CN-370000-HW558-DC023E.pdf
PDF 420 KB Posted
- Contract number
- HW558
- Issued by
- Florida
About this file
This is a Task Assignment Notification Form under Florida Department of Environmental Protection (FDEP) Contract HW558, awarded to Earth Systems. The contract is managed by the FDEP's Bureau of Waste Cleanup, Division of Waste Management, with Killian Talley serving as the DEP Contract Manager. The task assignment pertains to groundwater monitoring activities at the Jet Cleaners site located at 7451 103rd Street, Jacksonville, Duval County, Florida (ERIC_4594). The document represents a fixed-price task assignment issued on November 30, 2020, and signed by contractual authority William E. Burns, Jr.
Task Assignment DC023E authorizes Earth Systems to conduct annual groundwater monitoring activities comprising two subtasks: Project Management (Subtask 1) and Annual Monitoring of Natural Attenuation (MNA) Sampling and Reporting (Subtask 2). The work includes collecting groundwater samples from 17 monitoring wells, measuring water levels, conducting field parameter analysis, and analyzing 17 groundwater samples for volatile organic compounds via EPA Method 8260B. Earth Systems will generate an Annual Monitoring of Natural Attenuation Report with updated tables, figures, laboratory analytical data, and recommendations. The total task assignment value is $6,955.17, consisting of $552.94 for Project Management and $6,402.23 for MNA Sampling and Reporting, representing 54 direct labor hours. The final deliverable—the Groundwater Monitoring Report and GIS/ADaPT data—is due March 30, 2021, with the task execution period extending through June 25, 2021. Invoice payment is contingent upon FDEP receipt and approval of the deliverables.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Task Assignment Notification/Change Order
Deliverables and Invoice Schedule Attachment
WCP TAFORM 04-2017
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Subtasks 1-2: Submittal of Groundwater Monitoring Report; GIS/ADaPT 03/30/2021
Subtasks 1-2: FDEP receipt and approval of Groundwater Monitoring Report;
GIS/ADaPT $ 6,955.17
$ 6,955.17
HW558
DC023E
Florida Department of Memorandum Environmental Protection
Printed on recycled paper.
To:
From:
Date:
HW558 Contract Negotiation File Jet Cleaners Jacksonville, Duval County
ERIC_4594
Killian Talley, Project Manager November 30, 2020
Subject: Negotiation Summary
HW558 DC023E
Task Assignment authorizes Earth Systems to conduct annual groundwater monitoring at the Jet Cleaners site.
Subtask 1: Project Management An automatic calculation based upon total direct labor hours determines the labor hours within this subtask.
Subtask 2: Annual MNA Sampling & Reporting Subtask includes costs and labor for Earth Systems to conduct groundwater sampling along with analysis and reporting. Field event will be comprised of the following activities; collection of depth to water will be measured from site monitoring wells, field parameters for geochemical data, and seventeen (17) groundwater samples for analysis of volatile organic compounds via EPA Method 8260B. Upon receipt of the groundwater analytical data, Earth Systems will generate an Annual Monitoring of Natural Attenuation Report outlining and describing the field event, procedures, and analytical results. The report will also provide conclusion and recommendations.
The FDEP Project Manager agrees to the scope of work and final cost associated with this Task Assignment. The final cost for this Task Assignment is $6,955.17 with 54 labor hours.
Earth Systems may invoice following the schedule established in the Deliverables and Invoice Schedule Attachment, which accompanies the Task Assignment Notification Form.
