CN-370000-CN333-T1CO2.pdf
PDF 3 MB Posted
- Contract number
- CN333
- Issued by
- Florida
About this file
This is a Task Assignment Change Order Form (Change Order No. 02) issued by the Florida Department of Environmental Protection (FDEP), Bureau of Design and Construction, for Contract No. CN333. The contract involves MRD Associates, Inc. as the primary consultant, with subcontractors including Dewberry Engineers, Inc. (formerly Preble-Rish, Inc.), and Greenman-Pedersen, Inc. (formerly Aerial Cartographies of America, Inc.). The project is located at St Andrews State Park in Bay County, Florida, and concerns post-construction monitoring of the Gator Lake Shoreline Stabilization Project, specifically the breakwaters constructed at this location.
This change order authorizes the fifth and final year of required post-construction monitoring services as mandated by Florida Department of Environmental Protection Permit No. 0239292-004-JC. The work scope includes three primary subtasks: topographic and bathymetric surveys (Subtask 4A) at $17,328.40; scale-rectified aerial photography (Subtask 4B) at $12,705.01; and data analysis with a comprehensive monitoring report (Subtask 4C) at $17,760.00. The total fixed-price cost for this change order is $47,793.41 with no reimbursable expenses. The work is scheduled for 120 calendar days beginning February 28, 2021, with completion by July 27, 2021. All deliverables are due within 90 days of survey completion and must be submitted to FDEP staff, the Beach and Inlet Post-Construction (BIPP) Compliance Officer, and Bureau of Design and Construction (BDC) personnel. The cumulative total task amount including all previous change orders is $205,259.68.
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Revised:
Change in Task Amount:
Present Task End Date w/all COs:
Net Change In Number of Days:
Date, if different from E-Signature
Date, if different from E-Signature
Date, if different from E-Signature
Date, if different from E-Signature
Date, if different from E-Signature
Signature
Signature
Signature
Signature
Signature
Budget Representative, FDEP
Project Manager, FDEP
Contract Manager, FDEP
Approval Signatures:
Project No. Orgization Code Category-Year
FLAIR Account Code/s: Total:
AmountGrant No. Fund Module Object Code EO
Item TotalsFixed Fee Original Task Amount:
Total Task amount including all previous Change Orders:
Net increase/decrease in task amount for this Change Order:
Total Task Amounts with all Change Orders:
Required Signatures: Adobe Signature
Calculated Values: Read Only
Calculated Value: Read Only
FDEP Contract No: Task Assignment No: Change Order No:
Project Location:
Project Name:
Consultant Name:
Description and Justification of Change:
Consultant Representative: Phone: Email: Ext: Cell:
FDEP Contract Manager: Phone: Ext: Cell: Email:
Original Task Execution Date:
Original Task End Date:
Change in Task Time:
Project No:
Reimbursement
New Task End Date:
Not Included in Total Task Calculations
Read Only: Calculated Date
Grant No:
Attachment D
Florida Department of Environmental Protection Bureau of Design and Construction
TASK ASSIGNMENT CHANGE ORDER FORM
Budget Entity
CN333 TA#01 CO#02 80088C
Gator Lake Shoreline Stabilization Post Construction Monitoring
Michael Dombrowski
Alyssa Skehan (850) 245-2781
January-31-2017 July-27-2021
Joyce Papp
Marshall Flake
Alyssa Skehan
Michael Dombrowski, P.E.
Parks Small
Joyce Papp Digitally signed by Joyce Papp Date: 2021.03.17 14:48:10 -04'00'
Marshall FlakeDigitally signed by Marshall Flake Date: 2021.03.18 06:46:50 -04'00'
Alyssa SkehanDigitally signed by Alyssa Skehan Date: 2021.03.18 08:42:13 -04'00'
Michael R. Dombrowski
2021.03.18 08:45:46 -05'00'
Parks Small Digitally signed by Parks Small Date: 2021.03.22 10:40:23 -04'00'
80107 N/A 3750 0500 000 080039-21 408001 U1640 131500 PF
$ 0.00
$ 47,793.41
$ 0.00
$ 47,793.41
$ 0.00 $ 0.00 $ 0.00
$ 0.00
$ 114,292.56
$ 157,466.27 $ 47,793.41
$ 205,259.68
$ 114,292.56
$ 157,466.27 $ 47,793.41
(850) 654-1555 (850) 598-1545 alyssa.skehan@floridadep.gov
MRD Associates, Inc.
$ 205,259.68
St Andrews State Park
MRD Associates Inc.
Conduct the final (5th) year of Post Construction Monitoring for the breakwaters at Gator Lake, St Andrews State Park as indicated in the Proposal and Statement of Work, attached hereto.
N/A
06/29/2019
Contract Authority, FDEP (F.F.)
md@mrd-associates.com
July 27, 2021
July 27, 2021
37 500 300
VIA EMAIL
February 1, 2021
Marshall W. Flake
Coastal Project Manager Bureau of Natural and Cultural Resources Florida Department of Environmental Protection 3900 Commonwealth Boulevard MS 530 Tallahassee, Florida 32399
RE: Contract Number 333, Task Assignment Number 01, Change Order Number 02 Gator Lake Shoreline Stabilization Project Post Construction Physical Monitoring - 2021
Dear Mr. Flake;
For your review, MRD Associates, Inc. (MRD), has provided a proposal summary and man-hour documentation for the services tasks identified below:
This Task Assignment details the post-construction monitoring services for the Gator Lake Shoreline Stabilization Project. These services are based on Specific Conditions contained within the Florida Department of Environmental Protection (DEP) Permit No. 0239292-004-JC which includes:
1) Topographic and Bathymetric Surveys, DEP Specific Condition 23.a;
2) Scale Rectified Aerial Photography, DEP Specific Condition 23.b; and,
3) Data Analysis and Monitoring Report, Specific Condition 23.c.
The DEP Permit requires 5-years of post-construction monitoring commencing one year after completion of the Project which was in February 2016. Year 1 (2017), Year 2 (2018) and Year 3 (2019) were conducted under Task Assignment Number 01 and Year 4 (2020) was conducted under Task Assignment Number 01, Change Order Number 01. Year 5 (2021) is proposed under this Change Order Number 02.
Please review the attached Proposal Summary and deliverables.
Sincerely, mrd associates, inc.
Michael Dombrowski, P.E.
Statement of Work Gator Lake Shoreline Stabilization Project
St. Andrews State Park, Bay County, Florida
Contract No. CN333, Task Assignment No. 01, Change Order No. 02
Subtask 4: Post-Construction Physical Monitoring - 2021
Description:
4A. Topographic and Bathymetric Survey
MRD shall conduct an annual post-construction Topographic and Bathymetric Survey in accordance with the "Minimum Technical Standards" set forth by the Florida Board of Professional Surveyors and
Mappers in Title 61G17, Florida Administrative Code (FAC) and include the data and information outlined in "Section 01000 Beach Profiling Topographic Surveying" and "Section 01100 Offshore Profile
Surveying" specified in DEP's "Monitoring Standards for Beach Erosion Control Projects." dated March
2004, or the latest revision. The survey shall be conducted in January of each monitoring year.
However, the survey is required to conduct concurrently with taking aerial photographs outlined in
Task 4B and both are highly dependent on weather, water clarity and sea conditions and the schedule may need to be revised based on these parameters. Dewberry Engineers, Inc. (formerly Preble-Rish, Inc.) shall include the following survey information:
a) Vertical datum specified on the survey and referenced to NAVD, 1988 in feet.
b) Horizontal coordinates, bearings, and distances referenced to the control provided upon the most recently recorded Map of Record for the Bay County CCCL.
c) The field survey shall include the following:
i. 21 topographic profiles in the shore-normal direction at spacing as indicated on the drawings on Sheets 1 and 2, "Topographic and Bathymetric Monitoring Profiles", dated
March 17, 2009. These profiles shall begin at the Point of Beginning (POB) or more landward and extend to approximate wading depth. The data will be collected at a maximum of 25-foot intervals and at one foot or greater changes in elevation along each transect. Topographic profiles shall be conducted using standard differential leveling techniques and equipment including an automatic level, 25-foot survey rod and 300-foot long fiberglass or composite survey chain and/or GPS/RTK techniques. The offshore profiles along the west jetty (K-1 to K-4, and BW-1 to BW-4) shall extend up to the rock structure.
ii. 10 of the 21 profiles shall extend to the centerline of the Federal Navigation Channel and have adequate overlap with the seaward limit of the beach portion of the survey. These 10 profiles will include K-1, BW-1, BW-6, BW-11, G-1 through G-6 (total of 10).
d) The horizontal locations of the contour lines corresponding to elevation 0.0 feet, the approximate contour of MHW, will be based on interpolation of elevation data along K-1 to K-4, BW-1 to BW-
11, and G-1 to G-5 shore-normal transects as shown on Sheets 1 and 2 "Topographic and
Bathymetric Monitoring Profiles," dated March 17, 2009, prepared by MRD Associates, Inc.
4B. Scale Rectified Aerial Photography
Aerial photography of the inlet and shoreline will be performed by Greenman-Pedersen, Inc. (GPI)
(formerly Aerial Cartographies of America, Inc., ACA) and taken concurrently with the annual post-construction survey as described in Task 4A, as close to the date of the topographic and bathymetric surveys as possible. Field work and flight s are dependent on weather, water clarity and sea conditions.
a) The limits of the photograph y shall extend approximately 500 feet south of the beach and west jetty intersection, north to the north end of the Grand Lagoon spit.
b) The east to west extents shall be from the east shoreline of the St. Andrews Bay Entrance to approximately 1,000 feet west of the Project shoreline.
c) Set ground control targets required for processing scale-rectified aerials.
All Work activities and deliverables shall be conducted in accordance with the latest update of the BIPP
Monitoring Standards for Beach Erosion Control Projects, Section 0200 except for B.16 “Flight Time” which was waived by BIPP (email from Ralph Clark dated 01/19/16). Copies of electronic photographs submitted to BlPP shall be supplied to DRP staff in .pdf or suitable format, additionally one large scale
Project Print shall be provided to DRP.
4C. Data Analysis and Monitoring Report
MRD shall prepare and submit a Construction Engineering report and submit the monitoring data to
DEP staff, BIPP and BDC within 90 days following completion of the annual survey and aerials.
a) The report shall summarize and discuss the annual as well as cumulative data base, the performance of the breakwater Project, and identify erosion and accretion patterns within the monitored area. In addition, the report shall include a comparative review of Project performance to performance expectations and identification of adverse impacts attributable to the Project.
Appendices shall include plots of survey profiles and graphical representations of volumetric and shoreline position changes for the monitoring area. Results shall be analyzed for patterns, trends, or changes for between annual surveys and cumulatively since the Project construction.
b) All monitoring reports and data shall be submitted to the BIPP Compliance Officer in Tallahassee as hard copies as well as electronically to the appropriate reviewing staff members. Failure to submit reports and data in a timely manner constitutes grounds for revocation of the permit.
When submitting any monitoring information to BIPP, a transmittal cover letter will be included which clearly is labeled with the following at the top of each page: This monitoring information is submitted in accordance with Section Number 3.0 of the approved Monitoring Plan for Permit
No. 0239292-004-JC for the Post-Construction monitoring period. For all technical specifications not listed within this document, reference the latest update of the BIPP Monitoring Standards for
Beach Erosion Control Projects (BBCS, 2004). This 5 Year report will include an update to the
Sediment Budget using the data collected since the completion of the structures in 2016.
Deliverable:
4A. One (24" by 36") "signed and sealed" Monitoring Survey in CADD & pdf formats as applicable.
4B. Electronic scale -rectified aerial sets suitable for submission to the BIPP Compliance Officer, and one set of pdf copies and one large scale hard-copy print for DRP.
4C. A Post-Construction Monitoring Report with copies to DRP and the BIPP Compliance Officer in electronic .pdf format.
Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.
Fixed Price Cost:
Subtask 4A. Topographic and Bathymetric Survey
Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost
MRD Associates, Inc. Principal Engineer $190.00 1.0 $190.00
MRD Associates, Inc. Engineer II $115.00 1.0 $115.00
MRD Associates, Inc. Engineering Technician $100.00 2.0 $200.00
Preble-Rish, Inc. (Dewberry) Senior Project Manager $131.01 12.0 $1,572.12
Preble-Rish, Inc. (Dewberry) Senior Professional Surveyor $129.81 16.0 $2,076.96
Preble-Rish, Inc. (Dewberry) Field Crew Supervisor $71.40 48.0 $3,427.20
Preble-Rish, Inc. (Dewberry) Survey Crew – 3 man $129.15 48.0 $6,199.20
Preble-Rish, Inc. (Dewberry) CADD Technician $67.50 48.0 $3,240.00
Preble-Rish, Inc. (Dewberry) Administrative $38.49 8.0 $307.92
Subtask 4A. Total $17,328.40
Dewberry Engineers, Inc. (formerly Preble-Rish, Inc.)
Subtask 4B. Scale Rectified Aerial Photography
Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost
MRD Associates, Inc. Principal Engineer $190.00 1.0 $190.00
MRD Associates, Inc. Engineer II $115.00 1.0 $115.00
MRD Associates, Inc. Engineering Technician $100.00 2.0 $200.00
Preble-Rish, Inc. (Dewberry) Senior Project Manager $131.01 1.0 $131.01
Preble-Rish, Inc. (Dewberry) Senior Professional Surveyor $129.81 2.0 $259.62
Preble-Rish, Inc. (Dewberry) Field Crew Supervisor $71.40 8.0 $571.20
Preble-Rish, Inc. (Dewberry) Survey Crew – 3 man $129.15 8.0 $1,033.20
Preble-Rish, Inc. (Dewberry) CADD Technician $67.50 4.0 $270.00
Preble-Rish, Inc. (Dewberry) Administrative $38.49 2.0 $76.98
ACA (GPI) Project Manager $168.00 10.0 $1,680.00
ACA (GPI) Project Surveyor/QA/QC $159.00 10.0 $1,590.00
ACA (GPI) Surveyor/Aerial Triangulation $135.00 10.0 $1,350.00
ACA (GPI) CADD Tec/Image Clipping $78.00 4.0 $312.00
ACA (GPI) Ortho Analyst $99.00 30.0 $2,970.00
ACA (GPI) Pilot $115.50 8.0 $924.00
ACA (GPI) Sensor Operator $64.50 16.0 $1,032.00
Subtask 4B. Total $12,705.01
Greenman-Pedersen, Inc. (GPI) (formerly Aerial Cartographies of America, Inc., ACA)
Subtask 4C. Data Analysis and Monitoring Report
Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost
MRD Associates, Inc. Principal Engineer $190.00 24.0 $4,560.00
MRD Associates, Inc. Engineer II $115.00 80.0 $9,200.00
MRD Associates, Inc. Engineering Technician $100.00 40.0 $4,000.00
Subtask 4C. Total $17,760.00
Reimbursable Cost: (if applicable – provide for each task in which reimbursables are required)
Not Applicable Lump Sum $0.00
Reimbursable Total Cost Lump Sum $0.00
Total for Subtask 4: $17,328.40 (4A) + $12,705.01 (4B) + $17,760.00 (4C) = $47,033.41
Project Schedule:
Activity Duration (Calendar Days)
Subtask 4: 2021 120 days from February 28, 2021
Summary of Fees:
Subtask Subtask Fixed Price Cost Subtask Reimbursable
Subtask 4: 2021 $47,793.41 $0.00
Total Fixed Price Cost: $47,793.41
Total Reimbursable Cost: $0.00
Overall Total Cost: $47,793.41
Payment will be made upon approval of deliverables for each subtask by the FDEP in the amount specified.
ALL WORK CONDUCTED UNDER THIS CONTRACT
SHALL BE SUBJECT TO FINANCIAL CONSEQUENCES IF:
Failure of the Consultant to complete a Task on time and /or to meet the specifications detailed in the Scope of Work, may at the sole discretion of the Department, be subject to Financial
Consequences.
Payment shall not be made for submitted Tasks deemed unsatisfactory, late, or incomplete by the Department. The Consultant may be required to correct unsatisfactory work within 30 days, at their own expense, or the Department may terminate the contract for failure to perform.
File details come from the government source that posted it. Updated .