CN-370000-CN333-T7CO2.pdf

PDF 474 KB Posted

Attached to
Master Agreement FL|RFSOQBDC02-15/16|CN333|141078bdf72eb533340c58437f434344
Contract number
CN333
Issued by
Florida

About this file

This is a Task Assignment Change Order Form (DRP-085) issued by the Florida Department of Environmental Protection (FDEP), Division of Recreation and Parks, for a Beach Renourishment project at Deer Lake State Park. The change order modifies Contract Number CN333, Task Assignment Number 07, Change Order Number 02. The consultant performing the work is MRD Associates, Inc., represented by Thomas Pierro, PE. The FDEP Contract Manager is Vu Nguyen. The project is located at Deer Lake State Park and involves construction administration and post-construction monitoring services for a coastal restoration project consisting of native dune vegetation planting at two sites within the park boundaries (DEP Reference Monuments R-98 to R-101).

The change order increases the task amount by $25,965.00 in fixed fees with no reimbursable costs, bringing the total task amount to $83,345.00. The work consists of five subtasks: Subtask 3.A (Pre-Construction Meeting) at $3,835.00; Subtask 3.B.1 (Site Visit #1) at $2,975.00; Subtask 3.C (Records Management and RFI) at $8,605.00; Subtask 3.D (Substantial Completion) at $2,975.00; and Subtask 3.E (Post-Construction Vegetation Monitoring) at $7,115.00. All payments are fixed-price based on deliverable approval by FDEP. The original task execution date is August 1, 2023, with the task end date of July 26, 2026 remaining unchanged. Funding is charged to FLAIR Code 61459C under Fund 423001, Module U3200, Object Code 131500, EO Code QK.

View the file

Other files

File Type Posted
CN-370000-CN333-T5CO1.pdf PDF
CN-370000-CN333-T6CO1.pdf PDF
CN-370000-CN333-T5.pdf PDF
CN-370000-CN333-T3.pdf PDF
CN-370000-CN333-T4CO2.pdf PDF
CN-370000-CN333-T7CO1.pdf PDF
CN-370000-CN333-T1.pdf PDF
CN-370000-CN333-A1.pdf PDF
CN-370000-CN333-T2CO2.pdf PDF
CN-370000-CN333-T1CO1.pdf PDF
CN-370000-CN333-T6CO3.pdf PDF
CN-370000-CN333.pdf PDF
CN-370000-CN333-T1CO2.pdf PDF
CN-370000-CN333-T2.pdf PDF
CN-370000-CN333-CMC5.pdf PDF
CN-370000-CN333-T9CO1.pdf PDF
CN-370000-CN333-T4CO1.pdf PDF
CN-370000-CN333-T5CO2.pdf PDF
CN-370000-CN333-T8.pdf PDF
CN-370000-CN333-T7.pdf PDF
CN-370000-CN333-T2CO4.pdf PDF
CN-370000-CN333-CMC4.pdf PDF
PC-370000-CN333.pdf PDF
CN-370000-CN333-T9.pdf PDF
CN-370000-CN333-T4.pdf PDF
CN-370000-CN333-T8CO1.pdf PDF
CN-370000-CN333-CMC3.pdf PDF
CN-370000-CN333-T6.pdf PDF
CN-370000-CN333-CMC1.pdf PDF
CN-370000-CN333-T2CO1.pdf PDF
CN-370000-CN333-T6CO2.pdf PDF
CN-370000-CN333-CMC2.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Division of Recreation and Parks

Task Assignment Change Order Form

FLORIDA DEPARTMENT OF

ENVIRONMENTAL PROTECTION

DRP-085

Rev. /2025 1 of 2

FDEP Contract No: Project Number:

Task Assignment No: Change Order No:

Project Location Project

Consultant’s Name:

Consultant’s Representative:

Phone: Email:

FDEP Contract Manager:

Phone: Email:

Description of Change:

Change in Task Amount

Item Reimbursement Fixed Fee Total Original Task Amount Task Amount Including All Previous Change Orders Net Increase/Decrease in Task Amount for this Change Order Task amount with All Change Orders

CN333 61459C

07 02

Beach Renourishment

MRD Associates, Inc.

Thomas Pierro, PE

(561) 756-2535 tpierro@coastalprotectioneng.com

Vu Nguyen or successor

(850) 245-2630 vu.nguyen@floridadep.gov

Construction administration and post-construction monitoring to support the beach renourishment, per the attached proposal dated October 30, 2025.

$ 0.00 $ 19,320.00

$ 0.00 $ 57,380.00

$ 0.00 $ 25,965.00

$ 0.00 $ 83,345.00

$ 19,320.00

$ 57,380.00

$ 25,965.00

$ 83,345.00

Deer Lake State Park

FFLORIDAA DEPARTMENTT OF Divisionn off Recreationn andd Parks ENVIRONMENTALL PROTECTIONN Task Assignment Change Order Form

Change in Task Time

Original Task Execution Date Original Task End Date Present Task End Date Net Change in Days New Task End Date

Funding Information

29 Digit FLAIR Code:

Project # Grant # Org Code Cat/Year Fund Module Object Code

EO Amount

Total

Approval Signatures

Budget Representative, FDEP

Project Manager, FDEP

Contract Authority, FDEP

Signature

Signature

Signature

Signature

Signature

Date

Date

Date

Date

Date

DRP-085

Rev. 2 of 2 d nta atu

08/01/2023 07/26/2026 07/26/2026 07/26/2026

61459C 37501016248 080041/23 423001 U3200 131500 QK $ 25,965.00

$ 25,965.00

A. Diane Langston

Terry McCullum Jr.

Thomas Pierro, PE

Vu Nguyen

David Matson

Diane Langston Digitally signed by Diane Langston Date: 2025.11.25 08:11:50 -05'00'

Terry McCullum Jr.

Digitally signed by Terry McCullum Jr.

Date: 2025.11.25 10:01:22 -05'00'

Digitally signed by Thomas P Pierro Date: 2025.11.25 13:41:07 -05'00'

Vu Nguyen Digitally signed by Vu Nguyen Date: 2025.11.25 15:08:23 -05'00'

David Matson Digitally signed by David Matson Date: 2025.11.25 15:13:13 -05'00'

October 30, 2025

Mr. Terry McCullum Project Manager Bureau of Design and Construction Florida Department of Environmental Protection 3800 Commonwealth Boulevard 260M, MS 520 Tallahassee, Florida 32399

RE: Consultant Contract Number 333, Task Assignment Number 07 Change Order Number 02 Deer Lake State Park Beach Renourishment Construction Phase Services

Dear Mr. McCullum, For your review, MRD Associates, Inc., has provided a proposal summary and person-hour documentation for the services and tasks detailed in the attached Task Assignment proposal as identified below:

Construction Phase – including pre-construction meeting services, addressing contractor inquiries and submittals, construction observation and site visits, permit compliance, substantial and final completion, project certification (permit closeout), dune vegetation monitoring, and project closeout.

Should you have any questions regarding this matter, please feel free to contact me directly at 850.654.1555.

Sincerely, Thomas Hurlimann, E.I.

Coastal Engineer THurlimann@Coastalprotectioneng.com

Cc: Dylan Nestler, P.E.

Thomas P. Pierro, P.E., D.CE

Beach Renourishment Deer Lake State Park

Contract Number 333, Task Assignment Number 07 Change Order Number 02 Construction Phase Services

This Task Assessment is for Construction Phase Services of a coastal restoration project consisting of native dune vegetation planting as recommended in the report entitled “Deer Lake State Park – Beaches Project, Pre-engineering Report”, dated February 7, 2024, prepared for the Florida Department of Environmental Protection, Bureau of Design and Construction, prepared by MRD Associates, Inc. (MRD).The best option includes vegetation planting at two (2) sites identified in the pre-engineering report. The project limits are within the Deer Lake State Park (Florida Department of Environmental Protection (DEP) Reference (R-) Monuments R-98 to R-101). MRD Associates, Inc. (MRD) will provide construction phase services for the Florida Department of Environmental Protection (DEP), Bureau of Design and Construction (BDC).

Subtask 3: Construction Phase Services

This task includes construction related surveying services and all coastal engineering consulting services for the pre- and during-construction phase of the proposed project.

