This document is a Task Assignment Change Order Form (Change Order No. 01) for DEP Contract No. BS136 between the Florida Department of Environmental Protection (FDEP) and Atkins North America, Inc. The change order is dated May 1, 2024, with FDEP Contract Manager Chelsey Sliger and Contractor Contract Manager Matthew Taylor serving as primary contacts. The project concerns structural remediation services for the Rookery Bay National Estuarine Research Reserve pole barn located in Collier County, Florida.
The change order increases the scope of work to complete design and construction documents from 30% to 100% permit/Issued for Construction (IFC) set and includes assistance with permitting through Collier County Building Department. The contract value for this change order is $16,264.20 on a fixed-fee basis, with Task 1 (100% Permit/IFC Construction Documentation) valued at $13,151.16 and Task 2 (Assist with permitting of the 100% CDs) valued at $3,113.04. The total task amount with all change orders is $43,597.40. Work is to be completed within 92 days, with an original completion date of May 1, 2024, adjusted to August 1, 2024, with all change orders applied. Deliverables include complete structural engineering construction documents in digital format (Word or PDF) with specifications on drawings, and permit comment responses. The project schedule anticipates Task 1 completion in three weeks from notice to proceed and Task 2 completion in two weeks from receiving county comments.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CHANGE IN TASK AMOUNT
Item Cost Reimbursement
Original Task Amount: $0
Task Amount Prior to this Change Order: $0
Net Increase/Decrease in Task Amount: $0 Task Amount with all Change Orders: $0
CHANGE IN TASK TIME
Original Task Completion Date:
Completion Date Prior to This Change:
Net Increase/Decrease in Task Period:
Completion Date with all Change Orders:
CONTRACTOR
FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION
Contract Manager Date Project Manager
Contract Manager
Date
Date
APPROVED:
DateCost Center Administrator
CoCoCooooCooCoCoCCooCooCooCoCCoooooooooooooontraccccctccccccccccccccccccccccccccccccccccccccccccc Managgggggggggggggggggggggggggggggggggggggggggggggggggggeeeereeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeee Matthew Taylor
ATTACHMENT D – TASK ASSIGNMENT CHANGE ORDER FORM
DEP CONTRACT NO. BS136
Task Assignment Number: _________ Date: _____________________ Change Order No._01_______
Contractor Name: Atkins North America, Inc.
Contractor Contract Manager: __Matthew Taylor______________________ Phone: __407-806-4239______________
Description of Change (Use Additional Sheets if necessary):
Fee Schedule Total
DEP Contract Manager: __Chelsey Sliger___________________________ Phone: __850-245-8646______________
22 5/1/2024
Donna Pace
Chelsey Sliger cc: DEP Procurement Section (MS93), Bureau of Finance and Accounting (MS78) – 2 copies Contract No. BS136
$27,333.22
$27,333.22
$16,264.20 $43,597.40
$27,333.22
$27,333.22
$16,264.20
$43,597.40
May 1, 2024
May 1, 2024
August 1, 2024
May 1, 2024
92 days
Complete the design and construction documents from 30% to 100% permit/Issued for Construction (IFC) set and to assist with permitting thru Collier County Building Department.
Chelsey E. Sliger Digitally signed by Chelsey E.
Sliger Date: 2024.05.01 16:09:56 -04'00'
Lisa Yarborough
5/1/2024
Atkins North America, Inc.
Registered office: 4030 West Boy Scout Boulevard, Suite 700, Tampa FL 33607, United States
Atkins 3522 Thomasville Road
5th Floor Tallahassee, FL 32309
Tel: +1 850 575 1800 Fax: +1 850 575 0105 atkinsglobal.com snclavalin.com
May 1, 2024
Ms. Chelsey Sliger, FCCM Government Operations Consultant III Florida Department of Environmental Protection Division of Water Resource Management/Shared Services 2600 Blair Stone Road Tallahassee, FL 32399
RE: DEP WR Contract BS136: Change Order 1 to Task Assignment 22
Assessment and 30% Construction Documents for Structural Remediation of Rookery Bay Pole Barn
Dear Ms. Sliger, Background
Rookery Bay National Estuarine Research Reserve (Rookery Bay) has requested a proposal for Structural engineering consulting services. The original project was to assess, analyze and provide 30% structural engineering construction documents to update the structural system to current Florida Building Code requirements (specifically wind load) of an existing pole barn located at the Rookery Bay Research Reserve. The 30% construction documents were utilized to provide a cost estimate and procure a general contractor to execute the construction.
Task Assignment 22 was issued in November 2023 for the above services. This change order adds to the scope of work to complete the construction documents from 30% to 100% permit/Issued for Construction (IFC) set. Detail of the additional work is provided below.
Scope of Work
Atkins will provide professional services as set forth in the following Tasks to fully complete all agreed-upon elements of the change order.
Task 1. 100% Permit/IFC Construction Documentation
Atkins will complete the initial 30% construction documentation (CDs) to 100% CDs for any remediation work required to bring the Structural system up to current Florida Building Code.
