CO_FTNP_MEVE100(1)_Final_CrossSections 2of2.pdf
PDF 75 MB Posted
- Solicitation number
- 6982AF20B000036
About this file
This solicitation is for the CO FTNP MEVE 100(1) Cliff Palace and Mesa Top Loop Road project located in Mesa Verde National Park, Colorado. The project will improve approximately 9 miles of roadway including the Cliff Palace and Mesa Top loops to address substandard conditions such as drop-offs, narrow lanes, poor sightlines, and minimal rockfall protection. Work includes reconstruction of the Cliff Palace Loop, Mesa Top Loop, construction of an entrance roundabout, culverts, and rockfall and road repairs. The estimated total cost of the project is between $10 million and $14 million. The solicitation was issued by the Department of Transportation Federal Highway Administration as a full and open competition.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CO FTNP MEVE 100(1) Bid Tabs.pdf | ||
| Bid Opening Summary.pdf | ||
| A001.pdf | ||
| Amended Final QnA 12.11.2020.pdf | ||
| Final QnA 12.11.2020.pdf | ||
| QnA 12.9.2020.pdf | ||
| QnA 12.3.2020.pdf | ||
| CO_FTNP_MEVE100(1)_Final_Plans.pdf | ||
| 6982AF20B000036.pdf | ||
| CO_FTNP_MEVE100(1)_Final_CrossSections 1of2.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .