CN-370000-HW558-DC017G.pdf

PDF 384 KB Posted

Attached to
Master Agreement FL|HW558|146f330b53bd60a9234ae2599bc7c6cc
Contract number
HW558
Issued by
Florida

About this file

This is a Task Assignment Notification Form issued by the Florida Department of Environmental Protection (FDEP) under DEP Contract No. HW558. The contract involves Earth Systems as the contractor, with Jim Paxton serving as the contractor representative and Killian Talley as the FDEP Contract Manager. The task assignment authorizes work at the Adams Cleaners site located at 2525 East South Street, Orlando, Orange County, Florida (DEP Site ERIC_5013).

The task assignment authorizes Earth Systems to conduct annual groundwater monitoring activities in the Monitoring phase, specifically the collection and analysis of groundwater samples followed by preparation of a Natural Attenuation Monitoring Report. Subtask 1 covers Project Management with allowable costs calculated automatically based on total direct labor hours. Subtask 2 encompasses Annual MNA Sampling and Reporting, including mobilization of a senior technician to collect groundwater samples from monitoring well MW010 and gauge wells MW002, MW004, MW007, MW008, MW009, and MW012, with analysis for volatile organic compounds via EPA Method 8260B, and preparation of a comprehensive Natural Attenuation Monitoring Report. The total task assignment value is $4,484.76 on a fixed price basis, comprised of $379.45 for Project Management and $4,105.31 for Annual MNA Sampling and Reporting, with 34 total labor hours allocated. The deliverable due date is March 31, 2021, and the period of performance extends through June 25, 2021. Invoice payment is contingent upon FDEP receipt and approval of the Natural Attenuation Monitoring Report and GIS/ADaPT submission.

View the file

Other files

File Type Posted
CN-370000-HW558-A3.pdf PDF
CN-370000-HW558-A5.pdf PDF
CN-370000-HW558-A7.pdf PDF
CN-370000-HW558-CO2.pdf PDF
CN-370000-HW558-DC001G.pdf PDF
CN-370000-HW558-DC005G.pdf PDF
CN-370000-HW558-DC005i.pdf PDF
CN-370000-HW558-DC012FCO.pdf PDF
CN-370000-HW558-DC013F.pdf PDF
CN-370000-HW558-DC017E.pdf PDF
CN-370000-HW558-DC017F.pdf PDF
CN-370000-HW558-DC017H.pdf PDF
CN-370000-HW558-DC018C.pdf PDF
CN-370000-HW558-DC019F.pdf PDF
CN-370000-HW558-DC019H.pdf PDF
CN-370000-HW558-DC01ACO4.pdf PDF
CN-370000-HW558-DC01E.pdf PDF
CN-370000-HW558-DC01F.pdf PDF
CN-370000-HW558-DC022D.pdf PDF
CN-370000-HW558-DC023F.pdf PDF
CN-370000-HW558-DC025B.pdf PDF
CN-370000-HW558-DC027G.pdf PDF
CN-370000-HW558-DC028A.pdf PDF
CN-370000-HW558-DC028F.pdf PDF
CN-370000-HW558-DC02C.pdf PDF
CN-370000-HW558-DC02E.pdf PDF
CN-370000-HW558-DC02EC01.pdf PDF
CN-370000-HW558-DC02L.pdf PDF
CN-370000-HW558-DC03J.pdf PDF
CN-370000-HW558-DC03L.pdf PDF
CN-370000-HW558-DC04G.pdf PDF
CN-370000-HW558-DC04J.pdf PDF
CN-370000-HW558-DC04L.pdf PDF
CN-370000-HW558-DC04MCO1.pdf PDF
CN-370000-HW558-DC05C.pdf PDF
CN-370000-HW558-DC08ECO1.pdf PDF
CN-370000-HW558-DC09GCO1.pdf PDF
CN-370000-HW558-DC09H.pdf PDF
CN-370000-HW558-DC09I.pdf PDF
CN-370000-HW558-DC09ICO1.pdf PDF
CN-370000-HW558-DC09ICO2.pdf PDF
CN-370000-HW558-DC10E.pdf PDF
CN-370000-HW558-DC11G.pdf PDF
CN-370000-HW558-DC11GCO1.pdf PDF
CN-370000-HW558-DC11GCO2.pdf PDF
CN-370000-HW558-DC11H.pdf PDF
CN-370000-HW558-DC11J.pdf PDF
CN-370000-HW558-DC11MCO1.pdf PDF
CN-370000-HW558-DC11oCO1.pdf PDF
CN-370000-HW558-DC12B.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEP CONTRACT NO.

Task Assignment #: Module #: Grant #:

Contractor Name:

Contractor Representative:

DEP Contract Manager: Phone #:

DEP Site #:

Site Name:

Address(Street, City, County):

Phase:

Task Description [use additional pages if necessary]:

The Deliverable and Invoice Schedule is attached.

Final Deliverables:

Final Deliverable Due Date:

TASK ASSIGNMENT TYPE AND NOT TO EXCEED AMOUNTS:

FIXED FEE

RETAINAGE:

TOTAL TASK ASSIGNMENT VALUE: $0.00

DEP Task Manager:

DEP Contract Manager:

Contractual Authority:

Contractor Representative:

CC: Procurement Section (MS 93)

Section Representative ________

TASK ASSIGNMENT NOTIFICATION FORM

COST PLUS FIXED FEE

COST REIMBURSEMENT

FIXED PRICE FEE SCHEDULE

Period of Performance:

Execution of Task Assignment through:

DEP will review the deliverables to verify that they meet the specifications of this contract and task description. DEP’s Contract Manager shall notify the Contractor of any deficiencies in the deliverable(s) and shall give the Contractor reasonable opportunity to correct noted deficiencies and provide a revised deliverable(s).

WCP TAFORM 01_18

HW558

D000 N/ADC017G

Earth Systems

Jim Paxton

850-245-8928Killian Talley

ERIC_5013

Adams Cleaners

2525 East South Street, Orlando, Orange

Monitoring

This Task Assignment authorizes Earth Systems to conduct annual groundwater monitoring activities in accordance with the attached scope of work and cost estimate.

Natural Attenuation Monitoring Report; GIS/ADaPT

03/31/2021

06/25/2021

$ 4,484.76 $ 0.00 $ 0.00 $ 0.00

$ 0.00

Killian Talley Digitally signed by Killian Talley Date: 2020.12.15 15:54:38 -05'00'

Killian Talley Digitally signed by Killian Talley Date: 2020.12.15 15:54:52 -05'00'

William E. Burns, Jr. Digitally signed by William E. Burns, Jr.

Date: 2020.12.16 12:27:12 -05'00'

Mark A. Tumeo Digitally signed by Mark A. Tumeo Date: 2020.12.17 13:04:01 -05'00'

$ 4,484.76

Task Assignment Notification/Change Order

Deliverables and Invoice Schedule Attachment

WCP TAFORM 04-2017

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

Subtasks 1-2: Submittal of Natural Attenuation Monitoring Report; GIS/ADaPT 03/31/2021

Subtasks 1-2: FDEP receipt and approval of Natural Attenuation Monitoring Report;

GIS/ADaPT $ 4,484.76

$ 4,484.76

HW558

DC017G

Florida Department of Memorandum Environmental Protection

Printed on recycled paper.

To: HW558 Contract Negotiation File Adams Cleaners Orlando, Orange County

ERIC_5013

From: Killian Talley, Project Manager Date: December 15, 2020 Subject: Negotiation Summary

HW558 DC017G

Task Assignment authorizes Earth Systems to conduct annual groundwater monitoring at the Adams Cleaners site.

Subtask 1: Project Management An automatic calculation based upon total direct labor hours determines the labor hours within this subtask.

Subtask 2: Annual MNA Sampling & Reporting Subtask includes costs and labor for Earth Systems to conduct groundwater sampling along with analysis and reporting. Field event will be comprised of the following activities; collection of depth to water will be measured from site monitoring wells, field parameters for geochemical data, and one (1) groundwater samples for analysis of volatile organic compounds via EPA Method 8260B. Upon receipt of the groundwater analytical data, Earth Systems will generate a Natural Attenuation Monitoring Report outlining and describing the field event, procedures, and analytical results. The report will also provide conclusion and recommendations.