The tasks associated with this effort includes:
1. Project management of the design effort
2. Final Code research/validation
3. Final engineering calculation/modeling for main force system
4. Finalize drafting of new/remediation plans and details
5. Include final specifications on drawings
6. Quality assurance and quality control review
7. Final meeting (virtual) to review 100%CDs and respond to comments
8. Respond to GC Questions/RFIs for final construction cost
Deliverables: A Permit/IFC set (100% CDs) of Structural engineering construction documents including specifications on drawings. The CDs will convey design and construction information for a general contractor to attain a permit and execute the construction. The drawings and specifications will be a complete “Issued for Construction” set of Structural drawings and specifications for the remediation work required to bring the building in compliance structurally to the current Florida Building Code.
Task 2. Assist with permitting of the 100% CDs
Atkins will review and respond to all comments relative to the 100% Structural Engineering CDs. If the Collier County Building Department comments extend beyond the Structural drawings, Atkins will help facilitate potential responses and solutions. If the responses/solutions extend beyond the current Structural engineering scope, Atkins will setup a meeting to discuss with FDEP.
Deliverables: Permit comment responses and an update to the 100% Structural CDs addressing Collier County’s Building Department Comments.
Assumptions and Exclusions
All deliverables will be submitted in digital format No new geotechnical boring report or survey data will be collected Formal reviews of bids or cost estimates are excluded Selection or contract negotiation/review with a general contractor is excluded Construction phase services is excluded Other discipline assessment or analysis including Architecture, Survey Civil, Mechanical, Electrical, Plumbing, Fire Protection engineering is excluded
The above services can be provided as Additional Services to this agreement if required by the
FDEP.
Project Deliverables, Costs, and Invoicing
All deliverables will be digital and submitted in either Word or PDF format and are outlined in the Table below. The not to exceed cost for change order #1 is $16,264.20 and is summarized below. The change order is proposed on a fixed-fee basis and will be invoiced following milestone submittals of Task 1 and Task 2. A detailed breakdown of costs by labor hours and rates is attached.
Table 1 Project Deliverables and Invoicing Schedule
Deliverable Total Cost Task 1: 100% Permit/IFC Construction Documentation $13,151.16 Task 2: Assist with permitting of the 100% CDs $3,113.04
Total $16,264.20
Project Schedule
The proposed scope of work will begin immediately upon notice to proceed (NTP). It is anticipated that project schedule will proceed as follows:
Task Anticipated duration Task 1: 100% CDs 3 weeks from NTP Task 2: Permitting 2 weeks from receiving County Comments
Total 5 weeks from NTP
All contract deliverables will be submitted to the Department and accepted before August 1, 2024.
Staff
HRS.
Cost by Pos & Act
Staff
HRS.
Cost by Pos & Act
Staff HRS. Cost by Pos & Act
Staff HRS. Cost by Pos & Act
Staff
HRS.
Cost by Pos & Act
Staff HR
ACTIVITY
SALARY COST
BY ACTIVITY
1A PM Effort for Task $0.00 4 $1224.32 $0.00 $0.00 $0.00 4 $1,224.32
1B Final Code Research/validation $0.00 $0.00 $0.00 2 $492.12 $0.00 2 $492.12
1C Finalize engineering calculation/modeling for main force system $0.00 $0.00 $0.00 10 $2460.60 4 $452.64 14 $2,913.24
1D Finalize drafting of new/remediation plans and details $0.00 $0.00 $0.00 8 $1968.48 20 $2263.20 28 $4,231.68
1E Include Final specifications on drawings $0.00 $0.00 $0.00 4 $984.24 1 $113.16 5 $1,097.40
1F QA/QC
$0.00 1 $306.08 6 $1596.00 $0.00 $0.00 7 $1,902.08
1G Final meeting (virtual) to review 100%CDs and respond to comments $0.00 $0.00 $0.00 2 $492.12 $0.00 2 $492.12
1H Respond to GC Questions/RFIs for Final Construction Cost $0.00 1 $306.08 $0.00 2 $492.12 $0.00 3 $798.20
Lump Sum Task 1 Total: 0 $0.00 6 $1,836.48 6 $1,596.00 28 $6,889.68 25 $2,829.00 65 $13,151.16
2A Assist and Respond to Permit Comments $0.00 2 $612.16 $0.00 4 $984.24 $0.00 6 $1,596.40
2B Resubmit CDs based on Permit Comments $0.00 1 $306.08 $0.00 4 $984.24 2 $226.32 7 $1,516.64
Lump Sum Task 2 Total: 0 $0.00 3 $918.24 0 $0.00 8 $1,968.48 2 $226.32 13 $3,113.04
Project Total: 0 $0.00 9 $2,754.72 6 $1,596.00 36 $8,858.16 27 $3,055.32 78 $16,264.20
Task 2: Permitting
Task 1: 30% CDs to 100% CDs/IFC Drawings
Attachment B: Fee Breakdown Florida Department of Environmental Protection (FDEP)
(TA 22 Pole Barn Structural Engineering Remediation - Change Order #1)
ACTIVITY DESCRIPTION
Project Director Rate/Hr. $ 294.73
Project Manager Rate/Hr. $ 306.08
Sr Engineer IV Rate/Hr. $ 266.00
Sr Engineer III Rate/Hr. $ 246.06
Engineer I Rate/Hr. $ 113.16
TOTAL