CN-370000-CN333-T2.pdf
PDF 1 MB Posted
- Contract number
- CN333
- Issued by
- Florida
About this file
Document Summary
This is a Task Assignment Notification Form issued by the Florida Department of Environmental Protection (FDEP) under indefinite delivery Contract CN333 for professional services related to the restoration of Eagle Harbor Breach at St. Joseph Peninsula State Park. The assignment was executed between FDEP's Bureau of Design and Construction (BDC) and MRD Associates, Inc., with Michael Dombrowski, P.E., serving as the consultant representative and Jack Brady as the FDEP contract manager. The task assignment was authorized on December 7, 2018, and carries a completion date of April 25, 2021.
The scope of work encompasses five primary subtasks: Preliminary Design, Survey and Bathymetric Investigation, Geotechnical Investigation (field and laboratory analysis with compatibility assessment), Permitting under Emergency Orders, and Final Design and Plans for breach closure and roadway/utility restoration. The contract is structured with a fixed price cost of $151,856.70 and a cost reimbursement allowance not to exceed $5,000.00, yielding a total task amount of $156,856.70. Payment will be made upon FDEP approval of deliverables for each subtask. The work addresses hurricane damage to the barrier island and associated infrastructure, with services including professional engineering, surveying, geotechnical investigations, and permitting coordination with state and federal regulatory agencies including the U.S. Army Corps of Engineers and the Florida Department of Environmental Protection's Division of Water Resource Management.
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .