This document is a detailed roof inspection report for Section 12 of the Central Administration building, which is owned by the Department of Corrections (DEPTCOR). The report provides a comprehensive overview of the current condition of the EPDM roof system, which is approximately 13 years old. Several defects were identified throughout the roof, including delaminated flashings at all roof penetrations, damaged roof membrane, and delaminating field seams. The report outlines various repair options, including a full roof replacement, a restoration coating application, and an alternate EPDM roof system. The estimated costs for these options range from $22,825 for the identified repairs to $190,400 for a full roof replacement.

The report also includes a detailed breakdown of the repair costs, categorized by the level of impact on the overall roof strategy. The recommended strategy is to perform the necessary repairs to attain the most serviceable life of the existing roof system. The report provides specific repair processes for each identified deficiency, along with the estimated costs, locations, and photographic references.

View the file

Other files

File Type Posted
Photos.pdf PDF
5-A-2.07.tif TIF image
Central Administration Sec 27.pdf PDF
Central Administration Sec 13.pdf PDF
RFP Billable Rate 24342.pdf PDF
DTMB-0414 (RFP Addendum) 01.pdf PDF
4-A-2.07.tif TIF image
SAMPLE Billable Rate Contract (Rev 221207).pdf PDF
6-A-2.08.tif TIF image
LEIN Request 24342.pdf PDF
4-block.pdf PDF
Sign-in sheet 08082024.pdf PDF
18-A-2.04.tif TIF image
Project Statement 24342.pdf PDF
Central Administration Sec 15.pdf PDF
Conference Note 08082024.pdf PDF
5-block.pdf PDF
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

D0035-14

01/07/2014

Central Administration - Section 12

Description

Created

Drawing Id a b c d e f g h i j k l m n o p q r s t u v w

Building Drawing

Legend Control Joint Expansion Joint

* Note: -U indicates an unused item

Roof Top Units

Drainage

Miscellaneous

Problem Indicators

Projections xxxxx

Project

Customer

DWG. By

Date Scale

This drawing is the property of McDonald Roofing and It may not be reproduced without consent.

N.T.S

A. Kreichelt

HVAC on Curb

Roof Hatch

HVAC on Sleepers

Skylight

Unit on Curb

Unit on Sleepers

Plumbing Stack

Pitch Pan

Hot Stack

Metal Sleeve Stack

Drain (Existing)

Drain (New)

Scupper

Gas Line

Walkway

Paver Walkway

Crickets

Roof Level Change

Core Test

Blister

Ponding

Flashing Problem

Ridging

Bare Spot

Photo Indicator

Aug 27, 2013

A

S L

C

3960 Ann Arbor Rd McDonald Roofing

On Top Since 1947

Central Administration Sec 12

Department of Corrections

N

Legend Control Joint Expansion Joint

* Note: -U indicates an unused item

Roof Top Units

Drainage

Miscellaneous

Problem Indicators

Projections xxxxx

Project

Customer

DWG. By

Date Scale

This drawing is the property of McDonald Roofing and It may not be reproduced without consent.

N.T.S

A. Kreichelt

HVAC on Curb

Roof Hatch

HVAC on Sleepers

Skylight

Unit on Curb

Unit on Sleepers

Plumbing Stack

Pitch Pan

Hot Stack

Metal Sleeve Stack

Drain (Existing)

Drain (New)

Scupper

Gas Line

Walkway

Paver Walkway

Crickets

Roof Level Change

Core Test

Blister

Ponding

Flashing Problem

Ridging

Bare Spot

Photo Indicator

Aug 27, 2013

A

S L

C

3960 Ann Arbor Rd McDonald Roofing

On Top Since 1947

Central Administration Sec 12

Department of Corrections

N 68'

Deficiency Repair Cost

Please check the deficiencies to repair. Sign and date below to indicate your approval to begin repairs.

Signature Date

4000 Cooper St. C.Admin.12

Impact on strategy High

Create Date Component Status CostLocationRepair WarrantyPhoto ID

3429 01/15/2014 Curbs Open 3300.00All curbs N

Open seams or corners at roof curbs.

High

3431 01/15/2014 Gravel Stop Open 2450.00All perimeter edges N

Delaminated perimeter edge flashing membrane.

High

3433 01/15/2014 Penetrations Open 450.00I1.5 N

Deteriorated flashing at conduit line.

High

Total $6,200.00

Impact on strategy High

Create Date Component Status CostLocationRepair WarrantyPhoto ID

3434 01/15/2014 Curbs Open 1200.00K1-2.5 N

Flashing does not extend beneath rail curb cap.

High

Impact on strategy Low

Create Date Component Status CostLocationRepair WarrantyPhoto ID

3435 01/15/2014 Field Open 2880.00J2-4 / J6-8 N

Ponding water between drains.

Low

3436 01/15/2014 Gravel Stop Open 220.00I2 N

Damaged perimeter edge metal.

Low

Total $4,300.00

Impact on strategy High

Create Date Component Status CostLocationRepair WarrantyPhoto ID

3437 01/15/2014 Housecleaning Open 7500.00JK1-14 N

Abandoned exterior ducting on roof.

High

Total $7,500.00

Impact on strategy Low

Create Date Component Status CostLocationRepair WarrantyPhoto ID

3438 01/15/2014 HVAC Open 1850.00K3.5 N

Abaned HVAC cabinet

Low

Total $1,850.00

Impact on strategy High

Create Date Component Status CostLocationRepair WarrantyPhoto ID

3439 01/15/2014 Field Open 2975.00Through out N

General preventative maintenance.

High

Total $2,975.00

Section Total $22,825.00

Report Total $22,825.00

Section Composition

Section Condition Summary

Address - Section:

Section Summary

Roof System:

Manufacturer:

Age:

Area:

Replacement Cost $ :

Life:

Surface:

Membrane:

Insulation:

Prior Roof:

Vapor Barrier:

Deck:

Coping:

Base Flashing:

Counter Flash:

Drainage:

Construction:

Condition:

Restoration Cost $ :

Building Use:

Strategy:

Central Administration

Extensive repairs, but cost effective

Perform repairs to attain the most serviceable life

EPDM F

Firestone

None

.060 mil EPDM

(2) - 1.5" isocyanurate

N/A

None

Concrete

Pre-finished metal edging

EPDM

Termination bar

Drains

Block

154,700

71,400

DEPTCOR

The roof and its components were inspected on section 12 of the building known as Central Administration. The fully adhered EPDM stairwell roofs appear to be in good condition at approximately 13 years of age. Several defects were noted through out the roof including delaminated flashings at all roof penetrations, damaged roof membrane and delaminating field seams. The roof has the potential to last up to 7 more years with the recommended repairs performed and with routine maintenance and inspections.

The costs shown for the roof replacement, restoration and alternate specifications are for the purpose of budgeting only and may be subject to change.

The replacement specification is to remove the existing roof and replace with like system.

The restoration specification is to apply Andek restorative coating over the existing roof surface.

The alternate specification is to remove the existing roofing and replace with a fully adhered EPDM roof system at a cost of: $190,400

4000 Cooper St. C.Admin.12

01/15/2014

Drawing

Warranty Number

Warranty Expires

D0035-14

Squares (100 sft.)

03/03/2014

Restoration or Replacement Cost Specification

Address - Section ID: 4000 Cooper St. C.Admin.12

1. Replacement Specification

Remove the existing roof and replace with like roof system.

-Remove the existing roofing membrane, all flashings, metal copings and metal trim and properly dispose of.

-Inspect the decking for damage or deterioration and repair or replace as needed. This will be an extra cost based unit sf pricing determined at the time of the inspection.

-Mechanically attach 2 layers of 1.5" isocyanurate.

-Install tapered insulation as needed to guide water to roof drains or scuppers.

-Mechanically attach RFPS strip to the base of all walls and support curbing.

-Fully adhere .060 mil EPDM to the insulation with bonding adhesive.

-Properly flash all roof penetrations, support curbing, roof drains and walls to manufacturers specifications.

-Fabricate and install new metal copings and trim metal from 24 gauge pre-finished steel.

-This project shall include a 15 year manufacturers material warranty.

Specification

2. Restoration Specification

Coating Specification to apply Andek restorative coating over the entire roof system.

-Properly repair all urgent and preventative repairs to existing manufacture specification.

-Inspect roof decking for damage or deterioration and replace at an extra cost based on unit sf pricing determined at the time of the project.

-Remove and replace any damaged or wet insulation to existing roof height at an extra cost based on unit sf pricing determined at the time of the project.

-Lightly power wash the existing roof to a suitable surface and allow to dry.

-Reinforce all field and flashing seams with a 3 course application of polyester fabric and Andek RAC coating.

-Apply base coat of Andek RAC coating to the prepared roof system and allow to dry.

-Apply top finish coat of Andek RAC protective coating.

-Furnish a manufacturers 10 year warranty.

3. Alternate Specification

Remove the existing roof and replace with a fully adhered EPDM system.

-Remove the existing roofing membrane, all flashings, metal copings and metal trim and properly dispose of.

-Inspect the decking for damage or deterioration and repair or replace as needed. This will be an extra cost based unit sf pricing determined at the time of the inspection.

-Mechanically attach 2 layers of 2" isocyanurate.

-Install tapered insulation as needed to guide water to roof drains or scuppers.

-Mechanically attach RFPS strip to the base of all walls and support curbing.

-Fully adhere .060 mil EPDM to the insulation with bonding adhesive.

-Properly flash all roof penetrations, support curbing, roof drains and walls to manufacturers specifications.

-Fabricate and install new metal copings and trim metal from 24 gauge pre-finished steel.

-This project shall include a 15 year manufacturers material warranty.

Project Id:

Deficient Component:

Rating:

Status:

Deficiency Information

Locations:

Warranty:

Address-Section:

Cost to Repair

Component Deficiency

Units:

a b c d e f g h ji k l m n o p q r s t u v w

Cost per unit:

Impact on strategy:

Repair process

Cause

The strategy for this roof is:

Photo Id:

DEPTCOR 4000 Cooper St. C.Admin.12

01/15/2014

Curbs

1 1

High High

Open

3300.00

60.00

Ea

55.00

N

Open seams or corners at roof curbs.

Age and exposure.

Clean the open seams to a suitable surface for repair.

Apply 9" EPDM flashing centered over the seam to seal.

Apply EPDM lap sealant to the cut edges of the EPDM flashing and to intersecting roof seams.

All curbs

Perform repairs to attain the most serviceable life

Rating:

Status:

Deficiency Information

Locations:

Warranty:

Address-Section:

Cost to Repair

Component Deficiency

Units:

a b c d e f g h ji k l m n o p q r s t u v w

Cost per unit:

Impact on strategy:

Repair process

Cause

The strategy for this roof is:

Photo Id:

DEPTCOR 4000 Cooper St. C.Admin.12

01/15/2014

Gravel Stop

1 1

High High

Open

2450.00

350.00

Lft

7.00

N

Delaminated perimeter edge flashing membrane.

Age and exposure.

Clean the perimeter edge flashing to a suitable surface for repair.

Apply 9" EPDM flashing centered over the old perimeter edge flashing to seal.

Apply EPDM lap sealant to the cut edges of the EPDM flashing and to intersecting seams.

All perimeter edges

Perform repairs to attain the most

Rating:

Status:

Deficiency Information

Locations:

Warranty:

Address-Section:

Cost to Repair

Component Deficiency

Units:

a b c d e f g h ji k l m n o p q r s t u v w

Cost per unit:

Impact on strategy:

Repair process

Cause

The strategy for this roof is:

Photo Id:

DEPTCOR 4000 Cooper St. C.Admin.12

01/15/2014

Penetrations

1 1

High High

Open

450.00

1.00

Ea

450.00

N

Deteriorated flashing at conduit line.

Age and exposure.

Remove the old flashing from the conduit line and dispose of the debris.

Install one 6" prefabricated EPDM sealant pan around the conduit.

Fill the pitch pan with self leveling pourable sealant to finish.

I1.5

Perform repairs to attain the most

Rating:

Status:

Deficiency Information

Locations:

Warranty:

Address-Section:

Cost to Repair

Component Deficiency

Units:

a b c d e f g h ji k l m n o p q r s t u v w

Cost per unit:

Impact on strategy:

Repair process

Cause

The strategy for this roof is:

Photo Id:

DEPTCOR 4000 Cooper St. C.Admin.12

01/15/2014

Curbs

2 2

High High

Open

1200.00

40.00

Lft

30.00

N

Flashing does not extend beneath rail curb cap.

Improper installation by others.

Clean the roof membrane around the roof curb to a suitable surface for repair.

Install new EPDM membrane around the curb and splice to the roof field and extend beneath the rail cap as intended.

Install 6" wide slip metal flashing around each rail curb beneath the caps to finish.

K1-2.5

Perform repairs to attain the most

Rating:

Status:

Deficiency Information

Locations:

Warranty:

Address-Section:

Cost to Repair

Component Deficiency

Units:

a b c d e f g h ji k l m n o p q r s t u v w

Cost per unit:

Impact on strategy:

Repair process

Cause

The strategy for this roof is:

Photo Id:

DEPTCOR 4000 Cooper St. C.Admin.12

01/15/2014

Field

2 2

Low Low

Open

2880.00

240.00

Sft

12.00

N

Ponding water between drains.

Improper design.

Install tapered insulation between the roof drains to move ponding water to the roof drains.

Install EPDM membrane over the tapered insulation and splice to the existing roof system.

J2-4 / J6-8

Perform repairs to attain the most

Rating:

Status:

Deficiency Information

Locations:

Warranty:

Address-Section:

Cost to Repair

Component Deficiency

Units:

a b c d e f g h ji k l m n o p q r s t u v w

Cost per unit:

Impact on strategy:

Repair process

Cause

The strategy for this roof is:

Photo Id:

DEPTCOR 4000 Cooper St. C.Admin.12

01/15/2014

Gravel Stop

2 2

Low Low

Open

220.00

10.00

Lft

22.00

N

Damaged perimeter edge metal.

Damage by other trades.

Remove the damaged perimeter edge metal and properly dispose.

Fabricate a new edge metal to match the color and profile of the existing.

Install the new edge metal and seal with EPDM flashing membrane to finish.

I2

Perform repairs to attain the most

Rating:

Status:

Deficiency Information

Locations:

Warranty:

Address-Section:

Cost to Repair

Component Deficiency

Units:

a b c d e f g h ji k l m n o p q r s t u v w

Cost per unit:

Impact on strategy:

Repair process

Cause

The strategy for this roof is:

Photo Id:

DEPTCOR 4000 Cooper St. C.Admin.12

01/15/2014

Housecleaning

3 3

High High

Open

7500.00

150.00

Lft

50.00

N

Abandoned exterior ducting on roof.

Normal preventative maintenance

Cut and properly dispose of the 4' diameter by 150' length of exposed ducting.

A crane will be required to set the ducting into disposal containers.

JK1-14

Perform repairs to attain the most

Rating:

Status:

Deficiency Information

Locations:

Warranty:

Address-Section:

Cost to Repair

Component Deficiency

Units:

a b c d e f g h ji k l m n o p q r s t u v w

Cost per unit:

Impact on strategy:

Repair process

Cause

The strategy for this roof is:

Photo Id:

DEPTCOR 4000 Cooper St. C.Admin.12

01/15/2014

HVAC

4 4

Low Low

Open

1850.00

1.00

Ea

1850.00

N

Abaned HVAC cabinet

Neglected by other trades.

Cut and remove the abandoned cabinet from the roof.

Install plywood sheathing to cover the hole in the roof decking.

Install new insulation and EPDM membrane to cover the hole left from the HVAC removal.

K3.5

Perform repairs to attain the most

Rating:

Status:

Deficiency Information

Locations:

Warranty:

Address-Section:

Cost to Repair

Component Deficiency

Units:

a b c d e f g h ji k l m n o p q r s t u v w

Cost per unit:

Impact on strategy:

Repair process

Cause

The strategy for this roof is:

Photo Id:

DEPTCOR 4000 Cooper St. C.Admin.12

01/15/2014

Field

5 5

High High

Open

2975.00

0.00

N

General preventative maintenance.

Normal preventative maintenance

Perform repairs to open curb flashing laps, open field seams or holes found in the roof system.

Clean and properly remove of light debris from the roof.

Through out

Perform repairs to attain the most

15.1
15.2
15.3
15.4
15.5
15.6
15.7