This bid opening summary document outlines the bids received for the CO FTNP MEVE 100(1) Cliff Palace and Mesa Top Loop Road project. Five contractors submitted bids for the base Schedule A Cliff Palace Loop reconstruction work, as well as optional additions including the Mesa Top Loop reconstruction (Option W), entrance roundabout construction (Option X), park maintenance road culvert installation (Option Y), and rockfall and road repair work (Option Z). Bid amounts ranged from $11,039,970.92 to $16,062,536.50 including all optional additions. The engineer's estimate for the total project cost was $12,336,928. The low bid was submitted by JITA Contracting, Inc. at $11,039,970.92. The Department of Transportation Federal Highway Administration is the agency seeking these road reconstruction and safety improvement services at Mesa Verde National Park in Colorado.

View the file

Other files

File Type Posted
CO FTNP MEVE 100(1) Bid Tabs.pdf PDF
A001.pdf PDF
Amended Final QnA 12.11.2020.pdf PDF
Final QnA 12.11.2020.pdf PDF
QnA 12.9.2020.pdf PDF
QnA 12.3.2020.pdf PDF
CO_FTNP_MEVE100(1)_Final_Plans.pdf PDF
CO_FTNP_MEVE100(1)_Final_CrossSections 2of2.pdf PDF
6982AF20B000036.pdf PDF
CO_FTNP_MEVE100(1)_Final_CrossSections 1of2.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Opening Summary

Project Name: Cliff Palace & Mesa Top Loop Roads Project Number: CO FTNP MEVE 100(1) & 101(1)

Bid Opening Date: 12/15/2020 Time: 2:00 p.m. MST

Bid Opening Location: Lakewood, CO Bid Opening Officer: Ryan Phillips

Amendments: A001

Bidder’s Name Schedule A Option W Option X Option Y Option Z Bid Total

1. JITA Contracting, Inc.

Durango, CO

$4,156,351.84 $4,334,024.13 $885,296.08 $713,609.80 $950,689.06 $11,039,970.92

2. OldCastle SW Group, Inc.

Durango, CO

$4,648,968.79

$4,681,909.97 $1,172,629.19 $840,904.59 $1,145,780.89 $12,490,190.43

3. Kissner General

Contractors, Inc.

Cedaredge, CO

$6,507,561.25 $6,051,035.95 $1,357,208.21 $980,160.09 $1,067,060.46 $15,963,025.97

4. A&S Construction, Co.

Canon City, CO

$7,024,465.20 $6,056,928.20 $1,258,360.00 $715,913.10 $1,006,870.00 $16,062,536.50

5. WCA Construction, LLC.

Towaoc, CO

$4,634,480.80 $4,166,598.30 $824,589.00 $612,950.00 $884,485.00 $11,123,103.10

Engineer’s Estimate

$5,009,901.00 $4,880,257.00 $871,770.00 $670,000.00 $905,000.00 $12,336,928.00