This is a Task Assignment Notification Form from the Florida Department of Environmental Protection (FDEP) Division of Recreation and Parks for pre-engineering services related to dune protection and restoration. The contract involves FDEP as the state agency, MRD Associates, Inc. as the consulting firm, and the project is located at Grayton Beach State Park in Florida. The task assignment is designated as Contract Number 333, Task Assignment Number 06, with project reference number 61460C.
The scope of work encompasses pre-engineering services for dune protection and restoration across five identified beach segments within Grayton Beach State Park, spanning from reference monuments R-68 to R-78. The work is divided into three subtasks: Subtask 1A (Site Investigation) at $8,440.00, Subtask 1B (Conceptual Design and Assessment) at $11,280.00, and Subtask 1C (Pre-engineering Report) at $7,840.00, for a combined total fixed price cost of $27,560.00 with no reimbursable expenses. The project has a completion deadline of July 26, 2026, and payment will be made upon FDEP approval of deliverables for each subtask. The scope explicitly excludes final design, permitting, construction phase services, environmental assessments, surveying, and post-construction monitoring, which may be provided under separate authorization.
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Florida Department of Environmental Protection
TASK ASSIGNMENT NOTIFICATION FORM
Required Signatures: Adobe Signature
FDEP Contract No.: Task Assignment No.: Owner’s Name: Project No.:
Project Location: Project Name:
Consultant Name:
Consultant Representative: Phone: Email:
FDEP Contract Manager: Phone: Email:
Description of Task:
Project Manager:
Schedule Start Date: Fixed Price Cost:
Completion Date: Cost Reimbursement not to exceed:
Total Task Amount:
Approval Signatures:
Budget Representative, FDEP Signature Date
Project Manager, FDEP Signature Date
Contract Manager, FDEP Signature Date
Consultant Signature Date
Contract Authority, FDEP Signature Date
Project # Grant # Org Code Cat/Year Fund Module Object Code EO Amount
29 digit FLAIR Code: Total:
CN333 TA6 FDEP-DRP 61460C
Grayton Beach State Park Beaches Project mrd associates, inc.
Michael R. Dombrowski, P.E. (850) 654-1555 md@mrd-associates.com
Ralph Perkins, or successor (850) 245-2460 Ralph.Perkins@FloridaDEP.gov
This Task Assessment is for Pre-Engineering services for dune protection and restoration within the Grayton Beach State Park per proposal dated 7/26/2023.
Del Cobb, or successor
Upon Execution $ 27,560.00 7/26/2026
$ 27,560.00
Tamika Bass Tamika Bass Digitally signed by Tamika Bass Date: 2023.07.27 15:43:20 -04'00'
Del Cobb Del Cobb Digitally signed by Del Cobb Date: 2023.07.27 16:19:24 -04'00'
Ralph Perkins Ralph M Perkins Digitally signed by Ralph M Perkins Date: 2023.07.28 10:25:16 -04'00'
Michael R. Dombrowski, P.E. Digitally signed by Michael Dombrowski Date: 2023.07.30 14:06:59 -05'00'
Michael W. Foster Jr., P.E. Michael W. Foster Jr., P.E.
Digitally signed by Michael W.
Foster Jr., P.E.
Date: 2023.08.01 11:17:08 -04'00'
61460C 37501016033 080041/23 423001 U3200 131500 QK $ 27,560.00
$ 27,560.00
July 26, 2023
Mr. Del Cobb Project Manager – Engineering Specialist IV Division of Recreation and Parks Bureau of Design and Construction Florida Department of Environmental Protection 3800 Commonwealth Boulevard 260M, MS 520 Tallahassee, Florida 32399
RE: Consultant Contract Number 333, Task Assignment Number 06 Grayton Beach and Deer Lake State Parks Pre-Engineering Dune Restoration
Dear Mr. Cobb;
For your review, MRD Associates, Inc., has provided a proposal summary and man-hour documentation for the services tasks identified below:
Please review the attached Proposal Summary, deliverables and fees. Should you have any questions regarding this matter, please contact me at 850.654.1555.
Sincerely, Michael R. Dombrowski, P.E.
Principal Engineer md@mrd-associates.com
Pre-Engineering – Dune Restoration Grayton Beach State Park
Contract Number 333, Task Assignment Number 06
This Task Assessment is for pre-engineering services for dune protection and restoration within the Grayton Beach State Park (Florida Department of Environmental Protection (DEP) Reference (R-) Monuments R-68 to R-71, and R-72 to R-78). A meeting was held with State Park and DEP staff on June 6, 2024, and in general, the following potential elements were discussed for each beach segments:
Grayton Beach State Park
R-68.5 to R-71: Plantings along the frontal dunes and repair blowout east of R-69. This is both east and west of Alligator Lake.
R-73: Restore old existing access for habitat and dune protection.
R-74: New vehicular access site with dune restoration. Investigate dune slopes and stabilization for dune crossing.
Between R-75 and R-76: Restore dune.
R-77: Back dune plantings at blowouts.
In general, this Task Assignment will identify and map out project limits, develop typical details, and develop a Preliminary Opinion of Probable Construction Costs to include future tasks to implement the project (permitting, design, construction phase services, native dune vegetation installation, and post-construction monitoring). Based on the site investigation and preliminary discussions, sand placement will not be necessary and thus not included in this scope.