FDEP COST ESTI MATEContractor: Earth Systems
Date: 18-Nov-20
Task #: SubTask 1 Project Management SubTask 6
Site: Jet Cleaners # 7 SubTask 2 MNA Sampling 17 wells SubTask 7
Activity/Phase: MNA Sampling 2020 SubTask 3 SubTask 8
Project Manager: Crystal Posey SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category
$42.30 (Beardall) Project Manager 0 4.5 $42.30 (Beardall) Principal Manager 2 2 0 0 0 0 0 0 0 0 $34.65 Associate Eng./Geologist/Scientist 0 0 0 0 0 0 0 0 0 0 $40.62 (Paxton) Project Manager 20 20 0 0 0 0 0 0 0 0 $31.25 Associate Eng./Geologist/Scientist 0 0 0 0 0 0 0 0 0 0 $21.15 Staff Eng/Geologist/Scientist 0 0 0 0 0 0 0 0 0 0 $26.15 (Russell) Senior Technician/Field Geologist 2 2 0 0 0 0 0 0 0 0 $23.02 (Byrnes) Senior Technician/Field Geologist 22 22 0 0 0 0 0 0 0 0 $18.00 (Morse) Technician/Draftsperson II 2 2 0 0 0 0 0 0 0 0 $12.75 Technician/Draftsperson I 0 0 0 0 0 0 0 0 0 0 $17.00 (Meserve) Administrative Assistant 1 1 0 0 0 0 0 0 0 0 $10.75 General Office Clerk 0 0 0 0 0 0 0 0 0 0
$0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0
Total Hours 54 5 49 0 0 0 0 0 0 0 0
Direct Labor $1,697.33 $188.59 $1,508.74 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 63.00% $1,069.32 $118.81 $950.51 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 65.00% $1,103.26 $122.58 $980.68 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 34.00% $577.09 $64.12 $512.97 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $4,447.00 $494.10 $3,952.90 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Other Direct Costs $84.87 $9.43 $75.44 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Travel
FDEP COST ESTI MATEContractor: Earth Systems
Date: 18-Nov-20
Task #: SubTask 1 Project Management SubTask 6
Site: Jet Cleaners # 7 SubTask 2 MNA Sampling 17 wells SubTask 7
Activity/Phase: MNA Sampling 2020 SubTask 3 SubTask 8
Project Manager: Crystal Posey SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Vehicle Rental $194.00 $194.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $194.00 $194.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $1,188.00 $1,188.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $1,188.00 $1,188.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $65.00 $65.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $417.10 $417.10 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $114.50 $114.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $596.60 $596.60 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $6,510.47 $503.53 $6,006.94 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $444.70 $49.41 $395.29 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $6,955.17 $552.94 $6,402.23 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Jet Cleaners # 7
SUBTASK-2: MNA 2020
DATE: 11/18/2020
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Senior Tech. - T. Byrnes Travel time to and from site 2 days 2
Senior Tech. - T. Byrnes WL measurements and GW samples from 17 wells + Trip 17 wells (MW001, MW004, MW007, 20
IW001 through IW005, IW007 through IW012, DW001 through DW003. Analyses for 8260 compounds (VOHs).
Purge water treated and disposed onsite as non-haz per generator's knowledge.
Report:
G Beardall - Principal Manager Senior Report Review 2
J Paxton - Project Manager GW sampling report preparation 20
L. Russell - Field Geologist ADaPT (8 mins/well * 17 wells) 2
Shanon Meserve - Admin Assistant Compiling PDF of MNA report, printing and shipping hard copy 1
Kath Morse - Draft Person II Figures 2
TOTAL LABOR 49.0
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $32.50 day 2 $65.00
Shallow GWTR Sample Kit $208.55 day 2 $417.10
Portable Generator 5 KW $66.00 day 1 $66.00
Portable Compressor $48.50 day 1 $48.50
TOTAL EQUIPMENT $596.60
VEHICLE TYPE RATE UNIT USEAGE
Truck $97.00 day 2 $194.00
TOTAL VEHICLE $194.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
GW VOHs 17 wells plus Trip $66.00 17 1 $1,188.00
TOTAL LAB $1,188.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
TOTAL $0.00
FINAL --7/24/96
223 12th Avenue North, Jacksonville Beach, Florida 32250, Tel 904.247.0740, Fax 904.247.7650
Florida • Colorado • North Dakota • New Jersey
September 28, 2020
Ms. Crystal Posey Bureau of Waste Cleanup Division of Waste Management Florida Department of Environmental Protection 2600 Blair Stone Road, M. S. 4520 Tallahassee, Florida 32399-2400
Subject: Proposal to Conduct MNA Sampling 2020 Jet Cleaners # 7 7451 103rd Street, Jacksonville, Duval County, Florida
ERIC_4594
Dear Ms. Posey:
Earth Systems has prepared this proposal for conducting annual Monitoring of Natural Attenuation (MNA) sampling at the subject site. The tasks associated with this scope of work are as follows:
SUBTASK 1 – Project Management
Allowable costs for Project Management according to the Bureau of Waste Cleanup’s (BWC) contract with Earth Systems.
SUBTASK 2 – Annual MNA Sampling and Reporting
Earth Systems will mobilize a senior technician to the site to collect groundwater samples (with water level data) from 17 wells (MW001, MW004, MW007, IW001 through IW005, IW007 through IW012, DW001 through DW003). The samples will be analyzed for VOHs using EPA Method 8260. One trip blank will also be analyzed. All VOH samples will be analyzed by one of Earth Systems’ contract laboratories, Pace Analytical or Accutest. The well locations are depicted on the attached figure. The sampling event will take 2 days to complete. Th last groundwater sampling event was conducted in December 2019.
After receipt of the analytical results, Earth Systems will provide an Annual Monitoring of Natural Attenuation Report. The report will include updated tables and figures, the laboratory analytical data, and recommendations for additional work.
Proposal to MNA Sampling 2020 Jet Cleaners #7 7451 103rd Street Suite 30, Jacksonville, Florida
ERIC_4594
Cost and Schedule
The proposed cost and schedule for this project are provided in the table below.
Task Proposed
Cost Proposed Schedule/Deliverables
Subtask 1 – Project Management $552.94
May 30, 2021
Subtask 2 – Conduct 2019 MNA sampling and prepare MNA Report
$6,402.23
March 30, 2021 Groundwater sampling documentation, Laboratory Report, Annual MNA Report, GIS Tables, ADaPT Deliverables
Total/Completion Date $6,955.17
May 30, 2021
If you have questions or comments concerning this proposal, please contact me at
(904) 247-0740.
Sincerely, EARTH SYSTEMS
James Paxton Operations Manager
Figure 1
0 3015
( SCALE IN FEET )
SITE PLAN
LEGEND
AutoCAD SHX Text
1 STORY MASONRY BUILDING
AutoCAD SHX Text
"ASAP DENTAL CARE"
AutoCAD SHX Text
"NERDZ INK TATTOOS"
AutoCAD SHX Text
10' X 18' PARKING SPACES
AutoCAD SHX Text
9' X 16' PARKING SPACES
AutoCAD SHX Text
TRASH DUMPSTERS
AutoCAD SHX Text
CONCRETE PARKING
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
1 STORY MASONRY BUILDING
AutoCAD SHX Text
"DIVINE CUTZ"
AutoCAD SHX Text
"JC'S SEAFOOD"
AutoCAD SHX Text
CONCRETE WALK
AutoCAD SHX Text
CONCRETE WALK
AutoCAD SHX Text
COVERED CONCRETE WALK
AutoCAD SHX Text
COVERED CONCRETE WALK
AutoCAD SHX Text
ELECTRIC METER BANK
AutoCAD SHX Text
6" BOLLARDS
AutoCAD SHX Text
GRATE
AutoCAD SHX Text
STEP
AutoCAD SHX Text
8" MASONRY WALL
AutoCAD SHX Text
MW008
AutoCAD SHX Text
WOODEN FENCE
AutoCAD SHX Text
PLANTER
AutoCAD SHX Text
MW005
AutoCAD SHX Text
MW007
AutoCAD SHX Text
MW004
AutoCAD SHX Text
IW001
AutoCAD SHX Text
MW006
AutoCAD SHX Text
MW003
AutoCAD SHX Text
MW002
AutoCAD SHX Text
MW001
AutoCAD SHX Text
02/18 FIG1
AutoCAD SHX Text 7451-30 103rd Street
AutoCAD SHX Text Jet Cleaners #7
AutoCAD SHX Text Jacksonville, Florida
AutoCAD SHX Text
PLANTER
AutoCAD SHX Text
TATTOO STATIONS
AutoCAD SHX Text
LINOLEUM TILE
AutoCAD SHX Text
FORMER MACHNE LOCATION
AutoCAD SHX Text
FORMER STEAMER
AutoCAD SHX Text
FORMER FILTERS
AutoCAD SHX Text
STORAGE AREA
AutoCAD SHX Text
FORMER BOILER ROOM
AutoCAD SHX Text
REST ROOM
AutoCAD SHX Text
FORMER JET CLEANERS #7
AutoCAD SHX Text
TATTOO STATIONS
AutoCAD SHX Text N
AutoCAD SHX Text
DW001
AutoCAD SHX Text
IW004
AutoCAD SHX Text
IW003
AutoCAD SHX Text
IW002
AutoCAD SHX Text
IW005
AutoCAD SHX Text
1996 SOIL SAMPLE LOCATION
AutoCAD SHX Text
CPP
AutoCAD SHX Text
ELECTRIC METER BANK
AutoCAD SHX Text
6" BOLLARDS
AutoCAD SHX Text
IW006
AutoCAD SHX Text
IW007
AutoCAD SHX Text
IW008
AutoCAD SHX Text
IW009
AutoCAD SHX Text
DW002
AutoCAD SHX Text
IW010
AutoCAD SHX Text
CHAINLINK FENCE
AutoCAD SHX Text
WOODEN FENCE
AutoCAD SHX Text
VACANT BUILDING
AutoCAD SHX Text
CONCRETE SIDEWALK
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
IW012
AutoCAD SHX Text
IW011
AutoCAD SHX Text
DW003
AutoCAD SHX Text
UNDERGROUND SANITARY SEWER
AutoCAD SHX Text
UNDERGROUND STORM SEWER
AutoCAD SHX Text
SHALLOW MONITORING WELL LOCATION
AutoCAD SHX Text
INTERMEDIATE MONITORING WELL LOCATION
AutoCAD SHX Text
DEEP MONITORING WELL LOCATION
AutoCAD SHX Text
1996 SOIL SAMPLE LOCATION
AutoCAD SHX Text
OVERHEAD ELECTRIC LINE
AutoCAD SHX Text
UNDERGROUND GAS
AutoCAD SHX Text
UNDERGROUND WATER
AutoCAD SHX Text
UNDERGROUND FIBER OPTIC
File details come from the government source that posted it. Updated .