CN-370000-HW558-DC05B.pdf
PDF 798 KB Posted
- Contract number
- HW558
- Issued by
- Florida
About this file
This is a Task Assignment Notification Form under Florida Department of Environmental Protection Contract HW558, Module D002, establishing a biennial groundwater monitoring task assignment (DC005B) with Earth Systems, the contractor, and Miranda McClure serving as the DEP Contract Manager. The task assignment was executed at Miller Machinery facility located at 601 East Church Street, Jacksonville, Florida (DEP Site #16/9502637). The contract documentation includes memoranda, cost estimates, level of effort worksheets, and site monitoring plans prepared by Earth Systems with supporting coordination from Geoff Beardall and Jim Paxton.
Earth Systems will perform biennial natural attenuation monitoring at the Miller Machinery site during May 2013, including water level measurements from six wells and groundwater sampling from three monitoring wells (MW200, MW301, and MW311) for volatile organic hydrocarbon analysis using EPA Method 8260C. Purge water will be treated onsite via sparging and disposed of as non-hazardous waste per the generator's knowledge. The fixed-price task assignment value is $1,996.06 with no retainage, fee schedule, or cost reimbursement components. The final deliverable is a Biennial Groundwater Monitoring Report due June 28, 2013, with invoice payment contingent upon submittal and FDEP approval of the BMNA report, GIS tables, and EDD error logs. The Level of Effort worksheet details 18.0 total labor hours, equipment costs of $393.50, vehicle costs of $97.00, and laboratory costs of $264.00 for VOH analysis of four samples.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .