CO_FTNP_MEVE100(1)_Final_Plans.pdf

PDF 58 MB Posted

Attached to
CO FTNP MEVE 100(1) Cliff Palace and Mesa Top Loop Road
Solicitation number
6982AF20B000036
Issued by

About this file

This document outlines a federal contract opportunity for roadway reconstruction projects in Mesa Verde National Park. The solicitation is for Schedule A to reconstruct 4.70 miles of the Cliff Palace Loop roadway, Option W to reconstruct 4.23 miles of the Mesa Top Loop roadway, and additional options for an entrance roundabout, park maintenance road culverts, and rockfall and road repair work. The estimated total cost of the project is between $10 million and $14 million. The solicitation was issued by the Department of Transportation Federal Highway Administration to improve safety on the roadways which currently have substandard conditions like drop-offs, narrow lanes, poor sightlines, and minimal rockfall protection. The purpose is to increase safety, support economic development, reduce maintenance costs, enhance recreation, and preserve the transportation system in the national park.

View the file

Other files

File Type Posted
CO FTNP MEVE 100(1) Bid Tabs.pdf PDF
Bid Opening Summary.pdf PDF
A001.pdf PDF
Amended Final QnA 12.11.2020.pdf PDF
Final QnA 12.11.2020.pdf PDF
QnA 12.9.2020.pdf PDF
QnA 12.3.2020.pdf PDF
CO_FTNP_MEVE100(1)_Final_CrossSections 2of2.pdf PDF
6982AF20B000036.pdf PDF
CO_FTNP_MEVE100(1)_Final_CrossSections 1of2.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .