This document is a Task Assignment Notification Form issued by the Florida Department of Environmental Protection (FDEP) under DEP Contract No. HW558, authorizing Earth Systems to perform groundwater monitoring services at the American Drive-In Cleaners site located at 4178 Herschel Street, Jacksonville, Duval County, Florida (FDEP Site ERIC_4570). The task assignment was executed in December 2020 with signatures from FDEP Task Manager and Contract Manager Killian Talley, Contractual Authority William E. Burns, Jr., and Contractor Representative Mark A. Tumeo of Earth Systems.
The task assignment authorizes Earth Systems to conduct annual groundwater monitoring activities consisting of two subtasks: Subtask 1 involves project management with allowable costs calculated automatically based on total direct labor hours, and Subtask 2 encompasses annual Monitoring of Natural Attenuation (MNA) sampling and reporting. Subtask 2 includes groundwater sampling from eleven monitoring wells, measurement of water levels, collection of five groundwater samples analyzed for volatile organic compounds via EPA Method 8260B, and preparation of a Natural Attenuation Monitoring Report with updated tables, figures, laboratory data, and recommendations. The final deliverable, due August 31, 2021, is the Natural Attenuation Monitoring Report with GIS/ADaPT documentation. The total task assignment value is $4,886.41 on a fixed price basis, comprising $448.65 for Subtask 1 and $4,437.76 for Subtask 2, with 43 total labor hours allocated. Invoice payment is due upon FDEP receipt and approval of the Natural Attenuation Monitoring Report. The period of performance extends through November 19, 2021.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEP CONTRACT NO.
Task Assignment #: Module #: Grant #:
Contractor Name:
Contractor Representative:
DEP Contract Manager: Phone #:
DEP Site #:
Site Name:
Address(Street, City, County):
Phase:
Task Description [use additional pages if necessary]:
The Deliverable and Invoice Schedule is attached.
Final Deliverables:
Final Deliverable Due Date:
TASK ASSIGNMENT TYPE AND NOT TO EXCEED AMOUNTS:
FIXED FEE
RETAINAGE:
TOTAL TASK ASSIGNMENT VALUE: $0.00
DEP Task Manager:
DEP Contract Manager:
Contractual Authority:
Contractor Representative:
CC: Procurement Section (MS 93)
Section Representative ________
TASK ASSIGNMENT NOTIFICATION FORM
COST PLUS FIXED FEE
COST REIMBURSEMENT
FIXED PRICE FEE SCHEDULE
Period of Performance:
Execution of Task Assignment through:
DEP will review the deliverables to verify that they meet the specifications of this contract and task description. DEP’s Contract Manager shall notify the Contractor of any deficiencies in the deliverable(s) and shall give the Contractor reasonable opportunity to correct noted deficiencies and provide a revised deliverable(s).
WCP TAFORM 01_18
HW558
D000 N/ADC012N
Earth Systems
Jim Paxton
850-245-8928Killian Talley
ERIC_4570
American Drive-In Cleaners
4178 Herschel Street, Jacksonville, Duval
Monitoring
This Task Assignment authorizes Earth Systems to conduct annual groundwater monitoring activities in accordance with the attached scope of work and cost estimate.
Natural Attenuation Monitoring Report; GIS/ADaPT
08/31/2021
11/19/2021
$ 4,886.41 $ 0.00 $ 0.00 $ 0.00
$ 0.00
Killian Talley Digitally signed by Killian Talley Date: 2020.12.15 15:20:49 -05'00'
Killian Talley Digitally signed by Killian Talley Date: 2020.12.15 15:20:59 -05'00'
William E. Burns, Jr. Digitally signed by William E. Burns, Jr.
Date: 2020.12.16 09:23:06 -05'00'
Mark A. Tumeo Digitally signed by Mark A. Tumeo Date: 2020.12.17 13:37:34 -05'00'
$ 4,886.41
Task Assignment Notification/Change Order
Deliverables and Invoice Schedule Attachment
WCP TAFORM 04-2017
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Subtasks 1-2: Submittal of Natural Attenuation Monitoring Report; GIS/ADaPT 08/31/2021
Subtasks 1-2: FDEP receipt and approval of Natural Attenuation Monitoring Report;
GIS/ADaPT $ 4,886.41
$ 4,886.41
HW558
DC012N
Florida Department of Memorandum Environmental Protection
Printed on recycled paper.