Subtask 1: Pre-Engineering Services
Subtask 1A: Site Investigation
Description: MRD will conduct a site investigation to the beach segments to document and photograph the on-ground conditions, and meet with Park staff. This will allow the team to get a better idea on the conditions of the beach and dune, identify opportunities and limitations, identify potential construction access, and staging, and transfer areas that will be used during construction. Existing native coastal vegetation will be identified including densities, types and species which will assist in developing the post-sand placement planting plan. In addition, a drone will be flown from R-68 to R-71and R-72 to R-78 within Grayton Beach State Park to obtain a geo-refenced aerial (weather dependent). The aerial RTK enabled drone will collect upland topography and map vegetation from the approximate mean high water (MHW) line landward approximately 400 feet.
Deliverable: Summary of the site investigation and drone generated aerial and contour plot will be provided to the DEP Project Manager in PDF format.
Performance Measure: Deliverables will be reviewed by the DEP Project Manager to confirm they are complete, accurate, and timely.
Fixed Price Cost:
Subtask 1A
Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost
MRD Associates, Inc. Principal Engineer $190.00 8.0 $1,520.00 MRD Associates, Inc. Senior Engineer $140.00 40.0 $5,600.00 MRD Associates, Inc. Engineer II $115.00 8.0 $920.00 MRD Associates, Inc. Engineer Technician $100.00 4.0 $400.00 MRD Associates, Inc. Administrative/Clerical $65.00 0.0 $0.00
Subtask 1A Total: $8,440.00
Subtask 1B: Conceptual Design, Assessment and Summary
MRD will prepare and assess a conceptual design and to meet the Department’s goals and objectives for the shoreline segment(s) identified in the introduction and Subtask 1A that may need to be mitigated. The drone based topographic data will be plotted and used as a baseline condition to identify and layout the project limits.
The conceptual design will include:
1) Project description including plan views and details, construction templates, vegetation planting plan and quantities.
2) Mapping the historic outfall locations of Alligator Lake to determine the variation in locations. This will be used to identify the limits and minimize the potential erosion of the planting areas.
3) A characterization of permit probability including compliance with DEP and USACE regulatory requirements and criteria, and the USFWS Biological Opinion.
4) Outline the necessary steps and schedule to implement the conceptual project.
5) A Preliminary Opinion of Probable Construction Costs that will include future tasks
(permitting, design, construction administration services, construction, monitoring, etc...).
MRD will meet with the Department to present the preliminary findings. Based on the review and comments by the Department, MRD will proceed with Subtask 1.C.
Deliverable: Summary memorandum of the conceptual design and assessment will be provided to the DEP Project Manager in PDF format.
Performance Measure: Deliverables will be reviewed by the DEP Project Manager to confirm they are complete, accurate, and timely.
Fixed Price Cost:
Subtask 1B
Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost
MRD Associates, Inc. Principal Engineer $190.00 8.0 $1,520.00 MRD Associates, Inc. Senior Engineer $140.00 16.0 $2,240.00 MRD Associates, Inc. Engineer II $115.00 40.0 $4,600.00 MRD Associates, Inc. Engineer Technician $100.00 24.0 $2,400.00 MRD Associates, Inc. Administrative/Clerical $65.00 8.0 $520.00
Subtask 1B Total: $11,280.00
Subtask 1C: Pre-engineering Report
MRD will summarize the findings and results of Tasks 1.A through 1.B. and prepare a written report. The report will include documentation of data and methods used in the performance of the work and will be consistent with DEP guidelines. The report will rank the conceptual designs in order of cost-effectiveness and performance and outline an implementation strategy.
Deliverable: Final Pre-engineering report will be provided to the DEP Project Manager in PDF format.
Performance Measure: Deliverables will be reviewed by the DEP Project Manager to confirm they are complete, accurate, and timely.
Fixed Price Cost:
Subtask 1C
Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost
MRD Associates, Inc. Principal Engineer $190.00 8.0 $1,520.00 MRD Associates, Inc. Senior Engineer $140.00 16.0 $2,240.00 MRD Associates, Inc. Engineer II $115.00 24.0 $2,760.00 MRD Associates, Inc. Engineer Technician $100.00 8.0 $800.00 MRD Associates, Inc. Administrative/Clerical $65.00 8.0 $520.00
Subtask 1C Total: $7,840.00
Project Schedule:
Activity Duration (Calendar Days)
Subtask 1A: Site Investigation 60 days
Subtask 1B: Conceptual Design and Assessment 90 days
Subtask 1C: Pre-engineering Report 120 days
Summary of Fees:
Subtask Description Subtask Fixed Price Cost
Subtask Reimbursable
Subtask 1A: Site Investigation $8,440.00 $0.00
Subtask 1B: Conceptual Design and Assessment $11,280.00 $0.00
Subtask 1C: Pre-engineering Report $7,840.00 $0.00
Total Fixed Price Cost: $27,560.00
Total Reimbursable Cost: $0.00
Overall Total Cost: $27,560.00 Payment will be made upon approval of deliverables for each subtask by the FDEP in the amount specified. (Please do not alter this language)
EXCLUSIONS
Please note that this Task Assignment does not include the following, but these services can be provided under separate authorization: outfall stability and processes, surveying services, risk assessment, upland and offshore geotechnical investigations, final design, environmental, ecological, land use planning, upland construction easements, permit applications or local, State and Federal regulatory permitting, contract documents, bidding and construction phase services, and post-construction monitoring.
REMAINDER OF PAGE INTENTIONALLY LEFT BLANK
File details come from the government source that posted it. Updated .