CO_FTNP_MEVE100(1)_Final_CrossSections 1of2.pdf
PDF 63 MB Posted
- Solicitation number
- 6982AF20B000036
About this file
This federal contract opportunity solicitation is for reconstruction and improvement projects along Mesa Top and Cliff Palace loop roads located in Mesa Verde National Park in Colorado. The solicitation includes Schedule A for 4.70 miles of reconstruction along Cliff Palace Loop, Option W for 4.23 miles of reconstruction along Mesa Top Loop, and additional options for an entrance roundabout, park maintenance road culverts, and rockfall and road repair work. The total estimated cost for the project is between $10 million and $14 million. The solicitation was issued by the Department of Transportation Federal Highway Administration to increase safety, maintain economic development, reduce costs, and enhance recreation along the roadways.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CO FTNP MEVE 100(1) Bid Tabs.pdf | ||
| Bid Opening Summary.pdf | ||
| A001.pdf | ||
| Amended Final QnA 12.11.2020.pdf | ||
| Final QnA 12.11.2020.pdf | ||
| QnA 12.9.2020.pdf | ||
| QnA 12.3.2020.pdf | ||
| CO_FTNP_MEVE100(1)_Final_Plans.pdf | ||
| CO_FTNP_MEVE100(1)_Final_CrossSections 2of2.pdf | ||
| 6982AF20B000036.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .