This document is a Task Assignment Notification Form under Florida Department of Environmental Protection (FDEP) Contract No. HW558, executed between the State of Florida and Earth Systems Environmental Engineering. The task assignment (DC015G) authorizes work at the Sunland Cleaners site located at 895 Fox Valley Drive, Suite 113, Longwood, Seminole County, Florida (ERIC_5475). The contract is managed by FDEP's Bureau of Waste Cleanup, with Killian Talley serving as the DEP Contract Manager and Jim Paxton as the Contractor Representative.

The task assignment authorizes Earth Systems to conduct annual groundwater monitoring activities at a fixed price of $4,605.87. The scope of work comprises two subtasks: Subtask 1 involves project management at a cost of $410.15 for 3 labor hours, and Subtask 2 encompasses annual monitoring and natural attenuation (MNA) sampling and reporting at a cost of $4,195.72 for 34 labor hours. The work includes groundwater sampling from six monitoring wells (MW001-MW005 and PZ003), field parameter measurements, collection of five groundwater samples for volatile organic compound analysis via EPA Method 8260B, laboratory analytical costs of $462.00, equipment and vehicle rental costs totaling $452.55, and preparation of a Natural Attenuation Monitoring Report with GIS/AdaPT mapping. The final deliverable—the Natural Attenuation Monitoring Report and GIS/AdaPT documentation—is due March 31, 2021, with invoice payment contingent upon FDEP receipt and approval. The task assignment period runs through June 25, 2021, with no retainage amounts applied.

View the file

Other files

File Type Posted
CN-370000-HW558-A1.pdf PDF
CN-370000-HW558-CO3.pdf PDF
CN-370000-HW558-DC001H.pdf PDF
CN-370000-HW558-DC002I.pdf PDF
CN-370000-HW558-DC005H.pdf PDF
CN-370000-HW558-DC007I.pdf PDF
CN-370000-HW558-DC007L.pdf PDF
CN-370000-HW558-DC008F.pdf PDF
CN-370000-HW558-DC009J.pdf PDF
CN-370000-HW558-DC010G.pdf PDF
CN-370000-HW558-DC011F.pdf PDF
CN-370000-HW558-DC012N.pdf PDF
CN-370000-HW558-DC013G.pdf PDF
CN-370000-HW558-DC013J.pdf PDF
CN-370000-HW558-DC013L.pdf PDF
CN-370000-HW558-DC015H.pdf PDF
CN-370000-HW558-DC01ACO2.pdf PDF
CN-370000-HW558-DC01ACO7.pdf PDF
CN-370000-HW558-DC01J.pdf PDF
CN-370000-HW558-DC020B-1.pdf PDF
CN-370000-HW558-DC020B-2.pdf PDF
CN-370000-HW558-DC020F.pdf PDF
CN-370000-HW558-DC022A.pdf PDF
CN-370000-HW558-DC022G.pdf PDF
CN-370000-HW558-DC024E.pdf PDF
CN-370000-HW558-DC025A.pdf PDF
CN-370000-HW558-DC026B.pdf PDF
CN-370000-HW558-DC027E.pdf PDF
CN-370000-HW558-DC028C.pdf PDF
CN-370000-HW558-DC029F.pdf PDF
CN-370000-HW558-DC02D.pdf PDF
CN-370000-HW558-DC02F.pdf PDF
CN-370000-HW558-DC02K.pdf PDF
CN-370000-HW558-DC02KCO1.pdf PDF
CN-370000-HW558-DC030C.pdf PDF
CN-370000-HW558-DC032A.pdf PDF
CN-370000-HW558-DC03E.pdf PDF
CN-370000-HW558-DC03JCO1.pdf PDF
CN-370000-HW558-DC03M.pdf PDF
CN-370000-HW558-DC04D.pdf PDF
CN-370000-HW558-DC04E.pdf PDF
CN-370000-HW558-DC04F.pdf PDF
CN-370000-HW558-DC04H.pdf PDF
CN-370000-HW558-DC04LCO1.pdf PDF
CN-370000-HW558-DC06E.pdf PDF
CN-370000-HW558-DC06ECO1.pdf PDF
CN-370000-HW558-DC07C.pdf PDF
CN-370000-HW558-DC07D.pdf PDF
CN-370000-HW558-DC07E.pdf PDF
CN-370000-HW558-DC07FCO1.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEP CONTRACT NO.

Task Assignment #: Module #: Grant #:

Contractor Name:

Contractor Representative:

DEP Contract Manager: Phone #:

DEP Site #:

Site Name:

Address(Street, City, County):

Phase:

Task Description [use additional pages if necessary]:

The Deliverable and Invoice Schedule is attached.

Final Deliverables:

Final Deliverable Due Date:

TASK ASSIGNMENT TYPE AND NOT TO EXCEED AMOUNTS:

FIXED FEE

RETAINAGE:

TOTAL TASK ASSIGNMENT VALUE: $0.00

DEP Task Manager:

DEP Contract Manager:

Contractual Authority:

Contractor Representative:

CC: Procurement Section (MS 93)

Section Representative ________

TASK ASSIGNMENT NOTIFICATION FORM

COST PLUS FIXED FEE

COST REIMBURSEMENT

FIXED PRICE FEE SCHEDULE

Period of Performance:

Execution of Task Assignment through:

DEP will review the deliverables to verify that they meet the specifications of this contract and task description. DEP’s Contract Manager shall notify the Contractor of any deficiencies in the deliverable(s) and shall give the Contractor reasonable opportunity to correct noted deficiencies and provide a revised deliverable(s).

WCP TAFORM 01_18

HW558

D000 N/ADC015G

Earth Systems

Jim Paxton

850-245-8928Killian Talley

ERIC_5475

Sunland Cleaners

895 Fox Valley Drive Suite 113, Longwood, Seminole

Monitoring

This Task Assignment authorizes Earth Systems to conduct annual groundwater monitoring activities in accordance with the attached scope of work and cost estimate.

Natural Attenuation Monitoring Report; GIS/ADaPT

03/31/2021

06/25/2021

$ 4,605.87 $ 0.00 $ 0.00 $ 0.00

$ 0.00

Killian Talley Digitally signed by Killian Talley Date: 2020.12.15 15:45:09 -05'00'

Killian Talley Digitally signed by Killian Talley Date: 2020.12.15 15:45:22 -05'00'

William E. Burns, Jr. Digitally signed by William E. Burns, Jr.

Date: 2020.12.16 09:27:07 -05'00'

Mark A. Tumeo Digitally signed by Mark A. Tumeo Date: 2020.12.17 13:00:50 -05'00'

$ 4,605.87

Task Assignment Notification/Change Order

Deliverables and Invoice Schedule Attachment

WCP TAFORM 04-2017

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

Subtasks 1-2: Submittal of Natural Attenuation Monitoring Report; GIS/ADaPT 03/31/2021

Subtasks 1-2: FDEP receipt and approval of Natural Attenuation Monitoring Report;

GIS/ADaPT $ 4,605.87

$ 4,605.87

HW558

DC015G

Florida Department of Memorandum Environmental Protection

Printed on recycled paper.

To: HW558 Contract Negotiation File Sunland Cleaners Longwood, Seminole County

ERIC_5475

From: Killian Talley, Project Manager Date: December 15, 2020 Subject: Negotiation Summary

HW558 DC015G

Task Assignment authorizes Earth Systems to conduct annual groundwater monitoring at the Sunland Cleaners site.

Subtask 1: Project Management An automatic calculation based upon total direct labor hours determines the labor hours within this subtask.

Subtask 2: Annual MNA Sampling & Reporting Subtask includes costs and labor for Earth Systems to conduct groundwater sampling along with analysis and reporting. Field event will be comprised of the following activities; collection of depth to water will be measured from site monitoring wells, field parameters for geochemical data, and five (5) groundwater samples for analysis of volatile organic compounds via EPA Method 8260B. Upon receipt of the groundwater analytical data, Earth Systems will generate a Natural Attenuation Monitoring Report outlining and describing the field event, procedures, and analytical results. The report will also provide conclusion and recommendations.

The FDEP Project Manager agrees to the scope of work and final cost associated with this Task Assignment. The final cost for this Task Assignment is $4,605.87 with 37 labor hours.

Earth Systems may invoice following the schedule established in the Deliverables and Invoice Schedule Attachment, which accompanies the Task Assignment Notification Form.

FDEP COST ESTI MATEContractor: Earth Systems

Date: 12/15/2020

Task #: SubTask 1 Project Management SubTask 6

Site: Sunland Cleaners SubTask 2 Annual MNA Sampling and Reporting SubTask 7

Activity/Phase: Annual MNA - 2021 SubTask 3 SubTask 8

Project Manager: Killian Talley SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category

$42.30 Project Manager (Paxton) 3 3.3 $0.00 Principal Manager 0 0 0 0 0 0 0 0 0 0

$42.30 Principal Manager(Tumeo PE) 2 2 0 0 0 0 0 0 0 0 $0.00 Senior Engineer/Geologist/Scientist 0 0 0 0 0 0 0 0 0 0

$40.62 Project Manager (J Paxton) 18 18 0 0 0 0 0 0 0 0 $0.00 Staff Engineer/Geolgist/Scientist 0 0 0 0 0 0 0 0 0 0

$23.02 Senior Technician (Byrnes) 9 9 0 0 0 0 0 0 0 0 $26.15 Staff Scientist (Russell) 1 1 0 0 0 0 0 0 0 0

$0.00 Technician/Draftsperson II 0 0 0 0 0 0 0 0 0 0 $18.00 Technician/Draftsperson Ii (Morse) 2 2 0 0 0 0 0 0 0 0 $17.00 Administrative Assistant (Meserve) 2 2 0 0 0 0 0 0 0 0

$0.00 General Office Clerk 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0

Total Hours 37 3 34 0 0 0 0 0 0 0 0

Direct Labor $1,258.98 $139.89 $1,119.09 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 63.00% $793.16 $88.13 $705.03 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 65.00% $818.34 $90.93 $727.41 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 34.00% $428.05 $47.56 $380.49 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $3,298.53 $366.51 $2,932.02 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Other Direct Costs $62.94 $6.99 $55.95 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

REV: 02/03 CEF EARTH SYSTEMS Page 1

FDEP COST ESTI MATEContractor: Earth Systems

Date: 12/15/2020

Task #: SubTask 1 Project Management SubTask 6

Site: Sunland Cleaners SubTask 2 Annual MNA Sampling and Reporting SubTask 7

Activity/Phase: Annual MNA - 2021 SubTask 3 SubTask 8

Project Manager: Killian Talley SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Travel

Vehicle Rental $97.00 $97.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $97.00 $97.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs $462.00 $462.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $462.00 $462.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $32.50 $32.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $208.55 $208.55 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $114.50 $114.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $355.55 $355.55 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $4,276.02 $373.50 $3,902.52 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $329.85 $36.65 $293.20 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $4,605.87 $410.15 $4,195.72 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

REV: 02/03 CEF EARTH SYSTEMS Page 2

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Sunland Cleaners SUBTASK: Annual MNA Sampling and Reporting

DATE: 12/15/2020

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

J Paxton - Project Manager Schedule job and notify off-site property owners 2

Terry Byrnes - Sr. Tech. Travel time to site (1 hr from Adams Cleaners) 1

GW samples (MW001, 002, 003, 004, 005, and PZ003) plus Trip Blank. 8

Analyses for VOHs via 8260C. Purge water treated and disposed on-site as non-haz per generator's knowledge.

Report:

M. Tumeo - Principal Manager Annual MNA report review 2

J Paxton - Project Manager Annual MNA report preparation 16

L. Russell - Staff Scientist ADaPT (8 mins/well * 8 wells) 1

S Meserve - Admin Compiling PDF of MNA report, printing and shipping hard copy 2

Kath Morse - Drafting Figures 1-4 2

34.0

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Shallow GW sampling kit $208.55 day 1 $208.55

Portable Compressor $48.50 day 1 $48.50

Expendables $32.50 day 1 $32.50

Portable Generator $66.00 day 1 $66.00

TOTAL EQUIPMENT $355.55

VEHICLE TYPE RATE UNIT USEAGE

Truck $97.00 day 1 $97.00

$0.00

TOTAL VEHICLE $97.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

6 wells, 1 TB, VOH by 8260B $66.00 6 1 $462.00

TOTAL LAB $462.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

TOTAL $0.00

FINAL --7/24/96

223 12th Avenue North, Jacksonville Beach, Florida 32250, Tel 904.247.0740, Fax 904.247.7650

Florida • Colorado • North Dakota • New Jersey

November 9, 2020

Mr. Killian Talley Bureau of Waste Cleanup Division of Waste Management Florida Department of Environmental Protection 2600 Blair Stone Road, M. S. 4520 Tallahassee, Florida 32399-2400

Subject: Proposal to Conduct 2021 Natural Attenuation Monitoring Sunland Cleaners

895 Fox Valley Drive, Suite 113, Longwood, Florida

ERIC_5475

Dear Mr. Talley:

Earth Systems has prepared this proposal for conducting annual Natural Attenuation Monitoring (NAM) sampling at the subject site. The tasks associated with this scope of work are as follows:

SUBTASK 1 – Project Management

Allowable costs for Project Management according to the Bureau of Waste Cleanup’s (BWC) contract with Earth Systems.

SUBTASK 2 – Annual MNA Sampling and Reporting

Earth Systems will mobilize a senior technician to the site to collect groundwater samples (with water level data) from 6 wells (MW001, MW002, MW003, MW004, MW005, and PZ003). The samples will be analyzed for VOHs using EPA Method 8260. One trip blank will also be analyzed. All VOH samples will be analyzed by one of Earth Systems’ contract laboratories, Pace Analytical or Accutest.

Note that this sampling will be conducted as a “milk run” by combining it with a sampling event at the nearby Adams Cleaners site. Combining the two sampling events will reduce the cost of mobilizing to the Orlando area. In this proposal, Earth Systems requests one hour to mobilize from Adams Cleaners to the Sunland site. The remaining mobilization time from Jacksonville to Orlando is incorporated into the Adams Cleaners sampling proposal.

Proposal to Conduct 2020 Annual MNA Sampling Sunland Cleaners, Longwood, Florida FDEP Facility No. ERIC_5475

After receipt of the analytical results, Earth Systems will provide a Natural Attenuation Monitoring Report. The report will include updated tables and figures, the laboratory analytical data, and recommendations for additional work.

Task Proposed

Cost Proposed Schedule/Deliverables

Subtask 1 – Project Management

$410.15

May 31, 2020

Subtask 2 – 2020 NAM GWS Sampling

$4,195.72 March 31, 2020 Submittal of NAM Report.

Total/Completion Date $4,605.87

May 31, 2020

If you have questions or comments concerning this proposal, please contact me at (904) 247-0740.

Sincerely, James Paxton Operations Manager

GROUNDWATER

ANALYTICAL MAP

(MARCH 2013 - JANUARY 2020)

Figure 2

0 6030

( SCALE IN FEET )

BOLD

11.4 5.2

11.7 4.6

5.5 13.4 26.9 16.1 6.5