Subtask 3.A: Pre-Construction Meeting

Description: MRD will attend an in-person pre-construction meeting to support the BDC in presenting an overview of the PROJECT and scope of work, review the construction methodology, review the Construction Drawings and Technical Specifications, construction schedule, verify construction access and work areas, and the specific conditions and monitoring requirements of the DEP with the CONTRACTOR, sub-CONTRACTORs, DEP, Florida Fish and Wildlife Conservation Commission (FWC), and USFWS staff, shorebird monitor and other involved parties as necessary.

MRD shall provide a written summary of conclusions reached at the meeting to all participants.

Deliverables: A summary report of the pre-construction meeting will be provided to the DEP Project Manager in PDF format.

Performance Measure: Deliverables will be reviewed by the DEP Project Manager to confirm they are complete, accurate, and timely.

Fixed Price Cost:

Subtask 3.A

Firm Name Position Classification Hourly Rate

Hours Total Fixed Price Cost

MRD Associates, Inc. Principal Engineer $190.00 0.0 $ 0.00 MRD Associates, Inc. Senior Engineer $140.00 0.0 $ 0.00 MRD Associates, Inc. Engineer II $115.00 29.0 $3,335.00 MRD Associates, Inc. Engineer Technician $100.00 5.0 $ 500.00 MRD Associates, Inc. Administrative/Clerical $65.00 0.0 $ 0.00

Subtask 3.A Total: $3,835.00

Subtask 3.B: Site Visits

This subtask is for site visits

Subtask 3.B.1: Site Visit #1

Description: MRD will be present for a site visit during the vegetation planting. The Observation will be conducted to assess how construction is proceeding with regard to compliance with the construction plans, contract document, and permit authorizations granted for the work.

Deliverables: A summary of the site visit will be provided to the DEP Project Manager in PDF format.

Performance Measure: Deliverables will be reviewed by the DEP Project Manager to confirm they are complete, accurate, and timely.

Fixed Price Cost:

Subtask 3.B.1

Firm Name Position Classification Hourly Rate

Hours Total Fixed Price Cost

MRD Associates, Inc. Principal Engineer $190.00 0.0 $ 0.00 MRD Associates, Inc. Senior Engineer $140.00 0.0 $ 0.00 MRD Associates, Inc. Engineer II $115.00 25.0 $2,875.00 MRD Associates, Inc. Engineer Technician $100.00 1.0 $ 100.00 MRD Associates, Inc. Admin/Clerical $65.00 0.0 $ 0.00

Subtask 3.B.1 Total: $2,975.00

Subtask 3.C: Records Management, RFI

MRD shall obtain the CONTRACTOR's Daily Progress Reports through the duration of the project from mobilization through demobilization from the project site. MRD shall address questions concerning the Construction Drawings and Specifications and address other issues requiring coordination or technical support. MRD shall attend progress meetings with the CONTRACTOR and the CONTRACTOR's associated sub-CONTRACTORs as appropriate during construction and shall provide a written summary of the meeting.

MRD shall notify immediately the DEP BDC and the appropriate District Office of DEP of any non-compliance with any condition or limitation specified in the permit. The written report shall contain a description of and cause of noncompliance; and the period of noncompliance, including dates and times; or, if not corrected, the anticipated time the noncompliance is expected to continue, and steps being taken to reduce, eliminate, and prevent recurrence of the noncompliance.

Deliverables: The agenda of the progress meetings and copies of the contractor’s progress reports will be provided to the DEP Project Manager in PDF format.

Performance Measure: Deliverables will be reviewed by the DEP Project Manager to confirm they are complete, accurate, and timely.

Fixed Price Cost:

Subtask 3.C

Firm Name Position Classification Hourly Rate

Hours Total Fixed Price Cost

MRD Associates, Inc. Principal Engineer $190.00 0.0 $ 0.00 MRD Associates, Inc. Senior Engineer $140.00 0.0 $ 0.00 MRD Associates, Inc. Engineer II $115.00 67.0 $7,705.00 MRD Associates, Inc. Engineer Technician $100.00 9.0 $ 900.00 MRD Associates, Inc. Administrative/Clerical $65.00 0.0 $ 0.00

Subtask 3.C Total: $8,605.00

Subtask 3.D: Substantial Completion

Description: Following notification by the CONTRACTOR that construction activities have been completed, MRD shall conduct a visual inspection (substantial completion) of the beach and staging areas and prepare a punch list of remaining tasks to be completed by the CONTRACTOR including demobilization of equipment and material, and the restoration of access and staging areas. This list shall be furnished to the BDC and CONTRACTOR to track the progress of final clean

up. At this site visit, the vegetation that has not survived the 10 day monitoring period will be identified and that information will be provided to BDC.