The FDEP Project Manager agrees to the scope of work and final cost associated with this Task Assignment. The final cost for this Task Assignment is $4,484.76 with 34 labor hours.

Earth Systems may invoice following the schedule established in the Deliverables and Invoice Schedule Attachment, which accompanies the Task Assignment Notification Form.

FDEP COST ESTI MATEContractor: Earth Systems

Date: 12/15/2020

Task #: SubTask 1 Project Management SubTask 6

Site: Adams Cleaners SubTask 2 Annual MNA Sampling 2021 SubTask 7

Activity/Phase: Annual MNA Sampling SubTask 3 SubTask 8

Project Manager: Killian Talley SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category

$40.62 Project Manager (Paxton) 3 3.2 $42.30 Principal Manager(Tumeo) 2 2 0 0 0 0 0 0 0 0 $40.62 Project Manager (Paxton) 17 17 0 0 0 0 0 0 0

$0.00 Senior Engineer/Geologist/Scientist 0 0 0 0 0 0 0 0 0 0 $32.70 Associate Eng. 0 0 0 0 0 0 0 0 0 0

$0.00 Staff Engineer/Geolgist/Scientist 0 0 0 0 0 0 0 0 0 0 $23.02 Senior Technician (Byrnes) 9 9 0 0 0 0 0 0 0 $26.15 Field Geologist (Russell) 0 0.0 0.0 0.0 0.0 0 0 0 0 0

$0.00 Technician/Draftsperson I 0 0 0 0 0 0 0 0 0 0 $18.00 Technician/Draftsperson II (Morse) 2 2 0 0 0 0 0 0 0 0 $17.00 Administrative Assistant (Meserve) 1 1 0 0 0 0 0 0 0 0

$0.00 General Office Clerk 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0

Total Hours 34 3 31.0 0.0 0.0 0.0 0 0 0 0 0

Direct Labor $1,164.74 $129.42 $1,035.32 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 63.00% $733.78 $81.53 $652.25 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 65.00% $757.08 $84.12 $672.96 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 34.00% $396.01 $44.00 $352.01 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $3,051.61 $339.07 $2,712.54 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Other Direct Costs $58.24 $6.47 $51.77 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

REV: 02/03 CEF EARTH SYSTEMS Page 1

FDEP COST ESTI MATEContractor: Earth Systems

Date: 12/15/2020

Task #: SubTask 1 Project Management SubTask 6

Site: Adams Cleaners SubTask 2 Annual MNA Sampling 2021 SubTask 7

Activity/Phase: Annual MNA Sampling SubTask 3 SubTask 8

Project Manager: Killian Talley SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Travel

Vehicle Rental $97.00 $97.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $136.00 $136.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $233.00 $233.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs $132.00 $132.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $132.00 $132.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $32.50 $32.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $557.75 $557.75 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $114.50 $114.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $704.75 $704.75 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $4,179.60 $345.54 $3,834.06 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $305.16 $33.91 $271.25 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $4,484.76 $379.45 $4,105.31 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

REV: 02/03 CEF EARTH SYSTEMS Page 2

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Adams Cleaners SUBTASK: 2 Annual MNA Sampling 2020

DATE: 12/15/2020

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Project Manager - J. Paxton Schedule job and notify off-site property owners 1

Senior Tech. - T. Byrnes Travel time to and from site (2.5 hrs each way) 5

Senior Tech. - T. Byrnes

Collect GW sample from well MW010. Analyses for VOHs via 8260C. Purge water 4 treated and disposed onsite as non-haz per generator's knowledge. 1 Trip Blank VOHs

Gauge wells MW002, 004, 007, 008, 009, 011 and 0012.

