This justification document outlines a contract for roadway lighting on the CO FLAP US 36(1) Downtown Estes Park Loop project. The Federal Highway Administration Central Federal Lands Highway Division requires lighting systems from Amerilux, Leotek, and WJM totaling an estimated $435,000 in order to match existing infrastructure maintained by the Town of Estes and Colorado Department of Transportation. A justification is made under FAR 6.302-1 that only these name brand products are compatible with the current systems and readily available parts held by the maintaining agencies. The justification and solicitation will be posted publicly, and all costs will be analyzed to ensure fair and reasonable pricing. No market research was conducted due to the need for consistency with established specifications and systems.

View the file

Other files for this federal contract opportunity

Show all 23

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

JUSTIFICATION FOR OTHER THAN FULL AND OPEN COMPETITION

1. Identification of the agency and the contracting activity

Department of Transportation, Federal Highway Administration, Central Federal Lands Highway Division (CFLHD), 12300 Dakota Avenue, Lakewood, Colorado.

2. Nature and/or description of the action being approved

Justification and approval to use other than full and open competition to award a contract for the following name brands:

Lighting (see attached U-21)

Amerilux Leotek

WJM

3. Description of the supplies or services required to meet the agency’s needs

(including the estimated value)

The areas for these deliverables are roadway lighting. These items will all operated and/or maintained by the Town of Estes or the Colorado Department of Transportation.

These deliverables will match existing elements or systems within the project limits.

The total estimated amount of this product is as follows:

System Installation, Lighting $435,000.

4. Statutory authority permitting other than full and open competition

The authority to enter into a contract for this effort without full and open competition is 6.302-1, Only one responsible source and no other supplies or services will satisfy agency requirements.

5. Demonstration that the proposed contractor’s unique qualifications or the nature of the acquisition requires use of the authority cited

The name brand products are being prescribed for compatibility with existing systems and the maintaining agencies availability of the parts on hand. Other products would have system compatibility issues. Furthermore, the maintaining agency keeps excess stock of these items to replace them as needed.

6. Description of efforts made to ensure that offers are solicited from as many potential sources as is practicable, including whether a notice was or will be publicized

The Justification for Other than Full and Open Competition will be posted with the solicitation as required by FAR 5.102(a)(6).

7. Determination that the anticipated cost to the Government will be fair and reasonable

The FHWA will ensure that all costs associated with the proposed contract are fair and reasonable. The FHWA will perform a thorough analysis of the Offeror’s bid and/or proposal to substantiate this determination.

8. Description of the market research conducted and the results or a statement of the reason market research was not conducted

No market research was conducted. The decision to select these products are based on feedback from the maintaining partners and their standard specifications. The proposed products match the current, existing systems.

9. Other facts supporting the use of other than full and open competition

N/A.

10. A listing of the sources, if any, that expressed, in writing, an interest in the acquisition.

N/A

11. Statement of the actions, if any, the agency may take to remove or overcome any barriers to competition before any subsequent acquisition for the supplies or services required.

The purchase of the above listed products are a one-time buy to match the currently in-place systems for the Town of Estes. Replacing all existing systems is not economically viable and outside the scope of this project.

12. Certification

I certify that the information provided in this justification is complete and accurate to the best of my knowledge and belief.

Neil Ogden Date

Project Manager/COR

Ryan Phillips Date Contracting Officer

2022-08-25T13:56:12-0600
NEIL THOMAS OGDEN
2022-09-02T10:48:25-0600
RYAN DALE PHILLIPS

File details come from the government source that posted it. Updated .