Deliverables: Copy of substantial punch list and summary of 10 day plan survivability summary will be submitted to the DEP Project Manager in pdf format.

Performance Measure: Deliverables will be reviewed by the DEP Project Manager to confirm they are complete, accurate, and timely.

Fixed Price Cost:

Subtask 3.D

Firm Name Position Classification Hourly Rate

Hours Total Fixed Price Cost

MRD Associates, Inc. Principal Engineer $190.00 0.0 $ 0.00 MRD Associates, Inc. Senior Engineer $140.00 0.0 $ 0.00 MRD Associates, Inc. Engineer II $115.00 29.0 $3,335.00 MRD Associates, Inc. Engineer Technician $100.00 1.0 $ 100.00 MRD Associates, Inc. Administrative/Clerical $65.00 0.0 $ 0.00

Subtask 3.D Total: $3,435.00

Subtask 3.E: Post Construction Monitoring

Description: Dune planting success on will be evaluated after 6 months to assess whether at least 85% of the initial planting is surviving and to document how the vegetation is colonizing outside the initial planting limits. If it is determined that in certain areas there are deficiencies within the first year of planting and within the one-year contractor warranty period, MRD will support DEP BDC in their coordination with the CONTRACTOR to have the replanting completed. Field measurements will be conducted along transects spaced approximately every 1,000 feet between the planting limits. The survey methodology shall consist of stretching a 100-foot long tape along either a north or east axis from the seaward edge of the vegetation to a point located along the landward edge of the installed dune plantings. The survey shall begin at the zero mark and proceed along recording data at every foot mark making a visual observation 90 degrees perpendicular to the tape from above (101 observations per transect). Data recorded shall include plant species or bare earth present, and whether the mark fell on the plant itself or a stem of it.

Any stems not attached to a plant that are at the survey mark shall be considered as bare earth.

Additionally, dead plants shall not be counted and considered as bare earth if present under the survey mark. The results of the survey will be summarized in a report and provided to the DEP Project Manager

Deliverables: A summary report of the vegetation planting will be provided to the DEP Project Manager in PDF format.

Performance Measure: Deliverables will be reviewed by the DEP Project Manager to confirm they are complete, accurate, and timely.

Fixed Price Cost:

Subtask 3.E

Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost

MRD Associates, Inc. Principal Engineer $190.00 0.0 $ 0.00 MRD Associates, Inc. Senior Engineer $140.00 0.0 $ 0.00 MRD Associates, Inc. Engineer II $11 .00 61.0 $ .00 MRD Associates, Inc. Engineer Technician $100.00 1.0 $ 100.00 MRD Associates, Inc. Admin/Clerical $65.00 0.0 $ 0.00

Subtask 3.E Total: $7,115.00

Project Schedule:

Activity Duration (Calendar Days)

Subtask 3.A Pre-Construction Meeting TBD

Subtask 3.B.1: Site Visit #1 TBD

Subtask 3.C: Records Management, RFI, Requests for Payment TBD

Subtask 3.D: Post-Construction Site Visits and Submittals TBD

Subtask 3.E: Post Construction Vegetation Monitoring TBD

Summary of Fees:

Subtask Description Subtask Fixed Price Cost

Subtask Reimbursable

Subtask 3.A Pre-Construction Meeting $3,835.00 $0.00

Subtask 3.B.1: Site Visit #1 $2,975.00 $0.00

Subtask 3.C: Records Management, RFI $8,605.00 $0.00

Subtask 3.D: Substantial Completion $2,975.00 $0.00

Subtask 3.E: Post Construction Vegetation Monitoring $7,115.00 $0.00

Total Fixed Price Cost: $25,965.00

Total Reimbursable Cost: $0.00

Overall Total Cost: $25,965.00 Payment will be made upon approval of deliverables for each subtask by the FDEP in the amount specified. (Please do not alter this language)

REMAINDER OF PAGE INTENTIONALLY LEFT BLANK