Report:

M. Tumeo - Principal Manager. Annual MNA report review 2

J Paxton - Project Manager Annual MNA report preparation 16

S. Meserve - Admin Compiling PDF of MNA report, printing and shipping hard copy 1

Kath Morse - Drafting Figures 1-3 2

TOTAL LABOR 31.0

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Sample Shallow GW sampling kit $208.55 day 1 $208.55

Develop Deep GW Sampling Kit $349.20 day 1 $349.20

IDW Portable Compressor $48.50 day 1 $48.50

IDW Expendables $32.50 day 1 $32.50

IDW Portable Generator $66.00 day 1 $66.00

TOTAL EQUIPMENT $704.75

VEHICLE TYPE RATE UNIT USEAGE

Truck $97.00 day 1 $97.00

TOTAL VEHICLE $97.00

PER DIEM STAFF RATE UNIT USEAGE

Sr. Tech - Terry Byrnes - Meals $36.00 per day 1 $36.00

Sr. Tech - Terry Byrnes - Hotel $100.00 per day 1 $100.00

TOTAL PER DIEM $136.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

1 well, 1 TB, VOH by 8260B $66.00 1 1 $132.00

TOTAL LAB $132.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

TOTAL $0.00

FINAL --7/24/96

223 12th Avenue North, Jacksonville Beach, Florida 32250, Tel 904.247.0740, Fax 904.247.7650

Florida • Colorado • North Dakota • New Jersey

November 9, 2020

Mr. Killian Talley Bureau of Waste Cleanup Division of Waste Management Florida Department of Environmental Protection 2600 Blair Stone Road, M. S. 4520 Tallahassee, Florida 32399-2400

Subject: Proposal to Conduct Annual MNA Sampling

Adams Cleaners 2525 East South Street, Orlando, Florida FDEP No. ERIC_5013

Dear Mr. Talley:

Earth Systems has prepared this proposal for conducting annual Monitoring of Natural Attenuation (MNA) sampling at the subject site. This scope was agreed upon during Earth Systems annual contractor meeting on October 15, 2020. The tasks associated with this scope of work are as follows:

SUBTASK 1 – Project Management

Allowable costs for Project Management according to the Bureau of Waste Cleanup’s (BWC) contract with Earth Systems.

SUBTASK 2 – Annual MNA Sampling and Reporting

Earth Systems will mobilize a senior technician to the site to collect a groundwater sample (with water level data) from well MW010 and gauge wells MW002, MW004, MW007, MW008, MW009, and MW012. The samples will be analyzed for VOHs using EPA Method 8260. One trip blank will also be analyzed.

All VOH samples will be analyzed by one of Earth Systems contract laboratories, Pace Analytical. If the groundwater analytical results are below GCTLs, Earth Systems will submit a TACO to complete another round of groundwater sampling to achieve No Further Action.

After receipt of the analytical results, Earth Systems will provide an Annual Monitoring of Natural Attenuation Report. The report will include updated tables and figures, the laboratory analytical data, and recommendations for additional work.

Proposal to Annual MNA Sampling Adams Cleaners, Orlando, Florida

ERIC_5013

Note that this sampling will be conducted as a “milk run” by combining it with a sampling event at the nearby Sunland Cleaners site. Combining the two sampling events will reduce the cost of mobilizing to the Orlando area. In this proposal, Earth Systems requests 2.5 hours to mobilize from Jacksonville to Adams Cleaners and one night of per diem. Earth Systems will sample Sunland Cleaners the next business day.

Task Proposed

Cost Proposed Schedule/Deliverables

Subtask 1 – Project Management $379.45

May 31, 2021

Subtask 2 – 2021 MNA GWS Sampling

$4,105.31 March 31, 2021 Submittal of MNA Report.

Total/Completion Date $4,484.76

May 31, 2020

If you have questions or comments concerning this proposal, please contact me at (904) 247-0740.

Sincerely, James Paxton Operations Manager

GROUNDWATER

ANALYTICAL MAP

(AUGUST 2007 -

JANUARY 2020)

Figure 2

0 2010

( SCALE IN FEET )

LEGEND

BOLD

0.42 1.3

0.68 2.6

0.69

4.16

4.98 3.8 4.2 28.8

File details come from the government source that posted it. Updated .