CDRL A002 Security Equipment Listing .pdf

PDF 684 KB Posted

Attached to
Building 228 Access Controls Service Contract
Solicitation number
FA850126Q0013
Issued by

About this file

This is a DD Form 1423-1, Contract Data Requirements List (CDRL), which specifies data deliverables required under a federal contract. The form documents one data item requirement for Contract Line Item Number XX under the Bldg 228 Access Control System Maint. project, with the requiring office identified as 78 ABW/SCO at Robins AFB, GA. The data item is numbered A002 with the title "Security Equipment Listing" and is categorized as Administrative/Management Data. The authority for this requirement is DI-1SN-1231, referenced to PWS Section 4.4, with submission frequency and dates specified as BLOCK 16.

The contractor is required to perform a system inventory of security equipment components, including material and equipment listing no later than 30 calendar days after contract start, with subsequent maintenance of the listing upon equipment replacement. Physical inventory reports must be submitted with updated serial and model numbers of replaced components to the Contracting Officer utilizing the WR Security Equipment List excel spreadsheet. The report shall detail inventory results, unaccounted items, and damaged or destroyed equipment. Distribution of the final data item is required to 78 ABW/SCO at Robins AFB, GA, with one copy required. The form was prepared by Benjamin L. Jowers and approved on 25 Sep 2025. The CDRL applies across multiple contract line items (Exhibits A through E) covering the Base Year and four option years of performance.

View the file

Other files

File Type Posted
Equiptment list.xlsx XLSX spreadsheet
Copy of Appendix A_ WR Security Equipment List.xlsx XLSX spreadsheet
Questions.pdf PDF
Copy of Cameras by name.xlsx XLSX spreadsheet
Site visit.pdf PDF
SOLICITATION_228_RFQ.pdf PDF
LSJ_Signed_Redacted.pdf PDF
CDRL A005 Accident Incident Report 26 .pdf PDF
CDRL A004 Services Report 26 .pdf PDF
CDRL A001 Environmental Awareness Training .pdf PDF
Building 228 Access Control PWS .pdf PDF
SOLICITATION_draft 228_RFQ_02_26_2026 .pdf PDF
REGISTER OF WAGE DETERMINATIONS UNDER_2 .pdf PDF
CDRL A003 Mishap Notification .pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-1, FEB 2001

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

DD FORM 1423-1, FEB 2001 Page of Pages

INSTRUCTIONS FOR COMPLETING DD FORM 1423

(See DoD 5010.12-M for detailed instructions.)

FOR GOVERNMENT PERSONNEL

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP - Technical Data Package;

TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.

Item D. Enter name of system/item being acquired that data will support.

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Signature of preparer of CDRL.

Item H. Date CDRL was prepared.

Item I. Signature of CDRL approval authority.

Item J. Date CDRL was approved.

Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).

Item 10. Specify number of times data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through 15.

Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.

FOR THE CONTRACTOR

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.

a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.

DD FORM 1423-1 (BACK), FEB 2001

data_item: A002
title: Security Equipment Listing
sub:
auth: DI-ILSS-81251
ref: PWS Section 4.4
req_ofc: 78 ABW/SCQ
dd250: N
appcode:
dist: N
freq: BLOCK 16
asof: BLOCK 16
firstsub: BLOCK 16
subsub: BLOCK 16
addressee1: 78 ABW/SCQ
draft1:
reg1: 1
repro1:
addressee2: Robins AFB, GA
draft2:
reg2:
repro2:
addressee3:
draft3:
reg3:
repro3:
addressee4:
draft4:
reg4:
repro4:
addressee5:
draft5:
reg5:
repro5:
addressee6:
draft6:
reg6:
repro6:
addressee7:
draft7:
reg7:
repro7:
addressee8:
draft8:
reg8:
repro8:
addressee9:
draft9:
reg9:
repro9:
addressee10:
draft10:
reg10:
repro10:
addressee11:
draft11:
reg11:
repro11:
addressee12:
draft12:
reg12:
repro12:
addressee13:
draft13:
reg13:
repro13:
addressee14:
draft14:
reg14:
repro14:
addressee15:
draft15:
reg15:
repro15:
addressee16:
draft16:
reg16:
repro16:
addressee17:
draft17:
reg17:
repro17:
addressee18:
draft18:
reg18:
repro18:
addressee19:
draft19:
reg19:
repro19:
addressee20:
draft20:
reg20:
repro20:
addressee21:
draft21:
reg21:
repro21:
addressee22:
draft22:
reg22:
repro22:
addressee23:
draft23:
reg23:
repro23:
addressee24:
draft24:
reg24:
repro24:
addressee25:
draft25:
reg25:
repro25:
addressee26:
draft26:
reg26:
repro26:
addressee27:
draft27:
reg27:
repro27:
addressee28:
draft28:
reg28:
repro28:
addressee29:
draft29:
reg29:
repro29:
addressee30:
draft30:
reg30:
repro30:
addressee31:
draft31:
reg31:
repro31:
addressee32:
draft32:
reg32:
repro32:
addressee33:
draft33:
reg33:
repro33:
addressee34:
draft34:
reg34:
repro34:
addressee35:
draft35:
reg35:
repro35:
addressee36:
draft36:
reg36:
repro36:
addressee37:
draft37:
reg37:
repro37:
addressee38:
draft38:
reg38x:
repro38:
total_draft: 0
total_reg: 1
total_repro: 0
remarks: Blocks 5, 10, 11, 12, and 13.

1.5 System Inventory: The Government will provide a Security Equipment List (5.1 Appendix A). The contractor shall perform an inventory of system components to include material and equipment not later than 30 calendar days after contract start. After the initial inventory, the contractor shall maintain the listing thereafter in the event equipment is replaced. Physical Inventory reports shall be submitted with updated serial and model numbers of the components replaced to the COR utilizing the WR Security Equipment list excel spread sheet provided (5.1 Appendix A, References). The report shall detail the results of the inventory, any items not accounted for and items that are damaged or destroyed beyond use. (CDRL A002, Security Equipment List).

CLIN Exhibit Data Item No. Performance Period XXXX A A002 Base Year XXXX B B002 Option Year 1 XXXX C C002 Option Year 2 XXXX D D002 Option Year 3 XXXX E E002 Option Year 4

group:
total_price:
prep_name: Benjamin L. Jowers
prep_sign:
prep_date: 25 Sep 2025
app_by:
app_sign:
app_date:
Page:
app: Adobe Professional 7.0
line_item: XX
exhibit: A/B/C/D/E
xtdp: Off
xtm: Off
othercat: Admin/Mgmt Data
system: Bldg 228 Access Control System Maint.
ctr_no:
contr:
remarksb:
Page2:
of_pages:
Reset:

File details come from the government source that posted it. Updated .