Check Off sheet ITB~1.pdf
PDF 100 KB Posted
- Attached to
- SFFC Admin Building HVAC
- Solicitation number
- S-29100-00013280
- Issued by
- Tillamook County, Oregon
About this file
The document is a Bidder Reminders Check Off Sheet for the SFFC Admin Building HVAC project, issued by the state of Oregon. The check-off sheet details mandatory submission requirements for bidders, specifying that failure to submit the listed documents will result in a non-responsive bid. Key required submissions include Exhibit 1 (Pricing Submittal Section), Section D (Bid Security Requirements), Section G (Construction Contractors Board Registration), Addenda Acknowledgement, Contractor References, Residency Information, and First Tier Subcontractor Disclosure Form. Submissions must be made prior to the bid closing, with the First Tier Subcontractor Disclosure Form allowed up to two working hours after closing.
The check-off sheet serves as a critical compliance document ensuring that potential contractors provide comprehensive documentation demonstrating their qualifications, financial stability, and readiness to perform the HVAC renovation project. By mandating specific sections and attachments, the state aims to standardize the bidding process, verify contractor capabilities, and ensure all necessary information is received for a thorough evaluation. The document underscores the importance of complete and timely submissions, with each section designed to validate different aspects of a contractor's professional standing, including licensing, references, residency, and subcontractor relationships.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 13280 Background.pdf | ||
| 13280 Plan Holder List.pdf | ||
| 13280 ITB_GTC_SGC_SPECS.pdf | ||
| 13280 Plans.pdf | ||
| 13280 SFFC Admin Building HVAC SOW.pdf | ||
| 13280 Bid Tab.pdf | ||
| Beans Black~1.docx | DOCX document | |
| 13280 ADDENDA 1.pdf | ||
| 6991 NOITA.pdf | ||
| 6991 Contract_Executed.pdf | ||
| ITB~11.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bidder reminders check off sheet
INFORMATION TO BE SUBMITTED WITH THE BID: The items listed below in this section shall be submitted or the Bid shall be found to be non‐responsive. The following shall be submitted prior to Closing:
Exhibit 1- Pricing Submittal Section.
Section D- Bid Security Requirements
Section G- Construction Contractors Board (CCB) Registration Requirements; Asbestos Abatement Licensing Requirements, & Joint Venture ‐ Partnership Declaration, Section H- Addenda Acknowledgement.
Section I- Responsibility Inquiry & Contractor References; ESB Utilization.
Attachment D- Bidder References
Section K- Residency Information.
Section O- Signature of Bidder's Duly Authorized Representative.
Any Addenda (If required).
Section F- First Tier Subcontractor Disclosure Form. Or within two (2) working hours after the Closing.
File details come from the government source that posted it. Updated .