/4" C

HAND

OFF

AUTO

X00

00X

T-STAT

EF-1

NEMA 4X

MANUAL STARTER

EF-1

DISCONNECT

SWITCH

L-1

LOUVER

EF-1

120VAC

PANEL-E CKT 4

EXHAUST FAN EF-1 SCHEMATIC

Jones & Henry Engineers, Ltd.

Fluid thinking...

208VAC 3PH

PANEL-E

CKT 25-27-29

LSH-316

LSL-317

PIT-302

BFV-319

BACKWASH SUPPLY PUMP

CONTROL PANEL

MCP-291

MAIN CONTROL PANEL

APU-26

ON FILTER SKID

120V 1PH

PANEL-E

CKT-9

CFP-131

ANALOG 4-20 mA

ANALOG 4-20 mA FEEDBACK

WATER INLET BFV-011A

SERVICE OUTLET BFV-012A

BACKWASH INLET BFV-013A

BACKWASH OUTLET BFV-014A

RINSE OUTLET BFV-015A

MAIN RAW INLET BFV-201A

MAIN BW INLET BFV-217A

VESSEL "201A" FIT-251A

WATER INLET BFV-011B

SERVICE OUTLET BFV-012B

BACKWASH INLET BFV-013B

BACKWASH OUTLET BFV-014B

RINSE OUTLET BFV-015B

MAIN RAW INLET BFV-201B

MAIN BW INLET BFV-217B

VESSEL "201B" FIT-251B

WATER INLET BFV-011C

SERVICE OUTLET BFV-012C

BACKWASH INLET BFV-013C

BACKWASH OUTLET BFV-014C

RINSE OUTLET BFV-015C

MAIN RAW INLET BFV-201C

MAIN BW INLET BFV-217C

VESSEL "201C" FIT-251C

JB-292

JUNCTION BOX

APUIX

ON SOFTENER SKID

VESSEL "126A" FIT-252A

FLECK VALVE FKV-126A

INLET SOLENOID SLV-149A

FIT-253

PT-263

PT-264

BFV-227

FLECK VALVE FKV-126B

INLET SOLENOID SLV-149B

VESSEL "126B" FE-252B

DIGITAL

DIGITAL

ANALOG 4-20mA

120VAC CONTROL

DIGITAL PUMP CONTROL + FEEDBACK

BW SUPPLY PUMP P-303

BW ISOLATION VALVE

BFV-303A

CONDUIT AND WIRING BY FILTER & SOFTENER MANUFACTURER (ADEDGE)

CONDUIT AND WIRING BY CONTRACTOR

SYSTEM INLET PT-261

SYSTEM OUTLET PT-262

PT-1 BLADDER

TANK

AN

AL

O G

-2

0m A

19 20

WELL PUMP

CONTROL PANEL/VFD

OMNISITE

CRYSTAL BALL

STATION MONITOR

DOOR ACCESS

CONTROLLER

ANALOG 4-20 mA 2

ANALOG 4-20 mA 3

DIGITAL

DIGITAL

DIGITAL 4

DIGITAL

DIGITAL 9

DIGITAL 7

DIGITAL 8

3 2

Jones & Henry Engineers, Ltd.

Fluid thinking...

EXISTING STORAGE ROOM

Scale: 1/4" = 1'-0"

WELCOME CENTER - EXISTING ENLARGED MECH. RM. 108 FLOOR PLAN

SCALE: 1/4" = 1'-0"

WELCOME CENTER - MECH. ROOM 108 REMOVAL PLAN

SCALE: 1/4" = 1'-0"

(SEE NOTE 3)

(SEE NOTE 3)

NOTES:

1. WATER HEATER RELOCATED BY OTHERS. CONTRACTOR TO EXTEND POWER AND CONTROL

WIRES TO NEW LOCATION.

2. LOCATE NEW PRECISION DIGITAL PD2-6200 FLOW TOTALIZER REMOTE DISPLAY ON WALL

NEAR DOOR. SEE FLOWMETER DIAGRAM, DRAWING E602.

3. CONTRACTOR TO REMOVE JUNCTION BOX AND ALL CONDUIT, POWER AND CONTROL

WIRES OF CHEMICAL FEED, FILTERS, SOFTENER, AND BRINE EQUIPMENT.

4. SEE RISER DIAGRAM, DRAWING E603.

5. REMOVE EXISTING PANEL BREAKERS, BUS WORK AND FEEDER FROM PANEL MOP IN

WELCOME CENTER ELECTRIC ROOM. INSTALL TERMINALS IN EXISTING PANEL ENCLOSURE

AND CONNECT TO EXISTING CIRCUIT BRANCH WIRING. EXTEND CIRCUIT WIRING TO NEW

PANEL 'D'.

6. EXISTING 208/120V PANEL IS TO HAVE ALL LOADS FROM IT DISCONNECTED. REMOVE

INCOMING POWER CABLES AND CONDUIT OF PANEL BACK TO ITS SOURCE. REMOVE ALL

POWER CABLES AND CONDUIT TO ITS LOADS WHICH WILL BE RECIRCUITED FROM NEW

PANEL-E. REMOVE ALL INTERIOR COMPONENTS OF EXISTING PANEL AND LEAVE BOX FOR

OWNER'S USE.

EXISTING HEATER

TO REMAIN

(TYP. 2)

EXISTING RECEPTACLE

(TYP. 4)

EXISTING

208/120V PANEL

SEE NOTE 6.

REMOVE EXISTING LIGHT

FIXTURE AND REPLACE PER

DRAWING E102. (TYP. 6)

FLOW TOTALIZER

REMOTE DISPLAY

(SEE NOTE 2)

WATER HEATER

(RELOCATED)

SEE NOTE 1

J

W.H.

A-10

WATER HEATER PREVIOUS

LOCATION (SEE NOTE 1)

Jones & Henry Engineers, Ltd.

Fluid thinking...