To: HW558 Contract Negotiation File American Drive-In Cleaners Jacksonville, Duval County
ERIC_4570
From: Killian Talley, Project Manager Date: December 15, 2020 Subject: Negotiation Summary
HW558 DC012N
Task Assignment authorizes Earth Systems to conduct annual groundwater monitoring at the American Drive-In Cleaners site.
Subtask 1: Project Management An automatic calculation based upon total direct labor hours determines the labor hours within this subtask.
Subtask 2: Annual MNA Sampling & Reporting Subtask includes costs and labor for Earth Systems to conduct groundwater sampling along with analysis and reporting. Field event will be comprised of the following activities; collection of depth to water will be measured from site monitoring wells, field parameters for geochemical data, and five (5) groundwater samples for analysis of volatile organic compounds via EPA Method 8260B. Upon receipt of the groundwater analytical data, Earth Systems will generate a Natural Attenuation Monitoring Report outlining and describing the field event, procedures, and analytical results. The report will also provide conclusion and recommendations.
The FDEP Project Manager agrees to the scope of work and final cost associated with this Task Assignment. The final cost for this Task Assignment is $4,886.41 with 43 labor hours.
Earth Systems may invoice following the schedule established in the Deliverables and Invoice Schedule Attachment, which accompanies the Task Assignment Notification Form.
FDEP COST ESTI MATE
Contractor: Earth Systems
Date: 15-Dec-20
Task #: SubTask 1 Project Management SubTask 6
Site: American Drive-In Cleaners SubTask 2 MNA 2021 SubTask 7
Activity/Phase: MNA 2021 SubTask 3 SubTask 8
Project Manager: Killian Talley SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category
$42.30 Principal Manager (M. Tumeo) 4 3.6 $42.30 Principal Manager (M. Tumeo) 2 2 0 0 0.0 0 0 0 0 0 $40.62 Project Manager (Paxton) 18 18 0 0 0 0 0 0 0 0 $23.02 Senior Technician/Field Geologist (T. Byrnes 12 12 0 0 0 0 0 0 0 0 $21.63 Senior Technician/Field Geologist 0 0 0 0 0 0 0 0 0 0 $26.15 Senior Technician/Field Geologist (L. Russel 1 1 0 0.0 0 0 0 0 0 0 $17.00 Administrative Assistant (S Meserve) 2 2 0 0 0.0 0 0 0 0 0 $18.00 Technicia/Draftsperson II (Katherine Morse) 4 4 0 0 0 0 0 0 0 0 $17.60 Technician/Draftsperson II 0 0 0 0 0 0 0 0 0 0 $12.75 Technician/Draftsperson I 0 0 0 0 0 0 0 0 0 0 $14.00 Administrative Assistant 0 0 0 0 0 0 0 0 0 0
$0.00 General Office Clerk 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0
Total Hours 43 4 39 0 0 0.0 0 0 0 0 0
Direct Labor $1,377.17 $153.02 $1,224.15 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 63.00% $867.61 $96.40 $771.21 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 65.00% $895.16 $99.46 $795.70 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 34.00% $468.24 $52.03 $416.21 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $3,608.18 $400.91 $3,207.27 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Other Direct Costs $68.86 $7.65 $61.21 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
FDEP COST ESTI MATE
Contractor: Earth Systems
Date: 15-Dec-20
Task #: SubTask 1 Project Management SubTask 6
Site: American Drive-In Cleaners SubTask 2 MNA 2021 SubTask 7
Activity/Phase: MNA 2021 SubTask 3 SubTask 8
Project Manager: Killian Talley SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Travel
Vehicle Rental $97.00 $97.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $97.00 $97.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) Contract Rate $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $396.00 $396.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $396.00 $396.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $32.50 $32.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $323.05 $323.05 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $355.55 $355.55 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $4,525.59 $408.56 $4,117.03 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $360.82 $40.09 $320.73 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $4,886.41 $448.65 $4,437.76 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : American Drive-In Cleaners
SUBTASK -2: MNA 2021
DATE: 12/15/2020
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Senior Tech. - T. Byrnes Mobilization (2 hour) 12
Collect GW Samples from wells MW003, MW004, MW005, MW007,and MW011 plus a Trip Blank. All wells will be sampled for VOHs via 8260. Also measure water levels in wells MW001, MW002, MW006, MW008, MW010, MW012.
Report:
Principal Manager - Mark Tumeo Senior Report Review 2
Project Manager - J Paxton Report Writing 18
Field Geologist - L. Russell ADaPT (5 wells) 1
Drafting - Katherine Morse Create maps and figures 4
Admin - S Meserve Scanning, copying, mailing 2
TOTAL LABOR 39.0
FIELD EXPENSES ITEM RATE COSTING UNIT USEAGE TOTALS
Shallow Groundwater Sampling Kit $208.55 day 1 $208.55
Portable Compressor $48.50 day 1 $48.50
Expendables $32.50 day 1 $32.50
Portable Generator $66.00 day 1 $66.00
TOTAL EQUIPMEN $355.55
VEHICLE TYPE RATE UNIT USEAGE
Truck $97.00 day 1 $97.00
TOTAL VEHICLE $97.00
PER DIEM STAFF RATE UNIT USEAGE
$0.00
TOTAL PER DIEM $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
VOHs 8260 (Non-Aqueous) $66.00 5 1 $396.00
TOTAL LAB $396.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
TOTAL $0.00
223 12th Avenue North, Jacksonville Beach, Florida 32250, Tel 904.247.0740, Fax 904.247.7650
Florida • Colorado • North Dakota • New Jersey`
December 1, 2020
Mr. Killian Talley Florida Department of Environmental Protection Bureau of Waste Cleanup (BWC) 2600 Blair Stone Road, MS 4520 Tallahassee, Florida 32399-2400
Subject: Proposal for MNA Sampling 2021 American Drive-In Cleaners 4178 Herschel Street, Jacksonville, Duval County, Florida
FDEP Facility ERIC_4570
Dear Mr. Talley:
Earth Systems has prepared this proposal for conducting annual Monitoring of Natural Attenuation (MNA) sampling at the subject site. The tasks associated with this scope of work are as follows:
SUBTASK 1 – Project Management
Allowable costs for Project Management according to the Bureau of Waste Cleanup’s (BWC) contract with Earth Systems.
SUBTASK 2 – Annual MNA Sampling and Reporting
Earth Systems will mobilize a senior technician to the site to collect water level data from 6 wells (MW001, MW002, MW006, MW008, MW010, and MW012) and groundwater samples (with water level data) from 5 additional wells (MW003, MW004, MW005, MW007, and MW011). The samples will be analyzed for VOHs using EPA Method 8260.
One trip blank will also be analyzed. All VOH samples will be analyzed by one of Earth Systems’ contract laboratories, Pace Analytical or Accutest. The well locations are depicted on the attached figure.
After receipt of the analytical results, Earth Systems will provide an Annual Monitoring of Natural Attenuation Report. The report will include updated tables and figures, the laboratory analytical data, and recommendations for additional work.
Proposal for MNA Sampling 2021 American Drive-In Cleaners, Jacksonville, Florida
ERIC_4570
Cost and Schedule
The proposed cost and schedule for this project are provided in the table below.
Task Proposed
Cost Proposed Schedule/Deliverables
Subtask 1 – Project Management $448.65 October 30, 2021
Subtask 2 – Conduct 2021 MNA sampling and prepare MNA Report
$4,437.76
August 31, 2021 Groundwater sampling documentation, Laboratory Report, Annual MNA Report, GIS Tables, ADaPT Deliverables
Total/Completion Date $4,886.41 October 30, 2021
If you have questions or comments concerning this proposal, please contact me at (904) 247-0740.
Sincerely, EARTH SYSTEMS
James Paxton Operations Manager
Figure 2
0 5025
( SCALE IN FEET )
BOLD
ANALYTICAL MAP -
MONITORING WELLS
(OCTOBER 23, 2013 THROUGH
JUNE 30, 2020)
61.7 11.8
3.123.8
1.2
PCE
14.8 7.9
13.1
22.8 8.8
7.9 5.2 5.6
24.2
6.731.5 3.9
7.5
3.6 I
137 76.1 341 20.9
27.1 4.4
82.3
1.2
CIS
File details come from the government source that posted it. Updated .