This document provides details for a federal construction contract opportunity for the CO FLAP US 36(1) Downtown Estes Park Loop project. The project scope involves reconstructing and rehabilitating 2.3 miles of urban streets in Estes Park, Colorado, including construction of a new bridge, retaining walls, landscaping, irrigation, sidewalks, and a new roundabout. Schedule A covers work for the Downtown Loop, while Option X involves milling and overlaying 1.3 miles of West Elkhorn Avenue. The contract requires removal of walls, roadway and structure excavation, installation of mechanically stabilized earth and reinforced concrete retaining walls, placement of aggregate base and asphalt concrete pavement. The fixed completion date is December 15, 2024 with an early completion incentive date of July 26, 2024. The solicitation is being conducted by the Federal Highway Administration with involvement from the Town of Estes Park, National Park Service, and Colorado Department of Transportation as the project is located at the gateway to Rocky Mountain National Park.

View the file

Other files

Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CFLHD Organizational and Program Overview

CO FLAP US 36(1) Estes Park Loop Project Virtual Pre‐bid Information Meeting

September 15, 2022

Meeting Agenda

Project Background and Overview Contract Information Permit Information Questions

Project Background

Partnership between:

Federal Highway Administration Central Federal Lands Division (FHWA CFLHD) Town of Estes Park National Park Service (NPS) Colorado Department of Transportation (CDOT)

Administered by FHWA CFLHD

Gateway into Rocky Mountain National Park

Heavy tourist area in a mountainous environment

Project Overview – Project Location

Source: 2016 AECOM Environmental Assessment

Project Overview – Major Work Items

Schedule A: Downtown Estes Park Loop Bridge replacement Stream channel work Roundabout Retaining walls Storm drainage Utilities Roadway reconstruction Pavement preservation Traffic signal replacement/lighting Landscaping/Irrigation

Option X:

Pavement Preservation: West Elkhorn

Project Overview – Project Site Map

Project Overview – West Moraine

Roadway reconstruction

Concrete roundabout

MSE retaining wall

Storm drainage

Flatwork

Utilities

Project Overview – North Moraine and East Elkhorn

Mill and Fill with deep patches

Intersection reconstruction

Signal replacement at intersections

Utilities

Lighting

Pedestrian facilities

Project Overview – Riverside Dr.

Roadway reconstruction – Riverside Drive

Mill and Fill – Rockwell Street

Bridge Replacement (Ivy Street Bridge)

Stream channel work

Project Overview – Riverside and E. Elkhorn Intersection

Roadway reconstruction on approaches

Storm drainage

Utilities

Traffic signal replacement

Project Overview – Potential Staging/Storage Areas

Refer to Section 105 ROW Parcels AP 2 through AP 7

Project Overview – Utilities Coordination

Refer to Project Utility Sheets and Section 107 in Project Specifications for relocation and coordination information

Locate Utilities Pay Item

Project utilities (by contractor) Town of Estes electric/fiber optic, lighting, and water

Electric/Fiber – Design by contractor

Utility adjustments (by contractor) Estes Park and Upper Thomson Sanitation District

Third party utility coordination and relocation Excel TDS (communications) Century Link

All coordination and installation of utilities to be completed by contract completion

Contract Information – Completion Date

Fixed completion date: December 15, 2024

Early completion incentive: July 26, 2024 $1,000,000.00 Tiered by calendar day ($7,140/Day)

Contract Information – Public Traffic and Information

Public Traffic ‐ Refer to Section 156 Defines allowable full roadway and lane closures Local Roadways: Riverside Drive, Rockwell Street, and Craigs Drive CDOT Roadways: East Elkhorn (US34) and Moraine Ave (US36)

R4 Lane Closure Strategy Speed Limit Reduction Approvals

Refer to Section 110 Public Information Manager

Must meet minimum qualifications Not project superintendent, construction foreman, or traffic control manager

Public Meeting – prior to construction Progress Meetings Public Information Materials

Contract Information – Other Items

Appendixes A – CDOT Lighting and Traffic Specifications B – Town of Estes Park Water Standards C – Town of Estes Park Sanitation District Standards D – Town of Estes Park Light and Power Standards E – Town of Estes Park Community Wildfire Protection Plan F – Small Business Subcontracting Plan G – 401/404 Permits H – NPDES Permit I – FEMA‐CLOMR Permit

Reference Documents Town of Estes Park – Updated Night Noise Ordinance Geotechnical/Materials Report Hydraulics Report ROW Plans

Contract Information – Other Items

Small Business Subcontracting Plan HUBZone Price Preference Performance of Work by the Prime (30%) Option period – 90 days after award Bid bonds –originals only Field Lab (Government Furnished) – 154.04A Guaranteed* NTP date – 12/1/22 Explanation to Prospective Bidders – FAR 52.214‐6

*Subject to change between now and bid opening

Permit Information

401/404

NPDES

Town of Estes Park Floodplain Development Permit Town of Estes Park ROW Encroachment Permit CDOT Special Use/Utility Permit

Questions

Questions Responses will be provided in writing following meeting No questions will be accepted after September 30, 2022