CN-370000-HW558-DC03G.pdf
PDF 6 MB Posted
- Contract number
- HW558
- Issued by
- Florida
About this file
This document is a Task Assignment Notification Form for Florida Department of Environmental Protection (FDEP) Contract No. HW558 issued to Earth Systems, Inc. The task assignment (DC003G, Module D282) designates the contractor to perform groundwater monitoring services at the Emerald Cleaners site located at 868 Blanding Boulevard in Orange Park, Florida (FDEP Site #109500844). The contract is managed by FDEP Contract Manager Miranda McClure, with Richard Roberts serving as the Contractor Representative.
Earth Systems will conduct two quarters of groundwater monitoring at the Emerald Cleaners site as part of Post Active Remediation Monitoring activities. The work comprises three subtasks: Project Management (Subtask 1), Quarter 1 Groundwater Monitoring (Subtask 2), and Quarter 2 Groundwater Monitoring with Semi-Annual Reporting (Subtask 3). The contractor will collect and sample groundwater from ten wells total, including seven monitoring wells (MW009, MW010, MW011, MW012, DW013, MW014, DW015) and two newly installed wells, analyzing samples for Volatile Organic Hydrocarbons using EPA Method 8260. Deliverables include field notes, sampling logs, laboratory analytical data, and a Semi-Annual Groundwater Monitoring Report with GIS tables and ADaPT logs. The task assignment is a fixed-price contract valued at $6,006.41 with no retainage. Performance period extends through October 30, 2015, with a final deliverable due date of August 31, 2015. Invoice schedule allocates $1,876.44 upon approval of Quarter 1 deliverables and $4,129.97 upon approval of the Semi-Annual Monitoring Report.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .