CN-370000-HW558-DC013J.pdf
PDF 5 MB Posted
- Contract number
- HW558
- Issued by
- Florida
About this file
Task Assignment Summary
This document set consists of Task Assignment Notification Forms and supporting documentation for Florida Department of Environmental Protection (FDEP) Contract No. HW558, Task Assignment DC013J, awarded to Earth Systems for environmental remediation services at the former Jonfor Cleaners site in Jacksonville, Duval County, Florida (FDEP Facility ERIC_4542). The contract is managed by Margaret Power of FDEP's Bureau Waste Cleanup with contractor representative Richard Roberts. The task was executed between August 2017 and February 2018.
The task assignment encompasses three primary subtasks: Project Management (a percentage of overall project costs), TPOC (Temporary Point of Compliance) Well Installation and Sampling using direct-push technology to install a 35-foot PVC well with pre-packed screen for groundwater sampling, and Remedial Action Plan (RAP) preparation addressing soil and groundwater impacts from the former dry cleaning facility. The fixed-price task value is $11,663.35, split between two invoice milestones: $4,118.27 upon FDEP approval of TPOC well installation and sampling documentation (due October 31, 2017) and $7,545.08 upon FDEP approval of the Remedial Action Plan (due November 30, 2017). Supporting documentation includes detailed cost estimates, level-of-effort worksheets, and competitive quotes from three drilling subcontractors (Groundwater Protection at $1,890.00, Preferred Drilling Solutions at $2,040.00, and Environmental Drilling Service at $2,044.00), with Groundwater Protection selected as the lowest-cost provider for well installation work.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .